DAILY REPORT

REPORT NO :

MANPOWER, EQUIPMENT & MATERIAL

CED5072-DR-0096

DATE :

Specialist clinical center for Dentistry, Dermatology and


Diabetes Services- Enabling Works

5/9/2015

DAY

WEATHER

To: SSH DESIGN

S
Sunny

TEMP. C:
PROJECT

DIV/PACKAGE

STAFF:

Clear Overcast

Th

Rain

Dust

Windy

Humid

31C/34C

OWNER
ASHGHAL

NO.

TRADE

Jaimon Jacob (Project Manager)


V.M. Swamy (Project Incharge)
Jaison Varghese (Project Engineer)
Nikhil Balakrishna (Site Engineer)
Gautham Murali (Site Engineer)
Shihad (H&S Supervisor)
Jayasankar (Surveyor)

0
1
1
1
1
1
1

Drivers

Sub Contractor (Road & Bridge)


Engineer
Supervisor
Safety officer

2
2
1

CONTRACTOR
PETROSERV

Site Manager
HSE officer
Site Engineer

1
1

1
2

Supervisor

EQUIPMENT (Available at site today)


LOCATION / TYPE

Hitachi S 62 Crawler Crane


JCB 4CX- Backhoe loader
Hitachi S 61 Crawler Crane
Trucks
ACTIVITY DESCRIPTION

2
3
1
4
1
1
1
1
1

Operators
Drivers
Mechanic
Bank Man

First shift
13
1
1
5

Second
9
1
0
5

Sub Contractor (Durrat Al Doha Engg)


Engineer

Volvo EC 700 - 7 Ton breaker


Komatsu PC 600 - 5 Ton Breaker
Komatsu PC 600 - Bucket
Komatsu PC 350 - Bucket
Komatsu D85EX - Dozer
JCB JS 360 - 3 Ton Breaker
JCB JS 360 - Bucket
CAT 345 CL- 5 Ton Breaker
Volvo A 40 E - Dump Truck
Volvo G 990 - Grader
CAT - Skid loader
Solimec SR 60 Hydraulic Drilling Rig

NO.

AREA

Carpenter
Steel Fixer
Helper
Charge Hand
Operators
Store keeper
Night watchmen
Assistant Document controller
Subcontractor (Road & Bridge)

Subcontractor (Swiss Boring)

ACT. NO.

LABOUR:
POSITION

ccs

NO.

3
1
1
1
1
4
0
1
1
1
1
1
1
1
1
40

Subcontractor (Swiss Boring)


Rig operator
Rigger
Driver
Helper
Carpenter
Service Crane operator
Foreman
Mechanic
Lifting supervisor
Welder

ACTUAL
START

TODAY'S
STATUS

3
2
2
6
3
2
1
0
0
1

Cumulative Qty

Cumulative %
Comp

DAILY REPORT

REPORT NO :

MANPOWER, EQUIPMENT & MATERIAL

CED5072-DR-0096

DATE :

Specialist clinical center for Dentistry, Dermatology and


Diabetes Services- Enabling Works
WEATHER

To: SSH DESIGN

5/9/2015

DAY

S
Sunny

TEMP. C:
PROJECT

DIV/PACKAGE

Clear Overcast

Th

Rain

Dust

Windy

Humid

31C/34C

OWNER
ASHGHAL

CONTRACTOR
PETROSERV

1 Excavation
18-Jan-15
2737
177070
2 Hauling
3-Feb-15
4160
163520
3 Installed the shutter and Reinforcement for the guide wall of the piles CP-115 to CP-133
Water level observed in Borehole# 8 from

4 existing ground level (11.27m QNHD)

13.5m deep
(-2.23m QNHD)

COMMENTS:

CONTRACTOR

55.33
51.10