You are on page 1of 3

Da Nhim Hydropower Plant Expansion Project

Bidding documents Package 12.02 (DNE-D2)

SCHEDULE T-13 List of All Documents submitted with Bid


Name Of Bidder:

LILAMA 18/LILAMA 45.4 JOINT VENTURE.


LETTER OF TECHNICAL BID
FORMS OF BID SECURITY
ACKNOWLEDGEMENT OF "CODE OF ETLTICS AND CONDUCT FOR PUBLIC
PROCUREMENT"
BIDDERS QUALIFICATION
FORM Q-1 General Information on Bidder
FORM Q-2 Joint Venture Agreement
FORM Q-3 Power of Attorney
FORM Q-4 Financial Situation
FORM Q-4A Financial Situation (Banking Information)
FORM Q-4B Financial Situation (Single Bidders or Partners)
FORM Q-4C Financial Data (Joint Venture Summary)
FORM Q-5 Average Annual Turnover
FORM Q-5A Annual Turnover (Single Bidder or Partners)
FORM Q-5B Annual Turnover (Joint Venture Summary)
FORM Q-6 Statement of Credit Line from a Reputable Commercial Bank
FORM Q-6A Statement of Credit Line from a Reputable Commercial Bank
(Summary of Credit lines)
FORM Q-6B Statement of Credit Line from a Reputable Commercial Bank
FORM Q-7 Current Contract Commitments
FORM Q-8 Historical Contract Non-Performance
FORM Q-9 General Experience
FORM Q-10A Specific Experience

FORM Q-10B Experience in Key Activities


TECHNICAL PROPOSAL
1. Schedule T-1 Technical Particulars
1.1 Schedule T-1-1 Technical Data and Specifications of Inlet Coarse Trashrack
1.2 Schedule T-1-2 Technical Data and Specifications of Fine Trashrack Type I
1.3 Schedule T-1-3 Technical Data and Specifications of Fine Trashrack Type L
1.4 Schedule T-1-4 Technical Data and Specifications of Intake Bulkhead Gate

Da Nhim Hydropower Plant Expansion Project


Bidding documents Package 12.02 (DNE-D2)

1.5 Schedule T-1-5 Technical Data and Specifications of Intake Service Gate
1.6 Schedule T-1-6 Technical Data and Specifications of Intake Gantry Crane
1.7 Schedule T-1-7 Technical Data and Specifications of Steel Penstock
1.8 Schedule T-1-8 Technical Data and Specifications of Tailrace Gate
2. Schedule T-2 Statical Basic Calculation Sheets
3. Schedule T-3 General Arrangement and Layout Drawings
4. Schedule T-4 Construction Methods and Sequence of the Works
4.1 Method Statement for fabrication of steel Penstock
4.2 Method Statement for manufacture of Trashrack
4.3 Method Statement for manufacture of intake bulkhead gate
4.4 Method Statement for manufacture of intake service gate
4.5 Method Statement for manufacture of powerhouse tailrace gate
4.6 Method Statement for installation of intake gate
4.7 Method Statement for installation of powerhouse tailrace gate
4.8 Method Statement for installation of steel Penstock
4.9 Preliminary welding procedure specifications
4.10

Painting Procedure

4.11

Labour safety in production and execution

5. Schedule T-5 Temporary Facilities and Safety Protections


6. Schedule T-6 Construction Time Schedule
7. Schedule T-7 Contractors Equipment
7.1 Schedule T-7-1 Contractors Equipment (Summary)
7.2 Schedule T-7-2 Contractors Equipment (Available in Vietnam)
7.3 Schedule T-7-3 Contractors Equipment (Intended to be Imported)
7.4 Schedule T-7-4 Contractors Equipment (Intended to be Re-exported after use)
7.5 Contractors Equipment (Use schedule)
8. Schedule T-8 Labour Forces
8.1 Schedule T-8-1 Labour Forces (List of Labour Forces Required)
8.2 Schedule T-8-2 Labour Forces (Labour Flow Tabulation)
9. Schedule T-9 Organization Chart and Manning Schedule
9.1 Schedule T-9-1 Head office Organization Chart

Da Nhim Hydropower Plant Expansion Project


Bidding documents Package 12.02 (DNE-D2)

9.2 Schedule T-9-2 Site Organization Chart


9.3 Manning Schedule
10. Schedule T-10 Key Personnel
10.1

Schedule T-10-1 Key Personnel (Summary)

10.2

Schedule T-10-2 Key Personnel (Detail of Candidate)

10.3
Schedule T-10-3 Memorandum of Understanding (MOU) on Technical Design
Service of Hydro-mechanical Equipment
11. Schedule T-11 List of Subcontractors and Vendors
12. Schedule T-12 Health, Safety and Security Control, and Environmental Monitoring and
Management
12.1

HSE Policy

12.2

Certification of Registration

12.3

Organization chart of Health, safety and Environmental

12.4

Health Management Plan

12.5

Health, Safety and Environmental Plan

12.6

Safety Control Plan

12.7

Security Management Plan

12.8

Site Environmental Protection Plan

12.9

Workers accommodation Management Plan

12.10

Safety Transportation Management Plan

12.11

Emergency Evacuation Procedure

13. Schedule T-13 List of All Documents submitted with Bid


Bidders Official Representative:
Signature:
Name: Trn S Qunh
Position: General Director
Date:
Company: LILAMA 18 Joint Stock Company.
Company Stamp: