Professional Documents
Culture Documents
Chapter 3 Spreadsheets
Chapter 3 Spreadsheets
t = (d-c)(0.003)/c =
=
=0.65+(t-0.002)(250)/3 =
Mn =
Mn =
Mn
0.00525
0.0175
0.900
12091.7
1007.6
906.9
d
As
T-Beam Analysis-ASD
f'c =
fy =
beff =
bw =
3555.5555556
60000
12
3
d=
22
hf =
4
As =
2
c =
145
Ec =33w1.5sqrt(fc')=
3,435,735
Fs =
24000
Fc = 0.45fc' =
1600
n=
8.441
=
0.008
n =
0.0639
psi
psi
in.
in.
in.
in.
in2
pcf
psi
psi
psi
bw
8.00
clear span
between
parallel T
beams
If x < hf
k=n+ n22n=
0.30
x = kd =
jd =
Ms = AsFsjd =
6.59 in.
19.80 in.
950631 in-lb =
79.22 ft-k
Mc = Fcbd2kj/2 =
1252087 in-lb =
104.34 ft-k
If x > hf:
nA s
x=
+
bw
nA s 2 2 nA s d
b
+
1 ) h2f =
bw
bw
bw
I = bx /3-(b-bw)(x-hf) /3+nAs(d-x) =
3
<-- CONTROLS
Ms = FsI/n(d-x)=
Mc = FcI/x=
9.58 in2
5600 in4
1281977 in-lb
106.83 ft-k
935232 in-lb
77.94 ft-k
<-- CONTROLS
beff
hf
d
bw
clear span
between
parallel T
beams
<-- CONTROLS