Professional Documents
Culture Documents
T-13 List of All Documents Submitted With Bid
T-13 List of All Documents Submitted With Bid
1.5 Schedule T-1-5 Technical Data and Specifications of Intake Service Gate
1.6 Schedule T-1-6 Technical Data and Specifications of Intake Gantry Crane
1.7 Schedule T-1-7 Technical Data and Specifications of Steel Penstock
1.8 Schedule T-1-8 Technical Data and Specifications of Tailrace Gate
2. Schedule T-2 Statical Basic Calculation Sheets
3. Schedule T-3 General Arrangement and Layout Drawings
4. Schedule T-4 Construction Methods and Sequence of the Works
4.1 Method Statement for fabrication of steel Penstock
4.2 Method Statement for manufacture of Trashrack
4.3 Method Statement for manufacture of intake bulkhead gate
4.4 Method Statement for manufacture of intake service gate
4.5 Method Statement for manufacture of powerhouse tailrace gate
4.6 Method Statement for installation of intake gate
4.7 Method Statement for installation of powerhouse tailrace gate
4.8 Method Statement for installation of steel Penstock
4.9 Preliminary welding procedure specifications
4.10
Painting Procedure
4.11
10.2
10.3
Schedule T-10-3 Memorandum of Understanding (MOU) on Technical Design
Service of Hydro-mechanical Equipment
11. Schedule T-11 List of Subcontractors and Vendors
12. Schedule T-12 Health, Safety and Security Control, and Environmental Monitoring and
Management
12.1
HSE Policy
12.2
Certification of Registration
12.3
12.4
12.5
12.6
12.7
12.8
12.9
12.10
12.11