You are on page 1of 6
Marte anaron Auden o Singepore MPA ‘eon 50 fees ‘enone eaves 2 our Ret: FSC 7.07 = Date: 01 June 2015 AMERICAN BUREAU OF SHIPPING (ABS) BUREAU VERITAS (2V) CHINA CLASSIFICATION SOCIETY (ccs) ONV GLAS KOREAN REGISTER OF SHIPPING (KR) LLOYD'S REGISTER ASIA (LR) NIPPON KAIUI KYOKAI (NK) REGISTRO ITALIANO NAVALE (RINA) ‘SURVEY CIRCULAR No, 1/2018 ACCEPTANCE OF MARINE EQUIPMENT FOR USE ON SINGAPORE SHIPS This circular amends the scope of the Recognised Organisations (ROs) to approve and accept rrarine equipment for use on Singapore ships. It supercedes ‘Survey Circular No. 172012 dated 01 June 2012, Survay Circular No, 2/2014 dated 27 Jarwary 2014 remains valé and wil supplement this cru, 2 This circular applies to existing and new Singapore ships. Existing ships refer to ships, the building contract of which is placed before 01 September 2016. orin the absence ofa bulding contrac, the keel of which is laid or which is ata similar stage fof construction before 01 September 2015, Now ships are those which are not existing ships 3 IMO Conventions require marine equipment, tings, systems, ote. on ships to be tested and approved by the Adminisvaton to ensure they comply with the requirements of applicable provisions of the Conventions, Codes, specications, performance standards and guidelines developed by the IMO. The RO fs authorised {o approve and accept he equipment for use on Singapore ships on benalt of MA ‘when 2. Tho equipment is approved and fly certfcated to the applicable IMO Fequirements’ by ary of the ROs*. Such approved equipment shal bear the ‘marking of the RO that caried out the type approval. The marking shall be 'vaceabe tothe certification and test documentation forthe equipment, ‘hm es tno mC ptt pte rps ed b. The equgment is approved by the RO or by a duly authorised Notifed Body under the Marine Equipment Directve 96/9B/EC (EC MED) and issued ‘with valid and appropriato MED Certiieates, and marked accordingly, The equjment is approved by another SOLASY MARPOL contracting ‘government whose approval process is recognized by MPA 4 The ROs are authorised to accept the equipment after vertying the folowing applicable documentation ‘+The equipment is appropriately approved by a Notiied Body under the EC MED with the applcable IMO requirements Identified on the Module CCeriieates and which take Into account the consructon date ofthe vessel and latest requirements, +The type-approval or approval certificates iseued by the RO or government are vali, In the absence of ary proper documentation, the ROs shall not accept the equipment, 5 When the equipment is not approved In accocdance with paragraph 3, the RO ‘may submit their recommendation with the relevant documents to MPA for consideration, 6 For equipmert that Is already provided on the vessel before 01 September 2016 and which does not have approval marking or certification. the equipment Is ‘acceptable for use on board, provi: ‘a. tis good working condition; and b. itis to hesatisfaction ofthe RO. Ifthe equipment is subsequently replaced, it shall be replaced in accordance with paragraph 3, 7. _To provide documentary evidence for aceabilty, the allending surveyor of the RO shal issue a Statement of Ascoptance (SOA), together with the lst of approved equipment, © the vessel in accordance withthe format ¢6 shown in the attached sample SOA and lst of approved equipment 8 For exsting shies, including change of Class and change of Flag ‘The SOA shall be issued andlor verified by the attending surveyor during the vessels forthcoming Annual! Renewal statutory surveys, But not lator than 41 Bacambar 2018 1+ The list of approved equipment shall be lesued whenever existing ‘equipment 07 the vessel is replaced or when now equipmert is installed fon board after 01 September 2016, 9 Fornew ships: +The SOA, together withthe lst of approved equipment, shall be issued at the ial aureye for the lesuance of statutory cerifiates, 10. _ The list of approved equipment should be updated accordingly and reflect the latest date of update whenever existing equipment on the vessel is replaced or when ew equipment is instaled on board. I shall be Kept on board together with the SOA, ‘The SOA, and the list 2f approved equipment, it appicable, shall be verified by the attending surveyor during the vessel's Annual and Renewal statutory survey. BIONDI PHUA For DIRECTOR OF mat [MARITIME AND PORT AUTHORITY OF SINGAPORE (SAMPLE) STATEMENT OF ACCEPTANCE, ‘Approved marine equipment for use on Singapore Ships Name of vesset IMO Number. Gross Tonnage: ‘Type of vesse': ate of uiing contract if anyy eal Laid Date This isto conf that the equipment! on board the above vessel is accepted {for use, based on the flowing ‘2, The equipment fs approved and fully certfeated to the applicable IMO requirements by any of the ROs®. Such approved equipment shall bear te ‘marking of the RO that carried out the type approval. The marking shall be "Taceable to the certification and test documentation forthe equipment The equipment is approved by the RO or by a duly authorised Notified ody under the Marine Equipment Directive 96/96/EC (EC MED) and issued with valid and appropriate MED Certificates and marked accordingly: , © The equipment is approved by another SOLASIMARPOL contracting {government whawe approval process i recognized by MPA Sngapere. 2. Existing equipment already provided on board before 01 September 2015 and ‘which does not have approval marking or cerificaion has been assessed and deemed tobe acceptable for use by this Cassificaton Society. ‘eri toate ae argrontnsne Neh ata Date feu - ‘Name Signature of surveyor Lov teg 21g soquonon gz ep onset Neeye zu/svezrsocenel OyMSe ON BIEN: rene | IG enpon) oe>yuiag waisis fareno 93 noes uewiee ‘s610 oN f8 paunEN a “fouaby oudesSoiph pve oumsey 2984 | ‘992 woUdND UoqeULeSOpeR (aos) wousdntss pus uogebinen Y90-HS | Suynseoy gue pu pees | o1dweS ‘reayuo jo step ans, saquinu pue adi sieous69 suoweyns! OW iaeaiddy ‘p09 voneays80 Jo AAUEPL IES L “WAOWAAY BOS SIVIRO ONY ATOG TWACHAAY | scrvaNvLs OWI ONY SNOLYTNOTY ANaNdInos “ON INS SUCAVONIS NO 3sN Nos LNANAINDA G3) (eepdn sae 50 bxppusddy

You might also like