REKAPITULAS

KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

: PEMBANGUNAN BAK KOLAM PENAMPUNG AIR PADA PU


: PERENCANAAN BAK AIR KOLAM TERNAK
: DESA LOLEO KECAMATAN WEDA SELATAN
: 2015

NO.

JENIS PEKERJAAN

PEKERJAAN PERSIAPAN

II

PEKERJAAN TANAH

III

PEKERJAAN BETON

IV

PEKERJAAN PONDASI PASANGAN BATU

PEKERJAAN PIPA DAN ASCESORIS

VI

PEKERJAAN PENGECATAN

VII

PEKERJAAN LAIN

J U M L A H

P P N 10%

J U M L A H F I S I K ( A + B )

T O T A L

Terbilang :
SERATUS EMPAT PULUH JUTA RUPIAH

Mengetahui
PEJABAT PEMBUAT KOMITMEN ( PPK )
DINAS PERTANIAN PROVINSI MALUKU UTARA

Ir. NURJANNAH ALI


NIP. 196506031993092001

MENGETAHUI
KEPALA DINAS PERTANIA
PROVINSI MALUKU UTAR

Ir. MUSDALIFAH ILYAS


NIP.19579791983031013

REKAPITULASI

UNAN BAK KOLAM PENAMPUNG AIR PADA PUSAT PEMBIBITAN TERNAK


AAN BAK AIR KOLAM TERNAK
O KECAMATAN WEDA SELATAN
JENIS PEKERJAAN

SANGAN BATU

J U M L A H
P P N 10%

L A H F I S I K ( A + B )
T O T A L

AH

Mengetahui
BUAT KOMITMEN ( PPK )
N PROVINSI MALUKU UTARA

TERNATE, 18 MEI 2015


KONSULTAN PERENCANA
CV.AMARTA KONSULTANT ENGINEER

URJANNAH ALI
6506031993092001

M.SYAFRIL RUSTAM ST.MT


Direktur

MENGETAHUI
KEPALA DINAS PERTANIAN
PROVINSI MALUKU UTARA

Ir. MUSDALIFAH ILYAS


NIP.19579791983031013

ERNAK

JUMLAH HARGA ( Rp )
13,864,633.68
5,743,997.09
72,563,551.41
20,328,471.51
5,313,924.69
3,287,544.00
6,233,735.60
127,335,857.99
12,733,585.80
140,069,443.79
140,000,000.00

ERNATE, 18 MEI 2015


ONSULTAN PERENCANA
TA KONSULTANT ENGINEERING

SYAFRIL RUSTAM ST.MT


Direktur

ENGINEERING ESTIMATE
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

: PEMBANGUNAN BAK KOLAM PENAMPUNG AIR PADA PUS


: PERENCANAAN BAK AIR KOLAM TERNAK
: DESA LOLEO KECAMATAN WEDA SELATAN
: 2015

No

Uraian Pekerjaan

Pekerjaan Persiapan
Direksi keet
Pembersihan Lokasi
Pemasangan Bouplank

Pekerjaan Tanah
Galian Tanah
Urugan Pasir 10 Cm
Urugan Tanah Kembali
Urugan Tanah Pondasi

Pekerjaan Beton
Rabat Beton Camp. 1 : 3 : 5
Lantai Beton Bertulang t = 15 cm
Dinding dan Sekat Beton Bertulang t =15 cm
Kolom Beton Bertulang 25 x25
Balok beton bertulang 15x15 untuk dinding beton
Plat Dek Beton Bertulang t = 8 cm
Balok Beton Bertulang 25 x 25
Lantai Kerja Beton K-125 t=10 cm

Pekerjaan Pondasi pasangan batu


Pas Pondasi. 1 : 4
Pas Mortar Untuk Saluran

Pekerjaan Pengadaan dan Pemasangan Pipa dan Accessories Bak Air


Keran Air 2/3"
Pipa PVC 200 mm
Pipa PVC 4"

Pekerjaan Pengecetan
Cat Tembok

Pekerjaan Lain
Manhole 80 x 80
Air Vent
Tangga Besi

TAN
RJAAN
SI
N ANGGARAN

ENGINEERING ESTIMATE

: PEMBANGUNAN BAK KOLAM PENAMPUNG AIR PADA PUSAT PEMBIBITAN


: PERENCANAAN BAK AIR KOLAM TERNAK
: DESA LOLEO KECAMATAN WEDA SELATAN
: 2015
Uraian Pekerjaan

Pekerjaan Persiapan

Pembersihan Lokasi
Pemasangan Bouplank

Pekerjaan Tanah
Galian Tanah
Urugan Pasir 10 Cm
Urugan Tanah Kembali
Urugan Tanah Pondasi

Pekerjaan Beton
Rabat Beton Camp. 1 : 3 : 5
Lantai Beton Bertulang t = 15 cm
Dinding dan Sekat Beton Bertulang t =15 cm
Kolom Beton Bertulang 25 x25
Balok beton bertulang 15x15 untuk dinding beton
Plat Dek Beton Bertulang t = 8 cm
Balok Beton Bertulang 25 x 25
Lantai Kerja Beton K-125 t=10 cm

Pekerjaan Pondasi pasangan batu


Pas Pondasi. 1 : 4
Pas Mortar Untuk Saluran

Pekerjaan Pengadaan dan Pemasangan Pipa dan Accessories Bak Air


Keran Air 2/3"
Pipa PVC 200 mm
Pipa PVC 4"

Pekerjaan Pengecetan
Cat Tembok

Pekerjaan Lain
Manhole 80 x 80

Tangga Besi

MATE

ADA PUSAT PEMBIBITAN TERNAK

Volume

Satuan

Harga Satuan

Jumlah Harga
(Rp)

(Rp)

1.00
72.95
33.00

Ls
M2
M'

6,000,000.00
76,072.36
70,156.20

6,000,000.00
5,549,478.92
2,315,154.76
13,864,633.68

17.76
1.41
4.44
90

M3
M3
M3
M3

55,896.70
280,658.68
40,351.32
46,415.95

992,725.47
394,676.27
179,159.85
4,177,435.50
5,743,997.09

4.78
2.11
4.50
1.00
0.34
2.11
4.22
1.41

M3
M3
M3
M3
M3
M3
M3
M3

324,582.42
4,859,134.78
4,859,134.78
4,859,134.78
4,859,134.78
4,859,134.78
4,859,134.78
1,171,550.40

1,551,909.71
10,249,737.42
21,866,106.50
4,859,134.78
1,639,957.99
10,249,737.42
20,499,474.84
1,647,492.75
72,563,551.41

17.76
2.38

M3
M3

1,009,608.72
1,009,608.72

17,930,650.81
2,397,820.70
20,328,471.51

6.00
20.00
12.00

BH
M
M

58,912.10
83,885.11
273,562.50

353,472.57
1,677,702.12
3,282,750.00
5,313,924.69

65.00

M2

50,577.60

3,287,544.00
3,287,544.00

3.00
4.00
2.00

Bh
Bh
Ls

600,000.00
208,433.90
1,800,000.00

1,800,000.00
833,735.60
3,600,000.00
6,233,735.60
127,335,857.99

DAFTAR ANALISA HARGA SATUAN


Pekerjaan Pengadaan dan pemasangan Accessories Pipa HDPE
1Buah Pengadaan/Pemasangan Bend 90 HDPE dia 300 mm
1Buah Pengadaan Bend 90 HDPE dia 300 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 90 HDPE dia 300 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend 45 HDPE dia 300 mm


1Buah Pengadaan Bend 45 HDPE dia 300 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 45 HDPE dia 300 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend ,22,1/2 HDPE dia 300 mm


1Buah Pengadaan Bend ,22,1/2 HDPE dia 300 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi

Penyambuangan / Pengelasan Bend ,22,1/2 HDPE dia 300 mm


2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend 90 HDPE dia 250 mm


1Buah Pengadaan Bend 90 HDPE dia 250 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 90 HDPE dia 250 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend 45 HDPE dia 250 mm


1Buah Pengadaan Bend 45 HDPE dia 250 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 45 HDPE dia 250 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend 90 HDPE dia 200 mm


1Buah Pengadaan Bend 90 HDPE dia 200 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 90 HDPE dia 200 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend 45 HDPE dia 200 mm


1Buah Pengadaan Bend 45 HDPE dia 200 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 45 HDPE dia 200 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend 90 HDPE dia160 mm


1Buah Pengadaan Bend 90 HDPE dia 160 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 90 HDPE dia 160 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend 45 HDPE dia 160 mm


1Buah Pengadaan Bend 45 HDPE dia 160 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 45 HDPE dia 160 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend 90 HDPE dia110 mm


1Buah Pengadaan Bend 90 HDPE dia 110 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 90 HDPE dia 110 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend 45 HDPE dia 110 mm


1Buah Pengadaan Bend 45 HDPE dia 110 mm
1.00
Bh
Bend HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 45 HDPE dia 110 mm
2.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Bend Adaptor 90 HDPE dia 90 mm


1Buah Pengadaan Bend 90 HDPE dia 90 mm
1.00
Bh
Bend Adaptor HDPE
1.00
Ls
Mobilisasi
1Buah Pemasangan Bend Adaptor 90 HDPE dia 90 mm
0.85
h/o
Tukang Pipa
0.83
h/o
Kepala Tukang
0.85
h/o
Pekerja
0.85
h/o
Mandor

1.00

ls

Alat Bantu

1Buah Pengadaan/Pemasangan Bend Adaptor 45 HDPE dia 90 mm


1Buah Pengadaan Bend 45 HDPE dia 90 mm
1.00
Bh
Bend Adaptor HDPE
1.00
Ls
Mobilisasi
1Buah Pemasangan Bend Adaptor 90 HDPE dia 90 mm
0.85
h/o
Tukang Pipa
0.83
h/o
Kepala Tukang
0.85
h/o
Pekerja
0.85
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Bend Adaptor 90 HDPE dia 63 mm


1Buah Pengadaan Bend 90 HDPE dia 63 mm
1.00
Bh
Bend Adaptor HDPE
1.00
Ls
Mobilisasi
1Buah Pemasangan Bend Adaptor 90 HDPE dia 63 mm
0.83
h/o
Tukang Pipa
0.81
h/o
Kepala Tukang
0.83
h/o
Pekerja
0.83
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 300 mm - 250 mm


1Buah Pengadaan Reducer HDPE dia 300 mm - 250 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 300 mm - 250 mm
1.00
Titik
Pengelasan Pipa HDPE 300 mm
1.00
Titik
Pengelasan Pipa HDPE 250 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 300 mm - 200 mm

1Buah Pengadaan Reducer HDPE dia 300 mm - 200 mm


1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 300 mm - 200 mm
1.00
Titik
Pengelasan Pipa HDPE 300 mm
1.00
Titik
Pengelasan Pipa HDPE 200 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 250 mm - 200 mm


1Buah Pengadaan Reducer HDPE dia 250 mm - 200 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 250 mm - 200 mm
1.00
Titik
Pengelasan Pipa HDPE 250 mm
1.00
Titik
Pengelasan Pipa HDPE 200 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 250 mm - 160 mm


1Buah Pengadaan Reducer HDPE dia 250 mm - 160 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 250 mm - 160 mm
1.00
Titik
Pengelasan Pipa HDPE 250 mm
1.00
Titik
Pengelasan Pipa HDPE 160 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 200 mm - 160 mm


1Buah Pengadaan Reducer HDPE dia 200 mm - 160 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 200 mm - 160 mm
1.00
Titik
Pengelasan Pipa HDPE 200 mm
1.00
Titik
Pengelasan Pipa HDPE 160 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 200 mm - 110 mm


1Buah Pengadaan Reducer HDPE dia 200 mm - 110 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 200 mm - 110 mm
1.00
Titik
Pengelasan Pipa HDPE 200 mm
1.00
Titik
Pengelasan Pipa HDPE 110 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 160 mm - 110 mm


1Buah Pengadaan Reducer HDPE dia 160 mm - 110 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 160 mm - 110 mm
1.00
Titik
Pengelasan Pipa HDPE 160 mm
1.00
Titik
Pengelasan Pipa HDPE 110 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 160 mm - 90 mm


1Buah Pengadaan Reducer HDPE dia 160 mm - 90 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 160 mm - 90 mm
1.00
Titik
Pengelasan Pipa HDPE 160 mm
1.00
Titik
Pengelasan Pipa HDPE 90 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 110 mm - 90 mm


1Buah Pengadaan Reducer HDPE dia 110 mm - 90 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 110 mm - 90 mm
1.00
Titik
Pengelasan Pipa HDPE 110 mm

1.00
1.00

Titik
ls

Pengelasan Pipa HDPE 90 mm


Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer HDPE dia 110 mm - 63 mm


1Buah Pengadaan Reducer HDPE dia 110 mm - 63 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Reducer HDPE dia 110 mm - 63 mm
1.00
Titik
Pengelasan Pipa HDPE 110 mm
1.00
Titik
Pengelasan Pipa HDPE 63 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Reducer Adaptor HDPE dia 90 mm - 63 mm


1Buah Pengadaan Reducer Adaptor HDPE dia 90 mm - 63 mm
1.00
Bh
Reducer HDPE
1.00
Ls
Mobilisasi
1Buah Pemasangan Reducer Adaptor HDPE dia 90 mm - 63 mm
0.85
h/o
Tukang Pipa
0.83
h/o
Kepala Tukang
0.85
h/o
Pekerja
0.85
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 300 mm


1Buah Pengadaan Tee HDPE dia 300 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 300 mm
3.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 300 mm x 200 mm x 300 mm


1Buah Pengadaan Tee HDPE dia 300 mm x 200 mm x 300 mm
1.00
Bh
Tee HDPE

1.00

Ls

Mobilisasi

Penyambuangan / Pengelasan Tee HDPE dia 300 mm x 200 mm x 300 mm


2.00
Titik
Pengelasan Pipa 300 mm
1.00
Titik
Pengelasan Pipa 200 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 300 mm x 160 mm x 300 mm


1Buah Pengadaan Tee HDPE dia 300 mm x 160 mm x 300 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 300 mm x 160 mm x 300 mm
2.00
Titik
Pengelasan Pipa 300 mm
1.00
Titik
Pengelasan Pipa 160 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 300 mm x 110 mm x 300 mm


1Buah Pengadaan Tee HDPE dia 300 mm x 110 mm x 300 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 300 mm x 110 mm x 300 mm
2.00
Titik
Pengelasan Pipa 300 mm
1.00
Titik
Pengelasan Pipa 110 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 300 mm x 90 mm x 300 mm


1Buah Pengadaan Tee HDPE dia 300 mm x 90 mm x 300 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 300 mm x 90 mm x 300 mm
2.00
Titik
Pengelasan Pipa 300 mm
1.00
Titik
Pengelasan Pipa 90 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 300 mm x 63 mm x 300 mm


1Buah Pengadaan Tee HDPE dia 300 mm x 63 mm x 300 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 300 mm x 63 mm x 300 mm
2.00
Titik
Pengelasan Pipa 300 mm
1.00
Titik
Pengelasan Pipa 63 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 250 mm


1Buah Pengadaan Tee HDPE dia 250 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 250 mm
3.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 250 mm x 200 mm x 250 mm


1Buah Pengadaan Tee HDPE dia 250 mm x 200 mm x 250 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 250 mm x 200 mm x 250 mm
2.00
Titik
Pengelasan Pipa 250 mm
1.00
Titik
Pengelasan Pipa 200 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 250 mm x 160 mm x 250 mm


1Buah Pengadaan Tee HDPE dia 250 mm x 160 mm x 250 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 250 mm x 160 mm x 250 mm
2.00
Titik
Pengelasan Pipa 250 mm
1.00
Titik
Pengelasan Pipa 160 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 250 mm x 110 mm x 250 mm


1Buah Pengadaan Tee HDPE dia 250 mm x 110 mm x 250 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 250 mm x 110 mm x 250 mm
2.00
Titik
Pengelasan Pipa 250 mm
1.00
Titik
Pengelasan Pipa 110 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 250 mm x 90 mm x 250 mm


1Buah Pengadaan Tee HDPE dia 250 mm x 90 mm x 250 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 250 mm x 90 mm x 250 mm
2.00
Titik
Pengelasan Pipa 250 mm
1.00
Titik
Pengelasan Pipa 90 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 250 mm x 63 mm x 250 mm


1Buah Pengadaan Tee HDPE dia 250 mm x 63 mm x 250 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 250 mm x 63 mm x 250 mm
2.00
Titik
Pengelasan Pipa 250 mm
1.00
Titik
Pengelasan Pipa 63 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 200 mm


1Buah Pengadaan Tee HDPE dia 200 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 200 mm
3.00
Titik
Pengelasan

1.00

ls

Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 200 mm x 160 mm x 200 mm


1Buah Pengadaan Tee HDPE dia 200 mm x 160 mm x 200 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 200 mm x 160 mm x 200 mm
2.00
Titik
Pengelasan Pipa 250 mm
1.00
Titik
Pengelasan Pipa 160 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 200 mm x 110 mm x 200 mm


1Buah Pengadaan Tee HDPE dia 200 mm x 110 mm x 200 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia200 mm x 110 mm x 200 mm
2.00
Titik
Pengelasan Pipa 200 mm
1.00
Titik
Pengelasan Pipa 110 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 200 mm x 90 mm x 200 mm


1Buah Pengadaan Tee HDPE dia 200 mm x 90 mm x 200 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 200 mm x 90 mm x 200 mm
2.00
Titik
Pengelasan Pipa 200 mm
1.00
Titik
Pengelasan Pipa 90 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 200 mm x 63 mm x 200 mm


1Buah Pengadaan Tee HDPE dia 200 mm x 63 mm x 200 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi

Penyambuangan / Pengelasan Tee HDPE dia 200 mm x 63 mm x 200 mm


2.00
Titik
Pengelasan Pipa 200 mm
1.00
Titik
Pengelasan Pipa 63 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 160 mm


1Buah Pengadaan Tee HDPE dia 160 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 160 mm
3.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 160 mm x 110 mm x 160 mm


1Buah Pengadaan Tee HDPE dia 160 mm x 110 mm x 160 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 160 mm x 110 mm x 160 mm
2.00
Titik
Pengelasan Pipa 160 mm
1.00
Titik
Pengelasan Pipa 110 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 160 mm x 90 mm x 160 mm


1Buah Pengadaan Tee HDPE dia 160 mm x 90 mm x 160 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 160 mm x 90 mm x 160 mm
2.00
Titik
Pengelasan Pipa 160 mm
1.00
Titik
Pengelasan Pipa 90 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 160 mm x 63 mm x 160 mm


1Buah Pengadaan Tee HDPE dia 160 mm x 63 mm x 160 mm
1.00
Bh
Tee HDPE

1.00

Ls

Mobilisasi

Penyambuangan / Pengelasan Tee HDPE dia 160 mm x 63 mm x 160 mm


2.00
Titik
Pengelasan Pipa 160 mm
1.00
Titik
Pengelasan Pipa 63 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 110 mm


1Buah Pengadaan Tee HDPE dia 110 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 110 mm
3.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 110 mm x 90 mm x 110 mm


1Buah Pengadaan Tee HDPE dia 110 mm x 90 mm x 110 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 110 mm x 90 mm x 110 mm
2.00
Titik
Pengelasan Pipa 110 mm
1.00
Titik
Pengelasan Pipa 90 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee HDPE dia 110 mm x 63 mm x 110 mm


1Buah Pengadaan Tee HDPE dia 110 mm x 63 mm x 110 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Tee HDPE dia 110 mm x 63 mm x 110 mm
2.00
Titik
Pengelasan Pipa 110 mm
1.00
Titik
Pengelasan Pipa 63 mm
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Tee Adaptor HDPE dia 90 mm

1Buah Pengadaan Tee Adaptor HDPE dia 90 mm


1.00
Bh
Tee Adaptor HDPE
1.00
Ls
Mobilisasi
Pemasangan Tee Adaptor
0.83
0.81
0.83
0.83

HDPE dia 90 mm
h/o
Tukang Pipa
h/o
Kepala Tukang
h/o
Pekerja
h/o
Mandor

1Buah Pengadaan/Pemasangan Tee Adaptor HDPE dia 90 mm x 63 mm x 90 mm


1Buah Pengadaan Tee Adaptor HDPE dia 90 mm x 63 mm x 90 mm
1.00
Bh
Tee HDPE
1.00
Ls
Mobilisasi
Pemasangan Tee Adaptor
0.83
0.81
0.83
0.83
1.00

HDPE dia 90 mm x 63 mm x 90 mm
h/o
Tukang Pipa
h/o
Kepala Tukang
h/o
Pekerja
h/o
Mandor
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee Adaptor HDPE dia 63 mm


1Buah Pengadaan Tee Adaptor HDPE dia 63 mm
1.00
Bh
Tee Adaptor HDPE
1.00
Ls
Mobilisasi
Pemasangan Tee Adaptor
0.83
0.81
0.83
0.83

HDPE dia 63 mm
h/o
Tukang Pipa
h/o
Kepala Tukang
h/o
Pekerja
h/o
Mandor

1Buah Pengadaan/Pemasangan Stub Flange dan Flange HDPE dia 300 mm lengkap dengan m
1Buah Pengadaan Bend 90 HDPE dia 300 mm
1.00
Bh
Stub Flange HDPE dan Flange
1.00
Ls
Mobilisasi
Penyambuangan / Pengelasan Bend 90 HDPE dia 300 mm

1.00
1.00

Titik
ls

Pengelasan
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Stub Flange dan Flange HDPE dia 250 mm lengkap dengan m
1Buah Pengadaan Stub Flange dan Flange HDPE dia 250 mm lengkap dengan mur, bout, ring
1.00
Bh
Stub Flange HDPE dan Flange
1.00
Ls
Mobilisasi

Penyambuangan / Pengelasan Stub Flange dan Flange HDPE dia 250 mm lengkap dengan m
1.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Stub Flange dan Flange HDPE dia 200 mm lengkap dengan m
1Buah Pengadaan Stub Flange dan Flange HDPE dia 200 mm lengkap dengan mur, bout, ring
1.00
Bh
Stub Flange HDPE dan Flange
1.00
Ls
Mobilisasi

Penyambuangan / Pengelasan Stub Flange dan Flange HDPE dia 200 mm lengkap dengan m
1.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Stub Flange dan Flange HDPE dia 160 mm lengkap dengan m
1Buah Pengadaan Stub Flange dan Flange HDPE dia 160 mm lengkap dengan mur, bout, ring
1.00
Bh
Stub Flange HDPE dan Flange
1.00
Ls
Mobilisasi

Penyambuangan / Pengelasan Stub Flange dan Flange HDPE dia 160 mm lengkap dengan m
1.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Stub Flange dan Flange HDPE dia 110 mm lengkap dengan m
1Buah Pengadaan Stub Flange dan Flange HDPE dia 110 mm lengkap dengan mur, bout, ring
1.00
Bh
Stub Flange HDPE dan Flange
1.00
Ls
Mobilisasi

Penyambuangan / Pengelasan Stub Flange dan Flange HDPE dia 110 mm lengkap dengan m
1.00
Titik
Pengelasan

1.00

ls

Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Stub Flange dan Flange HDPE dia 90 mm lengkap dengan mu
1Buah Pengadaan Stub Flange dan Flange HDPE dia 90 mm lengkap dengan mur, bout, ring
1.00
Bh
Stub Flange HDPE dan Flange
1.00
Ls
Mobilisasi

Penyambuangan / Pengelasan Stub Flange dan Flange HDPE dia 90 mm lengkap dengan mu
1.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/PemasanganStub Flange dan Flange HDPE dia 63 mm lengkap dengan mu


1Buah Pengadaan Stub Flange dan Flange HDPE dia 63 mm lengkap dengan mur, bout, ring
1.00
Bh
Stub Flange HDPE dan Flange
1.00
Ls
Mobilisasi

Penyambuangan / Pengelasan Stub Flange dan Flange HDPE dia 63 mm lengkap dengan mu
1.00
Titik
Pengelasan
1.00
ls
Alat dan tenaga Bantu

1Buah Pengadaan/Pemasangan Gate Valve 300 mm lengkap dengan mur, bout, ring dan seal
1Buah Pengadaan Gate Valve 300 mm
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
Pemasangan Gate Valve
1.20
0.90
1.20
0.83

300 mm
h/o
h/o
h/o
h/o

Tukang Pipa
Kepala Tukang
Pekerja
Mandor

1Buah Pengadaan/Pemasangan Gate Valve 250 mm lengkap dengan mur, bout, ring dan seal
1Buah Pengadaan Gate Valve 250 mm
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
Pemasangan Gate Valve 250 mm

1.20
0.90
1.20
0.83

h/o
h/o
h/o
h/o

Tukang Pipa
Kepala Tukang
Pekerja
Mandor

1Buah Pengadaan/Pemasangan Gate Valve 200 mm lengkap dengan mur, bout, ring dan seal
1Buah Pengadaan Gate Valve 200 mm
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
Pemasangan Gate Valve
1.20
0.90
1.20
0.83

200 mm
h/o
h/o
h/o
h/o

Tukang Pipa
Kepala Tukang
Pekerja
Mandor

1Buah Pengadaan/Pemasangan Gate Valve 160 mm lengkap dengan mur, bout, ring dan seal
1Buah Pengadaan Gate Valve 160 mm
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
Pemasangan Gate Valve
1.20
0.90
1.20
0.83

160 mm
h/o
h/o
h/o
h/o

Tukang Pipa
Kepala Tukang
Pekerja
Mandor

1Buah Pengadaan/Pemasangan Gate Valve 110 mm lengkap dengan mur, bout, ring dan seal
1Buah Pengadaan Gate Valve 110 mm
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
Pemasangan Gate Valve
1.20
0.90
1.20
0.83

110 mm
h/o
h/o
h/o
h/o

Tukang Pipa
Kepala Tukang
Pekerja
Mandor

1Buah Pengadaan/Pemasangan Gate Valve 90 mm lengkap dengan mur, bout, ring dan seal
1Buah Pengadaan Gate Valve 90 mm
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
Pemasangan Gate Valve
1.20
0.90
1.20
0.83

90 mm
h/o
h/o
h/o
h/o

Tukang Pipa
Kepala Tukang
Pekerja
Mandor

1Buah Pengadaan/Pemasangan Gate Valve 63 mm lengkap dengan mur, bout, ring dan seal
1Buah Pengadaan Gate Valve 63 mm
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
Pemasangan Gate Valve
1.20
0.90
1.20
0.83

63 mm
h/o
h/o
h/o
h/o

Tukang Pipa
Kepala Tukang
Pekerja
Mandor

1Buah Pengadaan/Pemasangan Water Meter dia. 200 mm lengkap dengan mur, bout, ring da
1Buah Pengadaan Water Meter dia. 200 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Water Meter
1.00
Ls
Mobilisasi
Pemasangan Water Meter dia. 200 mm lengkap dengan mur, bout, ring dan seal
1.20
h/o
Tukang Pipa
0.90
h/o
Kepala Tukang
1.20
h/o
Pekerja
0.83
h/o
Mandor

1Buah Pengadaan/Pemasangan Water Meter dia. 160 mm lengkap dengan mur, bout, ring da
1Buah Pengadaan Water Meter dia. 160 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Water Meter
1.00
Ls
Mobilisasi

Pemasangan Water Meter dia. 160 mm lengkap dengan mur, bout, ring dan seal
1.20
h/o
Tukang Pipa
0.90
h/o
Kepala Tukang
1.20
h/o
Pekerja
0.83
h/o
Mandor

1Buah Pengadaan/Pemasangan Water Meter dia. 110 mm lengkap dengan mur, bout, ring da
1Buah Pengadaan Water Meter dia. 110 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Water Meter
1.00
Ls
Mobilisasi
Pemasangan Water Meter dia. 110 mm lengkap dengan mur, bout, ring dan seal
1.20
h/o
Tukang Pipa
0.90
h/o
Kepala Tukang
1.20
h/o
Pekerja
0.83
h/o
Mandor

1Buah Pengadaan/Pemasangan Water Meter dia. 90 mm lengkap dengan mur, bout, ring dan
1Buah Pengadaan Water Meter dia. 90 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Water Meter
1.00
Ls
Mobilisasi
Pemasangan Water Meter dia. 90 mm lengkap dengan mur, bout, ring dan seal
1.20
h/o
Tukang Pipa
0.90
h/o
Kepala Tukang
1.20
h/o
Pekerja
0.83
h/o
Mandor

1Buah Pengadaan/Pemasangan Reparasi PVC RR dia 63 mm


1Buah Pengadaan Reparasi PVC RR dia 63 mm
1.00
Bh
Reparasi
1.00
Ls
Mobilisasi
1Buah Pemasangan Reparasi PVC
0.83
h/o
0.81
h/o
0.83
h/o
0.83
h/o
1.00
ls

RR dia 63 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 300 mm


1Buah Pengadaan Tee PVC RR dia 300 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 300 mm
0.95
h/o
Tukang Pipa
0.88
h/o
Kepala Tukang
0.90
h/o
Pekerja
0.89
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 300 mm x 200 mm x 300 mm


1Buah Pengadaan Tee PVC RR dia 300 mm x 200 mm x 300 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 300 mm x 200 mm x 300 mm
0.95
h/o
Tukang Pipa
0.88
h/o
Kepala Tukang
0.90
h/o
Pekerja
0.89
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 300 mm x 160 mm x 300 mm


1Buah Pengadaan Tee PVC RR dia 300 mm x 160 mm x 300 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 300 mm x 160 mm x 300 mm
0.95
h/o
Tukang Pipa
0.88
h/o
Kepala Tukang
0.90
h/o
Pekerja
0.89
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 300 mm x 110 mm x 300 mm


1Buah Pengadaan Tee PVC RR dia 300 mm x 110 mm x 300 mm
1.00
Bh
Tee

1.00

Ls

Mobilisasi

1Buah Pemasangan Tee PVC RR dia 300 mm x 110 mm x 300 mm


0.95
h/o
Tukang Pipa
0.88
h/o
Kepala Tukang
0.90
h/o
Pekerja
0.89
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 300 mm x 90 mm x 300 mm


1Buah Pengadaan Tee PVC RR dia 300 mm x 90 mm x 300 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 300 mm x 90 mm x 300 mm
0.95
h/o
Tukang Pipa
0.88
h/o
Kepala Tukang
0.90
h/o
Pekerja
0.89
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 300 mm x 63 mm x 300 mm


1Buah Pengadaan Tee PVC RR dia 300 mm x 63 mm x 300 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 300 mm x 63 mm x 300 mm
0.95
h/o
Tukang Pipa
0.88
h/o
Kepala Tukang
0.90
h/o
Pekerja
0.89
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 250 mm


1Buah Pengadaan Tee PVC RR dia 250 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 250 mm

0.94
0.87
0.89
0.88
1.00

h/o
h/o
h/o
h/o
ls

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 250 mm x 200 mm x 250 mm


1Buah Pengadaan Tee PVC RR dia 250 mm x 200 mm x 250 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 250 mm x 200 mm x 250 mm
0.94
h/o
Tukang Pipa
0.87
h/o
Kepala Tukang
0.89
h/o
Pekerja
0.88
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 250 mm x 160 mm x 250 mm


1Buah Pengadaan Tee PVC RR dia 250 mm x 160 mm x 250 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 250 mm x 160 mm x 250 mm
0.94
h/o
Tukang Pipa
0.87
h/o
Kepala Tukang
0.89
h/o
Pekerja
0.88
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 250 mm x 110 mm x 250 mm


1Buah Pengadaan Tee PVC RR dia 250 mm x 110 mm x 250 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 250 mm x 110 mm x 250 mm
0.94
h/o
Tukang Pipa
0.87
h/o
Kepala Tukang
0.89
h/o
Pekerja

0.88
1.00

h/o
ls

Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 250 mm x 90 mm x 250 mm


1Buah Pengadaan Tee PVC RR dia 250 mm x 90 mm x 250 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 250 mm x 90 mm x 250 mm
0.94
h/o
Tukang Pipa
0.87
h/o
Kepala Tukang
0.89
h/o
Pekerja
0.88
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 250 mm x 63 mm x 250 mm


1Buah Pengadaan Tee PVC RR dia 250 mm x 63 mm x 250 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 250 mm x 63 mm x 250 mm
0.94
h/o
Tukang Pipa
0.87
h/o
Kepala Tukang
0.89
h/o
Pekerja
0.88
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 200 mm


1Buah Pengadaan Tee PVC RR dia 200 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 200 mm
0.93
h/o
Tukang Pipa
0.86
h/o
Kepala Tukang
0.88
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 200 mm x 160 mm x 200 mm


1Buah Pengadaan Tee PVC RR dia 200 mm x 160 mm x 200 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 200 mm x 160 mm x 200 mm
0.93
h/o
Tukang Pipa
0.86
h/o
Kepala Tukang
0.88
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 200 mm x 110 mm x 200 mm


1Buah Pengadaan Tee PVC RR dia 200 mm x 110 mm x 200 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 200 mm x 110 mm x 200 mm
0.93
h/o
Tukang Pipa
0.86
h/o
Kepala Tukang
0.88
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 200 mm x 90 mm x 200 mm


1Buah Pengadaan Tee PVC RR dia 200 mm x 90 mm x 200 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 200 mm x 90 mm x 200 mm
0.93
h/o
Tukang Pipa
0.86
h/o
Kepala Tukang
0.88
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 200 mm x 63 mm x 200 mm

1Buah Pengadaan Tee PVC RR dia 200 mm x 63 mm x 200 mm


1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 200 mm x 63 mm x 200 mm
0.93
h/o
Tukang Pipa
0.86
h/o
Kepala Tukang
0.88
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 160 mm


1Buah Pengadaan Tee dia 160 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee
0.93
0.86
0.88
0.87
1.00

dia 160
h/o
h/o
h/o
h/o
ls

mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 160 mm x 110 mm x 160 mm


1Buah Pengadaan Tee dia 160 mm x 110 mm x 160 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee dia 160 mm x 110 mm x 160 mm
0.93
h/o
Tukang Pipa
0.86
h/o
Kepala Tukang
0.88
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 160 mm x 90 mm x 160 mm


1Buah Pengadaan Tee PVC RR dia 160 mm x 90 mm x 160 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi

1Buah Pemasangan Tee dia 160 mm x 90 mm x 160 mm


0.93
h/o
Tukang Pipa
0.86
h/o
Kepala Tukang
0.88
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 160 mm x 63 mm x 160 mm


1Buah Pengadaan Tee PVC RR dia 160 mm x 63 mm x 160 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 160 mm x 90 mm x 160 mm
0.93
h/o
Tukang Pipa
0.86
h/o
Kepala Tukang
0.88
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 110 mm


1Buah Pengadaan Tee PVC RR dia 110 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 110 mm
0.91
h/o
Tukang Pipa
0.83
h/o
Kepala Tukang
0.85
h/o
Pekerja
0.84
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 110 mm x 90 mm x 110 mm


1Buah Pengadaan Tee PVC RR dia 110 mm x 90 mm x 110 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 110 mm x 90 mm x 110 mm
0.91
h/o
Tukang Pipa

0.83
0.85
0.84
1.00

h/o
h/o
h/o
ls

Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 110 mm x 63 mm x 110 mm


1Buah Pengadaan Tee PVC RR dia 110 mm x 63 mm x 110 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 110 mm x 63 mm x 110 mm
0.91
h/o
Tukang Pipa
0.83
h/o
Kepala Tukang
0.85
h/o
Pekerja
0.84
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 90 mm


1Buah Pengadaan Tee PVC RR dia 90 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 90 mm
0.90
h/o
Tukang Pipa
0.82
h/o
Kepala Tukang
0.84
h/o
Pekerja
0.84
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 90 mm x 63 mm x 90 mm


1Buah Pengadaan Tee PVC RR dia 90 mm x 63 mm x 90 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 90 mm x 63 mm x 90 mm
0.90
h/o
Tukang Pipa
0.82
h/o
Kepala Tukang
0.84
h/o
Pekerja
0.84
h/o
Mandor

1.00

ls

Alat Bantu

1Buah Pengadaan/Pemasangan Tee PVC RR dia 63 mm


1Buah Pengadaan Tee PVC RR dia 63 mm
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Tee PVC RR dia 63 mm
0.87
h/o
Tukang Pipa
0.81
h/o
Kepala Tukang
0.83
h/o
Pekerja
0.83
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Clamp Saddle dia. 110 mm x 3/4"


1Buah Pengadaan Clamp Saddle dia. 110 mm x 3/4"
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Clamp Saddle dia. 110 mm x 3/4"
0.87
h/o
Tukang Pipa
0.81
h/o
Kepala Tukang
0.83
h/o
Pekerja
0.83
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Clamp Saddle dia. 90 mm x 3/4"


1Buah Pengadaan Clamp Saddle dia. 90 mm x 3/4"
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Clamp Saddle dia. 90 mm x 3/4"
0.87
h/o
Tukang Pipa
0.81
h/o
Kepala Tukang
0.83
h/o
Pekerja
0.83
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Clamp Saddle dia. 63 mm x 3/4"


1Buah Pengadaan Clamp Saddle dia. 63 mm x 3/4"
1.00
Bh
Tee
1.00
Ls
Mobilisasi
1Buah Pemasangan Clamp Saddle dia. 63 mm x 3/4"
0.87
h/o
Tukang Pipa
0.81
h/o
Kepala Tukang
0.83
h/o
Pekerja
0.83
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Dop PVC dia 300 mm


1Buah Pengadaan Accessories Dop PVC dia 300 mm
1.00
Bh
Dop
1.00
Ls
Mobilisasi
1 Buah Pemasangan Accessories
0.60
h/o
0.40
h/o
0.45
h/o
0.35
h/o
1.00
ls

Dop PVC dia. 300 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Dop PVC dia 250 mm


1Buah Pengadaan Accessories Dop PVC dia 250 mm
1.00
Bh
Dop
1.00
Ls
Mobilisasi
1 Buah Pemasangan Accessories
0.60
h/o
0.40
h/o
0.45
h/o
0.35
h/o
1.00
ls

Dop PVC dia. 250 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Dop PVC dia 200 mm


1Buah Pengadaan Accessories Dop PVC dia 200 mm

1.00
1.00

Bh
Ls

1 Buah Pemasangan Accessories


0.60
h/o
0.40
h/o
0.45
h/o
0.35
h/o
1.00
ls

Dop
Mobilisasi
Dop PVC dia. 200 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Dop PVC dia 160 mm


1Buah Pengadaan Accessories Dop PVC dia 160 mm
1.00
Bh
Dop
1.00
Ls
Mobilisasi
1 Buah Pemasangan Accessories
0.60
h/o
0.40
h/o
0.45
h/o
0.35
h/o
1.00
ls

Dop PVC dia. 160 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Dop PVC dia 110 mm


1Buah Pengadaan Accessories Dop PVC dia 110 mm
1.00
Bh
Dop
1.00
Ls
Mobilisasi
1 Buah Pemasangan Accessories
0.60
h/o
0.40
h/o
0.45
h/o
0.35
h/o
1.00
ls

Dop PVC dia. 110 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Dop PVC dia 90 mm


1Buah Pengadaan Accessories Dop PVC dia 90 mm
1.00
Bh
Dop
1.00
Ls
Mobilisasi

1 Buah Pemasangan Accessories


0.60
h/o
0.40
h/o
0.45
h/o
0.35
h/o
1.00
ls

Dop PVC dia. 90 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Dop PVC dia 63 mm


1Buah Pengadaan Accessories Dop PVC dia 63 mm
1.00
Bh
Dop
1.00
Ls
Mobilisasi
1 Buah Pemasangan Accessories
0.60
h/o
0.40
h/o
0.45
h/o
0.35
h/o
1.00
ls

Dop PVC dia. 63 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR dia. 300 - 250 mm


1Buah Pengadaan Reducer PVC RR dia. 300 - 250 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer PVC RR dia. 300 - 250 mm
0.87
h/o
Tukang Pipa
0.79
h/o
Kepala Tukang
0.76
h/o
Pekerja
0.79
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR Dia. 300 - 200 mm


1Buah Pengadaan Reducer PVC RR dia. 300 - 200 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer PVC RR dia. 300 - 200 mm
0.87
h/o
Tukang Pipa
0.79
h/o
Kepala Tukang

0.76
0.79
1.00

h/o
h/o
ls

Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan PVC RR dia. 250 - 200 mm


1Buah Pengadaan Reducer PVC RR dia. 250 - 200 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer PVC RR dia. 250 - 200 mm
0.86
h/o
Tukang Pipa
0.79
h/o
Kepala Tukang
0.76
h/o
Pekerja
0.78
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR dia. 250 - 160 mm


1Buah Pengadaan Reducer PVC RR dia. 250 - 160 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer All Socket PVC dia. 250 -160 mm
0.85
h/o
Tukang Pipa
0.79
h/o
Kepala Tukang
0.76
h/o
Pekerja
0.78
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR dia. 200 - 160 mm


1Buah Pengadaan Reducer PVC RR dia. 200 - 160 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer RVC RR dia. 200 - 160 mm
0.85
h/o
Tukang Pipa
0.78
h/o
Kepala Tukang
0.76
h/o
Pekerja
0.77
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR dia. 200 - 110 mm


1Buah Pengadaan Reducer PVC RR dia. 200 - 110 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer PVC RR dia. 200 - 110 mm
0.85
h/o
Tukang Pipa
0.78
h/o
Kepala Tukang
0.75
h/o
Pekerja
0.77
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR dia. 160 - 110 mm


1Buah Pengadaan Reducer PVC RR dia. 160 - 110 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer PVC RR dia. 160 - 110 mm
0.81
h/o
Tukang Pipa
0.74
h/o
Kepala Tukang
0.72
h/o
Pekerja
0.73
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR dia. 160 - 90 mm


1Buah Pengadaan Reducer PVC RR dia. 160 - 90 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer PVC RR dia. 160 - 90 mm
0.79
h/o
Tukang Pipa
0.73
h/o
Kepala Tukang
0.70
h/o
Pekerja
0.72
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR dia. 110 - 90 mm


1Buah Pengadaan Reducer PVC RR dia. 110 - 90 mm

1.00
1.00

Bh
Ls

Reducer
Mobilisasi

1 Buah Pemasangan Reducer PVC RR dia. 110 - 90 mm


0.78
h/o
Tukang Pipa
0.72
h/o
Kepala Tukang
0.70
h/o
Pekerja
0.71
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR dia. 110 - 63 mm


1Buah Pengadaan Reducer PVC RR dia. 110 - 63 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer PVC RR dia. 110 - 63 mm
0.78
h/o
Tukang Pipa
0.71
h/o
Kepala Tukang
0.69
h/o
Pekerja
0.70
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Reducer PVC RR dia. 90 - 63 mm


1Buah Pengadaan Reducer PVC RR dia. 90 - 63 mm
1.00
Bh
Reducer
1.00
Ls
Mobilisasi
1 Buah Pemasangan Reducer PVC RR dia. 90 - 63 mm
0.77
h/o
Tukang Pipa
0.70
h/o
Kepala Tukang
0.68
h/o
Pekerja
0.69
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Gate Valve FF dia. 300 mm Lengkap dengan Mur, Bout, Ring
1Buah Pengadaan Gate Valve FF dia. 300 mm Lengkap dengan Mur, Bout, Ring dan Seal
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi

1 Buah PemasanganGate
0.97
0.97
0.96
0.87
1.00

Valve FF dia. 300 mm Lengkap dengan Mur, Bout, Ring dan Seal
h/o
Tukang Pipa
h/o
Kepala Tukang
h/o
Pekerja
h/o
Mandor
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Gate Valve FF dia. 250 mm Lengkap dengan Mur, Bout, Ring
1Buah Pengadaan Gate Valve FF dia. 250 mm Lengkap dengan Mur, Bout, Ring dan Seal
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
1 Buah Pemasangan Gate Valve FF dia. 250 mm Lengkap dengan Mur, Bout, Ring dan Seal
0.97
h/o
Tukang Pipa
0.97
h/o
Kepala Tukang
0.96
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Gate Valve FF dia. 200 mm Lengkap dengan Mur, Bout, Ring
1Buah Pengadaan AGate Valve FF dia. 200 mm Lengkap dengan Mur, Bout, Ring dan Seal
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
1 Buah Pemasangan Gate Valve FF dia. 200 mm Lengkap dengan Mur, Bout, Ring dan Seal
0.97
h/o
Tukang Pipa
0.97
h/o
Kepala Tukang
0.96
h/o
Pekerja
0.87
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Gate Valve FF dia. 160 mm Lengkap dengan Mur, Bout, Ring
1Buah Pengadaan Gate Valve FF dia. 160 mm Lengkap dengan Mur, Bout, Ring dan Seal
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi

1 Buah Pemasangan Gate Valve FF dia. 160 mm Lengkap dengan Mur, Bout, Ring dan Seal

0.92
0.94
0.92
0.85
1.00

h/o
h/o
h/o
h/o
ls

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Gate Valve FF dia. 110 mm Lengkap dengan Mur, Bout, Ring
1Buah Pengadaan Gate Valve FF dia. 110 mm Lengkap dengan Mur, Bout, Ring dan Seal
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
1 Buah Pemasangan Gate Valve FF dia. 110 mm Lengkap dengan Mur, Bout, Ring dan Seal
0.88
h/o
Tukang Pipa
0.89
h/o
Kepala Tukang
0.87
h/o
Pekerja
0.81
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Gate Valve FF dia. 90 mm Lengkap dengan Mur, Bout, Ring d
1Buah Pengadaan Accessories Gate Valve FF dia. 90 mm Lengkap dengan Mur, Bout, Ring da
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
1 Buah Pemasangan Accessories
0.85
h/o
0.87
h/o
0.85
h/o
0.78
h/o
1.00
ls

Gate Valve CL PVC dia. 90 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Gate Valve FF dia. 63 mm Lengkap dengan Mur, Bout, Ring d
1Buah Pengadaan Gate Valve FF dia. 63 mm Lengkap dengan Mur, Bout, Ring dan Seal
1.00
Bh
Gate Valve
1.00
Ls
Mobilisasi
1 Buah Pemasangan Gate Valve FF dia. 63 mm Lengkap dengan Mur, Bout, Ring dan Seal
0.83
h/o
Tukang Pipa
0.85
h/o
Kepala Tukang
0.83
h/o
Pekerja

0.77
1.00

h/o
ls

Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Stop Kran dia. 63 mm


1Buah Pengadaan Stop Kran dia. 63 mm
1.00
Bh
Stop Kran
1.00
Ls
Mobilisasi
1 Buah Pemasangan Stop Kran PVC dia. 63 mm
0.83
h/o
Tukang Pipa
0.85
h/o
Kepala Tukang
0.83
h/o
Pekerja
0.77
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Stop Kran dia. 90 mm


1Buah Pengadaan Stop Kran dia. 90 mm
1.00
Bh
Stop Kran
1.00
Ls
Mobilisasi
1 Buah Pemasangan Stop Kran PVC dia. 90 mm
0.83
h/o
Tukang Pipa
0.85
h/o
Kepala Tukang
0.83
h/o
Pekerja
0.77
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Check Valve dia. 63 mm


1Buah Pengadaan Check Valve dia. 63 mm
1.00
Bh
Check Valve
1.00
Ls
Mobilisasi
1 Buah Pemasangan Check Valve
0.83
h/o
0.85
h/o
0.83
h/o
0.77
h/o
1.00
ls

dia. 63 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Check Valve dia90 mm


1Buah Pengadaan Check Valve dia. 90 mm
1.00
Bh
Check Valve
1.00
Ls
Mobilisasi
1 Buah Pemasangan Check Valve
0.83
h/o
0.85
h/o
0.83
h/o
0.77
h/o
1.00
ls

dia. 90 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Water Meter Produksi dia. 63 mm


1Buah Pengadaan Water Meter Produksi dia. 63 mm
1.00
Bh
Water Meter Produksi
1.00
Ls
Mobilisasi
1 Buah Pemasangan Water Meter
0.83
h/o
0.85
h/o
0.83
h/o
0.77
h/o
1.00
ls

Produksi dia. 63 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Water Meter Produksi dia. 90 mm


1Buah Pengadaan Water Meter Produksi dia. 90 mm
1.00
Bh
Water Meter Produksi
1.00
Ls
Mobilisasi
1 Buah Pemasangan Water Meter
0.85
h/o
0.87
h/o
0.85
h/o
0.78
h/o
1.00
ls

Produksi dia. 90 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Water Meter Produksi dia. 110 mm


1Buah Pengadaan Water Meter Produksi dia. 110 mm

1.00
1.00

Bh
Ls

1 Buah Pemasangan Water Meter


0.88
h/o
0.89
h/o
0.87
h/o
0.81
h/o
1.00
ls

Water Meter Produksi


Mobilisasi
Produksi dia. 110 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Water Meter Produksi dia. 160 mm


1Buah Pengadaan Water Meter Produksi dia. 160 mm
1.00
Bh
Water Meter Produksi
1.00
Ls
Mobilisasi
1 Buah Pemasangan Water Meter
0.88
h/o
0.89
h/o
0.87
h/o
0.81
h/o
1.00
ls

Produksi dia. 160 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Water Meter Produksi dia. 200 mm


1Buah Pengadaan Water Meter Produksi dia. 200 mm
1.00
Bh
Water Meter Produksi
1.00
Ls
Mobilisasi
1 Buah Pemasangan Water Meter
0.88
h/o
0.89
h/o
0.87
h/o
0.81
h/o
1.00
ls

Produksi dia. 200 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Water Meter Produksi dia. 250 mm


1Buah Pengadaan Water Meter Produksi dia. 250 mm
1.00
Bh
Water Meter Produksi
1.00
Ls
Mobilisasi

1 Buah Pemasangan Water Meter


0.88
h/o
0.89
h/o
0.87
h/o
0.81
h/o
1.00
ls

Produksi dia. 250 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Water Meter dia. 300 mm


1Buah Pengadaan Water Meter dia. 300 mm
1.00
Bh
Water Meter Produksi
1.00
Ls
Mobilisasi
1Buah Pemasangan Water Meter
0.92
h/o
0.94
h/o
0.92
h/o
0.85
h/o
1.00
ls

dia. 300 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Adaptor PVC dia. 300 mm lengkap dengan mur, bout,
1Buah Pengadaan Flange Adaptor PVC dia. 300 mm lengkap dengan mur, bout, ring dan sea
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Adaptor PVC dia. 300 mm lengkap dengan mur, bout, ring dan s
0.59
h/o
Tukang Pipa
0.55
h/o
Kepala Tukang
0.56
h/o
Pekerja
0.48
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Adaptor PVC dia. 250 mm lengkap dengan mur, bout,
1Buah Pengadaan Accessories Flange Adaptor PVC dia. 250 mm lengkap dengan mur, bout, r
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Adaptor PVC dia. 250 mm lengkap dengan mur, bout, ring dan se
0.58
h/o
Tukang Pipa
0.51
h/o
Kepala Tukang

0.56
0.48
1.00

h/o
h/o
ls

Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Adaptor PVC dia. 200 mm lengkap dengan mur, bout,
1Buah Pengadaan Flange Adaptor PVC dia. 200 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Adaptor PVC dia. 200 mm lengkap dengan mur, bout, ring dan se
0.58
h/o
Tukang Pipa
0.51
h/o
Kepala Tukang
0.56
h/o
Pekerja
0.48
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Adaptor PVC dia. 160 mm lengkap dengan mur, bout,
1Buah Pengadaan Flange Adaptor PVC dia. 160 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Adaptor PVC dia. 160 mm lengkap dengan mur, bout, ring dan se
0.55
h/o
Tukang Pipa
0.50
h/o
Kepala Tukang
0.55
h/o
Pekerja
0.45
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Adaptor PVC dia. 110 mm lengkap dengan mur, bout,
1Buah Pengadaan Flange Adaptor PVC dia. 110 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Adaptor PVC dia. 110 mm lengkap dengan mur, bout, ring dan se
0.52
h/o
Tukang Pipa
0.48
h/o
Kepala Tukang
0.52
h/o
Pekerja
0.43
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Adaptor PVC dia. 90 mm lengkap dengan mur, bout, r
1Buah Pengadaan Flange Adaptor PVC dia. 90 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Adaptor PVC dia. 90 mm lengkap dengan mur, bout, ring dan sea
0.51
h/o
Tukang Pipa
0.46
h/o
Kepala Tukang
0.51
h/o
Pekerja
0.41
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Adaptor PVC dia. 63 mm lengkap dengan mur, bout, r
1Buah Pengadaan Flange Adaptor PVC dia. 63 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi
1 Buah Pemasangan Accessories
0.50
h/o
0.45
h/o
0.50
h/o
0.41
h/o
1.00
ls

Flange Adaptor PVC dia. 63 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Spigot PVC dia. 300 mm lengkap dengan mur, bout, r
1Buah Pengadaan Flange Spigot PVC dia. 300 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Spigot PVC dia. 300 mm lengkap dengan mur, bout, ring dan sea
0.59
h/o
Tukang Pipa
0.55
h/o
Kepala Tukang
0.56
h/o
Pekerja
0.48
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Spigot PVC dia. 250 mm lengkap dengan mur, bout, r

1Buah Pengadaan Accessories Flange Spigot PVC dia. 250 mm lengkap dengan mur, bout, rin
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Spigot PVC dia. 250 mm lengkap dengan mur, bout, ring dan sea
0.58
h/o
Tukang Pipa
0.51
h/o
Kepala Tukang
0.56
h/o
Pekerja
0.48
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Spigot PVC dia. 200 mm lengkap dengan mur, bout, r
1Buah Pengadaan Flange Spigot PVC dia. 200 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Spigot PVC dia. 200 mm lengkap dengan mur, bout, ring dan sea
0.58
h/o
Tukang Pipa
0.51
h/o
Kepala Tukang
0.56
h/o
Pekerja
0.48
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Spigot PVC dia. 160 mm lengkap dengan mur, bout, r
1Buah Pengadaan Flange Spigot PVC dia. 160 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Spigot PVC dia. 160 mm lengkap dengan mur, bout, ring dan sea
0.55
h/o
Tukang Pipa
0.50
h/o
Kepala Tukang
0.55
h/o
Pekerja
0.45
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Spigot PVC dia. 110 mm lengkap dengan mur, bout, r
1Buah Pengadaan Flange Spigot PVC dia. 110 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi

1 Buah Pemasangan Flange Spigot PVC dia. 110 mm lengkap dengan mur, bout, ring dan sea
0.52
h/o
Tukang Pipa
0.48
h/o
Kepala Tukang
0.52
h/o
Pekerja
0.43
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Spigot PVC dia. 90 mm lengkap dengan mur, bout, rin
1Buah Pengadaan Flange Spigot PVC dia. 90 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi
1 Buah Pemasangan Flange Spigot PVC dia. 90 mm lengkap dengan mur, bout, ring dan seal
0.51
h/o
Tukang Pipa
0.46
h/o
Kepala Tukang
0.51
h/o
Pekerja
0.41
h/o
Mandor
1.00
ls
Alat Bantu

1Buah Pengadaan/Pemasangan Flange Spigot PVC dia. 63 mm lengkap dengan mur, bout, rin
1Buah Pengadaan Flange Spigot PVC dia. 63 mm lengkap dengan mur, bout, ring dan seal
1.00
Bh
Flange
1.00
Ls
Mobilisasi
1 Buah Pemasangan Accessories
0.50
h/o
0.45
h/o
0.50
h/o
0.41
h/o
1.00
ls

Flange Spigot PVC dia. 63 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1 Buah Pemasangan Accessories


0.58
h/o
0.51
h/o
0.56
h/o
0.48
h/o
1.00
ls

Straat pot CL PVC dia. 300 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1 Buah Pemasangan Accessories


0.58
h/o
0.51
h/o
0.56
h/o
0.48
h/o
1.00
ls

Straat pot CL PVC dia. 250 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1 Buah Pemasangan Accessories


0.58
h/o
0.51
h/o
0.56
h/o
0.48
h/o
1.00
ls

Straat pot CL PVC dia. 200 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1 Buah Pemasangan Accessories


0.58
h/o
0.51
h/o
0.56
h/o
0.48
h/o
1.00
ls

Straat pot CL PVC dia. 160 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1 Buah Pemasangan Accessories


0.58
h/o
0.51
h/o
0.56
h/o
0.48
h/o
1.00
ls

Straat pot CL PVC dia. 110 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1 Buah Pemasangan Accessories


0.58
h/o
0.51
h/o
0.56
h/o
0.48
h/o
1.00
ls

Straat pot CL PVC dia. 90 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1 Buah Pemasangan Accessories


0.58
h/o
0.51
h/o
0.56
h/o
0.48
h/o

Straat pot CL PVC dia. 63 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor

1.00

ls

Alat Bantu

1 m' Test Hidrostatic Pipa


0.04
0.04
0.03
0.04
0.06
0.04
1.00

PVC dia. 300mm


h/o
Tukang Pipa
h/o
Pekerja
h/o
Operator
h
Sewa Test Pump
ltr
Bensin
m3
air Bersih
ls
Alat Bantu

1 m' Test Hidrostatic Pipa


0.03
0.04
0.02
0.04
0.06
0.03
1.00

PVC dia. 200mm


h/o
Tukang Pipa
h/o
Pekerja
h/o
Operator
h
Sewa Test Pump
ltr
Bensin
m3
air Bersih
ls
Alat Bantu

1 m' Test Hidrostatic Pipa


0.03
0.03
0.02
0.03
0.06
0.03
1.00

PVC dia. 150 mm


h/o
Tukang Pipa
h/o
Pekerja
h/o
Operator
h
Sewa Test Pump
ltr
Bensin
m3
air Bersih
ls
Alat Bantu

1 Buah Pembuatan Thurst Block PVC 150 - 300 mm


0.26
m3
Galian Tanah
0.01
m3
Galian Pasir
0.20
m3
Urugan Tanah
0.22
m3
Bekisting Biasa
0.02
m3
Beton 1:3:5
1.00
ls
Alat Bantu
1 Unit Pemasangan Jembatan Pipa GIP dia. 300 mm Bentang 32 m
15.00 m3
Galian Tanah
0.40 m3
Urugan Pasir
2.10 m3
Thrust Block Beton Cor 1:3:5
1.00 m3
Buangan Tanah Sisa Galian
1.80 m2
Pasangan Batu Kali
16.00 m2
Pasangan Bekisting

1,149.00
4,365.00
298.00
314.00
265.00
2.00
32.00
96.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00

Kg
Kg
Kg
Kg
Kg
buah
m'
buah
unit
buah
unit
ls
ls
ls
ls

Pasangan Besi beton


Pasangan Besi IWF 400 x 200 x 8 mm
Pasangan Besi Canal 100 x 50 x 5 mm
Pasangan Besi Siku 70 x 70 x 7 mm
Pasangan Besi Plat 5 mm
Pemasangan Bar Pengaman
Pemasangan Pipa dan Accessories
Pemasangan Baut dan Mur
Pemasangan Wash Out
Pemasangan Straat Pot (Box Valve)
Penyetelan Jembatan Pipa
Penyambungan dengan Pipa
Alat Bantu
Pengecetan dan Perapihan
Pengelasan

1 Unit Pemasangan Jembatan Pipa GIP dia. 300 mm, Bentang 9 m


8.00 m3
Galian Tanah
0.50 m3
Urugan Pasir
2.40 m3
Thrust Block Beton Cor 132:5
1.50 m3
Buangan Tanah Sisa Galian
0.75 m2
Pasangan Batu Kali
28.00 m2
Pasangan Bekisting
862.00 Kg
Pasangan Besi beton
3,273.00 Kg
Pasangan Besi IWF 300 x 20 x 8 mm
224.00 Kg
Pasangan Besi Canal 100 x 50 x 5 mm
235.00 Kg
Pasangan Besi Siku 70 x 70 x 7 mm
196.00 Kg
Pasangan Besi Plat 5 mm
2.00 buah
Pemasangan Bar Pengaman
11.00 m'
Pemasangan Pipa dan Accessories
32.00 buah
Pemasangan Baut dan Mur
1.00 unit
Pemasangan Wash Out
2.00 buah
Pemasangan Straat Pot (Box Valve)
1.00 unit
Penyetelan Jembatan Pipa
1.00 ls
Penyambungan dengan Pipa
1.00 ls
Alat Bantu
1.00 ls
Pengecetan dan Perapihan
1.00 ls
Pengelasan
1 Unit Pemasangan Jembatan Pipa GIP dia. 300 mm, Bentang 8 m
2.75 m3
Galian Tanah
0.45 m3
Urugan Pasir
1.25 m3
Thrust Block Beton Cor 132:5
0.75 m3
Buangan Tanah Sisa Galian

0.65
2.00
10.00
54.00
1.00
1.00
1.00
1.00

m2
buah
m'
buah
ls
ls
ls
ls

Pasangan Batu Kali


Pemasangan Bar Pengaman
Pemasangan Pipa dan Accessories
Pemasangan Baut dan Mur
Penyambungan dengan Pipa
Alat Bantu
Pengecetan dan Perapihan
Pengelasan

1 Unit Pemasangan Jembatan Pipa GIP dia. 200 mm, Bentang 9 m


2.50 m3
Galian Tanah
0.40 m3
Urugan Pasir
1.25 m3
Thrust Block Beton Cor 132:5
0.35 m3
Buangan Tanah Sisa Galian
0.65 m2
Pasangan Batu Kali
2.00 buah
Pemasangan Bar Pengaman
54.00 m'
Pemasangan Pipa dan Accessories
1.00 buah
Pemasangan Baut dan Mur
1.00 ls
Penyambungan dengan Pipa
1.00 ls
Alat Bantu
1.00 ls
Pengecetan dan Perapihan
1.00 ls
Pengelasan
1 Unit Pemasangan Jembatan Pipa GIP dia. 200 mm, Bentang 6 m
2.50 m3
Galian Tanah
0.40 m3
Urugan Pasir
1.25 m3
Thrust Block Beton Cor 132:5
0.35 m3
Buangan Tanah Sisa Galian
0.65 m2
Pasangan Batu Kali
2.00 buah
Pemasangan Bar Pengaman
8.00 m'
Pemasangan Pipa dan Accessories
24.00 buah
Pemasangan Baut dan Mur
1.00 ls
Penyambungan dengan Pipa
1.00 ls
Alat Bantu
1.00 ls
Pengecetan dan Perapihan
1.00 ls
Pengelasan
1 Unit Pemasangan Jembatan Pipa GIP dia. 200 mm, Bentang 5 m
2.50 m3
Galian Tanah
0.40 m3
Urugan Pasir
1.10 m3
Thrust Block Beton Cor 132:5
0.30 m3
Buangan Tanah Sisa Galian
0.60 m2
Pasangan Batu Kali
2.00 buah
Pemasangan Bar Pengaman
7.00 m'
Pemasangan Pipa dan Accessories

24.00
1.00
1.00
1.00
1.00

buah
ls
ls
ls
ls

Pemasangan Baut dan Mur


Penyambungan dengan Pipa
Alat Bantu
Pengecetan dan Perapihan
Pengelasan

1 Unit Pemasangan Jembatan Pipa GIP dia. 150 mm, Bentang 7 m


2.50 m3
Galian Tanah
0.40 m3
Urugan Pasir
1.10 m3
Thrust Block Beton Cor 132:5
0.30 m3
Buangan Tanah Sisa Galian
0.60 m2
Pasangan Batu Kali
2.00 buah
Pemasangan Bar Pengaman
9.00 m'
Pemasangan Pipa dan Accessories
54.00 buah
Pemasangan Baut dan Mur
1.00 ls
Penyambungan dengan Pipa
1.00 ls
Alat Bantu
1.00 ls
Pengecetan dan Perapihan
1.00 ls
Pengelasan

20

Memasang 1 M' Pipa Galvanis Diameter 1/2"


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

21

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 3/4"


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

22

0.05
0.09
0.01
0.03

0.05
0.09
0.01
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 1"

Bahan

Tenaga

23

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.11
0.18
0.02
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 3"


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

25

0.05
0.09
0.01
0.03

Memasang 1 M' Pipa Galvanis Diameter 2


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

24

1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

0.11
0.18
0.02
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 4"


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

0.14
0.23
0.02
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

26

Memasang 1 M' Pipa PVC Tipe AW Diameter 1/2"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

27

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.04
0.06
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 1"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

29

Oh
Oh
Oh
Oh

Memasang 1 M' Pipa PVC Tipe AW Diameter 3/4"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

28

0.04
0.06
0.01
0.00

0.04
0.06
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 11/2"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

0.04
0.06

Oh
Oh

Pekerja
Tukang Batu

0.01
0.00

30

Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 2"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

32

Oh
Oh

0.05
0.09
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 3"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

0.08
0.14
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

2.00 Memasang 1 M' Pipa PVC Tipe AW Diameter 4"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

36

0.08
0.14
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 Buah Kran Diameter 1/2"


Bahan
1.00
Bh
Kran Air
0.03
Bh
Seal Tape

Tenaga

37

0.01
0.10
0.01
0.01

Oh
Oh
Oh
Oh

Memasang 1 Buah Floor Drain


Bahan
1.00
Bh

Tenaga

0.01
0.10
0.01
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Floor Drain

Pekerja
Tukang Batu
Kepala Tukang
Mandor

RGA SATUAN

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

2,056,500.00 = Rp.
411,300.00 = Rp.
Jumlah I = Rp.
500,000.00
50,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.

1,000,000.00
50,000.00
1,050,000.00
3,517,800.00

1,725,500.00 = Rp.
345,100.00 = Rp.
Jumlah I = Rp.

1,725,500.00
345,100.00
2,070,600.00

500,000.00
50,000.00
Jumlah II
JumlahI + II

=
=
=
=

2,056,500.00
411,300.00
2,467,800.00

Rp.
Rp.
Rp.
Rp.

1,000,000.00
50,000.00
1,050,000.00
3,120,600.00

1,725,000.00 = Rp.
345,000.00 = Rp.
Jumlah I = Rp.

1,725,000.00
345,000.00
2,070,000.00

500,000.00
50,000.00
Jumlah II
JumlahI + II

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

1,000,000.00
50,000.00
1,050,000.00
3,120,000.00

@ Rp.
@ Rp.

1,875,000.00 = Rp.
375,000.00 = Rp.
Jumlah I = Rp.

1,875,000.00
375,000.00
2,250,000.00

@ Rp.
@ Rp.

450,000.00 = Rp.
45,000.00 = Rp.

900,000.00
45,000.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

Jumlah II = Rp.
JumlahI + II = Rp.

945,000.00
3,195,000.00

1,525,000.00 = Rp.
305,000.00 = Rp.
Jumlah I = Rp.

1,525,000.00
305,000.00
1,830,000.00

450,000.00
45,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.

900,000.00
45,000.00
945,000.00
2,775,000.00

1,474,000.00 = Rp.
294,800.00 = Rp.
Jumlah I = Rp.

1,474,000.00
294,800.00
1,768,800.00

400,000.00
40,000.00
Jumlah II
JumlahI + II

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

800,000.00
40,000.00
840,000.00
2,608,800.00

1,253,000.00 = Rp.
250,600.00 = Rp.
Jumlah I = Rp.

1,253,000.00
250,600.00
1,503,600.00

@ Rp.
@ Rp.

400,000.00
40,000.00
Jumlah II
JumlahI + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

800,000.00
40,000.00
840,000.00
2,343,600.00

@ Rp.
@ Rp.

920,000.00 = Rp.
184,000.00 = Rp.
Jumlah I = Rp.

920,000.00
184,000.00
1,104,000.00

@ Rp.
@ Rp.

350,000.00 = Rp.
35,000.00 = Rp.
Jumlah II = Rp.

700,000.00
35,000.00
735,000.00

JumlahI + II = Rp.

1,839,000.00

@ Rp.
@ Rp.

874,000.00 = Rp.
174,800.00 = Rp.
Jumlah I = Rp.

874,000.00
174,800.00
1,048,800.00

@ Rp.
@ Rp.

350,000.00
35,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.

700,000.00
35,000.00
735,000.00
1,783,800.00

@ Rp.
@ Rp.

726,000.00 = Rp.
145,200.00 = Rp.
Jumlah I = Rp.

726,000.00
145,200.00
871,200.00

@ Rp.
@ Rp.

300,000.00
30,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.

600,000.00
30,000.00
630,000.00
1,501,200.00

@ Rp.
@ Rp.

680,000.00 = Rp.
136,000.00 = Rp.
Jumlah I = Rp.

680,000.00
136,000.00
816,000.00

@ Rp.
@ Rp.

300,000.00
30,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.

600,000.00
30,000.00
630,000.00
1,446,000.00

@ Rp.
@ Rp.

650,000.00 = Rp.
130,000.00 = Rp.
Jumlah I = Rp.

650,000.00
130,000.00
780,000.00

@
@
@
@

Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47

=
=
=
=

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

64,636.99
73,495.61
60,725.78
78,714.65

@ Rp.

7,500.00 = Rp.
Jumlah II = Rp.
Jumlah I+II = Rp.

7,500.00
285,073.03
1,065,073.03

@ Rp.
@ Rp.

575,000.00 = Rp.
115,000.00 = Rp.
Jumlah I = Rp.

575,000.00
115,000.00
690,000.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
7,500.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

64,636.99
73,495.61
60,725.78
78,714.65
7,500.00
285,073.03
975,073.03

@ Rp.
@ Rp.

485,000.00 = Rp.
97,000.00 = Rp.
Jumlah I = Rp.

485,000.00
97,000.00
582,000.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
7,500.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,294.82
72,139.04
59,597.71
76,563.42
7,500.00
279,095.00
861,095.00

1,845,000.00 = Rp.
369,000.00 = Rp.
Jumlah I = Rp.

1,845,000.00
369,000.00
2,214,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

500,000.00
450,000.00
50,000.00
Jumlah II
JumlahI + II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

500,000.00
450,000.00
50,000.00
1,000,000.00
3,214,000.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

1,725,500.00 = Rp.
345,100.00 = Rp.
Jumlah I = Rp.
500,000.00
400,000.00
50,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

500,000.00
400,000.00
50,000.00
950,000.00
3,020,600.00

1,745,000.00 = Rp.
349,000.00 = Rp.
Jumlah I = Rp.

1,745,000.00
349,000.00
2,094,000.00

450,000.00
400,000.00
45,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

1,725,500.00
345,100.00
2,070,600.00

Rp.
Rp.
Rp.
Rp.
Rp.

450,000.00
400,000.00
45,000.00
895,000.00
2,989,000.00

1,625,000.00 = Rp.
325,000.00 = Rp.
Jumlah I = Rp.

1,625,000.00
325,000.00
1,950,000.00

450,000.00
350,000.00
45,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

450,000.00
350,000.00
45,000.00
845,000.00
2,795,000.00

1,436,000.00 = Rp.
287,200.00 = Rp.
Jumlah I = Rp.

1,436,000.00
287,200.00
1,723,200.00

400,000.00
350,000.00
40,000.00
Jumlah II

=
=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

400,000.00
350,000.00
40,000.00
790,000.00

@ Rp.
@ Rp.

JumlahI + II = Rp.

2,513,200.00

1,231,000.00 = Rp.
246,200.00 = Rp.
Jumlah I = Rp.

1,231,000.00
246,200.00
1,477,200.00

@ Rp.
@ Rp.
@ Rp.

400,000.00
300,000.00
40,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

400,000.00
300,000.00
40,000.00
740,000.00
2,217,200.00

@ Rp.
@ Rp.

960,000.00 = Rp.
192,000.00 = Rp.
Jumlah I = Rp.

960,000.00
192,000.00
1,152,000.00

@ Rp.
@ Rp.
@ Rp.

350,000.00
300,000.00
35,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

350,000.00
300,000.00
35,000.00
685,000.00
1,837,000.00

@ Rp.
@ Rp.

870,000.00 = Rp.
174,000.00 = Rp.
Jumlah I = Rp.

870,000.00
174,000.00
1,044,000.00

@ Rp.
@ Rp.
@ Rp.

350,000.00
250,000.00
35,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

350,000.00
250,000.00
35,000.00
635,000.00
1,679,000.00

@ Rp.
@ Rp.

720,000.00 = Rp.
144,000.00 = Rp.
Jumlah I = Rp.

720,000.00
144,000.00
864,000.00

@ Rp.

300,000.00 = Rp.

300,000.00

=
=
=
=
=

=
=
=
=
=

@ Rp.
@ Rp.

250,000.00
30,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.

250,000.00
30,000.00
580,000.00
1,444,000.00

@ Rp.
@ Rp.

685,000.00 = Rp.
137,000.00 = Rp.
Jumlah I = Rp.

685,000.00
137,000.00
822,000.00

@ Rp.
@ Rp.
@ Rp.

300,000.00
200,000.00
30,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

300,000.00
200,000.00
30,000.00
530,000.00
1,352,000.00

@ Rp.
@ Rp.

570,000.00 = Rp.
114,000.00 = Rp.
Jumlah I = Rp.

570,000.00
114,000.00
684,000.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
7,500.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

64,636.99
73,495.61
60,725.78
78,714.65
7,500.00
285,073.03
969,073.03

2,455,000.00 = Rp.
491,000.00 = Rp.
Jumlah I = Rp.

2,455,000.00
491,000.00
2,946,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.

500,000.00
50,000.00
Jumlah II
JumlahI + II

=
=
=
=

=
=
=
=
=

=
=
=
=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

1,500,000.00
50,000.00
1,550,000.00
4,496,000.00

2,378,000.00 = Rp.

2,378,000.00

@ Rp.

475,600.00 = Rp.
Jumlah I = Rp.

475,600.00
2,853,600.00

@ Rp.
@ Rp.
@ Rp.

500,000.00
400,000.00
50,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

1,000,000.00
400,000.00
50,000.00
1,450,000.00
4,303,600.00

2,134,000.00 = Rp.
426,800.00 = Rp.
Jumlah I = Rp.

2,134,000.00
426,800.00
2,560,800.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

500,000.00
350,000.00
50,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,000,000.00
350,000.00
50,000.00
1,400,000.00
3,960,800.00

1,980,000.00 = Rp.
396,000.00 = Rp.
Jumlah I = Rp.

1,980,000.00
396,000.00
2,376,000.00

500,000.00
300,000.00
50,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,000,000.00
300,000.00
50,000.00
1,350,000.00
3,726,000.00

1,825,000.00 = Rp.
365,000.00 = Rp.
Jumlah I = Rp.

1,825,000.00
365,000.00
2,190,000.00

500,000.00
250,000.00
50,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

1,000,000.00
250,000.00
50,000.00
1,300,000.00
3,490,000.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

1,725,500.00 = Rp.
345,100.00 = Rp.
Jumlah I = Rp.
500,000.00
200,000.00
50,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

1,000,000.00
200,000.00
50,000.00
1,250,000.00
3,320,600.00

2,230,000.00 = Rp.
446,000.00 = Rp.
Jumlah I = Rp.

2,230,000.00
446,000.00
2,676,000.00

450,000.00
45,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

1,725,500.00
345,100.00
2,070,600.00

Rp.
Rp.
Rp.
Rp.

1,350,000.00
45,000.00
1,395,000.00
4,071,000.00

2,139,000.00 = Rp.
427,800.00 = Rp.
Jumlah I = Rp.

2,139,000.00
427,800.00
2,566,800.00

450,000.00
400,000.00
45,000.00
Jumlah II
JumlahI + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

900,000.00
400,000.00
45,000.00
1,345,000.00
3,911,800.00

1,820,000.00 = Rp.
364,000.00 = Rp.
Jumlah I = Rp.

1,820,000.00
364,000.00
2,184,000.00

450,000.00
350,000.00
45,000.00
Jumlah II

=
=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

900,000.00
350,000.00
45,000.00
1,295,000.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

JumlahI + II = Rp.

3,479,000.00

1,770,000.00 = Rp.
354,000.00 = Rp.
Jumlah I = Rp.

1,770,000.00
354,000.00
2,124,000.00

450,000.00
300,000.00
45,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

900,000.00
300,000.00
45,000.00
1,245,000.00
3,369,000.00

1,725,500.00 = Rp.
345,100.00 = Rp.
Jumlah I = Rp.

1,725,500.00
345,100.00
2,070,600.00

450,000.00
250,000.00
45,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

900,000.00
250,000.00
45,000.00
1,195,000.00
3,265,600.00

1,437,000.00 = Rp.
287,400.00 = Rp.
Jumlah I = Rp.

1,437,000.00
287,400.00
1,724,400.00

450,000.00
200,000.00
45,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

900,000.00
200,000.00
45,000.00
1,145,000.00
2,869,400.00

@ Rp.
@ Rp.

1,756,000.00 = Rp.
351,200.00 = Rp.
Jumlah I = Rp.

1,756,000.00
351,200.00
2,107,200.00

@ Rp.

400,000.00 = Rp.

1,200,000.00

@ Rp.

40,000.00 = Rp.
Jumlah II = Rp.
JumlahI + II = Rp.

40,000.00
1,240,000.00
3,347,200.00

@ Rp.
@ Rp.

1,432,000.00 = Rp.
286,400.00 = Rp.
Jumlah I = Rp.

1,432,000.00
286,400.00
1,718,400.00

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

400,000.00
350,000.00
40,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

800,000.00
350,000.00
40,000.00
1,190,000.00
2,908,400.00

1,260,000.00 = Rp.
252,000.00 = Rp.
Jumlah I = Rp.

1,260,000.00
252,000.00
1,512,000.00

400,000.00
200,000.00
40,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

800,000.00
200,000.00
40,000.00
1,040,000.00
2,552,000.00

1,137,000.00 = Rp.
227,400.00 = Rp.
Jumlah I = Rp.

1,137,000.00
227,400.00
1,364,400.00

400,000.00
175,000.00
40,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

800,000.00
175,000.00
40,000.00
1,015,000.00
2,379,400.00

1,080,000.00 = Rp.
216,000.00 = Rp.
Jumlah I = Rp.

1,080,000.00
216,000.00
1,296,000.00

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.

450,000.00
200,000.00
45,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

900,000.00
200,000.00
45,000.00
1,145,000.00
2,441,000.00

1,456,000.00 = Rp.
291,200.00 = Rp.
Jumlah I = Rp.

1,456,000.00
291,200.00
1,747,200.00

400,000.00
40,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.

1,200,000.00
40,000.00
1,240,000.00
2,987,200.00

1,345,000.00 = Rp.
269,000.00 = Rp.
Jumlah I = Rp.

1,345,000.00
269,000.00
1,614,000.00

350,000.00
300,000.00
35,000.00
Jumlah II
JumlahI + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

700,000.00
300,000.00
35,000.00
1,035,000.00
2,649,000.00

1,210,000.00 = Rp.
242,000.00 = Rp.
Jumlah I = Rp.

1,210,000.00
242,000.00
1,452,000.00

350,000.00
250,000.00
35,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

700,000.00
250,000.00
35,000.00
985,000.00
2,437,000.00

1,056,000.00 = Rp.

1,056,000.00

@ Rp.

211,200.00 = Rp.
Jumlah I = Rp.

211,200.00
1,267,200.00

@ Rp.
@ Rp.
@ Rp.

350,000.00
200,000.00
35,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

700,000.00
200,000.00
35,000.00
935,000.00
2,202,200.00

1,087,000.00 = Rp.
217,400.00 = Rp.
Jumlah I = Rp.

1,087,000.00
217,400.00
1,304,400.00

@ Rp.
@ Rp.

=
=
=
=
=

@ Rp.
@ Rp.

300,000.00
30,000.00
Jumlah II
JumlahI + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

900,000.00
30,000.00
930,000.00
2,234,400.00

@ Rp.
@ Rp.

965,000.00 = Rp.
193,000.00 = Rp.
Jumlah I = Rp.

965,000.00
193,000.00
1,158,000.00

@ Rp.
@ Rp.
@ Rp.

300,000.00
200,000.00
30,000.00
Jumlah II
JumlahI + II

Rp.
Rp.
Rp.
Rp.
Rp.

600,000.00
200,000.00
30,000.00
830,000.00
1,988,000.00

@ Rp.
@ Rp.

824,000.00 = Rp.
164,800.00 = Rp.
Jumlah I = Rp.

824,000.00
164,800.00
988,800.00

@ Rp.
@ Rp.
@ Rp.

300,000.00
200,000.00
30,000.00
Jumlah II
JumlahI + II

=
=
=
=
=

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

600,000.00
200,000.00
30,000.00
830,000.00
1,818,800.00

@ Rp.
@ Rp.

870,000.00 = Rp.
174,000.00 = Rp.
Jumlah I = Rp.

870,000.00
174,000.00
1,044,000.00

@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,294.82
72,139.04
59,597.71
76,563.42
271,595.00
1,315,595.00

@ Rp.
@ Rp.

825,000.00 = Rp.
165,000.00 = Rp.
Jumlah I = Rp.

825,000.00
165,000.00
990,000.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
7,500.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

mm x 90 mm

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,294.82
72,139.04
59,597.71
76,563.42
7,500.00
279,095.00
1,269,095.00

@ Rp.
@ Rp.

780,000.00 = Rp.
156,000.00 = Rp.
Jumlah I = Rp.

780,000.00
156,000.00
936,000.00

@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,294.82
72,139.04
59,597.71
76,563.42
271,595.00
1,207,595.00

00 mm lengkap dengan mur, bout, ring dan seal


@ Rp.
@ Rp.

1,433,000.00 = Rp.
286,600.00 = Rp.
Jumlah I = Rp.

1,433,000.00
286,600.00
1,719,600.00

@ Rp.
@ Rp.

500,000.00
50,000.00
Jumlah II
JumlahI + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

500,000.00
50,000.00
550,000.00
2,269,600.00

50 mm lengkap dengan mur, bout, ring dan seal


ap dengan mur, bout, ring dan seal
@ Rp.
1,242,000.00 = Rp.
1,242,000.00
@ Rp.
248,400.00 = Rp.
248,400.00
Jumlah I = Rp.
1,490,400.00
50 mm lengkap dengan mur, bout, ring dan seal
@ Rp.
450,000.00 = Rp.
450,000.00
@ Rp.
45,000.00 = Rp.
45,000.00
Jumlah II = Rp.
495,000.00
JumlahI + II = Rp.
1,985,400.00

00 mm lengkap dengan mur, bout, ring dan seal


ap dengan mur, bout, ring dan seal
@ Rp.
1,080,000.00 = Rp.
1,080,000.00
@ Rp.
216,000.00 = Rp.
216,000.00
Jumlah I = Rp.
1,296,000.00
00 mm lengkap dengan mur, bout, ring dan seal
@ Rp.
400,000.00 = Rp.
400,000.00
@ Rp.
40,000.00 = Rp.
40,000.00
Jumlah II = Rp.
440,000.00
JumlahI + II = Rp.
1,736,000.00

60 mm lengkap dengan mur, bout, ring dan seal


ap dengan mur, bout, ring dan seal
@ Rp.
965,000.00 = Rp.
965,000.00
@ Rp.
193,000.00 = Rp.
193,000.00
Jumlah I = Rp.
1,158,000.00
60 mm lengkap dengan mur, bout, ring dan seal
@ Rp.
350,000.00 = Rp.
350,000.00
@ Rp.
35,000.00 = Rp.
35,000.00
Jumlah II = Rp.
385,000.00
JumlahI + II = Rp.
1,543,000.00

10 mm lengkap dengan mur, bout, ring dan seal


ap dengan mur, bout, ring dan seal
@ Rp.
875,000.00 = Rp.
875,000.00
@ Rp.
175,000.00 = Rp.
175,000.00
Jumlah I = Rp.
1,050,000.00
10 mm lengkap dengan mur, bout, ring dan seal
@ Rp.
300,000.00 = Rp.
300,000.00

@ Rp.

30,000.00 = Rp.
Jumlah II = Rp.
JumlahI + II = Rp.

0 mm lengkap dengan mur, bout, ring dan seal


ap dengan mur, bout, ring dan seal
@ Rp.
720,000.00 = Rp.
@ Rp.
144,000.00 = Rp.
Jumlah I = Rp.
0 mm lengkap dengan mur, bout, ring dan seal
@ Rp.
250,000.00 = Rp.
@ Rp.
25,000.00 = Rp.
Jumlah II = Rp.
JumlahI + II = Rp.

3 mm lengkap dengan mur, bout, ring dan seal


p dengan mur, bout, ring dan seal
@ Rp.
685,000.00 = Rp.
@ Rp.
137,000.00 = Rp.
Jumlah I = Rp.
3 mm lengkap dengan mur, bout, ring dan seal
@ Rp.
200,000.00 = Rp.
@ Rp.
20,000.00 = Rp.
Jumlah II = Rp.
JumlahI + II = Rp.

30,000.00
330,000.00
1,380,000.00

720,000.00
144,000.00
864,000.00
250,000.00
25,000.00
275,000.00
1,139,000.00

685,000.00
137,000.00
822,000.00
200,000.00
20,000.00
220,000.00
1,042,000.00

n mur, bout, ring dan seal


@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

9,500,000.00 = Rp.
1,900,000.00 = Rp.
Jumlah I = Rp.
76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

=
=
=
=
=
=

9,500,000.00
1,900,000.00
11,400,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
11,733,240.19

8,750,000.00 = Rp.
1,750,000.00 = Rp.
Jumlah I = Rp.

8,750,000.00
1,750,000.00
10,500,000.00

n mur, bout, ring dan seal


@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
10,833,240.19

7,775,000.00 = Rp.
1,555,000.00 = Rp.
Jumlah I = Rp.

7,775,000.00
1,555,000.00
9,330,000.00

n mur, bout, ring dan seal


@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
9,663,240.19

6,800,000.00 = Rp.
1,360,000.00 = Rp.
Jumlah I = Rp.

6,800,000.00
1,360,000.00
8,160,000.00

n mur, bout, ring dan seal


@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
8,493,240.19

5,600,000.00 = Rp.
1,120,000.00 = Rp.
Jumlah I = Rp.

5,600,000.00
1,120,000.00
6,720,000.00

n mur, bout, ring dan seal


@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
7,053,240.19

mur, bout, ring dan seal


@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

4,775,000.00 = Rp.
955,000.00 = Rp.
Jumlah I = Rp.
76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

=
=
=
=
=
=

4,775,000.00
955,000.00
5,730,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
6,063,240.19

3,850,000.00 = Rp.
770,000.00 = Rp.
Jumlah I = Rp.

3,850,000.00
770,000.00
4,620,000.00

mur, bout, ring dan seal


@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
4,953,240.19

= Rp.
= Rp.
= Rp.

12,700,000.00
2,540,000.00
15,240,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
15,573,240.19

dengan mur, bout, ring dan seal


bout, ring dan seal
@ Rp. 10,200,000.00 = Rp.
@ Rp.
2,040,000.00 = Rp.
Jumlah I = Rp.

10,200,000.00
2,040,000.00
12,240,000.00

dengan mur, bout, ring dan seal


bout, ring dan seal
@ Rp. 12,700,000.00
@ Rp.
2,540,000.00
Jumlah I
ring dan seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
Jumlah II
Jumlah I+II

=
=
=
=
=
=

ring dan seal


@
@
@
@

Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
Jumlah II
Jumlah I+II

dengan mur, bout, ring dan seal


bout, ring dan seal
@ Rp.
7,200,000.00
@ Rp.
1,440,000.00
Jumlah I
ring dan seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
Jumlah II
Jumlah I+II

engan mur, bout, ring dan seal


out, ring dan seal
@ Rp.
4,350,000.00
@ Rp.
870,000.00
Jumlah I
ng dan seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
Jumlah II
Jumlah I+II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
12,573,240.19

= Rp.
= Rp.
= Rp.

7,200,000.00
1,440,000.00
8,640,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
8,973,240.19

= Rp.
= Rp.
= Rp.

4,350,000.00
870,000.00
5,220,000.00

=
=
=
=
=
=

91,252.22
79,694.04
85,730.51
76,563.42
333,240.19
5,553,240.19

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

40,700.00 = Rp.
8,140.00 = Rp.
Jumlah I = Rp.
76,043.52
88,548.93
71,442.09
92,605.47
7,500.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,700.00
8,140.00
48,840.00
63,294.82
72,139.04
59,597.71
76,563.42
7,500.00
279,095.00
327,935.00

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

2,263,300.00 = Rp.
452,660.00 = Rp.
Jumlah I = Rp.
76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

2,263,300.00
452,660.00
2,715,960.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,241.34
77,568.86
64,083.55
82,326.26
25,000.00
321,220.02
3,037,180.02

2,263,300.00 = Rp.
452,660.00 = Rp.
Jumlah I = Rp.

2,263,300.00
452,660.00
2,715,960.00

x 300 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,241.34
77,568.86
64,083.55
82,326.26
25,000.00
321,220.02
3,037,180.02

2,263,300.00 = Rp.
452,660.00 = Rp.
Jumlah I = Rp.

2,263,300.00
452,660.00
2,715,960.00

x 300 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,241.34
77,568.86
64,083.55
82,326.26
25,000.00
321,220.02
3,037,180.02

2,263,300.00 = Rp.

2,263,300.00

x 300 mm
@ Rp.

@ Rp.

452,660.00 = Rp.
Jumlah I = Rp.

452,660.00
2,715,960.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,241.34
77,568.86
64,083.55
82,326.26
25,000.00
321,220.02
3,037,180.02

2,263,300.00 = Rp.
452,660.00 = Rp.
Jumlah I = Rp.

2,263,300.00
452,660.00
2,715,960.00

Rp.
Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=
=

300 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,241.34
77,568.86
64,083.55
82,326.26
25,000.00
321,220.02
3,037,180.02

2,263,300.00 = Rp.
452,660.00 = Rp.
Jumlah I = Rp.

2,263,300.00
452,660.00
2,715,960.00

300 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,241.34
77,568.86
64,083.55
82,326.26
25,000.00
321,220.02
3,037,180.02

2,150,000.00 = Rp.
430,000.00 = Rp.
Jumlah I = Rp.

2,150,000.00
430,000.00
2,580,000.00

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,100.69
76,793.17
63,442.72
81,503.00
25,000.00
317,839.58
2,897,839.58

2,150,000.00 = Rp.
430,000.00 = Rp.
Jumlah I = Rp.

2,150,000.00
430,000.00
2,580,000.00

x 250 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,100.69
76,793.17
63,442.72
81,503.00
25,000.00
317,839.58
2,897,839.58

2,150,000.00 = Rp.
430,000.00 = Rp.
Jumlah I = Rp.

2,150,000.00
430,000.00
2,580,000.00

x 250 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,100.69
76,793.17
63,442.72
81,503.00
25,000.00
317,839.58
2,897,839.58

@ Rp.
@ Rp.

2,150,000.00 = Rp.
430,000.00 = Rp.
Jumlah I = Rp.

2,150,000.00
430,000.00
2,580,000.00

@ Rp.
@ Rp.
@ Rp.

76,043.52 = Rp.
88,548.93 = Rp.
71,442.09 = Rp.

71,100.69
76,793.17
63,442.72

x 250 mm

@ Rp.
@ Rp.

92,605.47
25,000.00
Jumlah II
Jumlah I+II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

81,503.00
25,000.00
317,839.58
2,897,839.58

2,150,000.00 = Rp.
430,000.00 = Rp.
Jumlah I = Rp.

2,150,000.00
430,000.00
2,580,000.00

250 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,100.69
76,793.17
63,442.72
81,503.00
25,000.00
317,839.58
2,897,839.58

2,150,000.00 = Rp.
430,000.00 = Rp.
Jumlah I = Rp.

2,150,000.00
430,000.00
2,580,000.00

250 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,100.69
76,793.17
63,442.72
81,503.00
25,000.00
317,839.58
2,897,839.58

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.

2,125,000.00
425,000.00
2,550,000.00

76,043.52
88,548.93
71,442.09
92,605.47
20,000.00
Jumlah II

=
=
=
=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,024.65
76,017.49
62,801.88
80,679.74
20,000.00
310,523.75

Jumlah I+II = Rp.

2,860,523.75

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.

2,125,000.00
425,000.00
2,550,000.00

x 200 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
20,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,024.65
76,017.49
62,801.88
80,679.74
20,000.00
310,523.75
2,860,523.75

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.

2,125,000.00
425,000.00
2,550,000.00

x 200 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
20,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,024.65
76,017.49
62,801.88
80,679.74
20,000.00
310,523.75
2,860,523.75

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.

2,125,000.00
425,000.00
2,550,000.00

200 mm
@ Rp.
@ Rp.

@
@
@
@
@

200 mm

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
20,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,024.65
76,017.49
62,801.88
80,679.74
20,000.00
310,523.75
2,860,523.75

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.
76,043.52
88,548.93
71,442.09
92,605.47
20,000.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,024.65
76,017.49
62,801.88
80,679.74
20,000.00
310,523.75
2,860,523.75

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.

2,125,000.00
425,000.00
2,550,000.00

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

2,125,000.00
425,000.00
2,550,000.00

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

70,948.60
75,784.78
62,609.63
80,432.76
15,000.00
304,775.77
2,854,775.77

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.

2,125,000.00
425,000.00
2,550,000.00

x 160 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

70,948.60
75,784.78
62,609.63
80,432.76
15,000.00
304,775.77
2,854,775.77

2,125,000.00 = Rp.
425,000.00 = Rp.

2,125,000.00
425,000.00

160 mm
@ Rp.
@ Rp.

Jumlah I = Rp.
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

2,550,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

70,948.60
75,784.78
62,609.63
80,432.76
15,000.00
304,775.77
2,854,775.77

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.

2,125,000.00
425,000.00
2,550,000.00

160 mm
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

70,948.60
75,784.78
62,609.63
80,432.76
15,000.00
304,775.77
2,854,775.77

@ Rp.
@ Rp.

302,400.00 = Rp.
60,480.00 = Rp.
Jumlah I = Rp.

302,400.00
60,480.00
362,880.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
10,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

69,199.60
73,690.42
60,879.38
78,209.95
10,000.00
291,979.35
654,859.35

@ Rp.
@ Rp.

302,400.00 = Rp.
60,480.00 = Rp.
Jumlah I = Rp.

302,400.00
60,480.00
362,880.00

@ Rp.

76,043.52 = Rp.

69,199.60

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

110 mm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

88,548.93
71,442.09
92,605.47
10,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

73,690.42
60,879.38
78,209.95
10,000.00
291,979.35
654,859.35

@ Rp.
@ Rp.

302,400.00 = Rp.
60,480.00 = Rp.
Jumlah I = Rp.

302,400.00
60,480.00
362,880.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
10,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

69,199.60
73,690.42
60,879.38
78,209.95
10,000.00
291,979.35
654,859.35

@ Rp.
@ Rp.

172,600.00 = Rp.
34,520.00 = Rp.
Jumlah I = Rp.

172,600.00
34,520.00
207,120.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
7,500.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,439.17
72,914.73
60,238.54
77,386.69
7,500.00
286,479.13
493,599.13

172,600.00 = Rp.
34,520.00 = Rp.
Jumlah I = Rp.

172,600.00
34,520.00
207,120.00

110 mm

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47

=
=
=
=
=
=
=

=
=
=
=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

68,439.17
72,914.73
60,238.54
77,386.69

@ Rp.

7,500.00 = Rp.
Jumlah = Rp.
Jumlah I+II = Rp.

7,500.00
286,479.13
493,599.13

@ Rp.
@ Rp.

127,000.00 = Rp.
25,400.00 = Rp.
Jumlah I = Rp.

127,000.00
25,400.00
152,400.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,157.86
72,139.04
59,597.71
76,563.42
5,000.00
279,458.04
431,858.04

75,000.00 = Rp.
15,000.00 = Rp.
Jumlah I = Rp.

75,000.00
15,000.00
90,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,157.86
72,139.04
59,597.71
76,563.42
5,000.00
279,458.04
369,458.04

75,000.00 = Rp.
15,000.00 = Rp.
Jumlah I = Rp.

75,000.00
15,000.00
90,000.00

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,157.86
72,139.04
59,597.71
76,563.42
5,000.00
279,458.04
369,458.04

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00 = Rp.
15,000.00 = Rp.
Jumlah I = Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,157.86
72,139.04
59,597.71
76,563.42
5,000.00
279,458.04
369,458.04

@ Rp.
@ Rp.

220,300.00 = Rp.
44,060.00 = Rp.
Jumlah I = Rp.

220,300.00
44,060.00
264,360.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,626.11
35,419.57
32,148.94
32,411.91
15,000.00
160,606.54
424,966.54

@ Rp.
@ Rp.

220,300.00 = Rp.
44,060.00 = Rp.
Jumlah I = Rp.

220,300.00
44,060.00
264,360.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah
Jumlah I+II

45,626.11
35,419.57
32,148.94
32,411.91
15,000.00
160,606.54
424,966.54

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

75,000.00
15,000.00
90,000.00

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

220,300.00 = Rp.
44,060.00 = Rp.
Jumlah I = Rp.

220,300.00
44,060.00
264,360.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,626.11
35,419.57
32,148.94
32,411.91
15,000.00
160,606.54
424,966.54

@ Rp.
@ Rp.

220,300.00 = Rp.
44,060.00 = Rp.
Jumlah I = Rp.

220,300.00
44,060.00
264,360.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,626.11
35,419.57
32,148.94
32,411.91
15,000.00
160,606.54
424,966.54

@ Rp.
@ Rp.

220,300.00 = Rp.
44,060.00 = Rp.
Jumlah I = Rp.

220,300.00
44,060.00
264,360.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,626.11
35,419.57
32,148.94
32,411.91
15,000.00
160,606.54
424,966.54

220,300.00 = Rp.
44,060.00 = Rp.
Jumlah I = Rp.

220,300.00
44,060.00
264,360.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

=
=
=
=
=
=
=

=
=
=
=
=
=
=

=
=
=
=
=
=
=

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,626.11
35,419.57
32,148.94
32,411.91
15,000.00
160,606.54
424,966.54

@ Rp.
@ Rp.

220,300.00 = Rp.
44,060.00 = Rp.
Jumlah I = Rp.

220,300.00
44,060.00
264,360.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,626.11
35,419.57
32,148.94
32,411.91
15,000.00
160,606.54
424,966.54

1,082,300.00 = Rp.
216,460.00 = Rp.
Jumlah I = Rp.

1,082,300.00
216,460.00
1,298,760.00

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah
Jumlah I+II

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,233.91
70,219.30
54,438.87
72,695.29
25,000.00
288,587.37
1,587,347.37

@ Rp.
@ Rp.

952,300.00 = Rp.
190,460.00 = Rp.
Jumlah I = Rp.

952,300.00
190,460.00
1,142,760.00

@ Rp.
@ Rp.

76,043.52 = Rp.
88,548.93 = Rp.

66,233.91
70,219.30

@ Rp.
@ Rp.
@ Rp.

71,442.09
92,605.47
25,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.

54,438.87
72,695.29
25,000.00
288,587.37
1,431,347.37

@ Rp.
@ Rp.

590,300.00 = Rp.
118,060.00 = Rp.
Jumlah I = Rp.

590,300.00
118,060.00
708,360.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
20,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,397.43
70,219.30
54,367.43
71,954.45
20,000.00
281,938.61
990,298.61

@ Rp.
@ Rp.

520,000.00 = Rp.
104,000.00 = Rp.
Jumlah I = Rp.

520,000.00
104,000.00
624,000.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
20,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

64,865.12
70,042.20
54,224.55
71,769.24
20,000.00
280,901.11
904,901.11

@ Rp.
@ Rp.

380,300.00 = Rp.
76,060.00 = Rp.
Jumlah I = Rp.

380,300.00
76,060.00
456,360.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
20,000.00
Jumlah
Jumlah I+II

64,789.08
69,333.81
54,010.22
71,491.42
20,000.00
279,624.53
735,984.53

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

=
=
=
=
=

=
=
=
=
=
=
=

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

310,500.00 = Rp.
62,100.00 = Rp.
Jumlah I = Rp.

310,500.00
62,100.00
372,600.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

64,636.99
69,156.71
53,867.34
71,306.21
15,000.00
273,967.25
646,567.25

@ Rp.
@ Rp.

169,200.00 = Rp.
33,840.00 = Rp.
Jumlah I = Rp.

169,200.00
33,840.00
203,040.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
10,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,549.63
65,867.12
51,309.71
67,916.85
10,000.00
256,643.31
459,683.31

@ Rp.
@ Rp.

129,500.00 = Rp.
25,900.00 = Rp.
Jumlah I = Rp.

129,500.00
25,900.00
155,400.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
10,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=
=

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

60,253.84
64,480.45
50,229.50
66,487.02
10,000.00
251,450.82
406,850.82

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

95,600.00 = Rp.
19,120.00 = Rp.
Jumlah I = Rp.
76,043.52
88,548.93
71,442.09
92,605.47
7,500.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

59,605.95
63,787.11
49,689.40
65,772.11
7,500.00
246,354.57
361,074.57

60,400.00 = Rp.
12,080.00 = Rp.
Jumlah I = Rp.

60,400.00
12,080.00
72,480.00

76,043.52
88,548.93
71,442.09
92,605.47
6,000.00
Jumlah I+II
Jumlah I+II

=
=
=
=
=
=
=

95,600.00
19,120.00
114,720.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58,958.06
63,093.77
49,149.30
65,057.19
6,000.00
242,258.33
314,738.33

56,300.00 = Rp.
11,260.00 = Rp.
Jumlah I = Rp.

56,300.00
11,260.00
67,560.00

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58,310.17
62,400.43
48,609.20
64,342.28
5,000.00
238,662.08
306,222.08

p dengan Mur, Bout, Ring dan Seal


, Bout, Ring dan Seal
@ Rp.
4,250,000.00 = Rp.
@ Rp.
850,000.00 = Rp.
Jumlah I = Rp.

4,250,000.00
850,000.00
5,100,000.00

ur, Bout, Ring dan Seal


@ Rp.
76,043.52 = Rp.
@ Rp.
88,548.93 = Rp.
@ Rp.
71,442.09 = Rp.
@ Rp.
92,605.47 = Rp.
@ Rp.
25,000.00 = Rp.
Jumlah = Rp.
Jumlah I+II = Rp.

p dengan Mur, Bout, Ring dan Seal


, Bout, Ring dan Seal
@ Rp.
3,750,000.00
@ Rp.
750,000.00
Jumlah I
ur, Bout, Ring dan Seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
@ Rp.
25,000.00
Jumlah
Jumlah I+II

74,066.39
86,158.11
68,727.29
80,844.58
25,000.00
334,796.36
5,434,796.36

= Rp.
= Rp.
= Rp.

3,750,000.00
750,000.00
4,500,000.00

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

74,066.39
86,158.11
68,727.29
80,844.58
25,000.00
334,796.36
4,834,796.36

= Rp.
= Rp.
= Rp.

3,750,000.00
750,000.00
4,500,000.00

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

74,066.39
86,158.11
68,727.29
80,844.58
20,000.00
329,796.36
4,829,796.36

p dengan Mur, Bout, Ring dan Seal


, Bout, Ring dan Seal
@ Rp.
3,000,000.00 = Rp.
@ Rp.
600,000.00 = Rp.
Jumlah I = Rp.

3,000,000.00
600,000.00
3,600,000.00

p dengan Mur, Bout, Ring dan Seal


r, Bout, Ring dan Seal
@ Rp.
3,750,000.00
@ Rp.
750,000.00
Jumlah I
ur, Bout, Ring dan Seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
@ Rp.
20,000.00
Jumlah
Jumlah I+II

ur, Bout, Ring dan Seal

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
15,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

70,188.17
83,413.09
65,798.16
78,899.86
15,000.00
313,299.29
3,913,299.29

= Rp.
= Rp.
= Rp.

2,500,000.00
500,000.00
3,000,000.00

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,678.76
79,242.44
62,508.26
74,954.87
10,000.00
293,384.32
3,293,384.32

dengan Mur, Bout, Ring dan Seal


engan Mur, Bout, Ring dan Seal
@ Rp.
2,000,000.00 = Rp.
@ Rp.
400,000.00 = Rp.
Jumlah I = Rp.

2,000,000.00
400,000.00
2,400,000.00

p dengan Mur, Bout, Ring dan Seal


, Bout, Ring dan Seal
@ Rp.
2,500,000.00
@ Rp.
500,000.00
Jumlah I
ur, Bout, Ring dan Seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
@ Rp.
10,000.00
Jumlah
Jumlah I+II

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
8,000.00
Jumlah
Jumlah I+II

dengan Mur, Bout, Ring dan Seal


Bout, Ring dan Seal
@ Rp.
1,500,000.00
@ Rp.
300,000.00
Jumlah I
r, Bout, Ring dan Seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

64,573.12
76,740.04
60,534.31
72,587.87
8,000.00
282,435.34
2,682,435.34

= Rp.
= Rp.
= Rp.

1,500,000.00
300,000.00
1,800,000.00

= Rp.
= Rp.
= Rp.

63,169.35
75,071.78
59,218.35

@ Rp.
@ Rp.

92,605.47
5,000.00
Jumlah
Jumlah I+II

Rp.
Rp.
Rp.
Rp.

71,009.87
5,000.00
273,469.36
2,073,469.36

@ Rp.
@ Rp.

800,000.00 = Rp.
160,000.00 = Rp.
Jumlah I = Rp.

800,000.00
160,000.00
960,000.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,169.35
75,071.78
59,218.35
71,009.87
5,000.00
273,469.36
1,233,469.36

1,000,000.00 = Rp.
200,000.00 = Rp.
Jumlah I = Rp.

1,000,000.00
200,000.00
1,200,000.00

76,043.52
88,548.93
71,442.09
92,605.47
7,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,169.35
75,071.78
59,218.35
71,009.87
7,000.00
275,469.36
1,475,469.36

600,000.00 = Rp.
120,000.00 = Rp.
Jumlah I = Rp.

600,000.00
120,000.00
720,000.00

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah II

=
=
=
=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,169.35
75,071.78
59,218.35
71,009.87
5,000.00
273,469.36

Jumlah I+II = Rp.

993,469.36

@ Rp.
@ Rp.

800,000.00 = Rp.
160,000.00 = Rp.
Jumlah I = Rp.

800,000.00
160,000.00
960,000.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
7,000.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,169.35
75,071.78
59,218.35
71,009.87
7,000.00
275,469.36
1,235,469.36

@ Rp.
@ Rp.

850,000.00 = Rp.
170,000.00 = Rp.
Jumlah I = Rp.

850,000.00
170,000.00
1,020,000.00

@
@
@
@
@

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,169.35
75,071.78
59,218.35
71,009.87
5,000.00
273,469.36
1,293,469.36

1,000,000.00 = Rp.
200,000.00 = Rp.
Jumlah I = Rp.

1,000,000.00
200,000.00
1,200,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
7,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

64,573.12
76,740.04
60,534.31
72,587.87
7,000.00
281,435.34
1,481,435.34

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

1,500,000.00 = Rp.
300,000.00 = Rp.
Jumlah I = Rp.
76,043.52
88,548.93
71,442.09
92,605.47
10,000.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,678.76
79,242.44
62,508.26
74,954.87
10,000.00
293,384.32
2,093,384.32

1,500,000.00 = Rp.
300,000.00 = Rp.
Jumlah I = Rp.

1,500,000.00
300,000.00
1,800,000.00

76,043.52
88,548.93
71,442.09
92,605.47
10,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

1,500,000.00
300,000.00
1,800,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,678.76
79,242.44
62,508.26
74,954.87
10,000.00
293,384.32
2,093,384.32

1,500,000.00 = Rp.
300,000.00 = Rp.
Jumlah I = Rp.

1,500,000.00
300,000.00
1,800,000.00

76,043.52
88,548.93
71,442.09
92,605.47
10,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,678.76
79,242.44
62,508.26
74,954.87
10,000.00
293,384.32
2,093,384.32

1,500,000.00 = Rp.
300,000.00 = Rp.
Jumlah I = Rp.

1,500,000.00
300,000.00
1,800,000.00

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
10,000.00
Jumlah II
Jumlah I+II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,678.76
79,242.44
62,508.26
74,954.87
10,000.00
293,384.32
2,093,384.32

5,700,000.00 = Rp.
1,140,000.00 = Rp.
Jumlah I = Rp.

5,700,000.00
1,140,000.00
6,840,000.00

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II
Jumlah I+II

ngkap dengan mur, bout, ring dan


n mur, bout, ring dan seal
@ Rp.
892,400.00
@ Rp.
178,480.00
Jumlah I
gan mur, bout, ring dan seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
@ Rp.
25,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

70,188.17
83,413.09
65,798.16
78,899.86
25,000.00
323,299.29
7,163,299.29

seal
= Rp.
= Rp.
= Rp.

892,400.00
178,480.00
1,070,880.00

=
=
=
=
=
=
=

44,865.68
48,701.91
40,007.57
44,450.63
25,000.00
203,025.78
1,273,905.78

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ngkap dengan mur, bout, ring dan seal


gkap dengan mur, bout, ring dan seal
@ Rp.
622,400.00 = Rp.
@ Rp.
124,480.00 = Rp.
Jumlah I = Rp.
gan mur, bout, ring dan seal
@ Rp.
76,043.52 = Rp.
@ Rp.
88,548.93 = Rp.

622,400.00
124,480.00
746,880.00
44,105.24
45,159.95

@ Rp.
@ Rp.
@ Rp.

71,442.09
92,605.47
25,000.00
Jumlah II
Jumlah I+II

ngkap dengan mur, bout, ring dan


n mur, bout, ring dan seal
@ Rp.
572,400.00
@ Rp.
114,480.00
Jumlah I
gan mur, bout, ring dan seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
@ Rp.
20,000.00
Jumlah II
Jumlah I+II
ngkap dengan mur, bout, ring dan
n mur, bout, ring dan seal
@ Rp.
355,100.00
@ Rp.
71,020.00
Jumlah I
gan mur, bout, ring dan seal
@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
@ Rp.
15,000.00
Jumlah II
Jumlah I+II
ngkap dengan mur, bout, ring dan
n mur, bout, ring dan seal
@ Rp.
192,600.00
@ Rp.
38,520.00
Jumlah I

gan mur, bout, ring dan seal


@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
@ Rp.
10,000.00
Jumlah II

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

40,007.57
44,450.63
25,000.00
198,723.39
945,603.39

seal
= Rp.
= Rp.
= Rp.

572,400.00
114,480.00
686,880.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
seal

44,105.24
45,159.95
40,007.57
44,450.63
20,000.00
193,723.39
880,603.39

= Rp.
= Rp.
= Rp.

355,100.00
71,020.00
426,120.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
seal

41,823.94
44,274.47
39,293.15
41,672.46
15,000.00
182,064.01
608,184.01

= Rp.
= Rp.
= Rp.

192,600.00
38,520.00
231,120.00

=
=
=
=
=
=

39,732.74
42,060.74
37,328.49
39,588.84
10,000.00
168,710.81

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I+II = Rp.

gkap dengan mur, bout, ring dan seal


mur, bout, ring dan seal
@ Rp.
146,000.00 = Rp.
@ Rp.
29,200.00 = Rp.
Jumlah I = Rp.
an mur, bout, ring dan seal
@ Rp.
76,043.52 = Rp.
@ Rp.
88,548.93 = Rp.
@ Rp.
71,442.09 = Rp.
@ Rp.
92,605.47 = Rp.
@ Rp.
8,000.00 = Rp.
Jumlah II = Rp.
Jumlah I+II = Rp.

gkap dengan mur, bout, ring dan seal


mur, bout, ring dan seal
@ Rp.
106,100.00 = Rp.
@ Rp.
21,220.00 = Rp.
Jumlah I = Rp.
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

gkap dengan mur, bout, ring dan seal


mur, bout, ring dan seal
@ Rp.
892,400.00 =
@ Rp.
178,480.00 =
Jumlah I =
an mur, bout, ring dan seal
@ Rp.
76,043.52 =
@ Rp.
88,548.93 =
@ Rp.
71,442.09 =
@ Rp.
92,605.47 =
@ Rp.
25,000.00 =
Jumlah II
=
Jumlah I+II =

gkap dengan mur, bout, ring dan seal

399,830.81

146,000.00
29,200.00
175,200.00
38,478.02
40,732.51
36,149.70
38,338.66
8,000.00
161,698.89
336,898.89

106,100.00
21,220.00
127,320.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

37,641.54
39,847.02
35,363.83
37,505.22
5,000.00
155,357.61
282,677.61

Rp.
Rp.
Rp.

892,400.00
178,480.00
1,070,880.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,865.68
48,701.91
40,007.57
44,450.63
25,000.00
203,025.78
1,273,905.78

kap dengan mur, bout, ring dan seal


@ Rp.
622,400.00 =
@ Rp.
124,480.00 =
Jumlah I =
an mur, bout, ring dan seal
@ Rp.
76,043.52 =
@ Rp.
88,548.93 =
@ Rp.
71,442.09 =
@ Rp.
92,605.47 =
@ Rp.
25,000.00 =
Jumlah II
=
Jumlah I+II =

gkap dengan mur, bout, ring dan seal


mur, bout, ring dan seal
@ Rp.
572,400.00 =
@ Rp.
114,480.00 =
Jumlah I =
an mur, bout, ring dan seal
@ Rp.
76,043.52 =
@ Rp.
88,548.93 =
@ Rp.
71,442.09 =
@ Rp.
92,605.47 =
@ Rp.
20,000.00 =
Jumlah II
=
Jumlah I+II =
gkap dengan mur, bout, ring dan seal
mur, bout, ring dan seal
@ Rp.
355,100.00 =
@ Rp.
71,020.00 =
Jumlah I =
an mur, bout, ring dan seal
@ Rp.
76,043.52 =
@ Rp.
88,548.93 =
@ Rp.
71,442.09 =
@ Rp.
92,605.47 =
@ Rp.
15,000.00 =
Jumlah II
=
Jumlah I+II =
gkap dengan mur, bout, ring dan seal
mur, bout, ring dan seal
@ Rp.
192,600.00 =
@ Rp.
38,520.00 =
Jumlah I =

Rp.
Rp.
Rp.

622,400.00
124,480.00
746,880.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,105.24
45,159.95
40,007.57
44,450.63
25,000.00
198,723.39
945,603.39

Rp.
Rp.
Rp.

572,400.00
114,480.00
686,880.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,105.24
45,159.95
40,007.57
44,450.63
20,000.00
193,723.39
880,603.39

Rp.
Rp.
Rp.

355,100.00
71,020.00
426,120.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

41,823.94
44,274.47
39,293.15
41,672.46
15,000.00
182,064.01
608,184.01

Rp.
Rp.
Rp.

192,600.00
38,520.00
231,120.00

an mur, bout, ring dan seal


@ Rp.
76,043.52
@ Rp.
88,548.93
@ Rp.
71,442.09
@ Rp.
92,605.47
@ Rp.
10,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

39,732.74
42,060.74
37,328.49
39,588.84
10,000.00
168,710.81
399,830.81

Rp.
Rp.
Rp.

146,000.00
29,200.00
175,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

38,478.02
40,732.51
36,149.70
38,338.66
8,000.00
161,698.89
336,898.89

kap dengan mur, bout, ring dan seal


mur, bout, ring dan seal
@ Rp.
106,100.00 = Rp.
@ Rp.
21,220.00 = Rp.
Jumlah I = Rp.

106,100.00
21,220.00
127,320.00

kap dengan mur, bout, ring dan seal


mur, bout, ring dan seal
@ Rp.
146,000.00 =
@ Rp.
29,200.00 =
Jumlah I =
n mur, bout, ring dan seal
@ Rp.
76,043.52 =
@ Rp.
88,548.93 =
@ Rp.
71,442.09 =
@ Rp.
92,605.47 =
@ Rp.
8,000.00 =
Jumlah II =
Jumlah I+II =

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
5,000.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

37,641.54
39,847.02
35,363.83
37,505.22
5,000.00
155,357.61
282,677.61

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,105.24
45,159.95
40,007.57
44,450.63
25,000.00
198,723.39

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,105.24
45,159.95
40,007.57
44,450.63
25,000.00
198,723.39

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,105.24
45,159.95
40,007.57
44,450.63
25,000.00
198,723.39

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,105.24
45,159.95
40,007.57
44,450.63
25,000.00
198,723.39

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,105.24
45,159.95
40,007.57
44,450.63
25,000.00
198,723.39

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47
25,000.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,105.24
45,159.95
40,007.57
44,450.63
25,000.00
198,723.39

@
@
@
@

Rp.
Rp.
Rp.
Rp.

76,043.52
88,548.93
71,442.09
92,605.47

=
=
=
=

Rp.
Rp.
Rp.
Rp.

44,105.24
45,159.95
40,007.57
44,450.63

@ Rp.

25,000.00 = Rp.
Jumlah II = Rp.

25,000.00
198,723.39

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
71,442.09
103,622.58
45,000.00
2,500.00
1,200.00
25,000.00
Jumlah II

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,661.52
2,786.24
2,590.56
1,755.00
155.00
42.00
25,000.00
34,990.33

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
71,442.09
103,622.58
92,605.47
2,500.00
1,200.00
20,000.00
Jumlah II

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,509.44
2,643.36
2,383.32
3,426.40
150.00
39.60
20,000.00
31,152.12

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52
71,442.09
103,622.58
45,000.00
2,500.00
1,200.00
15,000.00
Jumlah II

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,281.31
2,429.03
1,968.83
1,440.00
137.50
36.00
15,000.00
23,292.67

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
45,444.48
31,850.31
579,060.00
1,251,120.00
50,000.00
Jumlah II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,815.56
545.33
6,370.06
127,393.20
25,022.40
50,000.00
221,146.56

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
215,250.00
1,251,120.00
33,735.28
820,820.10
579,060.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

681,667.13
86,100.00
2,627,352.00
33,735.28
1,477,476.17
9,264,960.00

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,500.00
9,250.00
9,250.00
9,250.00
9,250.00
250,000.00
14,850.00
4,250.00
280,350.00
60,200.00
750,000.00
350,000.00
100,000.00
1,000,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,468,500.00
40,376,250.00
2,756,500.00
2,904,500.00
2,451,250.00
500,000.00
475,200.00
408,000.00
280,350.00
120,400.00
750,000.00
350,000.00
100,000.00
1,000,000.00
500,000.00
74,612,240.57

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
215,250.00
1,251,120.00
33,735.28
820,820.10
579,060.00
6,500.00
9,250.00
9,250.00
9,250.00
9,250.00
250,000.00
14,850.00
4,250.00
280,350.00
60,200.00
750,000.00
350,000.00
100,000.00
1,000,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

363,555.80
107,625.00
3,002,688.00
50,602.92
615,615.07
16,213,680.00
5,603,000.00
30,275,250.00
2,072,000.00
2,173,750.00
1,813,000.00
500,000.00
163,350.00
136,000.00
280,350.00
120,400.00
750,000.00
350,000.00
100,000.00
1,000,000.00
500,000.00
66,190,866.79

@
@
@
@

Rp.
Rp.
Rp.
Rp.

45,444.48
215,250.00
1,251,120.00
33,735.28

=
=
=
=

Rp.
Rp.
Rp.
Rp.

124,972.31
96,862.50
1,563,900.00
25,301.46

@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

820,820.10
250,000.00
14,850.00
4,250.00
350,000.00
50,000.00
750,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

533,533.06
500,000.00
148,500.00
229,500.00
350,000.00
50,000.00
750,000.00
500,000.00
4,872,569.33

@
@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
215,250.00
1,251,120.00
33,735.28
820,820.10
250,000.00
14,850.00
4,250.00
350,000.00
50,000.00
300,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

113,611.19
86,100.00
1,563,900.00
11,807.35
533,533.06
500,000.00
801,900.00
4,250.00
350,000.00
50,000.00
300,000.00
500,000.00
4,815,101.60

@
@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
215,250.00
1,251,120.00
33,735.28
820,820.10
250,000.00
14,850.00
4,250.00
350,000.00
30,000.00
400,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

113,611.19
86,100.00
1,563,900.00
11,807.35
533,533.06
500,000.00
118,800.00
102,000.00
350,000.00
30,000.00
400,000.00
500,000.00
4,309,751.60

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
215,250.00
1,251,120.00
33,735.28
820,820.10
250,000.00
14,850.00

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

113,611.19
86,100.00
1,376,232.00
10,120.58
492,492.06
500,000.00
103,950.00

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

4,250.00
350,000.00
30,000.00
350,000.00
500,000.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

102,000.00
350,000.00
30,000.00
350,000.00
500,000.00
4,014,505.83

@
@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
215,250.00
1,251,120.00
33,735.28
820,820.10
250,000.00
14,850.00
4,250.00
350,000.00
30,000.00
300,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

113,611.19
86,100.00
1,376,232.00
10,120.58
492,492.06
500,000.00
133,650.00
229,500.00
350,000.00
30,000.00
300,000.00
500,000.00
4,121,705.83

@ Rp.
@ Rp.

47,583.33 = Rp.
47,583.33 = Rp.
Jumlah I
Rp.

57,100.00
16,654.17
73,754.17

@
@
@
@

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,136.48
6,182.55
751.79
2,032.80
12,103.62
85,857.79

@ Rp.
@ Rp.

19,333.33 = Rp.
19,333.33 = Rp.
Jumlah I
Rp.

23,200.00
6,766.67
29,966.67

@
@
@
@

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

3,136.48
6,182.55
751.79
2,032.80
12,103.62
42,070.29

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

45,666.67 = Rp.
45,666.67 = Rp.
Jumlah I
Rp.

54,800.00
15,983.33
70,783.33

@
@
@
@

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,136.48
6,182.55
751.79
2,032.80
12,103.62
82,886.96

@ Rp.
@ Rp.

55,000.00 = Rp.
55,000.00 = Rp.
Jumlah I
Rp.

66,000.00
19,250.00
85,250.00

@
@
@
@

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,272.96
12,365.10
1,503.58
406.56
20,548.20
105,798.20

@ Rp.
@ Rp.

71,666.67 = Rp.
71,666.67 = Rp.
Jumlah I
Rp.

86,000.00
25,083.33
111,083.33

@
@
@
@

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,272.96
12,365.10
1,503.58
406.56
20,548.20
131,631.53

@ Rp.
@ Rp.

112,166.67 = Rp.
112,166.67 = Rp.
Jumlah I
Rp.

134,600.00
39,258.33
173,858.33

@
@
@
@

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

7,841.21
15,456.38
1,879.47
511.97
25,689.02

Jumlah I + II

Rp.

199,547.35

@ Rp.
@ Rp.

2,750.00 = Rp.
2,750.00 = Rp.
Jumlah I
Rp.

3,300.00
962.50
4,262.50

@
@
@
@

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,090.99
4,121.70
501.19
135.52
6,849.40
11,111.90

@ Rp.
@ Rp.

13,833.33 = Rp.
13,833.33 = Rp.
Jumlah I
Rp.

16,600.00
4,841.67
21,441.67

@
@
@
@

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,090.99
4,121.70
501.19
135.52
6,849.40
28,291.07

24,354.00 = Rp.
24,354.00 = Rp.

Rp.

29,224.80
8,523.90
37,748.70

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,090.99
4,121.70
501.19
135.52
6,849.40
44,598.10

41,943.00 = Rp.
41,943.00 = Rp.

Rp.

50,331.60
14,680.05
65,011.65

58,083.00 = Rp.
68,695.00 = Rp.

2,090.99
4,121.70

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

=
=
=
=

=
=
=
=

Jumlah I
@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
@ Rp.
@ Rp.

=
=
=
=

@ Rp.
@ Rp.

83,532.00 = Rp.
75,289.00 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

501.19
135.52
6,849.40
71,861.05

@ Rp.
@ Rp.

34,501.50 = Rp.
34,501.50 = Rp.

Rp.

41,401.80
12,075.53
53,477.33

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,136.48
6,182.55
751.79
203.28
10,274.10
63,751.43

46,300.00 = Rp.
46,300.00 = Rp.

Rp.

55,560.00
16,205.00
71,765.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,704.72
9,273.83
1,127.68
308.68
15,414.91
87,179.91

@ Rp.
@ Rp.

191,898.43 = Rp.
191,898.43 = Rp.
Jumlah I
Rp.

230,278.11
67,164.45
297,442.56

@
@
@
@

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,704.72
9,273.83
1,127.68
308.68
15,414.91
312,857.48

36,900.00 = Rp.
7,500.00 = Rp.

36,900.00
187.50
37,087.50

Jumlah I
@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Jumlah I
@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I

=
=
=
=

=
=
=
=

Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

580.83
6,869.50
835.32
376.45
8,662.10
45,749.60

19,434.00 = Rp.

Rp.

19,434.00
19,434.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

580.83
6,869.50
835.32
376.45
8,662.10
28,096.10

Jumlah I
@
@
@
@

Rp.
Rp.
Rp.
Rp.

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

DAFTAR ANALISA HARGA SATUAN

A.
6

Analisa Biaya Konstruksi Pekerjaan Persiapan


1 M2 Pembuatan Gudang Semen dan alat - alat
Bahan
1.700
Btg
Dolken Kayu 0

Kayu
Paku Biasa
Seng Gelombang Bjls 32

@ Rp.
@ Rp.
@ Rp.

2.000
1.000
0.200
0.050

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

@
@
@
@

Oh
Oh

Pekerja
Mandor

@ Rp.
@ Rp.

PEKERJAAN TANAH
SNI 2835 : 2008 - 6.1
Galian Tanah Biasa sedalam 1 Meter
Tenaga
0.750
Oh
Pekerja
0.025
Oh
Mandor

@ Rp.
@ Rp.

SNI 2835 2008 - 6.5


Galian Tanah Cadas sedalam 1 Meter
Tenaga
1.500
Oh
Pekerja
0.060
Oh
Mandor

@ Rp.
@ Rp.

3.00 1 M2 Pembersihan Lokasi


SNI 2835 - 6
Tenaga
1.000
0.050

@ Rp.

M
Kg
Lbr

Tenaga

B.

8-10/400 Cm

2.300
0.300
1.500

Untuk urugan kembali


Galian
Galian
Galian
Galian
Galian
Galian

tanah
tanah
tanah
tanah
tanah
tanah

1
2
3
4
5
6

s/d
s/d
s/d
s/d
s/d
s/d

2
3
4
5
6
7

m
m
m
m
m
m

=
=
=
=
=
=

x
x
x
x
x
x

Rp.
Rp.
Rp.
Rp.

Galian tanah 8 s/d 9 m =


Galian tanah 9 s/d 10 m =
Galian tanah 10 s/d 11 m =
Galian tanah 11 s/d 12 m =
Galian tanah 12 s/d 13 m =
Galian tanah 13 s/d 14 m =
Galian tanah 14 s/d 15 m =
Galian tanah 15 s/d 16 m =
Galian tanah 16 s/d 17 m =
Galian tanah 17 s/d 18 m =
Maka galian tanah dari 0 s/d 18 m adalah

x
x
x
x
x
x
x
x
x
x

Galian tanah 1 s/d 2 m =


Galian tanah 2 s/d 3 m =
Galian tanah 3 s/d 4 m =
Galian tanah 4 s/d 5 m =
Galian tanah 5 s/d 6 m =
Galian tanah 6 s/d 7 m =
Galian tanah 7 s/d 8 m =
Maka galian tanah dari 0 s/d 8 m adalah

x
x
x
x
x
x
x

Galian Tanah Biasa sedalam 2 Meter


Tenaga
0.526
Oh
Pekerja
1.650
Oh
Tukang Gali
0.165
Oh
Kepala Tukang
0.052
Oh
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Galian Tanah Biasa sedalam 3 Meter


Tenaga
0.735
Oh
Pekerja
3.400
Oh
Tukang Gali
0.340
Oh
Kepala Tukang
0.073
Oh
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Galian Tanah Keras sedalam 1 Meter


Tenaga
0.625
Oh
Pekerja
1.650
Oh
Tukang Gali
0.165
Oh
Kepala Tukang
0.062
Oh
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Galian Tanah Cadas sedalam 1 Meter


Tenaga
1.250
Oh
Pekerja
1.650
Oh
Tukang Gali
0.165
Oh
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

0.125

Oh

Mandor

Galian Tanah Lumpur sedalam 1 Meter


Tenaga
0.823
Oh
Pekerja
1.650
Oh
Tukang Gali
0.165
Oh
Kepala Tukang
0.083
Oh
Mandor

9 1 M3 Urugan Kembali dan Pemadatan Tanah


SNI 2835 : 2008 - 6.10
Tenaga
0.500
Oh
Pekerja
0.050
Oh
Mandor

10.00 1 M3 Pemadatan Tanah


Tenaga
0.500
0.450
0.250
0.050

@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

Oh

Pasir Urug

@ Rp.

Oh
Oh

Pekerja
Mandor

@ Rp.
@ Rp.

Oh

Sirtu

@ Rp.

0.300
0.010

Oh
Oh

Pekerja
Mandor

@ Rp.
@ Rp.

12 Pemasangan Ijuk
AN - TAKSIRAN
Bahan
6.000

Ikat

Ijuk

@ Rp.

11 1 M3 Urugan Pasir
SNI 2835 ; 2008 - 6.11
Bahan
1.200

Tenaga

0.300
0.010

12 1 M3 Urugan Sirtu
SNI 2835 ; 2008 - 6.11
Bahan
1.200

Tenaga

Rp.
Rp.
Rp.
Rp.

Tenaga

0.250
0.025

Batu Pecah uk. 1 - 2 Cm


Supl. SNI 2835 - 6.9
Bahan
1.200

Tenaga

17

Pekerja
Mandor

@ Rp.
@ Rp.

M3

Batu Pecah uk. 1 - 2 Cm

@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Perbaikan Jalan Hotmix, Tebal 25 Cm


Bahan
0.275
M3
Batu Belah
0.030
M3
Kerikil
0.050
M3
Pasir
0.050
M3
Hotmix

Tenaga

0.284
0.286
1.432
0.143

Oh
Oh

1.000
2.100
0.040
0.100

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

Analisa Biaya Konstruksi Pekerjaan Pondasi


1 M3 Pasangan Susunan Batu Kali
Bahan

1.200

M3

Batu Belah 15 / 20

@ Rp.

Tenaga

0.780
0.300
0.039
0.039

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M3 Pasangan Pondasi Batu Kosong


SNI 2836 - 6.9
Bahan

1.200

M3

Batu Belah 15 cm/20cm

@ Rp.

0.432

M3

Pasir Urug

@ Rp.

Tenaga

0.780
0.390
0.039
0.039

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

7.00 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 4 Ps


SNI 6837 - 6.2
Bahan

Tenaga

C
1

M3
Kg

Batu
Semen Portland

@ Rp.
@ Rp.

0.520

M3

Pasir Pasang

@ Rp.

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Analisa Biaya Konstruksi Pekerjaan Beton


1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr
SNI 7394 - 6.2
Bahan
388.000
Kg
Semen Portland

Tenaga

18

1.100
163.000

@ Rp.

0.828

Pasir Beton

@ Rp.

0.650

M3

Koral Beton

@ Rp.

6.000
1.000
0.100
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton Kedap Air dengan Strorox - 100


Bahan
400.000
Kg
Semen Portland
0.480

0.800
1.200

M3
Kg

Rp.
Rp.
Rp.
Rp.

@ Rp.

Pasir Beton

@ Rp.

Koral Beton
Strorox - 100

@ Rp.
@ Rp.

Tenaga

28

10

11

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bekisting untuk Pondasi


Bahan

0.040
0.300
0.100

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.300
0.260
0.026
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bekisting untuk Sloof


Bahan

0.045
0.300
0.100

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.300
0.260
0.026
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bekisting untuk Kolom


Bahan

Tenaga

0.040
0.400
0.200

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.015
0.350
2.000

M3
Lbr
Btg

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m

@ Rp.
@ Rp.
@ Rp.

0.300
0.330

Oh
Oh

Pekerja
Tukang Kayu

@ Rp.
@ Rp.

0.033
0.006

12

Tenaga

@ Rp.
@ Rp.

0.040
0.400
0.200

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.018
0.350
2.000

M3
Lbr
Btg

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m

@ Rp.
@ Rp.
@ Rp.

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bekisting untuk Lantai


Bahan

Tenaga

14

Kepala Tukang
Mandor

1 M2 Pasangan Bekisting untuk Balok


Bahan

13

Oh
Oh

0.040
0.400
0.200

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.015
0.350
6.000

M3
Lbr
Btg

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m

@ Rp.
@ Rp.
@ Rp.

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bekisting untuk Dinding


Bahan

0.030
0.400
0.200

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.020
0.350
3.000
4.000

M3
Lbr
Btg
Bh

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m
Formtie/ Penjaga jarak Bekisting/ Sp

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Tenaga

15

Tenaga

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

0.030
0.400
0.150

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.015
0.350
2.000

M3
Lbr
Btg

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m

@ Rp.
@ Rp.
@ Rp.

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton dengan Mutu K225


Bahan
388.000
Kg
Semen Portland

Tenaga

Oh
Oh
Oh
Oh

1 M2 Pasangan Bekisting untuk Tangga


Bahan

0.320
0.330
0.033
0.006

@ Rp.

0.650

Pasir Beton

@ Rp.

0.650

M3

Koral Beton

@ Rp.

6.000
1.000
0.100
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton dengan Mutu K275


Bahan
400.000
Kg
Semen Portland

Tenaga

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.400

M3

Pasir Beton

@ Rp.

0.820

Koral Beton

@ Rp.

6.000
1.000
0.100
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M3 Membuat Pondasi Beton Bertulang (150 Kg Besi dan Bekisting)


SNI 7394; 2008 - 6.28
Bahan

Tenaga

20

M3
Kg
Ltr
Kg
Kg
Kg

Papan Kayu
Paku Campur
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@
@

0.540

M3

Pasir Beton

@ Rp.

0.810

Koral Beton

@ Rp.

5.300
0.275
1.300
1.050
0.262
0.265

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 M3 Membuat Pondasi Beton Bertulang (200 Kg Besi dan Bekisting)


Bahan

Tenaga

0.240
1.500
0.400
157.500
2.250
336.000

0.270
2.000
0.600
200.000
3.000
323.000

M3
Kg
Ltr
Kg
Kg
Kg

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@
@

0.520

M3

Pasir Beton

@ Rp.

0.780

Koral Beton

@ Rp.

4.850
0.350
1.560
1.400
0.331
0.170

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

@
@
@
@
@
@

Analisa Biaya Konstruksi Pekerjaan Dinding

1.00 1 M2 Pasangan Bata Semen Tebal 1 Bata, 1 Pc : 4Ps

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

SNI 6897 ; 2008 - 6.4


Bahan
140.000
26.550

Tenaga

Bh
Kg

Batu Tella
Semen Portland

@ Rp.
@ Rp.

0.093

M3

Pasir Pasang

@ Rp.

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Analisa Biaya Konstruksi Pekerjaan Plesteran

1.00 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm


SNI 2837 ; 2008 - 6.4
Bahan
6.240
Kg
Semen Portland

Tenaga

15

@ Rp.

0.024

M3

Pasir Pasang

@ Rp.

0.300
0.150
0.015
0.015

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm


Bahan
8.680
Kg
Semen Portland

Tenaga

Rp.
Rp.
Rp.
Rp.

0.028

0.250
0.200
0.020
0.013

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.

Pasir Pasang

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Analisa Biaya Konstruksi Pekerjaan Kayu

1.00 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kls. I


SNI 3434 ; 2008 - 6.1
Bahan

1.100
1.250

M3
Kg

Kayu Kls. I
Paku

@ Rp.
@ Rp.

Tenaga

1.000

Kg

Lem Kayu

@ Rp.

7.000
21.000
2.100
0.350

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

2.00 1 M3 Rangka Kuda-Kuda Kayu Kls. I


SNI 3434 ; 2008 - 6.15
Bahan

Tenaga

1.200
5.600

M3
kg

Kayu Kls. I
paku 12 cm

@ Rp.
@ Rp.

21.215
2.122
10.608
1.061

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas I


Bahan

Tenaga

1.200

M3

Kayu Kelas I

@ Rp.

6.000
18.000
2.000
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1.100

M3

Kayu Kls. II

@ Rp.

4.000
12.000
1.200
0.250

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

2.00 1 M3 Gording Kayu Kls. II


Supl. SNI 3434 - 6.20a
Bahan

Tenaga

Rp.
Rp.
Rp.
Rp.

5.00 1 M2 Pasang Rangka Langit - Langit ( uk. 1.00 x 1.00 ) Kayu Kls. II
Supl. SNI 3434 - 6.20a

47

60

Bahan

0.012
0.100

M3
Kg

Kayu Kls. II
Paku Campur

@ Rp.
@ Rp.

Tenaga

0.305
0.031
0.153
0.015

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M' Pasang Lisplang (3x20) Cm Kayu Kls. I


SNI 3434 ; 2008 - 6.21
Bahan

0.011
0.100

M3
Kg

Papan Kayu Kls. I


Paku Campur

@ Rp.
@ Rp.

Tenaga

0.100
0.200
0.020
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M' Pasang List Plafon - Kayu Profil


Bahan
1.050
M'
Kayu Profil

Tenaga

I
1

Rp.
Rp.
Rp.
Rp.

0.021
0.021
0.002
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Analisa Biaya Konstruksi Pekerjaan Kunci dan Kaca


1 Buah Pasang Kunci Tanam
Bahan
1.000
Bh
Kunci Tanam Kwalitas Baik

Tenaga

0.060
0.600
0.060
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp.
Rp.
Rp.
Rp.

@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 Buah Pasang Kunci Tanam Kamar Mandi


Bahan
1.000
Bh
Kunci Km Kwalitas Baik

Tenaga

0.005
0.500
0.005
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Kunci Silinder

@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Engsel Pintu

@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 Buah Pasang Engsel Jendela


Bahan
1.000
Bh

Engsel Jendela

@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 Buah Pasang Kunci Silinder


Bahan
1.000
Bh

Tenaga

0.005
0.500
0.005
0.000

Oh
Oh
Oh
Oh

2.00 1 Buah Pasang Engsel Pintu


Bahan
1.000
Bh

Tenaga

Tenaga

@ Rp.

0.015
0.150
0.015
0.001

0.010
0.100
0.010
0.001

Oh
Oh
Oh
Oh

1 Buah Pasang Engsel Angin

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Bahan

1.000

Bh

Kait Angin

@ Rp.

Tenaga

0.010
0.100
0.010
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Sping Knip

@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Kait Angin

@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Door Closer

@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 Buah Pasang Kunci Grendel


Bahan
1.000
Bh

Kunci Grendel

@ Rp.

Tenaga

Pekerja

@ Rp.

1 Buah Pasang Sping Knip


Bahan
1.000
Bh

Tenaga

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

1 Buah Pasang Door Closer


Bahan
1.000
Bh

Tenaga

11

Oh
Oh
Oh
Oh

1 Buah Pasang Kait Angin


Bahan
1.000
Bh

Tenaga

10

0.015
0.150
0.015
0.001

0.050
0.500
0.050
0.003

0.020

Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

0.200
0.020
0.001

12

0.010
0.100
0.010
0.001

0.060
0.600
0.060
0.003

0.025
0.250
0.025
0.001

@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Bh

Door Stop

@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rel Pintu Dorong

@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Kunci Lemari

@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Oh
Oh
Oh
Oh

1 Buah Pasang Kunci Lemari


Bahan
1.000
Bh

Tenaga

@ Rp.
@ Rp.
@ Rp.

Oh
Oh
Oh
Oh

1 Buah Pasang Rel Pintu Dorong


Bahan
1.000
Bh

Tenaga

15

0.050
0.500
0.050
0.003

1 Buah Pasang Door Stop


Bahan
1.000

Tenaga

14

Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Pegangan Pintu / Door Holder


Bahan
1.000
Bh
Door Holder

Tenaga

13

Oh
Oh
Oh

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

16

17

18

19

1 M2 Buah Pasang Kaca, Tebal 3 mm


Bahan

1.100

M2

Kaca Bening Tebal 3 mm

@ Rp.

Tenaga

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Buah Pasang Kaca, Tebal 5 mm


Bahan

1.100

M2

Kaca Ryben Tebal 5 mm

@ Rp.

Tenaga

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1M2 Buah Pasang Kaca, Tebal 8 mm


Bahan

1.100

M2

Kaca Polos

@ Rp.

Tenaga

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1M2 Buah Pasang Kaca Buram , Tebal 12 mm


Bahan

1.100
0.050

M2
Kg

Kaca Buram
Sealent

@ Rp.
@ Rp.

Tenaga

0.025
0.250
0.025
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

20

21

22

23

24

1M2 Buah Pasang Kaca Cermin , Tebal 5 mm


Bahan

1.100

M2

Kaca Cermin

@ Rp.

Tenaga

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1M2 Buah Pasang Kaca Cermin , Tebal 6 mm


Bahan

1.100

M2

Kaca Cermin

@ Rp.

Tenaga

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1M2 Buah Pasang Kaca Cermin , Tebal 8 mm


Bahan

1.100

M2

Kaca Cermin

@ Rp.

Tenaga

0.017
0.165
0.017
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1M2 Buah Pasang Kaca Wireglass , Tebal 5 mm


Bahan

1.100

M2

Kaca Wireglass

@ Rp.

Tenaga

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1M2 Buah Pasang Kaca Patri , Tebal 5 mm


Bahan

1.100

M2

Kaca Wireglass

@ Rp.

Tenaga

J
1

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 6 mm


Bahan
1.100
Lbr
Pelat Asbes Tebal 6 mm
0.010
Kg
Paku

0.030
0.070
0.007
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit - langit Asbes (1.00x1.00) m, Tebal 5 mm


Bahan
1.100
Lbr
Pelat Asbes Tebal 5 mm
0.010
Kg
Paku

Tenaga

Oh
Oh
Oh
Oh

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Analisa Biaya Konstruksi Pekerjaan Langit - Langit

Tenaga

0.015
0.150
0.015
0.001

0.030
0.070
0.007
0.002

Oh
Oh
Oh
Oh

1 M2 Langit - langit Triplek 3 mm


Supl. SNI 3434 - 6.20a
Bahan
0.700
Lbr
0.010
Kg

Tenaga

0.030
0.070
0.007
0.002

Oh
Oh
Oh
Oh

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Triplek Tebal 3 mm
Paku Campur

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Langit; - langit Asbes (1.00x1.00) m, Tebal 3.5 mm


Bahan
1.100
Lbr
Pelat Asbes Tebal 3.5 mm
0.010
Kg
Paku

Tenaga

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.060
1.000
0.010
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit - langit Akustik (30x60) Cm


Bahan
5.800
Lbr
Akustik ukuran 30x60 Cm
0.050
Kg
Paku

Tenaga

Oh
Oh
Oh
Oh

1 M2 Langit - langit Akustik (30x30) Cm


Bahan
5.800
Lbr
Akustik ukuran 30x30 Cm
0.050
Kg
Paku

Tenaga

0.030
0.070
0.007
0.002

0.060
1.000
0.010
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit - langit Akustik (60x120) Cm

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Bahan

1.500
0.050

Lbr
Kg

Akustik Arm Strong ukuran 60x120 @ Rp.


Paku
@ Rp.

Tenaga

0.060
1.000
0.010
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit - langit Plywood (30x60) Cm, Tebal 4 mm


Bahan
0.360
Lbr
Plywood 4"x8"x4 mm
0.030
Kg
Paku

Tenaga

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.00 1 M2 Langit - langit Plywood (30x60) Cm, Tebal 6 mm


Bahan
0.360
Lbr
Plywood 4"x8"x6 mm
0.030
Kg
Paku

Tenaga

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

2.00 1 M2 Langit - langit Plywood (60x120) Cm, Tebal 4 mm


Bahan
0.375
Lbr
Plywood 4"x8"x4 mm
0.030
Kg
Paku

Tenaga

11

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit - langit Plywood (60x120) Cm, Tebal 6 mm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Bahan

0.375
0.030

Lbr
Kg

Plywood 4"x8"x6 mm
Paku

@ Rp.
@ Rp.

Tenaga

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

3.00 1 M2 Langit - langit Teakwood (30x60) Cm, Tebal 4 mm


Bahan
0.360
Lbr
Teakwood 4"x8"x4 mm
0.030
Kg
Paku

Tenaga

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

4.00 1 M2 Langit - langit Teakwood (60x120) Cm, Tebal 4 mm


Bahan
0.375
Lbr
Teakwood 4"x8"x4 mm
0.030
Kg
Paku

Tenaga

14

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Langit - langit Lat Kayu Jati


Bahan

0.024
0.010
0.050

M3
Kg
Kg

Kayu Jati, Papan


Paku
Paku Sekrup

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.200
0.600
0.060
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

15

16

17

1 M2 Langit - langit Lat Kayu Ramin


Bahan

0.024
0.010
0.050

M3
Kg
Kg

Kayu Ramin
Paku
Paku Sekrup

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.200
0.600
0.060
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Langit - langit Lat Kayu Kamper


Bahan

0.024
0.010
0.050

M3
Kg
Kg

Kayu Kamper, Papan


Paku
Paku Sekrup

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.200
0.600
0.060
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Kayu Kamper, Papan


Paku Biasa

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Cm dan Rangka alluminium


Profi Alluminium "T"
Kawat Seng Polos
Ramset/ Dina Bolt
Akustik Arm Strong 60x120 Cm

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang Kayu
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

1 M2 Langit - langit Soft Board


Bahan
0.350
Lbr
0.030
Kg

Tenaga

18

Rp.
Rp.
Rp.
Rp.

0.600
0.100
0.010
0.003

Oh
Oh
Oh
Oh

1 M2 Langit - langit Akustik 60x120


Bahan
3.600
M'
0.150
Kg
1.000
Bh
1.500
Lbr

Tenaga

0.150
0.500
0.050

Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

0.008

19

1 M1 List Langit - langit Kayu Profil


Bahan
1.100
M'
0.010
Kg

Tenaga

20

21

22

Oh

0.050
0.050
0.005
0.003

Oh
Oh
Oh
Oh

Mandor

@ Rp.

List Kayu Profil


Paku

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 List Langit - langit Asbes (1.00x1.00) m, Tebal 3.2 mm, Rangka Borneo
Bahan

0.012
0.060
1.100

M3
Kg
Lbr

Kayu Borneo, Balok


Paku Biasa
Asbes 1.00x1.00 m

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.180
0.320
0.320
0.009

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 List Langit - langit Plywood 4 mm dan Rangka Kayu Borneo


Bahan

0.023
0.060
0.390

M3
Kg
Lbr

Kayu Borneo
Paku Biasa 2" - 5"
Plywood 4"x8"x4 mm

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.270
0.400
0.040
0.014

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 List Langit - langit Akustik (30x60) Cm dan Rangka Kayu Borneo


Bahan

0.023
0.060
5.800

M3
Kg
Lbr

Kayu Borneo
Paku Biasa
Akustik 30x60 Cm

@ Rp.
@ Rp.
@ Rp.

Tenaga

23

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Tenaga

Rp.
Rp.
Rp.
Rp.

0.027
0.060
11.500

M3
Kg
Lbr

Kayu Borneo
Paku Biasa
Akustik 30x30 Cm

@ Rp.
@ Rp.
@ Rp.

0.310
0.470
0.047
0.016

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M2 List Langit - langit Gypsum Board, Tebal 9 mm


Bahan
0.364
Lbr
Gypsum Board (120x240x9)
0.110
Kg
Paku Sekrup

Tenaga

0.100
0.050
0.005
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Analisa Biaya Konstruksi Pekerjaan Penutup Atap

1 M2 Pasang Atap Genteng Pelentong Kecil


Bahan
25.000
Bh
Genteng Pelentong

Tenaga

@
@
@
@

1 M2 List Langit - langit Akustik (30x30) Cm dan Rangka Kayu Borneo


Bahan

24

0.260
0.400
0.040
0.013

0.150
0.075
0.008
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Genteng Kodok / Glazzur


Bahan
25.000
Bh
Genteng Kodok

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

Tenaga

0.150
0.060
0.006
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.032

M3

Pasir Pasang

@ Rp.

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M' Pasang Bubung Genteng Kodok Glazuur


Bahan
5.000
Bh
Genteng Bubungan Kodok
8.000
Kg
Semen Portland

Tenaga

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Genteng Bubungan Palentong


Bahan
5.000
Bh
Genteng Bubungan Pelentong
8.000
Kg
Semen Portland

Tenaga

Oh
Oh
Oh
Oh

1 M2 Pasang Atap Genteng Pelentong Super / Besar


Bahan
12.000
Bh
Genteng Kodok

Tenaga

0.150
0.075
0.008
0.008

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.032

M3

Pasir Pasang

@ Rp.

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M' Pasang Bubung Genteng Palentong Besar


Bahan
4.000
Bh
Genteng Bubungan Pelentong
8.000
Kg
Semen Portland

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Tenaga

0.032

M3

Pasir Pasang

@ Rp.

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasang Roof Ligt Fiberglass ( 180 x 90 ) Cm


Bahan
0.600
Lbr
Roof Light Fiberglass
0.050
Kg
Paku Biasa 1/2" - 1"

Tenaga

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.00 1 M2 Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) x 3 mm


Bahan
0.700
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

0.140
0.075
0.008
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

2.00 1 M2 Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) x 4 mm


Bahan
0.700
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

0.140
0.075
0.008
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

3.00 1 M2 Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) x 5 mm


Bahan
0.600
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Tenaga

11

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Asbes Gelombang ( 2.70 x 1.05 m ) x 4 mm


Bahan
0.420
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

14

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Asbes Gelombang ( 3.00 x 1.05 m ) x 4 mm


Bahan
0.350
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

13

Oh
Oh
Oh
Oh

1 M2 Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) x 5 mm


Bahan
0.750
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

12

0.140
0.070
0.007
0.007

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Asbes Gelombang ( 2.40 x 1.05 m ) x 4 mm


Bahan
0.440
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Tenaga

15

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) x 6 mm


Bahan
0.370
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

18

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) x 4 mm


Bahan
0.800
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

17

Oh
Oh
Oh
Oh

1 M2 Pasang Atap Asbes Gelombang ( 2.10 x 1.05 m ) x 4 mm


Bahan
0.510
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

16

0.140
0.067
0.007
0.007

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Asbes Gelombang ( 2.70 x 1.08 m ) x 6 mm


Bahan
0.380
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Tenaga

19

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) x 6 mm


Bahan
0.460
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

4.00 1 M2 Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) x 6 mm


Bahan
0.490
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

5.00 1 M2 Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) x 6 mm


Bahan
0.570
Lbr
Asbes Gelombang
0.120
Kg
Paku Pancing 60 x 230

Tenaga

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

6.00 1 M' Pasang Bubungan Stel Gelombang 0.92 m


Bahan
0.240
Lbr
Bubungan Stel Gelombang
6.000
Bh
Paku Sekrup 3,5"

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Tenaga

23

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

1 M' Pasang Nok Paten 0.92 m


Bahan
1.200
Lbr
6.000
Bh

Tenaga

26

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M' Pasang Nok Stel Gelombang 1.08 m


Bahan
2.050
Lbr
Nok Stel Gelombang
6.000
Bh
Paku Sekrup 3,5"

Tenaga

25

Oh
Oh
Oh
Oh

1 M' Pasang Nok Stel Gelombang 1.05 m


Bahan
2.100
Lbr
Nok Stel Gelombang
6.000
Bh
Paku Sekrup 3,5"

Tenaga

24

0.084
0.125
0.013
0.004

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

1 M' Pasang Nok Paten 1.05 m


Bahan
1.200
Lbr
6.000
Bh

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Nok Paten
Paku Sekrup 3,5"

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Nok Paten
Paku Sekrup 3,5"

@ Rp.
@ Rp.

Rp.
Rp.
Rp.
Rp.

Tenaga

27

Oh
Oh
Oh
Oh

@
@
@
@

Nok Paten
Paku Sekrup 3,5"

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

0.100
0.150
0.013
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M' Pasang Nok Stel Rata 1.05 m


Bahan
1.100
Lbr
Nok Stel Rata
6.000
Bh
Paku Sekrup 3,5"

Tenaga

30

0.084
0.125
0.013
0.004

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M' Pasang Nok Stel Rata 0.92 m


Bahan
1.100
Lbr
Nok Stel Rata
6.000
Bh
Paku Sekrup 3,5"

Tenaga

29

Oh
Oh
Oh
Oh

1 M' Pasang Nok Paten 1.08 m


Bahan
1.200
Lbr
6.000
Bh

Tenaga

28

0.084
0.125
0.013
0.004

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

1 M2 Pasang Atap Genteng Beton


Bahan
11.000
Bh
0.030
Kg

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Genteng Beton
Paku 2" - 5"

@ Rp.
@ Rp.

Tenaga

31

1 M2 Pasang Atap Genteng


Bahan
6.900
0.350
0.030
0.500

Tenaga

32

0.200
0.300
0.003
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Aspal
Lbr
Lbr
Kg
Bh

Genteng Aspal
Plywood 4"x 8"x 6 mm
Paku Biasa 1/2" - 1"
Plastic Aerator

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Genteng Metal
Paku 2" - 5"

@ Rp.
@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Bh
Kg

Genteng Sirap
Paku 1/2" - 1"

@ Rp.
@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasang Atap Genteng Metal


Bahan
1.020
Bh
0.200
Kg

Tenaga

33

0.200
0.100
0.010
0.010

0.200
0.100
0.010
0.010

1 M2 Pasang Atap Sirap


Bahan
60.000
0.200

Tenaga

0.166
0.250
0.008

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

34

1 M' Pasang Nok Genteng


Bahan
3.500
0.050
10.800

Tenaga

35

37

Pasir Pasang
Semen Warna

@ Rp.
@ Rp.

0.400
0.200
0.020
0.020

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Genteng Aspal
Paku Biasa 1/2" - 1"

@ Rp.
@ Rp.

Rp.
Rp.
Rp.
Rp.

0.004

M3

Kayu Borneo Balok

@ Rp.

0.125
0.250
0.025
0.006

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Genteng Derca Bond


Paku Biasa 1/2" - 1"

@ Rp.
@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Lbr
Kg
Kg

Seng Plat 3"x 6" Bjls 28


Paku Biasa 1/2" - 1"
Paku Biasa 2" - 5"

@ Rp.
@ Rp.
@ Rp.

0.004

M3

Kayu Borneo, Papan Tebal 3 Cm

@ Rp.

0.125

Oh

Pekerja

@ Rp.

0.250
0.150
0.015
0.013

1 M' Pasang Nok Sirap


Bahan
0.400
0.060
0.050

Tenaga

@ Rp.
@ Rp.
@ Rp.

M3
Kg

1 M' Pasang Nok Genteng Metal


Bahan
1.100
Bh
0.050
Kg

Tenaga

Genteng Sirap
Paku 2" x 5"
Semen Abu - abu

0.032
1.000

1 M' Pasang Nok Genteng Aspal


Bahan
2.000
Bh
0.050
Kg

Tenaga

36

Beton
Bh
Kg
Kg

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

0.250
0.050
0.006

38

41

0.140
0.075
0.008
0.008

Oh
Oh
Oh
Oh

1 M2 Pasang Atap Nok Seng


Bahan
0.300
Lbr
0.040
Kg

Tenaga

40

Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Seng Gelombang


Supl. SNI 3434 - 6.20a
Bahan
0.700
Lbr
Seng Gel. Bjls 0.25
0.120
Kg
Paku Campur

Tenaga

39

Oh
Oh
Oh

0.150
0.070
0.008
0.006

Oh
Oh
Oh
Oh

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Seng Plat Bjls 0.25


Paku Campur

@ Rp.
@ Rp.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Atap Alluminium


Bahan

1.050
0.020

M2
Kg

Atap Alluminium Gelombang Tebal 0 @ Rp.


Paku Hak Panjang 15 Cm
@ Rp.

Tenaga

0.150
0.750
0.008
0.006

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Nok Standar 40 Cm 18, Swg 22


Paku Hak Panjang 15 Cm

@ Rp.
@ Rp.

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Nok Alluminium


Bahan

1.200
0.040

M2
Kg

Tenaga

42

L
4

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Alluminium Foil / Sisalation


Bahan

1.050

M2

Sisalation / Alluminium Foil

@ Rp.

Tenaga

0.150
0.050
0.005
0.008

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Analisa Biaya Konstruksi Pekerjaan Penutup Lantai dan Dinding


1 M2 Pasang Lantai Keramik Ukuran 40x40 Cm
Bahan
1.000
M2
Keamik 40 x 40 Cm
11.380
Kg
Semen Portland

Tenaga

0.100
1.000
0.010
0.010

0.042
1.500

M3
Kg

Pasir Pasang
Semen Warna

@ Rp.
@ Rp.

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasang Lantai Keramik Ukuran 30x30 Cm


Bahan
1.000
M2
Keramik 30 x 30 Cm
11.380
Kg
Semen Portland

Tenaga

@ Rp.
@ Rp.

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.042
1.500

M3
Kg

Pasir Pasang
Semen Warna

@ Rp.
@ Rp.

0.620
0.350
0.035
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Lantai Keramik Ukuran 20x20 Cm


Bahan
1.000
M2
Keramik 20 x 20 Cm
11.380
Kg
Semen Portland

Tenaga

68

0.042
1.500

M3
Kg

Pasir Pasang
Semen Warna

@ Rp.
@ Rp.

0.700
0.350
0.035
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasang Dinding Keramik 20x20 Cm


Bahan
1.000
M2
Keramik 20x20 Cm
9.300
Kg
Semen Abu - Abu

Tenaga

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.018
1.500

M3
Kg

Pasir Pasang
Semen Warna

@ Rp.
@ Rp.

0.600
1.000
0.045
0.030

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Cat Meni
Plamir
Cat Kayu
Cat Kayu Penutup 2 Kali

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang Cat
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pengecatan Bidang Kayu Baru


2 Lapis Cat Penutup
Bahan
0.200
Kg
0.150
Kg
0.170
Kg
0.260
Kg

Tenaga

@ Rp.
@ Rp.

0.080
0.100
0.004
0.003

Oh
Oh
Oh
Oh

(1 Lapis Plamir), 1 Lapis Cat Dasar,

1.00 1 M2 Pengecatan dinding (1 Lapis Plamir), 1 Lapis Cat Dasar,)

2 Lapis Cat Penutup


0.150
Bahan
0.170
0.350

Tenaga

21

Plamir
Cat Dasar
Cat Penutup 2 Kali

@ Rp.
@ Rp.
@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Cat
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pengecatan Pipa dan jembatan Pipa dengan Meni Besi 2 lapis dan cat besi 2 lapis
Bahan
0.200
Kg
Meni Besi
@ Rp.
0.200
Kg
Cat Besi
@ Rp.

Tenaga

0.070
0.100
0.004
0.003

Kg
Kg
Kg

0.040
0.250
0.020
0.010

Oh
Oh
Oh
Oh

Pekerja
Tukang Cat
Kepala Tukang
Mandor

Analisa Biaya Konstruksi Pekerjaan Sanitasi


1 Memasang 1 Buah Closet Jongkok
Bahan
1.000
Bh
Kloset Jongkok Porselen
6.000
Kg
Semen Portland

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.160

M3

Pasir Pasang

@ Rp.

Tenaga

1.000
1.500
0.300
0.110

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Tenaga

2.100
0.750
0.070
0.110

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Memasang 1 Buah Bak Mandi Fiberglass Volume 0.30 M 3

Bahan

1.000
1 Bh
Bak Fiberglass
18% Harga Bak Perlengkapan

@ Rp.
@ Rp.

Tenaga

1.800
2.700
0.540
0.110

@
@
@
@

Tenaga

Rp.
Rp.
Rp.
Rp.

0.400
120.000

M3
Kg

Batu bata
Semen Portland

@ Rp.
@ Rp.

0.300
360.000
6.000

M3
Bh
Kg

Pasir Pasang
Porselen (11x11) Cm
Semen Nat

@ Rp.
@ Rp.
@ Rp.

6.000
3.000
0.300
0.300

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Memasang 1 Buah Badkip Porselen


Bahan
1.000
Bh
Badkip
20% Harga Badkip Perlengkapan

Tenaga
0.075
0.750
0.250

11

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 Buah Bak Mandi Batu Bata Volume 0.30 M 3


Bahan

10

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Membuat 1 Buah Bak Beton Volume 1 M3 Air


Bahan

0.900
180.000

M3
Kg

8.000

M3

Beton 1 : 1 1/2 : 2
Besi Beton

@ Rp.
@ Rp.

Kayu cetakan

@ Rp.

5.000
M
Ubin Porselen
10%H. Total BahanPerlengkapan

@ Rp.
@ Rp.

3.500

@ Rp.

Tenaga

1/2

Oh

Pekerja

4.500
0.900
0.900

12

Tukang Batu
Kepala Tukang
Mandor

@ Rp.
@ Rp.
@ Rp.

Membuat 1 Buah Bak Fiberglass Volume 1 M3 Air


Bahan
1.000
Bh
Bak Fiberglass
12%H. Total BahanPerlengkapan

@ Rp.
@ Rp.

Tenaga

13

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.013

M3

Pasir Pasang

@ Rp.

0.011

Pasir Urug

@ Rp.

0.060
0.030
0.003
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 20 Cm


Bahan
1.600
Bh
Pipa Tanah
0.870
Kg
Semen portland

Tenaga

15

Oh
Oh
Oh
Oh

Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, Diameter 15 Cm


Bahan
1.600
Bh
Pipa Tanah
0.680
Kg
Semen prtland

Tenaga

14

3.000
4.500
0.900
0.900

Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.014

M3

Pasir Pasang

@ Rp.

0.014

M3

Pasir Urug

@ Rp.

0.080
0.040
0.004
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Memasang 1 M' Pipa Beton, Diameter 15 Cm - 20 Cm


Bahan
1.100
Bh
Pipa Beton

Rp.
Rp.
Rp.
Rp.

@ Rp.

Tenaga

16

Batu Bata
Semen portland

@ Rp.
@ Rp.

0.056

M3

Pasir Pasang

@ Rp.

0.024

M3

Pasir Urug

@ Rp.

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.550
10.300

M
Kg

Batu Bata
Semen portland

@ Rp.
@ Rp.

0.061

M3

Pasir Pasang

@ Rp.

0.069

M3

Pasir Urug

@ Rp.

0.380
0.190
0.019
0.019

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (30x30) Cm, Tinggi 35 Cm
Bahan

Tenaga

18

M3
Kg

Memasang 1 M' Pipa Beton, Diameter 30 Cm - 100 Cm


Bahan
1.100
Bh
Pipa Beton

Tenaga

17

0.027
3.920

0.145
44.000

M3
Kg

Batu Bata
Semen Portland

@ Rp.
@ Rp.

0.070

M3

Pasir Pasang

@ Rp.

0.070
1.600

M
Kg

Kerikil Beton
Besi Beton

@ Rp.
@ Rp.

0.060

M3

Pasir Beton

@ Rp.

3.200
1.015
0.002
0.016

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (45x45) Cm, Tinggi 50 Cm
Bahan

0.250
77.000

M3
Kg

Batu Bata
Semen Portland

@ Rp.
@ Rp.

Tenaga

19

0.130

M3

Pasir Pasang

@ Rp.

0.020
2.600

M3
Kg

Kerikil Beton
Besi Beton

@ Rp.
@ Rp.

0.090

M3

Pasir Beton

@ Rp.

1.420
0.473
0.047
0.071

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (60x60) Cm, Tinggi 50 Cm
Bahan

Tenaga

0.371
114.000

M3
Kg

Batu Bata
Semen Portland

@ Rp.
@ Rp.

0.184

M3

Pasir Pasang

@ Rp.

0.033
4.850

M
Kg

Kerikil Beton
Besi Beton

@ Rp.
@ Rp.

0.120

M3

Pasir Beton

@ Rp.

2.160
0.720
0.072
0.108
0.100

Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor
Tukang Gali

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN PEMASANGAN PIPA


Pekerjaan Pemasangan Pipa
1m' Pengadaan/Pemasangan Pipa GIP dia.150 mm
1m' Pengadaan Pipa GIP dia.150 mm
1.000
M1
Pipa GIP
1.000
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa GIP dia, 150 mm


0.800
M3
Galian tanah
0.500
M3
Urugan Pasir
0.300
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa GIP dia. 150 mm


0.210
h/o
Tukang Pipa
0.029
h/o
Kepala Tukang
0.150
h/o
Pekerja
0.027
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

1m' Pengadaan/Pemasangan Pipa GIP dia.110 mm


1m' Pengadaan Pipa GIP dia.110 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa GIP dia, 110 mm


0.800
M3
Galian tanah
0.500
M3
Urugan Pasir
0.300
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa GIP dia. 110 mm


0.210
h/o
Tukang Pipa
0.029
h/o
Kepala Tukang
0.150
h/o
Pekerja
0.027
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

1m' Pengadaan/Pemasangan Pipa GIP dia.90 mm

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

1.

1.

2.

3.

5.

1m' Pengadaan Pipa GIP dia.90 mm


1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa GIP dia, 90 mm


0.800
M3
Galian tanah
0.500
M3
Urugan Pasir
0.300
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa GIP dia. 90 mm


0.210
h/o
Tukang Pipa
0.029
h/o
Kepala Tukang
0.150
h/o
Pekerja
0.027
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1 m' Pemasangan Pipa PVC dan GIP dia. 150 mm


0.945
M3
Galian tanah
0.342
M3
Urugan Pasir
0.704
M3
Urugan Tanah kembali
0.024
M3
Buangan sisa galian
0.014
Kg
Bahan Pelicin/sabun

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Untuk Pipa GIP.Dia. 150 mm


1 m' Pemasangan Pipa PVC dan GIP dia. 100 mm
0.332
M3
Galian tanah
0.138
M3
Urugan Pasir
0.281
M3
Urugan Kembali

1.50

Untuk Pipa GIP.Dia. 100 mm


1 m' Pemasangan Pipa PVC dan GIP dia. 75 mm
0.296
M3
Galian tanah
0.119
M3
Urugan Pasir
0.246
M3
Urugan Kembali

1.50

Untuk Pipa GIP.Dia. 75 mm


1 m' Pemasangan Pipa PVC dan GIP dia. 50 mm
0.263
M3
Galian tanah
0.102
M3
Urugan Pasir
0.210
M3
Urugan Kembali

1.50

Untuk Pipa GIP.Dia. 50 mm


1 m' Pemasangan Pipa PVC dia. 40 mm
0.350
M3
Galian tanah
0.033
M3
Urugan Pasir

1.50

Rp.
@ Rp.
@ Rp.
@ Rp.
Rp.
@ Rp.
@ Rp.
@ Rp.
Rp.
@ Rp.
@ Rp.
@ Rp.
Rp.
@ Rp.
@ Rp.

0.236
0.074
0.010

6.

M3
M3
Kg

Urugan Kembali
Buangan sisa galian
Bahan Pelicin/sabun

@ Rp.
@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia. 25 mm


0.310
M3
Galian tanah
0.021
M3
Urugan Pasir
0.236
M3
Urugan Kembali
0.064
M3
Buangan sisa galian
0.010
Kg
Bahan Pelicin/sabun

1.00 1m' Pengadaan/Pemasangan Pipa PVC dia.300 mm


1m' Pengadaan Pipa PVC dia.300 mm
1.000
M1
Pipa PVC
1.000
Ls

1m' Pemasangan Pipa PVC


0.900
0.450
0.500

dia.300
M3
M3
M3

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
Mobilisasi @ Rp.

mm
Galian tanah
Urugan Pasir
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC dia. 300 mm


0.230
h/o
Tukang Pipa
0.031
h/o
Kepala Tukang
0.170
h/o
Pekerja
0.031
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
Untuk Pipa GIP.Dia. 300 mm
1.00 1m' Pengadaan/Pemasangan Pipa PVC dia.200 mm
1m' Pengadaan Pipa PVC dia.200 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

1.50

Rp.

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia. 200 mm


0.570
M3
Galian tanah
0.279
M3
Urugan Pasir
0.460
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC dia. 200 mm


0.210
h/o
Tukang Pipa

@ Rp.

0.029
0.150
0.027
1.000

h/o
h/o
h/o
ls

Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Jumlah I +
Untuk Pipa GIP.Dia. 200 mm
1

1.50

1m' Pengadaan/Pemasangan Pipa PVC dia.300 mm


1m' Pengadaan Pipa PVC dia.300 mm
1.000
M1
Pipa PVC
1.000
Ls

1m' Pemasangan Pipa PVC


0.900
0.600
0.500

dia.300
M3
M3
M3

Rp.

@ Rp.
Mobilisasi @ Rp.

mm
Galian tanah Biasa
Urugan Pasir
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC dia. 300 mm


0.230
h/o
Tukang Pipa
0.031
h/o
Kepala Tukang
0.170
h/o
Pekerja
0.031
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
Untuk Pipa GIP.Dia. 300 mm

1.50

Rp.

1m' Pengadaan/Pemasangan Pipa PVC dia.250 mm


1m' Pengadaan Pipa PVC dia.250 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia, 250 mm


0.850
M3
Galian tanah Biasa
0.550
M3
Urugan Pasir
0.400
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC dia. 250 mm


0.210
h/o
Tukang Pipa
0.029
h/o
Kepala Tukang
0.150
h/o
Pekerja
0.027
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Untuk Pipa GIP.Dia. 250 mm

1.50

2.00 1m' Pengadaan/Pemasangan Pipa PVC dia.200 mm


1m' Pengadaan Pipa PVC dia.200 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

Rp.

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia, 200 mm


0.800
M3
Galian tanah Biasa
0.500
M3
Urugan Pasir
0.300
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC dia. 200 mm


0.210
h/o
Tukang Pipa
0.029
h/o
Kepala Tukang
0.150
h/o
Pekerja
0.027
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Untuk Pipa GIP.Dia. 200 mm

1.50

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

1m' Pengadaan/Pemasangan Pipa PVC dia.150 mm


1m' Pengadaan Pipa PVC dia.150 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia, 150 mm


0.800
M3
Galian tanah Biasa
0.500
M3
Urugan Pasir
0.300
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC dia. 150 mm


0.210
h/o
Tukang Pipa
0.029
h/o
Kepala Tukang
0.150
h/o
Pekerja
0.027
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Untuk Pipa GIP.Dia. 150 mm

1.50

2.00 1m' Pengadaan/Pemasangan Pipa PVC dia.150 mm


1m' Pengadaan Pipa PVC dia.150 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

10

Rp.

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia, 150 mm


0.800
M3
Galian tanah Biasa
0.500
M3
Urugan Pasir
0.300
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC dia. 150 mm


0.210
h/o
Tukang Pipa
0.029
h/o
Kepala Tukang
0.150
h/o
Pekerja
0.027
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Untuk Pipa GIP.Dia. 150 mm


1 m' Pemasangan Pipa GIP dia, 150 mm
0.550
M3
Galian tanah
0.455
M3
Urugan Pasir
0.245
M3
Urugan Kembali
1 m' Upah Pemasangan Pipa PVC dia. 150 mm
0.200
h/o
Tukang Pipa
0.027
h/o
Kepala Tukang
0.140
h/o
Pekerja
0.025
h/o
Mandor
1.000
ls
Alat Bantu

3.00 1m' Pengadaan/Pemasangan Pipa PVC dia.100 mm


1m' Pengadaan Pipa PVC dia.100 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

1 m' Pemasangan Pipa PVC dan GIP dia. 100 mm


0.560
M3
Galian tanah Biasa
0.250
M3
Urugan Pasir
0.281
M3
Urugan Kembali

1.50

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
@ Rp.
@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC dan GIP dia. 100 mm


0.196
h/o
Tukang Pipa
0.026
h/o
Kepala Tukang
0.137
h/o
Pekerja
0.025
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
Untuk Pipa GIP.Dia. 100 mm

1.50

Rp.

1m' Pengadaan/Pemasangan Pipa PVC dia.100 mm


1m' Pengadaan Pipa PVC dia.100 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dan GIP dia. 100 mm


0.560
M3
Galian tanah Biasa
0.250
M3
Urugan Pasir
0.281
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC dan GIP dia. 100 mm


0.196
h/o
Tukang Pipa
0.026
h/o
Kepala Tukang
0.137
h/o
Pekerja
0.025
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
3.00 1m' Pengadaan/Pemasangan Pipa HDPE dia.100 mm
1m' Pengadaan Pipa HDPE dia.100 mm
1.000
M1
Pipa HDPE
1.000
Ls
Mobilisasi Ke Lokasi

1 m' Pemasangan Pipa HDPE dia. 100 mm


0.560
M3
Galian tanah
0.250
M3
Urugan Pasir
0.281
M3
Urugan Kembali

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa HDPE dan GIP dia. 100 mm


0.196
h/o
Tukang Pipa
0.026
h/o
Kepala Tukang
0.137
h/o
Pekerja
0.025
h/o
Mandor
1.000
ls
Alat Bantu

Untuk Pipa GIP.Dia. 100 mm

4.00 1m' Pengadaan/Pemasangan Pipa PVC dia.90 mm


1m' Pengadaan Pipa PVC dia.90 mm
1.000
M1
Pipa PVC
1.000
Ls

@
@
@
@
@

1.50

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

@ Rp.
Mobilisasi @ Rp.

1 m' Pemasangan Pipa PVC dan GIP dia. 90 mm


0.462
M3
Galian tanah Biasa
0.264
M3
Urugan Pasir
0.275
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC dan GIP dia. 90 mm


0.194
h/o
Tukang Pipa
0.026
h/o
Kepala Tukang
0.136
h/o
Pekerja
0.024
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
Untuk Pipa GIP.Dia. 90 mm
3.00 1m' Pengadaan/Pemasangan Pipa HDPE dia.75 mm
1m' Pengadaan Pipa PVC dia.75 mm
1.000
M1
Pipa HDPE
1.000
Ls

1 m' Pemasangan Pipa PVC dan GIP dia. 75 mm


0.296
M3
Galian tanah Biasa
0.119
M3
Urugan Pasir

1.50

Rp.

@ Rp.
Mobilisasi @ Rp.

@ Rp.
@ Rp.

0.246

M3

Urugan Kembali

@ Rp.

1 m'Upah Pemasangan Pipa PVC dan GIP dia. 75 mm


0.194
h/o
Tukang Pipa
0.026
h/o
Kepala Tukang
0.136
h/o
Pekerja
0.024
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
Untuk Pipa GIP.Dia. 75 mm
4.00 1m' Pengadaan/Pemasangan Pipa HDPE dia.50 mm
1m' Pengadaan Pipa HDPE dia.50 mm
1.000
M1
Pipa PVC
1.000
Ls

1.50

Rp.

@ Rp.
Mobilisasi @ Rp.

1 m' Pemasangan Pipa HDPE dia. 50 mm


0.263
M3
Galian tanah Biasa
0.102
M3
Urugan Pasir
0.210
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa HDPE dia. 50 mm


0.192
h/o
Tukang Pipa
0.026
h/o
Kepala Tukang
0.134
h/o
Pekerja
0.024
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Untuk Pipa GIP.Dia. 50 mm


1m' Pengadaan/Pemasangan Pipa PVC dia.90 mm
1m' Pengadaan Pipa PVC dia.90 mm
1.000
M1
Pipa PVC
1.000
Ls

1.50

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

@ Rp.
Mobilisasi @ Rp.

1 m' Pemasangan Pipa PVC dan GIP dia. 90 mm


0.462
M3
Galian tanah Biasa
0.264
M3
Urugan Pasir
0.275
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC dan GIP dia. 90 mm


0.194
h/o
Tukang Pipa

@ Rp.

0.026
0.136
0.024
1.000

h/o
h/o
h/o
ls

Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

JumlahI +

5.00 1m' Pengadaan/Pemasangan Pipa PVC dia.63 mm


1m' Pengadaan Pipa PVC dia.63 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia. 63 mm


0.420
M3
Galian tanah Biasa
0.240
M3
Urugan Pasir
0.250
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC dia. 63 mm


0.192
h/o
Tukang Pipa
0.026
h/o
Kepala Tukang
0.134
h/o
Pekerja
0.024
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Untuk Pipa GIP.Dia. 63 mm


6.00 1m' Pengadaan/Pemasangan Pipa PVC dia.40 mm
1m' Pengadaan Pipa PVC dia.40 mm
1.000
M1
Pipa PVC
1.000
Ls

1.50

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

@ Rp.
Mobilisasi @ Rp.

1 m' Pemasangan Pipa PVC dia. 40 mm


0.200
M3
Galian tanah
0.090
M3
Urugan Pasir
0.200
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC dia. 40 mm


0.200
h/o
Tukang Pipa
0.026
h/o
Kepala Tukang
0.133
h/o
Pekerja
0.024
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
Untuk Pipa GIP.Dia. 40 mm
6.00 1m' Pengadaan/Pemasangan Pipa PVC dia.25 mm
1m' Pengadaan Pipa PVC dia.25 mm
1.000
M1
Pipa PVC
1.000
Ls

1.50

Rp.

@ Rp.
Mobilisasi @ Rp.

1 m' Pemasangan Pipa PVC dia. 25 mm


0.310
M3
Galian tanah
0.010
M3
Urugan Pasir
0.236
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC dia. 25 mm


0.188
h/o
Tukang Pipa
0.025
h/o
Kepala Tukang
0.132
h/o
Pekerja
0.024
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Untuk Pipa GIP.Dia. 25 mm

1.50

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

1m' Pengadaan/Pemasangan Pipa PVC dia.63 mm


1m' Pengadaan Pipa PVC dia.63 mm
1.000
M1
Pipa PVC
1.000
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia. 63 mm


0.420
M3
Galian tanah
0.240
M3
Urugan Pasir
0.250
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC dia. 63 mm


0.192
h/o
Tukang Pipa
0.026
h/o
Kepala Tukang
0.134
h/o
Pekerja
0.024
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1 m' Pengadaan/Pemasangan Pipa Kabel Tanah


1 m' Pengadaan Pipa Kabel Tanah
1.000
M1
Kabel Tanah
1.000
Ls

@ Rp.
Mobilisasi @ Rp.

1 m' Pemasangan Pipa Kabel Tanah


0.030
M3
Galian tanah
0.006
M3
Urugan Pasir
0.008
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Kabel Tanah


0.180
h/o
0.024
h/o
0.126
h/o
0.023
h/o
1.000
ls

@
@
@
@
@

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
1Buah Pengadaan/Pemasangan Accessories Bend 90, All Socket PVC dia 300 mm
1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 300 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 90 All Socket PVC dia 300 mm


0.895
h/o
Tukang Pipa
0.876
h/o
Kepala Tukang
0.897
h/o
Pekerja
0.889
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Bend 45 All Socket PVC dia 300 mm


1Buah Pengadaan Accessories Bend 45 All Socket PVC dia 300 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 45 All Socket PVC dia 300 mm


0.895
h/o
Tukang Pipa
0.876
h/o
Kepala Tukang
0.897
h/o
Pekerja
0.889
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

8.00

1Buah Pengadaan/Pemasangan Accessories Bend ,22,1/2 All Socket PVC dia 300 mm
1Buah PengadaanAccessories Bend ,22,1/2 All Socket PVC dia 300 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend ,22,1/2 All Socket PVC dia 300 mm
0.895
h/o
Tukang Pipa
@ Rp.
0.876
h/o
Kepala Tukang
@ Rp.
0.897
h/o
Pekerja
@ Rp.
0.889
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

1Buah Pengadaan/Pemasangan Accessories Bend 90 All Socket PVC dia 250 mm


1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 250 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 90 All Socket PVC dia 250 mm


0.886
h/o
Tukang Pipa
0.867
h/o
Kepala Tukang
0.888
h/o
Pekerja
0.880
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Bend 45 All Socket PVC dia 250 mm


1Buah Pengadaan Accessories Bend 45 All Socket PVC dia 250 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 45 All Socket PVC dia 250 mm


0.877
h/o
Tukang Pipa
0.858
h/o
Kepala Tukang
0.879
h/o
Pekerja
0.871
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

9.00 1Buah Pengadaan/Pemasangan Accessories Bend 90 All Socket PVC dia 200 mm
1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 200 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 90 All Socket PVC dia 200 mm


0.868
h/o
Tukang Pipa
0.850
h/o
Kepala Tukang
0.870
h/o
Pekerja
0.862
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Bend 45 All Socket PVC dia 200 mm


1Buah Pengadaan Accessories Bend 45All Socket PVC dia 200 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 45 All Socket PVC dia 200 mm


0.859
h/o
Tukang Pipa
0.841
h/o
Kepala Tukang
0.861
h/o
Pekerja
0.853
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

10.00 1Buah Pengadaan/Pemasangan Accessories Bend 90 All Socket PVC dia 150 mm
1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 150 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 90All Socket PVC dia 150 mm


0.859
h/o
Tukang Pipa
0.841
h/o
Kepala Tukang
0.861
h/o
Pekerja
0.853
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

11.00 1Buah Pengadaan/Pemasangan Accessories Bend 45 All Socket PVC dia 150 mm
1Buah Pengadaan Accessories Bend 45 All Socket PVC dia 150 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 45All Socket PVC dia 150 mm


0.859
h/o
Tukang Pipa
0.841
h/o
Kepala Tukang
0.861
h/o
Pekerja
0.853
h/o
Mandor
1.000
ls
Alat Bantu

12

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Bend 90 All Socket PVC dia 300 mm


1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 300 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 22 1/2All Socket PVC dia 150 mm


0.859
h/o
Tukang Pipa
@ Rp.
0.841
h/o
Kepala Tukang
@ Rp.
0.861
h/o
Pekerja
@ Rp.
0.853
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

1Buah Pengadaan/Pemasangan Accessories Bend 90 All Socket PVC dia 250 mm


1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 250 mm
1.000
Bh
Bend
@ Rp.

1.000

Ls

Mobilisasi

@ Rp.

1Buah Pemasangan Accessories Bend 22 1/2All Socket PVC dia 250 mm


0.859
h/o
Tukang Pipa
@ Rp.
0.841
h/o
Kepala Tukang
@ Rp.
0.861
h/o
Pekerja
@ Rp.
0.853
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

13

1Buah Pengadaan/Pemasangan Accessories Bend 90 All Socket PVC dia 200 mm


1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 200 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 22 1/2All Socket PVC dia 200 mm


0.859
h/o
Tukang Pipa
@ Rp.
0.841
h/o
Kepala Tukang
@ Rp.
0.861
h/o
Pekerja
@ Rp.
0.853
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

1Buah Pengadaan/Pemasangan Accessories Bend 90 All Socket PVC dia 150 mm


1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 150 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 90All Socket PVC dia 150 mm


0.868
h/o
Tukang Pipa
0.850
h/o
Kepala Tukang
0.870
h/o
Pekerja
0.862
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Bend 45 All Socket PVC dia 150 mm


1Buah Pengadaan Accessories Bend 45 All Socket PVC dia 150 mm
1.000
Bh
Bend
@ Rp.

1.000

Ls

Mobilisasi

1Buah Pemasangan Accessories Bend 45All Socket PVC dia 150 mm


0.859
h/o
Tukang Pipa
0.841
h/o
Kepala Tukang
0.861
h/o
Pekerja
0.853
h/o
Mandor
1.000
ls
Alat Bantu

@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

7.00 1Buah Pengadaan/Pemasangan Accessories Bend 22 1/2 All Socket PVC dia 150 mm
1Buah Pengadaan Accessories Bend 22 1/2 All Socket PVC dia 150 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 22 1/2All Socket PVC dia 150 mm


0.850
h/o
Tukang Pipa
@ Rp.
0.832
h/o
Kepala Tukang
@ Rp.
0.852
h/o
Pekerja
@ Rp.
0.845
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

8.00 1Buah Pengadaan/Pemasangan Accessories Bend 90 All Socket PVC dia 100 mm
1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 100 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.
1Buah Pemasangan Accessories Bend 90 All Socket PVC dia 100 mm
0.850
h/o
Tukang Pipa
0.832
h/o
Kepala Tukang
0.852
h/o
Pekerja
0.845
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Untuk Bend Gip dia. 110 mm

1.50 @ Rp.

9.00 1Buah Pengadaan/Pemasangan Accessories Bend 45 All Socket PVC dia 100 mm
1Buah Pengadaan Accessories Bend 45 100 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 45 All Socket PVC dia 100 mm


0.850
h/o
Tukang Pipa
0.832
h/o
Kepala Tukang
0.852
h/o
Pekerja
0.845
h/o
Mandor
1.000
ls
Alat Bantu

Untuk Bend Gip dia. 110 mm

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1.50 @ Rp.

10.00 1Buah Pengadaan/Pemasangan Accessories Bend 22 1/2 All Socket PVC dia 100 mm
1Buah Pengadaan Accessories Bend 22 1/2 100 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 22 1/2 All Socket PVC dia 100 mm
0.850
h/o
Tukang Pipa
@ Rp.
0.832
h/o
Kepala Tukang
@ Rp.
0.852
h/o
Pekerja
@ Rp.
0.845
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

11.00 1Buah Pengadaan/Pemasangan Accessories Bend 90 All Socket PVC dia 90 mm


1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 90 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 90 All Socket PVC dia 90 mm


0.841
h/o
Tukang Pipa
0.823
h/o
Kepala Tukang
0.843
h/o
Pekerja
0.836
h/o
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1.000

ls

Alat Bantu

@ Rp.

12.00 1Buah Pengadaan/Pemasangan Accessories Bend 45 All Socket PVC dia 90 mm


1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 90 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Bend 45 All Socket PVC dia 90 mm


0.841
h/o
Tukang Pipa
0.823
h/o
Kepala Tukang
0.843
h/o
Pekerja
0.836
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

13.00 1Buah Pengadaan/Pemasangan Accessories Bend 22 1/2 All Socket PVC dia 90 mm
1Buah Pengadaan Accessories Bend 22 1/2 All Socket PVC dia 90 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 22 1/2 All Socket PVC dia 90 mm


0.841
h/o
Tukang Pipa
@ Rp.
0.823
h/o
Kepala Tukang
@ Rp.
0.843
h/o
Pekerja
@ Rp.
0.836
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

14.00 1Buah Pengadaan/Pemasangan Accessories Bend 90All Socket PVC dia 63 mm


1Buah Pengadaan Accessories Bend 90 All Socket PVC dia 63 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 90 All Socket PVC dia 63 mm


0.832
h/o
Tukang Pipa
0.815
h/o
Kepala Tukang
0.834
h/o
Pekerja
0.827
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

15.00 1 Buah Pemasangan Accessories Bend ,22,1/2, 11,1/4 All Socket PVC dia. 300 mm

0.871
0.793
0.762
0.785
1.000

h/o
h/o
h/o
h/o
ls

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

16.00 1 Buah Pemasangan Accessories Bend 22,1/2, 11,1/4 All Socket PVC dia. 200 mm
0.852
h/o
Tukang Pipa
@ Rp.
0.783
h/o
Kepala Tukang
@ Rp.
0.756
h/o
Pekerja
@ Rp.
0.772
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.
17.00 1 Buah Pemasangan Accessories Bend 45 22,1/2, 11,1/4 All Socket PVC dia. 150 mm
0.600
h/o
Tukang Pipa
@ Rp.
0.400
h/o
Kepala Tukang
@ Rp.
0.450
h/o
Pekerja
@ Rp.
0.350
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

18.00 1 Buah Pemasangan Accessories Bend 45 22,1/2, 11,1/4 All Socket PVC dia. 150 mm
0.588
h/o
Tukang Pipa
@ Rp.
0.392
h/o
Kepala Tukang
@ Rp.
0.441
h/o
Pekerja
@ Rp.
0.343
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

19.00 1 Buah Pemasangan Accessories Bend 45 22,1/2, 11,1/4 All Socket PVC dia. 110 mm
0.576
h/o
Tukang Pipa
@ Rp.
0.384
h/o
Kepala Tukang
@ Rp.
0.432
h/o
Pekerja
@ Rp.
0.336
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

20.00 1 Buah Pemasangan Accessories Bend 45 22,1/2, 11,1/4 All Socket PVC dia. 90 mm
0.564
h/o
Tukang Pipa
@ Rp.
0.376
h/o
Kepala Tukang
@ Rp.
0.423
h/o
Pekerja
@ Rp.
0.329
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

21.00 1 Buah Pemasangan Accessories Bend 45 22,1/2, 11,1/4 All Socket PVC dia. 63 mm
0.552
h/o
Tukang Pipa
@ Rp.
0.368
h/o
Kepala Tukang
@ Rp.

0.414
0.322
1.000

h/o
h/o
ls

Pekerja
Mandor
Alat Bantu

@ Rp.
@ Rp.
@ Rp.

15.00 1Buah Pengadaan/Pemasangan Accessories Bend 45All Socket PVC dia 63 mm


1Buah Pengadaan Accessories Bend 45 All Socket PVC dia 63 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 45 All Socket PVC dia 63 mm


0.832
h/o
Tukang Pipa
0.815
h/o
Kepala Tukang
0.834
h/o
Pekerja
0.827
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

16.00 1Buah Pengadaan/Pemasangan Accessories Bend 22 1/2All Socket PVC dia 63 mm


1Buah Pengadaan Accessories Bend 22 1/2 All Socket PVC dia 63 mm
1.000
Bh
Bend
@ Rp.
1.000
Ls
Mobilisasi
@ Rp.

1Buah Pemasangan Accessories Bend 22 1/2 All Socket PVC dia 63 mm


0.832
h/o
Tukang Pipa
@ Rp.
0.815
h/o
Kepala Tukang
@ Rp.
0.834
h/o
Pekerja
@ Rp.
0.827
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

22.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 300 mm


1Buah Pengadaan Accessories Tee dia 300 mm
1.000
Bh
Tee
1.000
Ls
Mobilisasi

1Buah Pemasangan Accessories Tee dia 300 mm

@ Rp.
@ Rp.

0.950
0.876
0.897
0.889
1.000

h/o
h/o
h/o
h/o
ls

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Tee dia 250 x 250 mm


1Buah Pengadaan Accessories Tee dia 250 x 250 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 250 x 250 mm


0.935
h/o
Tukang Pipa
0.867
h/o
Kepala Tukang
0.888
h/o
Pekerja
0.880
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Tee dia 250 x 200 mm


1Buah Pengadaan Accessories Tee dia 250 x 200 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 250 x 200 mm


0.934
h/o
Tukang Pipa
0.858
h/o
Kepala Tukang
0.879
h/o
Pekerja
0.871
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Tee dia 250 x 160 mm


1Buah Pengadaan Accessories Tee dia 250 x 160 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 250 x 160 mm


0.933
h/o
Tukang Pipa
0.856
h/o
Kepala Tukang
0.876
h/o
Pekerja

@ Rp.
@ Rp.
@ Rp.

0.869
1.000

h/o
ls

Mandor
Alat Bantu

@ Rp.
@ Rp.

23.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 200 x 200 mm


1Buah Pengadaan Accessories Tee dia 200 x 200 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 200 x 200 mm


0.930
h/o
Tukang Pipa
0.850
h/o
Kepala Tukang
0.870
h/o
Pekerja
0.862
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Tee dia 200 x 160 mm


1Buah Pengadaan Accessories Tee dia 200 x 160mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 200 x 160 mm


0.900
h/o
Tukang Pipa
0.841
h/o
Kepala Tukang
0.861
h/o
Pekerja
0.853
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Tee dia 200 x 110 mm


1Buah Pengadaan Accessories Tee dia 200 x 110mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 200 x 110 mm


0.890
h/o
Tukang Pipa
0.815
h/o
Kepala Tukang
0.834
h/o
Pekerja
0.827
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

17.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 160 x 160 mm


1Buah Pengadaan Accessories Tee dia 160 x 160 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 160 x 160 mm


0.925
h/o
Tukang Pipa
0.841
h/o
Kepala Tukang
0.861
h/o
Pekerja
0.853
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

18.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 160 x 110 mm


1Buah Pengadaan Accessories Tee dia 160 x 110 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 160 x 110 mm


0.925
h/o
Tukang Pipa
0.841
h/o
Kepala Tukang
0.861
h/o
Pekerja
0.853
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

19.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 160 x 90 mm


1Buah Pengadaan Accessories Tee dia 160 x 90 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 160 x 90 mm


0.925
h/o
Tukang Pipa
0.841
h/o
Kepala Tukang
0.861
h/o
Pekerja
0.853
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Tee dia 160 x 63 mm


1Buah Pengadaan Accessories Tee dia 160 x 63 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 160 x 63 mm


0.915
h/o
Tukang Pipa
0.832
h/o
Kepala Tukang
0.852
h/o
Pekerja
0.845
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

20.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 110 x 110 mm


1Buah Pengadaan Accessories Tee dia 110 x 110 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 110 x 110 mm


0.910
h/o
Tukang Pipa
0.832
h/o
Kepala Tukang
0.852
h/o
Pekerja
0.845
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

21.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 110 x 90 mm


1Buah Pengadaan Accessories Tee dia 110 x 90 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 110 x 90 mm


0.910
h/o
Tukang Pipa
0.832
h/o
Kepala Tukang
0.852
h/o
Pekerja
0.845
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

22.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 110 x 63 mm


1Buah Pengadaan Accessories Tee dia 110 x 63 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 110 x 63 mm


0.910
h/o
Tukang Pipa
0.832
h/o
Kepala Tukang
0.852
h/o
Pekerja
0.845
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

23.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 90 x 90 mm


1Buah Pengadaan Accessories Tee dia 90 x 90 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 90 x 90 mm


0.900
h/o
Tukang Pipa
0.823
h/o
Kepala Tukang
0.843
h/o
Pekerja
0.836
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

24.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 90 x 63 mm


1Buah Pengadaan Accessories Tee dia 90 x 90 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 90 x 63 mm


0.900
h/o
Tukang Pipa
0.823
h/o
Kepala Tukang
0.843
h/o
Pekerja
0.836
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

25.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 63 x 63 mm


1Buah Pengadaan Accessories Tee dia 63 x 63 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 63 x 63 mm


0.870
h/o
Tukang Pipa
0.815
h/o
Kepala Tukang
0.834
h/o
Pekerja
0.827
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

33.00 1Buah Pengadaan/Pemasangan Accessories Tee dia 2 x 3/4 mm


1Buah Pengadaan Accessories Tee dia 2 x 3/4 mm
1.000
Bh
Tee
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Tee dia 2 x 3/4 mm


0.870
h/o
Tukang Pipa
0.815
h/o
Kepala Tukang
0.834
h/o
Pekerja
0.827
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

26.00 1Buah Pengadaan/Pemasangan Accessories Dop dia 150 mm


1Buah Pengadaan Accessories Dop dia 150 mm
1.000
Bh
Dop
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Dop PVC dia. 150 mm


0.600
h/o
Tukang Pipa
0.400
h/o
Kepala Tukang
0.450
h/o
Pekerja
0.350
h/o
Mandor
1.000
ls
Alat Bantu

27.00 1Buah Pengadaan/Pemasangan Accessories Dop dia 110 mm


1Buah Pengadaan Accessories Dop dia 110 mm

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1.000
1.000

Bh
Ls

Dop

1 Buah Pemasangan Accessories Dop PVC dia. 110 mm


0.576
h/o
Tukang Pipa
0.384
h/o
Kepala Tukang
0.432
h/o
Pekerja
0.336
h/o
Mandor
1.000
ls
Alat Bantu

@ Rp.
Mobilisasi @ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

28.00 1Buah Pengadaan/Pemasangan Accessories Dop dia 90 mm


1Buah Pengadaan Accessories Dop dia 90 mm
1.000
Bh
Dop
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Dop PVC dia. 90 mm


0.570
h/o
Tukang Pipa
0.380
h/o
Kepala Tukang
0.428
h/o
Pekerja
0.333
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

29.00 1Buah Pengadaan/Pemasangan Accessories Dop dia 63 mm


1Buah Pengadaan Accessories Dop dia 63 mm
1.000
Bh
Dop
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Dop PVC dia. 63 mm


0.558
h/o
Tukang Pipa
0.372
h/o
Kepala Tukang
0.419
h/o
Pekerja
0.326
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 300 x 250 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 300 x 250 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 300 x 250 mm

0.871
0.793
0.762
0.785
1.000

h/o
h/o
h/o
h/o
ls

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

38.00 1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 300 x 200 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 300 x 200 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 300 x 200 mm
0.871
h/o
Tukang Pipa
@ Rp.
0.793
h/o
Kepala Tukang
@ Rp.
0.762
h/o
Pekerja
@ Rp.
0.785
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 250 x 200 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 250 x 200 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 250 x 200 mm
0.860
h/o
Tukang Pipa
@ Rp.
0.793
h/o
Kepala Tukang
@ Rp.
0.761
h/o
Pekerja
@ Rp.
0.777
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 250 x 160 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 250 x 160 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 250 x 160 mm

0.853
0.791
0.759
0.775
1.000

h/o
h/o
h/o
h/o
ls

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

39.00 1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 200 x 150 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 200 x 150 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 200 x 150 mm
0.852
h/o
Tukang Pipa
@ Rp.
0.783
h/o
Kepala Tukang
@ Rp.
0.756
h/o
Pekerja
@ Rp.
0.772
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 200 x 110 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 200 x 110 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 200 x 110 mm
0.850
h/o
Tukang Pipa
@ Rp.
0.781
h/o
Kepala Tukang
@ Rp.
0.754
h/o
Pekerja
@ Rp.
0.770
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

30.00 1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 150 x 110 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 150 x 110 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 150 x 110 mm

0.809
0.744
0.718
0.733
1.000

h/o
h/o
h/o
h/o
ls

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 150 x 63 mm


1Buah Pengadaan Accessories Reducer All Socket PVC dia. 150 x 63 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 150 x 63 mm


0.792
h/o
Tukang Pipa
@ Rp.
0.728
h/o
Kepala Tukang
@ Rp.
0.703
h/o
Pekerja
@ Rp.
0.718
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

31.00 1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 110 x 90 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 110 x 90 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 110 x 90 mm


0.784
h/o
Tukang Pipa
@ Rp.
0.720
h/o
Kepala Tukang
@ Rp.
0.696
h/o
Pekerja
@ Rp.
0.710
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

32.00 1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 110x63 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 110x63 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 110 x 63 mm


0.775
h/o
Tukang Pipa
@ Rp.
0.713
h/o
Kepala Tukang
@ Rp.
0.688
h/o
Pekerja
@ Rp.
0.703
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

32.00 1Buah Pengadaan/Pemasangan Accessories Reducer All Socket PVC dia. 90x63 mm
1Buah Pengadaan Accessories Reducer All Socket PVC dia. 90x63 mm
1.000
Bh
Reducer
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Reducer All Socket PVC dia. 90 x 63 mm


0.767
h/o
Tukang Pipa
@
0.705
h/o
Kepala Tukang
@
0.680
h/o
Pekerja
@
0.695
h/o
Mandor
@
1.000
ls
Alat Bantu
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Gate Valve dia. 300 mm


1Buah Pengadaan Accessories Gate Valve dia. 300 mm
1.000
Bh
Gate Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.
1 Buah Pemasangan Accessories Gate Valve CL PVC dia. 300 mm
0.974
h/o
Tukang Pipa
0.973
h/o
Kepala Tukang
0.962
h/o
Pekerja
0.873
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Gate Valve dia. 250 mm


1Buah Pengadaan Accessories Gate Valve dia. 250 mm
1.000
Bh
Gate Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.
1 Buah Pemasangan Accessories Gate Valve CL PVC dia. 250 mm
0.974
h/o
Tukang Pipa
0.973
h/o
Kepala Tukang

@ Rp.
@ Rp.

0.962
0.873
1.000

h/o
h/o
ls

Pekerja
Mandor
Alat Bantu

@ Rp.
@ Rp.
@ Rp.

1Buah Pengadaan/Pemasangan Accessories Gate Valve dia. 250 mm


1Buah Pengadaan Accessories Gate Valve dia. 250 mm
1.000
Bh
Gate Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.
1 Buah Pemasangan Accessories Gate Valve CL PVC dia. 250 mm
0.974
h/o
Tukang Pipa
0.973
h/o
Kepala Tukang
0.962
h/o
Pekerja
0.873
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

43.00 1Buah Pengadaan/Pemasangan Accessories Gate Valve dia. 200 mm


1Buah Pengadaan Accessories Gate Valve dia. 200 mm
1.000
Bh
Gate Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.
1 Buah Pemasangan Accessories Gate Valve CL PVC dia. 200 mm
0.954
h/o
Tukang Pipa
0.953
h/o
Kepala Tukang
0.942
h/o
Pekerja
0.873
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

33.00 1Buah Pengadaan/Pemasangan Accessories Gate Valve dia. 150 mm


1Buah Pengadaan Accessories Gate Valve dia. 150 mm
1.000
Bh
Gate Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Gate Valve CL PVC dia. 150 mm


0.923
h/o
Tukang Pipa
0.942
h/o
Kepala Tukang
0.921
h/o
Pekerja
0.852
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

34.00 1Buah Pengadaan/Pemasangan Accessories Gate Valve dia. 110 mm


1Buah Pengadaan Accessories Gate Valve dia. 110 mm
1.000
Bh
Gate Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Gate Valve CL PVC dia. 110 mm


0.877
h/o
Tukang Pipa
0.895
h/o
Kepala Tukang
0.875
h/o
Pekerja
0.809
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

35.00 1Buah Pengadaan/Pemasangan Accessories Gate Valve dia. 90 mm


1Buah Pengadaan Accessories Gate Valve dia. 90 mm
1.000
Bh
Gate Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Gate Valve CL PVC dia. 90 mm


0.849
h/o
Tukang Pipa
0.867
h/o
Kepala Tukang
0.847
h/o
Pekerja
0.784
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

36.00 1Buah Pengadaan/Pemasangan Accessories Gate Valve dia. 63 mm


1Buah Pengadaan Accessories Gate Valve dia. 63 mm
1.000
Bh
Gate Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Gate Valve CL PVC dia. 63 mm


0.831
h/o
Tukang Pipa
0.848
h/o
Kepala Tukang
0.829
h/o
Pekerja
0.767
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

42.00 1 Buah Pemasangan Accessories Colar PVC dia. 200 mm


0.850
h/o
Tukang Pipa
0.800
h/o
Kepala Tukang
0.900
h/o
Pekerja
0.750
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

43.00 1 Buah Pemasangan Accessories Colar PVC dia. 150 mm


0.820
h/o
Tukang Pipa
0.780
h/o
Kepala Tukang
0.770
h/o
Pekerja
0.720
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

44.00 1 Buah Pemasangan Accessories Colar PVC dia. 110 mm


0.779
h/o
Tukang Pipa
0.741
h/o
Kepala Tukang
0.732
h/o
Pekerja
0.684
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

45.00 1 Buah Pemasangan Accessories Colar PVC dia. 90 mm


0.754
h/o
Tukang Pipa
0.718
h/o
Kepala Tukang
0.708
h/o
Pekerja
0.662
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

46.00 1 Buah Pemasangan Accessories Colar PVC dia. 63 mm


0.738
h/o
Tukang Pipa
0.702
h/o
Kepala Tukang
0.693
h/o
Pekerja
0.648
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

48.00 1Buah Pengadaan/Pemasangan Accessories Stop Kran dia. 63 mm


1Buah Pengadaan Accessories Stop Kran dia. 63 mm
1.000
Bh
Stop Kran
@ Rp.
1.000
Ls
Mobilisasi @ Rp.
1 Buah Pemasangan AccessoriesStop Kran PVC dia. 63 mm
0.831
h/o
Tukang Pipa
0.848
h/o
Kepala Tukang
0.829
h/o
Pekerja
0.767
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

49.00 1Buah Pengadaan/Pemasangan Accessories Stop Kran dia. 90 mm


1Buah Pengadaan Accessories Stop Kran dia. 90 mm
1.000
Bh
Stop Kran
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan AccessoriesStop Kran PVC dia. 90 mm


0.831
h/o
Tukang Pipa
0.848
h/o
Kepala Tukang
0.829
h/o
Pekerja
0.767
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

37.00 1Buah Pengadaan/Pemasangan AccessoriesCheck Valve dia. 63 mm


1Buah Pengadaan Accessories Check Valve dia. 63 mm
1.000
Bh
Check Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Check Valve dia. 63 mm


0.831
h/o
Tukang Pipa
0.848
h/o
Kepala Tukang
0.829
h/o
Pekerja
0.767
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

38.00 1Buah Pengadaan/Pemasangan AccessoriesCheck Valve dia90 mm


1Buah Pengadaan Accessories Check Valve dia. 90 mm
1.000
Bh
Check Valve
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Check Valve dia. 90 mm


0.831
h/o
Tukang Pipa
0.848
h/o
Kepala Tukang
0.829
h/o
Pekerja
0.767
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

39.00 1Buah Pengadaan/Pemasangan Accessories Meter Produksi dia. 63 mm


1Buah Pengadaan Accessories Meter Produksi dia. 63 mm
1.000
Bh
Meter Produksi
@ Rp.

1.000

Ls

Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Meter Produksi dia. 63 mm


0.831
h/o
Tukang Pipa
0.848
h/o
Kepala Tukang
0.829
h/o
Pekerja
0.767
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

40.00 1Buah Pengadaan/Pemasangan Accessories Meter Produksi dia. 90 mm


1Buah Pengadaan Accessories Meter Produksi dia. 90 mm
1.000
Bh
Meter produksi
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Meter Produksi dia. 90 mm


0.849
h/o
Tukang Pipa
0.867
h/o
Kepala Tukang
0.847
h/o
Pekerja
0.784
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

41.00 1Buah Pengadaan/Pemasangan Accessories Meter Produksi dia. 110 mm


1Buah Pengadaan Accessories Meter Produksi dia. 110 mm
1.000
Bh
Meter produksi
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Meter Produksi dia. 110 mm


0.877
h/o
Tukang Pipa
0.895
h/o
Kepala Tukang
0.875
h/o
Pekerja
0.809
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Water Meter dia. 300 mm


1Buah Pengadaan Accessories Water Meter dia. 300 mm
1.000
Bh
Meter produksi
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1Buah Pemasangan Accessories Water Meter dia. 300 mm


0.923
h/o
Tukang Pipa
0.942
h/o
Kepala Tukang
0.921
h/o
Pekerja
0.852
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

42.00 1Buah Pengadaan/Pemasangan Accessories Meter Produksi dia. 160 mm


1Buah Pengadaan Accessories Meter Produksi dia. 160 mm
1.000
Bh
Meter produksi
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Meter Produksi dia. 160 mm


0.923
h/o
Tukang Pipa
0.942
h/o
Kepala Tukang
0.921
h/o
Pekerja
0.852
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Flange dia. ;300 mm


1Buah Pengadaan Accessories Glange dia. 300 mm
1.000
Bh
Flange
@ Rp.
1.000
Ls
Mobilisasi @ Rp.
1 Buah Pemasangan Accessories Flange PVC dia. 300 mm
0.590
h/o
Tukang Pipa
0.550
h/o
Kepala Tukang
0.560
h/o
Pekerja
0.480
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1Buah Pengadaan/Pemasangan Accessories Flange dia. 250 mm


1Buah Pengadaan Accessories Glange dia. 250 mm
1.000
Bh
Flange
@ Rp.
1.000
Ls
Mobilisasi @ Rp.
1 Buah Pemasangan Accessories Flange PVC dia. 250 mm
0.580
h/o
Tukang Pipa
0.510
h/o
Kepala Tukang
0.560
h/o
Pekerja
0.480
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

43.00 1Buah Pengadaan/Pemasangan Accessories Flange dia. 200 mm


1Buah Pengadaan Accessories Glange dia. 200 mm
1.000
Bh
Flange
@ Rp.
1.000
Ls
Mobilisasi @ Rp.
1 Buah Pemasangan Accessories Flange PVC dia. 200 mm
0.580
h/o
Tukang Pipa
0.510
h/o
Kepala Tukang
0.560
h/o
Pekerja
0.480
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

44.00 1Buah Pengadaan/Pemasangan Accessories Flange dia. 150 mm


1Buah Pengadaan Accessories Flange dia. 150 mm
1.000
Bh
Flange
@ Rp.
1.000
Ls
Mobilisasi @ Rp.
1 Buah Pemasangan Accessories Flange PVC dia. 150 mm
0.550
h/o
Tukang Pipa
0.500
h/o
Kepala Tukang
0.550
h/o
Pekerja
0.450
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

45.00 1Buah Pengadaan/Pemasangan Accessories Flange dia. 110 mm


1Buah Pengadaan Accessories Flange dia. 110 mm
1.000
Bh
Flange
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Flange PVC dia. 110 mm


0.523
h/o
Tukang Pipa
0.475
h/o
Kepala Tukang
0.523
h/o
Pekerja
0.428
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

46.00 1Buah Pengadaan/Pemasangan Accessories Flange dia. 90 mm


1Buah Pengadaan Accessories Flange dia. 90 mm
1.000
Bh
Flange
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Flange PVC dia. 90 mm


0.506
h/o
Tukang Pipa
0.460
h/o
Kepala Tukang
0.506
h/o
Pekerja
0.414
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

47.00 1Buah Pengadaan/Pemasangan Accessories Flange dia. 63 mm


1Buah Pengadaan Accessories Flange dia. 63 mm
1.000
Bh
Flange
@ Rp.
1.000
Ls
Mobilisasi @ Rp.

1 Buah Pemasangan Accessories Flange Adaptor/Spigot PVC dia. 63 mm


0.495
h/o
Tukang Pipa
@ Rp.
0.450
h/o
Kepala Tukang
@ Rp.
0.495
h/o
Pekerja
@ Rp.
0.405
h/o
Mandor
@ Rp.
1.000
ls
Alat Bantu
@ Rp.

52.00 1 Buah Pemasangan Accessories Straat pot CL PVC dia. 150 mm


0.580
h/o
Tukang Pipa
0.510
h/o
Kepala Tukang
0.560
h/o
Pekerja
0.480
h/o
Mandor
1.000
ls
Alat Bantu

@
@
@
@
@

53.00 1 m' Test Hidrostatic Pipa PVC dia. 300mm


0.035
h/o
Tukang Pipa

@ Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

0.039
0.025
0.039
0.062
0.035
1.000

h/o
h/o
h
ltr
m3
ls

Pekerja
Operator
Sewa Test Pump
Bensin
air Bersih
Alat Bantu

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

54.00 1 m' Test Hidrostatic Pipa PVC dia. 200mm


0.033
h/o
Tukang Pipa
0.037
h/o
Pekerja
0.023
h/o
Operator
0.037
h
Sewa Test Pump
0.060
ltr
Bensin
0.033
m3
air Bersih
1.000
ls
Alat Bantu

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

55.00 1 m' Test Hidrostatic Pipa PVC dia. 150 mm


0.030
h/o
Tukang Pipa
0.034
h/o
Pekerja
0.019
h/o
Operator
0.032
h
Sewa Test Pump
0.055
ltr
Bensin
0.030
m3
air Bersih
1.000
ls
Alat Bantu

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

56.00 1 Buah Pembuatan Thurst


0.260
0.012
0.200
0.220
0.020
1.000

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Block PVC 150 - 300 mm


m3
Galian Tanah
m3
Galian Pasir
m3
Urugan Tanah
m3
Bekisting Biasa
m3
Beton 1:3:5
ls
Alat Bantu

57.00 1 Unit Pemasangan Jembatan Pipa GIP dia. 300 mm Bentang 32 m


15.000 m3
Galian Tanah
@ Rp.
0.400 m3
Urugan Pasir
@ Rp.
2.100 m3
Thrust Block Beton Cor 1:3:5
@ Rp.
1.000 m3
Buangan Tanah Sisa Galian
@ Rp.
1.800 m2
Pasangan Batu Kali
@ Rp.
16.000 m2
Pasangan Bekisting
@ Rp.
1,149.000 Kg
Pasangan Besi beton
@ Rp.
4,365.000 Kg
Pasangan Besi IWF 400 x 200 x 8 m @ Rp.
298.000 Kg
Pasangan Besi Canal 100 x 50 x 5 m @ Rp.
314.000 Kg
Pasangan Besi Siku 70 x 70 x 7 mm @ Rp.
265.000 Kg
Pasangan Besi Plat 5 mm
@ Rp.
2.000 buah
Pemasangan Bar Pengaman
@ Rp.
32.000 m'
Pemasangan Pipa dan Accessories @ Rp.
96.000 buah
Pemasangan Baut dan Mur
@ Rp.

1.000
2.000
1.000
1.000
1.000
1.000
1.000

unit
buah
unit
ls
ls
ls
ls

Pemasangan Wash Out


Pemasangan Straat Pot (Box Valve)
Penyetelan Jembatan Pipa
Penyambungan dengan Pipa
Alat Bantu
Pengecetan dan Perapihan
Pengelasan

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58.00 1 Unit Pemasangan Jembatan Pipa GIP dia. 300 mm, Bentang 9 m
8.000 m3
Galian Tanah
@
0.500 m3
Urugan Pasir
@
2.400 m3
Thrust Block Beton Cor 132:5
@
1.500 m3
Buangan Tanah Sisa Galian
@
0.750 m2
Pasangan Batu Kali
@
28.000 m2
Pasangan Bekisting
@
862.000 Kg
Pasangan Besi beton
@
3,273.000 Kg
Pasangan Besi IWF 300 x 20 x 8 mm @
224.000 Kg
Pasangan Besi Canal 100 x 50 x 5 m @
235.000 Kg
Pasangan Besi Siku 70 x 70 x 7 mm @
196.000 Kg
Pasangan Besi Plat 5 mm
@
2.000 buah
Pemasangan Bar Pengaman
@
11.000 m'
Pemasangan Pipa dan Accessories @
32.000 buah
Pemasangan Baut dan Mur
@
1.000 unit
Pemasangan Wash Out
@
2.000 buah
Pemasangan Straat Pot (Box Valve) @
1.000 unit
Penyetelan Jembatan Pipa
@
1.000 ls
Penyambungan dengan Pipa
@
1.000 ls
Alat Bantu
@
1.000 ls
Pengecetan dan Perapihan
@
1.000 ls
Pengelasan
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

59.00 1 Unit Pemasangan Jembatan Pipa GIP dia. 300 mm, Bentang 8 m
2.750 m3
Galian Tanah
0.450 m3
Urugan Pasir
1.250 m3
Thrust Block Beton Cor 132:5
0.750 m3
Buangan Tanah Sisa Galian
0.650 m2
Pasangan Batu Kali
2.000 buah
Pemasangan Bar Pengaman
10.000 m'
Pemasangan Pipa dan Accessories
54.000 buah
Pemasangan Baut dan Mur
1.000 ls
Penyambungan dengan Pipa
1.000 ls
Alat Bantu
1.000 ls
Pengecetan dan Perapihan
1.000 ls
Pengelasan

@
@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

60.00 1 Unit Pemasangan Jembatan Pipa GIP dia. 200 mm, Bentang 9 m
2.500 m3
Galian Tanah

@ Rp.

0.400
1.250
0.350
0.650
2.000
54.000
1.000
1.000
1.000
1.000
1.000

m3
m3
m3
m2
buah
m'
buah
ls
ls
ls
ls

Urugan Pasir
Thrust Block Beton Cor 132:5
Buangan Tanah Sisa Galian
Pasangan Batu Kali
Pemasangan Bar Pengaman
Pemasangan Pipa dan Accessories
Pemasangan Baut dan Mur
Penyambungan dengan Pipa
Alat Bantu
Pengecetan dan Perapihan
Pengelasan

@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61.00 1 Unit Pemasangan Jembatan Pipa GIP dia. 200 mm, Bentang 6 m
2.500 m3
Galian Tanah
0.400 m3
Urugan Pasir
1.250 m3
Thrust Block Beton Cor 132:5
0.350 m3
Buangan Tanah Sisa Galian
0.650 m2
Pasangan Batu Kali
2.000 buah
Pemasangan Bar Pengaman
8.000 m'
Pemasangan Pipa dan Accessories
24.000 buah
Pemasangan Baut dan Mur
1.000 ls
Penyambungan dengan Pipa
1.000 ls
Alat Bantu
1.000 ls
Pengecetan dan Perapihan
1.000 ls
Pengelasan

@
@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62.00 1 Unit Pemasangan Jembatan Pipa GIP dia. 200 mm, Bentang 5 m
2.500 m3
Galian Tanah
0.400 m3
Urugan Pasir
1.100 m3
Thrust Block Beton Cor 132:5
0.300 m3
Buangan Tanah Sisa Galian
0.600 m2
Pasangan Batu Kali
2.000 buah
Pemasangan Bar Pengaman
7.000 m'
Pemasangan Pipa dan Accessories
24.000 buah
Pemasangan Baut dan Mur
1.000 ls
Penyambungan dengan Pipa
1.000 ls
Alat Bantu
1.000 ls
Pengecetan dan Perapihan
1.000 ls
Pengelasan

@
@
@
@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63.00 1 Unit Pemasangan Jembatan Pipa GIP dia. 150 mm, Bentang 7 m
2.500 m3
Galian Tanah
0.400 m3
Urugan Pasir
1.100 m3
Thrust Block Beton Cor 132:5
0.300 m3
Buangan Tanah Sisa Galian
0.600 m2
Pasangan Batu Kali
2.000 buah
Pemasangan Bar Pengaman
9.000 m'
Pemasangan Pipa dan Accessories

@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

54.000
1.000
1.000
1.000
1.000
41.

buah
ls
ls
ls
ls

Pemasangan Baut dan Mur


Penyambungan dengan Pipa
Alat Bantu
Pengecetan dan Perapihan
Pengelasan

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1 Unit Crossing Jalan Pipa GIP dia. 150 mm, Lebar 30 m


3.250 m3
Galian Aspal
@
4.860 m3
Urugan Pasir
@
12.800 m3
Urugan Tanah Keras
@
30.000 m'
Penyambungan Pipa dan Accessories@
5.400 m3
Urugan Tanah Kembali
@
5,091.000 m3
Buangan Sisa Galian
@
12.000 m3
Perbaikan Aspal/Perapihan
@
1.000 ls
Alat Bantu
@
1.000 ls
Pengecetan dan Perapihan
@
1.000 ls
Pengelasan
@
Utk Flange GIP dia. 63 mm
1.50 @

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

20

Memasang 1 M' Pipa Galvanis Diameter 1/2"


Bahan
1.200
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

21

0.054
0.090
0.009
0.027

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 3/4"


Bahan
1.200
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

0.054
0.090
0.009
0.027

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

22

Memasang 1 M' Pipa Galvanis Diameter 1"


Bahan
1.200
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

23

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.108
0.180
0.018
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 3"


Bahan
1.200
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

25

Oh
Oh
Oh
Oh

Memasang 1 M' Pipa Galvanis Diameter 2


Bahan
1.200
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

24

0.054
0.090
0.009
0.027

0.108
0.180
0.018
0.005

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 4"


Bahan
1.200
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

0.135
0.225
0.023
0.007

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

26

Memasang 1 M' Pipa PVC Tipe AW Diameter 1/2"


Bahan
1.200
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

27

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.036
0.060
0.006
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 1"


Bahan
1.200
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

29

Oh
Oh
Oh
Oh

Memasang 1 M' Pipa PVC Tipe AW Diameter 3/4"


Bahan
1.200
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

28

0.036
0.060
0.006
0.002

0.036
0.060
0.006
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 11/2"


Bahan
1.200
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

0.036
0.060
0.006
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

30

Memasang 1 M' Pipa PVC Tipe AW Diameter 2"


Bahan
1.200
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

31

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 21/2"


Bahan
1.200
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

32

0.054
0.090
0.009
0.003

0.036
0.060
0.006
0.002

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 3"


Bahan
1.200
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

0.081
0.135
0.014
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

2.00 Memasang 1 M' Pipa PVC Tipe AW Diameter 4"


Bahan
1.200
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

0.081
0.135
0.014
0.004

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

34

Memasang 1 Buah Bak Cuci Piring Stainless Steel


Bahan
1.000
Bh
Bak Cuci Stainless Steel
1.000
Set
Water Drain dan Asesories

Tenaga

35

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Teraso
Bak Cuci Teraso
Water Drain dan Asesories
Semen Portland

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

M3

Pasir

@ Rp.

0.050
0.500
0.050
0.003

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

0.010
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Memasang 1 Buah Floor Drain


Bahan
1.000
Bh

Tenaga

@
@
@
@

0.003

Memasang 1 Buah Kran Diameter 3/4" atau 1/2"


Bahan
1.000
Bh
Kran Air
0.025
Bh
Seal Tape

Tenaga

37

Oh
Oh
Oh
Oh

Memasang 1 Buah Bak Cuci Piring


Bahan
1.000
Bh
1.000
Bh
20.000
Kg

Tenaga

36

0.030
0.300
0.030
0.002

@ Rp.
@ Rp.

0.010
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Floor Drain

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

ATUAN

17,220.00 = Rp.

29,274.00

2,767,500.00 = Rp.
12,792.00 = Rp.
90,232.80 = Rp.
Jumlah I
Rp.

6,365,250.00
3,837.60
135,349.20
6,533,710.80

84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

168,989.70
71,442.09
20,548.87
4,630.27
265,610.94
6,799,321.74

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah I
Rp.

71,442.09
4,630.27
76,072.36

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah
Rp.

53,581.57
2,315.14
55,896.70

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah
Rp.

107,163.14
5,556.33
112,719.46

45,444.48
54,533.37
65,440.04
78,528.05
94,233.66
113,080.40

=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

135,696.48
162,835.77
195,402.92
234,483.51
281,380.21
337,656.25
405,187.50
486,225.00
583,470.01
700,164.01

=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

37,578.54
130,159.95
14,610.57
4,815.48
187,164.55

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

52,509.94
268,208.39
30,106.64
6,760.20
357,585.16

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

44,651.31
130,159.95
14,610.57
5,741.54
195,163.37

71,442.09 = Rp.
78,884.82 = Rp.
88,548.93 = Rp.

89,302.61
130,159.95
14,610.57

3,973,761.67

45,444.48
54,533.37
65,440.04
78,528.05
94,233.66
113,080.40
135,696.48
586,956.48

92,605.47 = Rp.
Jumlah
Rp.

11,575.68
245,648.82

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

Rp.
Rp.
Rp.
Rp.
Rp.

58,796.84
130,159.95
14,610.57
7,686.25
211,253.62

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah
Rp.

35,721.05
4,630.27
40,351.32

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

Rp.
Rp.
Rp.
Rp.
Rp.

35,721.05
35,498.17
22,137.23
4,630.27
97,986.72

215,250.00 = Rp.
Jumlah I
Rp.

258,300.00
258,300.00

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

21,432.63
926.05
22,358.68
280,658.68

647,595.00 = Rp.
Jumlah I
Rp.

777,114.00
777,114.00

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

21,432.63
926.05
22,358.68
799,472.68

104,550.00 = Rp.
Jumlah I
Rp.

627,300.00
627,300.00

=
=
=
=

=
=
=
=

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

17,860.52
2,315.14
20,175.66
647,475.66

615,000.00 = Rp.
Jumlah I
Rp.

738,000.00
738,000.00

71,442.09 = Rp.
84,494.85 = Rp.
88,548.93 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

20,275.27
24,199.33
126,793.21
13,261.10
184,528.91
922,528.91

289,050.00
325,950.00
369,000.00
3,700,000.00
Jumlah I

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

79,488.75
9,778.50
18,450.00
185,000.00
292,717.25

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,442.09
165,658.12
3,541.96
9,260.55
249,902.72
542,619.97

289,050.00 = Rp.
Jumlah I
Rp.

346,860.00
346,860.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

55,724.83
25,348.46
4,007.03
3,611.61
88,691.93
435,551.93

289,050.00 = Rp.

346,860.00

215,250.00 = Rp.

92,988.00

=
=
=
=

Jumlah I

Rp.

439,848.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

55,724.83
32,952.99
4,007.03
3,611.61
96,296.47
536,144.47

289,050.00 = Rp.
2,017.20 = Rp.

317,955.00
328,803.60

369,000.00 = Rp.
Jumlah I
Rp.

191,880.00
838,638.60

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,163.14
50,696.91
6,164.66
6,945.41
170,970.12
1,009,608.72

2,017.20 = Rp.

782,673.60

430,500.00 = Rp.

356,454.00

492,000.00 = Rp.
Jumlah I
Rp.

319,800.00
1,458,927.60

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

428,652.54
84,494.85
10,274.44
27,781.64
551,203.47
2,010,131.07

2,017.20 = Rp.

806,880.00

430,500.00 = Rp.

206,640.00

615,000.00 = Rp.
26,000.00 = Rp.

492,000.00
31,200.00

=
=
=
=

Jumlah I

Rp.

1,536,720.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

142,884.18
29,573.20
3,596.05
92,605.47
268,658.90
1,805,378.90

2,767,500.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.
Jumlah I
Rp.

110,700.00
3,837.60
3,400.00
117,937.60

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,432.63
21,968.66
2,671.35
463.03
46,535.67
164,473.27

17,220.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.
Jumlah I
Rp.

774.90
3,837.60
3,400.00
8,012.50

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,432.63
21,968.66
2,671.35
463.03
46,535.67
54,548.17

17,220.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

688.80
5,116.80
6,800.00

4,538,700.00 = Rp.

63,250.00 = Rp.
17,220.00 = Rp.
Jumlah I
Rp.

68,080.50
22,137.50
34,440.00
137,263.60

71,442.09 = Rp.
84,494.85 = Rp.

21,432.63
27,883.30

102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

3,390.56
555.63
53,262.12
190,525.72

14,000.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

560.00
5,116.80
6,800.00

4,538,700.00 = Rp.

63,250.00 = Rp.
17,220.00 = Rp.
Jumlah I
Rp.

81,696.60
22,137.50
34,440.00
150,750.90

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
27,883.30
3,390.56
555.63
54,690.97
205,441.87

14,000.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

560.00
5,116.80
6,800.00

4,538,700.00 = Rp.

63,250.00 = Rp.
17,220.00 = Rp.
Jumlah I
Rp.

68,080.50
22,137.50
103,320.00
206,014.80

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
27,883.30
3,390.56
555.63
54,690.97
260,705.77

14,000.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

420.00
5,116.80
6,800.00

4,538,700.00 = Rp.

90,774.00
22,137.50
51,660.00
312,000.00
488,908.30

=
=
=
=

=
=
=
=

63,250.00 = Rp.
17,220.00 = Rp.
78,000.00 = Rp.
Jumlah I
Rp.

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
27,883.30
3,390.56
555.63
54,690.97
543,599.27

14,000.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

420.00
5,116.80
5,100.00

4,538,700.00 = Rp.

63,250.00 = Rp.
17,220.00 = Rp.
Jumlah I
Rp.

68,080.50
22,137.50
34,440.00
135,294.80

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
27,883.30
3,390.56
555.63
54,690.97
189,985.77

2,017.20 = Rp.

782,673.60

430,500.00 = Rp.

279,825.00

615,000.00 = Rp.
Jumlah I
Rp.

399,750.00
1,462,248.60

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

428,652.54
84,494.85
10,274.44
27,781.64
551,203.47
2,013,452.07

2,017.20 = Rp.

806,880.00

430,500.00 = Rp.

172,200.00

615,000.00 = Rp.
Jumlah I
Rp.

504,300.00
1,483,380.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II

=
=
=
=

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

428,652.54
84,494.85
10,274.44
27,781.64
551,203.47

Jumlah I + II

Rp.

2,034,583.47

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

664,200.00
36,715.50
13,600.00
2,022,603.30
61,715.25
677,779.20

430,500.00 = Rp.

232,470.00

615,000.00 = Rp.
Jumlah I
Rp.

498,150.00
4,207,233.25

71,442.09
84,494.85
84,494.85
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

378,643.08
23,236.08
109,843.31
88,719.59
26,919.02
24,540.45
651,901.53
4,859,134.78

2,767,500.00
12,792.00
34,000.00
12,841.93
27,429.00
2,017.20

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

747,225.00
25,584.00
20,400.00
2,568,385.14
82,287.00
651,555.60

430,500.00 = Rp.

223,860.00

615,000.00 = Rp.
Jumlah I
Rp.

479,700.00
4,798,996.74

71,442.09
84,494.85
84,494.85
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

346,494.14
29,573.20
131,811.97
118,292.79
34,008.38
15,742.93
675,923.40
5,474,920.14

2,767,500.00
24,477.00
34,000.00
12,841.93
27,429.00
2,017.20

=
=
=
=
=
=

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,950.00 = Rp.
2,017.20 = Rp.

273,000.00
53,556.66

369,000.00 = Rp.
Jumlah I
Rp.

34,317.00
360,873.66

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

46,437.36
16,898.97
2,054.89
2,778.16
68,169.38
429,043.04

2,017.20 = Rp.

12,587.33

369,000.00 = Rp.
Jumlah I
Rp.

8,856.00
21,443.33

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,432.63
12,674.23
1,541.17
1,389.08
37,037.10
58,480.43

2,017.20 = Rp.

17,509.30

369,000.00 = Rp.
Jumlah I
Rp.

10,332.00
27,841.30

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,860.52
16,898.97
2,054.89
1,157.57
37,971.95
65,813.24

4,538,700.00 = Rp.
24,477.00 = Rp.

4,992,570.00
30,596.25

=
=
=
=

=
=
=
=

=
=
=
=

2,250,000.00 = Rp.
Jumlah I
Rp.

2,250,000.00
7,273,166.25

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

500,094.63
1,774,391.85
215,763.16
32,411.91
2,522,661.55
9,795,827.80

4,538,700.00 = Rp.
13,591.50 = Rp.
Jumlah I
Rp.

5,446,440.00
76,112.40
5,522,552.40

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,515,665.37
179,255.82
1,089,881.35
98,235.88
2,883,038.43
8,405,590.83

4,538,700.00 = Rp.
Jumlah I
Rp.

5,446,440.00
5,446,440.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

428,652.54
1,520,907.30
205,488.72
27,781.64
2,182,830.20
7,629,270.20

2,767,500.00 = Rp.
Jumlah I
Rp.

3,044,250.00
3,044,250.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

285,768.36
1,013,938.20
123,293.23
23,151.37
1,446,151.16
4,490,401.16

=
=
=
=

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,767,500.00 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.

33,210.00
2,447.70
35,657.70

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,782.69
2,577.09
15,668.51
1,407.60
41,435.90
77,093.60

4,538,700.00 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.

49,017.96
2,447.70
51,465.66

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,144.21
16,898.97
2,054.89
463.03
26,561.09
78,026.75

17,589.00 = Rp.
Jumlah I
Rp.

18,468.45
18,468.45

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,500.28
1,774.39
205.49
92.61
3,572.77
22,041.22

221,400.00 = Rp.

Rp.

221,400.00
221,400.00

Rp.
Rp.
Rp.
Rp.
Rp.

4,286.53
50,696.91
6,164.66
277.82
61,425.91

=
=
=
=

=
=
=
=

=
=
=
=

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II

=
=
=
=

Jumlah I + II

Rp.

282,825.91

153,750.00 = Rp.
Jumlah I
Rp.

153,750.00
153,750.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

43,050.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

33,948.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

357.21
42,247.43
513.72
231.51
43,349.87
197,099.87
#VALUE!
357.21
42,247.43
513.72
23.15
#VALUE!
#VALUE!
43,050.00
#VALUE!
1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
33,948.00
#VALUE!
714.42
8,449.49
1,027.44
46.30
#VALUE!
#VALUE!
-

11,193.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,193.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

18,450.00 = Rp.
Jumlah I
Rp.
71,442.09 = Rp.

11,193.00
#VALUE!
714.42
8,449.49
1,027.44
46.30
#VALUE!
#VALUE!
#VALUE!
1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
11,193.00
#VALUE!
1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
#VALUE!
3,572.10
42,247.43
5,137.22
231.51
#VALUE!
#VALUE!
18,450.00
#VALUE!
1,428.84

84,494.85 = Rp.
102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

16,898.97
2,054.89
92.61
#VALUE!
#VALUE!
#VALUE!
3,572.10
42,247.43
5,137.22
231.51
#VALUE!
#VALUE!
#VALUE!
714.42
8,449.49
1,027.44
46.30
#VALUE!
#VALUE!
#VALUE!
4,286.53
50,696.91
6,164.66
277.82
#VALUE!
#VALUE!
#VALUE!
1,786.05
21,123.71
2,568.61
115.76
#VALUE!

Jumlah I + II

Rp.

#VALUE!
-

232,470.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

255,717.00
#VALUE!
1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
-

238,620.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

262,482.00
#VALUE!
1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
-

Err:512
Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Err:512
#VALUE!
1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
-

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
1,786.05
21,123.71
2,568.61
115.76
#VALUE!
#VALUE!
-

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
-

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
-

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
1,178.79
13,941.65
1,695.28
74.08
#VALUE!
#VALUE!
-

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
-

Jumlah I

= Rp.
Rp.

#VALUE!

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

82,410.00 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,071.63
12,674.23
1,541.17
69.45
#VALUE!
#VALUE!
244.77
#VALUE!
2,143.26
5,914.64
719.21
138.91
#VALUE!
#VALUE!
244.77
#VALUE!
2,143.26
5,914.64
719.21
138.91
#VALUE!
#VALUE!
57,687.00
244.77
#VALUE!
2,143.26
5,914.64
719.21
138.91
#VALUE!
#VALUE!
-

= Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
244.77
#VALUE!
2,143.26
5,914.64
719.21
138.91
#VALUE!
#VALUE!
1,223.85
#VALUE!
4,286.53
84,494.85
1,027.44
277.82
#VALUE!
#VALUE!
1,223.85
#VALUE!
4,286.53
84,494.85
1,027.44
277.82
#VALUE!
#VALUE!
-

= Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,250.00 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,250.00 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

63,250.00 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,223.85
#VALUE!
4,286.53
84,494.85
1,027.44
277.82
#VALUE!
#VALUE!
22,770.00
734.31
#VALUE!
5,000.95
8,449.49
1,027.44
324.12
#VALUE!
#VALUE!
22,770.00
734.31
#VALUE!
5,000.95
8,449.49
1,027.44
324.12
#VALUE!
#VALUE!
23,718.75
734.31
#VALUE!
5,000.95
8,449.49
1,027.44
324.12
#VALUE!
#VALUE!
-

63,250.00 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

139,782.50 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

139,782.50 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

23,718.75
734.31
#VALUE!
5,000.95
8,449.49
1,027.44
324.12
#VALUE!
#VALUE!
50,321.70
734.31
#VALUE!
5,000.95
8,449.49
1,027.44
324.12
#VALUE!
#VALUE!
52,418.44
734.31
#VALUE!
5,000.95
8,449.49
1,027.44
324.12
#VALUE!
#VALUE!
-

= Rp.
24,477.00 = Rp.
11,832.60 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

244.77
591.63
#VALUE!
14,288.42
50,696.91
6,164.66
926.05
#VALUE!
#VALUE!
-

= Rp.
24,477.00 = Rp.
11,832.60 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

244.77
591.63
#VALUE!
14,288.42
50,696.91
6,164.66
926.05
#VALUE!
#VALUE!
-

= Rp.
24,477.00 = Rp.
11,832.60 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
75,289.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

71,442.09 = Rp.
84,494.85 = Rp.
102,744.36 = Rp.

244.77
591.63
#VALUE!
14,288.42
50,696.91
6,164.66
926.05
#VALUE!
#VALUE!
2,258.67
#VALUE!
42,865.25
8,449.49
1,027.44
277.82
#VALUE!
#VALUE!
#VALUE!
10,716.31
42,247.43
5,137.22

92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.
= Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

694.54
#VALUE!
#VALUE!
244.77
#VALUE!
3,572.10
4,224.74
513.72
277.82
#VALUE!
#VALUE!
-

Err:512
= Rp.
12,792.00 = Rp.
= Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Err:512
767.52
#VALUE!
12,859.58
27,038.35
32,878.20
833.45
#VALUE!
#VALUE!
-

Err:512
= Rp.
12,792.00 = Rp.
63,250.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Err:512
767.52
24,667.50
#VALUE!
19,289.36
33,797.94
4,109.77
1,250.17
#VALUE!
#VALUE!
-

Err:512
= Rp.
75,289.00 = Rp.
= Rp.
Jumlah I
Rp.

Err:512
4,517.34
#VALUE!
-

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

18,574.94
33,797.94
4,109.77
1,203.87
#VALUE!
#VALUE!
-

= Rp.
75,289.00 = Rp.
= Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
11,832.60 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.

4,517.34
#VALUE!
22,147.05
39,712.58
4,828.98
1,435.38
#VALUE!
#VALUE!
1,301.59
#VALUE!
7,144.21
4,224.74
513.72
463.03
#VALUE!
#VALUE!
#VALUE!
10,716.31
6,337.11
821.95
740.84
#VALUE!
#VALUE!
#VALUE!

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Err:512

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

369,000.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Err:512

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

369,000.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Err:512

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.

10,716.31
6,337.11
821.95
740.84
#VALUE!
#VALUE!
#VALUE!
10,716.31
5,069.69
616.47
740.84
#VALUE!
#VALUE!
Err:512
11,808.00
#VALUE!
28,576.84
16,898.97
2,054.89
185.21
#VALUE!
#VALUE!
Err:512
11,808.00
#VALUE!
28,576.84
16,898.97
2,054.89
185.21
#VALUE!
#VALUE!
Err:512

369,000.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
13,591.50 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

90,232.80 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

90,232.80 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

90,232.80 = Rp.
32,472.00 = Rp.

11,808.00
#VALUE!
28,576.84
16,898.97
2,054.89
185.21
#VALUE!
#VALUE!
679.58
#VALUE!
10,001.89
5,661.15
719.21
648.24
#VALUE!
#VALUE!
63,162.96
3,896.64
#VALUE!
10,001.89
6,337.11
821.95
740.84
#VALUE!
#VALUE!
63,162.96
3,896.64
#VALUE!
10,001.89
6,337.11
821.95
740.84
#VALUE!
#VALUE!
54,139.68
3,896.64

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62,680.80 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62,680.80 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62,680.80 = Rp.
32,472.00 = Rp.

#VALUE!
10,001.89
5,914.64
719.21
648.24
#VALUE!
#VALUE!
47,010.60
3,896.64
#VALUE!
10,001.89
5,914.64
719.21
648.24
#VALUE!
#VALUE!
26,615.23
3,896.64
#VALUE!
10,001.89
5,914.64
719.21
648.24
#VALUE!
#VALUE!
26,325.94
3,896.64
#VALUE!
10,001.89
5,914.64
719.21
648.24
#VALUE!
#VALUE!
27,579.55
3,896.64

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62,680.80 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62,680.80 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

76,043.52 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62,680.80 = Rp.
32,472.00 = Rp.

#VALUE!
10,001.89
5,661.15
719.21
648.24
#VALUE!
#VALUE!
31,967.21
3,896.64
#VALUE!
10,001.89
5,661.15
719.21
648.24
#VALUE!
#VALUE!
50,144.64
3,896.64
#VALUE!
10,001.89
5,661.15
719.21
648.24
#VALUE!
#VALUE!
28,136.10
3,896.64
#VALUE!
10,001.89
5,661.15
719.21
648.24
#VALUE!
#VALUE!
23,818.70
3,896.64

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62,680.80 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62,680.80 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

137,726.88 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

137,726.88 = Rp.
11,832.60 = Rp.

#VALUE!
10,001.89
5,661.15
719.21
648.24
#VALUE!
#VALUE!
28,833.17
3,896.64
#VALUE!
10,001.89
5,661.15
719.21
648.24
#VALUE!
#VALUE!
30,713.59
3,896.64
#VALUE!
10,001.89
5,661.15
719.21
648.24
#VALUE!
#VALUE!
78,504.32
3,896.64
#VALUE!
10,001.89
5,661.15
719.21
648.24
#VALUE!
#VALUE!
33,054.45
70,995.60

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

137,726.88 = Rp.
11,832.60 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

137,726.88 = Rp.
32,472.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
11,832.60 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
11,832.60 = Rp.

#VALUE!
6,001.14
10,561.86
1,335.68
370.42
#VALUE!
#VALUE!
289,226.44
70,995.60
#VALUE!
6,001.14
10,561.86
1,335.68
370.42
#VALUE!
#VALUE!
282,340.09
194,832.00
#VALUE!
6,001.14
10,561.86
1,335.68
370.42
#VALUE!
#VALUE!
70,995.60
#VALUE!
6,001.14
10,561.86
1,335.68
370.42
#VALUE!
#VALUE!
70,995.60

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
11,832.60 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
11,832.60 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
11,832.60 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
12,792.00 = Rp.

#VALUE!
6,001.14
10,561.86
1,335.68
370.42
#VALUE!
#VALUE!
70,995.60
#VALUE!
6,001.14
10,561.86
1,335.68
370.42
#VALUE!
#VALUE!
70,995.60
#VALUE!
7,144.21
12,674.23
1,335.68
370.42
#VALUE!
#VALUE!
70,995.60
#VALUE!
6,001.14
10,561.86
1,335.68
370.42
#VALUE!
#VALUE!
383.76

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,194.69 = Rp.
63,250.00 = Rp.
13,591.50 = Rp.
= Rp.
= Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
12,792.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
13,591.50 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
14,288.42
8,449.49
1,027.44
926.05
#VALUE!
#VALUE!
49,643.39
22,137.50
407.75
#VALUE!
14,288.42
25,348.46
308.23
926.05
#VALUE!
#VALUE!
2,558.40
#VALUE!
14,288.42
8,449.49
1,027.44
926.05
#VALUE!
#VALUE!
2,718.30
#VALUE!
14,026.15
25,686.09
740.84
#VALUE!
#VALUE!
-

= Rp.
12,792.00 = Rp.
5,781.00 = Rp.
369,000.00 = Rp.
21,525.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,194.69 = Rp.
13,591.50 = Rp.
Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
13,591.50 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

69,891.25 = Rp.
13,591.50 = Rp.
12,792.00 = Rp.
Jumlah I

= Rp.
Rp.

71,442.09 = Rp.

639.60
62,434.80
11,808.00
21,525.00
#VALUE!
28,576.84
16,898.97
2,054.89
1,852.11
#VALUE!
#VALUE!
14,389.39
679.58
#VALUE!
8,930.26
21,123.71
2,568.61
555.63
#VALUE!
#VALUE!
679.58
#VALUE!
17,860.52
12,674.23
1,541.17
1,203.87
#VALUE!
#VALUE!
27,956.50
815.49
639.60
#VALUE!
8,930.26

84,494.85 = Rp.
102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

76,043.52 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

73,800.00 = Rp.
24,477.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,123.71
5,137.22
555.63
#VALUE!
#VALUE!
53,230.46
2,937.24
#VALUE!
10,001.89
6,337.11
821.95
740.84
#VALUE!
#VALUE!
22,140.00
979.08
#VALUE!
10,716.31
5,914.64
821.95
555.63
#VALUE!
#VALUE!
-

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
10,716.31
63,371.14
821.95
555.63
#VALUE!
#VALUE!
-

Jumlah I

= Rp.
= Rp.
Rp.

#VALUE!
-

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,144.21
84,494.85
1,027.44
926.05
#VALUE!
#VALUE!
-

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
10,716.31
4,224.74
513.72
740.84
#VALUE!
#VALUE!

81,250.00 = Rp.
2,017.20 = Rp.

81,250.00
22,955.74

369,000.00 = Rp.
21,525.00 = Rp.
Jumlah I
Rp.

15,498.00
32,287.50
151,991.24

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah I + II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

44,294.10
29,573.20
3,596.05
2,778.16
80,241.51
232,232.75

59,000.00 = Rp.
2,017.20 = Rp.

59,000.00
22,955.74

369,000.00 = Rp.
21,525.00 = Rp.
Jumlah I
Rp.

15,498.00
32,287.50
129,741.24

71,442.09
84,494.85
102,744.36
92,605.47

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

44,294.10
29,573.20
3,596.05
2,778.16

Jumlah II
Jumlah I + II

Rp.
Rp.

80,241.51
209,982.75

56,500.00 = Rp.
2,017.20 = Rp.

56,500.00
22,955.74

369,000.00 = Rp.
21,525.00 = Rp.
Jumlah I
Rp.

15,498.00
32,287.50
127,241.24

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,009.46
29,573.20
3,596.05
2,778.16
85,956.88
213,198.11

56,500.00 = Rp.

2,017.20 = Rp.

56,500.00
18,759.96

300,000.00 = Rp.
17,500.00 = Rp.
Jumlah I
Rp.

5,400.00
26,250.00
106,909.96

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

34,849.80
68,695.00
3,758.94
2,258.67
109,562.41
216,472.37

25,000.00
24,500.00
98,700.00
98,700.00
Jumlah I

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
3,675.00
16,779.00
25,662.00
51,116.00

58,083.00
64,134.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,646.64
6,413.40
334.13
188.22
11,582.39
62,698.39

=
=
=
=

41,250.00 = Rp.
98,700.00 = Rp.
98,700.00 = Rp.
Jumlah I
Rp.

6,187.50
16,779.00
34,545.00
57,511.50

58,083.00
64,134.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,065.81
6,413.40
334.13
188.22
11,001.56
68,513.06

25,000.00 = Rp.
35,000.00 = Rp.
Jumlah I
Rp.

5,000.00
7,000.00
12,000.00

58,083.00
64,134.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,323.32
16,033.50
1,670.64
752.89
20,780.35
32,780.35

225,000.00 = Rp.
1,640.00 = Rp.

225,000.00
9,840.00

300,000.00 = Rp.
Jumlah I
Rp.

48,000.00
282,840.00

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

58,083.00
103,042.50
25,059.60
8,281.79
194,466.89
477,306.89

58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

=
=
=
=

cat besi 2 lapis

=
=
=
=

121,974.30
51,521.25
5,847.24
8,281.79
#VALUE!
#VALUE!
-

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
104,549.40
185,476.50
45,107.28
8,281.79
#VALUE!
#VALUE!
-

= Rp.
1,640.00 = Rp.
300,000.00 = Rp.
= Rp.
= Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

196,800.00
90,000.00
#VALUE!
348,498.00
206,085.00
25,059.60
22,586.70
#VALUE!
#VALUE!
#VALUE!
5,152.13
62,649.00
18,822.25
#VALUE!
#VALUE!
-

Jumlah I

= Rp.
= Rp.

= Rp.

= Rp.
= Rp.
Rp.

58,083.00 = Rp.

#VALUE!
203,290.50

68,695.00 = Rp.
83,532.00 = Rp.
75,289.00 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
1,640.00 = Rp.
300,000.00 = Rp.
Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
1,640.00 = Rp.
300,000.00 = Rp.
Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.

309,127.50
75,178.80
67,760.10
#VALUE!
#VALUE!
#VALUE!
174,249.00
309,127.50
75,178.80
67,760.10
#VALUE!
#VALUE!
1,115.20
3,900.00
#VALUE!
3,484.98
2,060.85
250.60
188.22
#VALUE!
#VALUE!
1,426.80
4,200.00
#VALUE!
4,646.64
2,747.80
334.13
527.02
#VALUE!
#VALUE!
-

= Rp.
1,640.00 = Rp.

6,428.80

300,000.00 = Rp.

16,800.00

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.

#VALUE!
8,131.62
4,808.65
584.72
527.02
#VALUE!
#VALUE!
-

= Rp.
1,640.00 = Rp.

16,892.00

300,000.00 = Rp.

18,300.00

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

m, Tinggi 35 Cm

#VALUE!
22,071.54
13,052.05
1,587.11
1,430.49
#VALUE!
#VALUE!
-

= Rp.
1,640.00 = Rp.

72,160.00

300,000.00 = Rp.

21,000.00

= Rp.
= Rp.
Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

m, Tinggi 50 Cm
= Rp.
1,640.00 = Rp.

#VALUE!
185,865.60
69,725.43
125.30
1,204.62
#VALUE!
#VALUE!
126,280.00

300,000.00 = Rp.
= Rp.
= Rp.
Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

m, Tinggi 50 Cm

39,000.00
#VALUE!
82,477.86
32,492.74
3,926.00
5,345.52
#VALUE!
#VALUE!
-

= Rp.
1,640.00 = Rp.

186,960.00

300,000.00 = Rp.

55,200.00

= Rp.
= Rp.
Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
125,459.28
49,460.40
6,014.30
8,131.21
#VALUE!
#VALUE!
-

825,000.00
206,250.00
Jumlah I = Rp.

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
25,000.00
Jumlah III
Jumlah I + II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

613,333.33
153,333.33
Jumlah I = Rp.

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
12,500.00
Jumlah III
Jumlah I + II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

825,000.00
206,250.00
#VALUE!
36,355.58
114,088.90
9,841.79
#VALUE!
12,983.04
2,422.43
8,712.45
2,032.80
25,000.00
#VALUE!
#VALUE!
613,333.33
153,333.33
#VALUE!
36,355.58
114,088.90
9,841.79
#VALUE!
12,983.04
2,422.43
8,712.45
2,032.80
12,500.00
#VALUE!
#VALUE!
-

425,500.00 = Rp.
106,375.00 = Rp.
Jumlah I = Rp.

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
10,000.00
Jumlah III
Jumlah I + II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
228,177.79
32,805.95
33,735.28
55,000.00
Jumlah
145,656.87

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
228,177.79
31,850.31
Jumlah
55,524.21

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
228,177.79
31,850.31
Jumlah
48,412.44

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
228,177.79
31,850.31
Jumlah
41,891.87

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48 = Rp.
228,177.79 = Rp.

425,500.00
106,375.00
#VALUE!
36,355.58
114,088.90
9,841.79
#VALUE!
12,983.04
2,422.43
8,712.45
2,032.80
10,000.00
#VALUE!
#VALUE!
42,945.03
78,036.80
23,095.39
809.65
770.00
#VALUE!
15,092.11
31,488.54
8,943.57
#VALUE!
13,469.74
27,107.52
7,835.18
#VALUE!
11,929.17
23,274.13
6,688.56
#VALUE!
15,923.74
7,598.32

31,850.31
31,650.00
53,480.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.

45,444.48
228,177.79
31,850.31
31,650.00
53,480.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

413,376.44 = Rp.
82,675.29 = Rp.
Jumlah I = Rp.

45,444.48
228,177.79
31,850.31
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
3,000.00
Jumlah III
Jumlah I + II + III
687,574.00

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

218,850.00 = Rp.
54,712.50 = Rp.
Jumlah I = Rp.

45,444.48
228,177.79
31,850.31
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00 = Rp.

7,516.67
2,354.76
534.80
#VALUE!
14,087.79
4,791.73
7,516.67
2,025.60
534.80
#VALUE!
413,376.44
82,675.29
#VALUE!
40,900.03
102,680.01
15,925.15
#VALUE!
14,219.52
2,589.49
9,874.11
2,333.96
3,000.00
#VALUE!
#VALUE!
218,850.00
54,712.50
#VALUE!
25,903.35
63,661.60
14,651.14
#VALUE!
12,983.04

83,532.00
58,083.00
75,289.00
3,000.00
Jumlah III
Jumlah I + II + III
406,929.32

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

385,310.67 = Rp.
77,062.13 = Rp.
Jumlah I = Rp.

45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
Jumlah I + II + III
548,692.88

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

341,500.00 = Rp.
85,375.00 = Rp.
Jumlah I = Rp.

45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
-

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

2,422.43
8,712.45
2,032.80
3,000.00
#VALUE!
#VALUE!
385,310.67
77,062.13
#VALUE!
40,900.03
16,402.98
#VALUE!
14,219.52
2,589.49
9,874.11
2,333.96
#VALUE!
#VALUE!
341,500.00
85,375.00
#VALUE!
38,627.80
13,122.38
#VALUE!
12,983.04
2,422.43
8,712.45
2,032.80
-

Jumlah III = Rp.


Jumlah I + II+III = Rp.
504,775.90
Rp.

218,850.00 = Rp.
54,712.50 = Rp.
Jumlah I = Rp.

45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
Jumlah I + II+III
345,910.59

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

140,500.00 = Rp.
35,125.00 = Rp.
Jumlah I = Rp.

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
Jumlah I + II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
#VALUE!
218,850.00
54,712.50
#VALUE!
36,355.58
9,841.79
#VALUE!
12,983.04
2,422.43
8,712.45
2,032.80
#VALUE!
#VALUE!
140,500.00
35,125.00
#VALUE!
36,355.58
114,088.90
9,841.79
#VALUE!
12,983.04
2,422.43
8,712.45
2,032.80
#VALUE!
#VALUE!

362,061.98

Rp.

140,500.00 = Rp.
35,125.00 = Rp.
Jumlah I = Rp.

45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
Jumlah I + II
247,973.09

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
32,805.95
Jumlah I

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
2,000.00
Jumlah II
Jumlah I + II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,500.00 = Rp.
17,125.00 = Rp.
Jumlah I = Rp.

45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

140,500.00
35,125.00
#VALUE!
36,355.58
9,841.79
#VALUE!
12,983.04
2,422.43
8,712.45
2,032.80
#VALUE!
#VALUE!
24,994.46
8,037.46
#VALUE!
12,364.80
2,255.36
8,131.62
1,882.23
2,000.00
#VALUE!
#VALUE!
68,500.00
17,125.00
#VALUE!
25,448.91
9,211.91
#VALUE!

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
JumlahI + II + III
144,427.15

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,500.00 = Rp.
17,125.00 = Rp.
Jumlah I = Rp.

45,444.48
228,177.79
68,500.00
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
JumlahI + II + III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

79,100.00 = Rp.
19,775.00 = Rp.
Jumlah I = Rp.

Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

12,117.50
2,210.26
7,968.99
1,844.58
#VALUE!
#VALUE!
68,500.00
17,125.00
#VALUE!
25,448.91
57,044.45
19,234.80
#VALUE!
12,117.50
2,210.26
7,968.99
1,844.58
#VALUE!
#VALUE!
79,100.00
19,775.00
#VALUE!
#VALUE!

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
JumlahI + II
123,016.33

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

43,750.00 = Rp.
8,750.00 = Rp.
Jumlah I = Rp.

45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
JumlahI + II + III
106,411.97

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,900.00 = Rp.
10,580.00 = Rp.
Jumlah I = Rp.

45,444.48 = Rp.
- = Rp.

12,117.50
2,210.26
7,968.99
1,844.58
#VALUE!
#VALUE!
43,750.00
8,750.00
#VALUE!
20,995.35
9,021.64
#VALUE!
11,993.86
2,187.70
7,887.67
1,825.76
#VALUE!
#VALUE!
52,900.00
10,580.00
#VALUE!
13,469.74
-

32,805.95 = Rp.
Jumlah II = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
1,900.00
Jumlah III
JumlahI + II + III
110,814.99

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,800.00 = Rp.
5,160.00 = Rp.
Jumlah I = Rp.
45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
1,900.00
Jumlah III
JumlahI +II + III
75,327.07

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

43,750.00 = Rp.
8,750.00 = Rp.
Jumlah I = Rp.

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00 = Rp.

8,070.26
#VALUE!
11,993.86
2,187.70
7,887.67
1,825.76
1,900.00
#VALUE!
#VALUE!
25,800.00
5,160.00
#VALUE!
11,929.17
6,889.25
#VALUE!
11,870.21
2,165.15
7,806.36
1,806.94
1,900.00
#VALUE!
#VALUE!
43,750.00
8,750.00
#VALUE!
20,995.35
60,238.94
9,021.64
#VALUE!
11,993.86

83,532.00
58,083.00
75,289.00
Jumlah III
JumlahI + II + III

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,083.33 = Rp.
5,520.83 = Rp.
Jumlah I = Rp.
45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
JumlahI +II + III
78,540.98

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,138.00 = Rp.
4,227.60 = Rp.
Jumlah I = Rp.

45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,187.70
7,887.67
1,825.76
#VALUE!
#VALUE!
22,083.33
5,520.83
#VALUE!
19,086.68
8,201.49
#VALUE!
11,870.21
2,165.15
7,806.36
1,806.94
#VALUE!
#VALUE!
21,138.00
4,227.60
#VALUE!
9,088.90
6,561.19
#VALUE!
12,364.80
2,142.60
7,725.04
1,788.11
#VALUE!

JumlahI + II + III = Rp.


65,036.23

Rp.

9,083.00 = Rp.
1,816.60 = Rp.
Jumlah I = Rp.

45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
JumlahI +II + III
55,885.56

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,083.33 = Rp.
5,520.83 = Rp.
Jumlah I = Rp.
45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
JumlahI +II + III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
9,083.00
1,816.60
#VALUE!
14,087.79
7,742.20
#VALUE!
11,622.91
2,120.04
7,643.72
1,769.29
#VALUE!
#VALUE!
22,083.33
5,520.83
#VALUE!
19,086.68
54,762.67
8,201.49
#VALUE!
11,870.21
2,165.15
7,806.36
1,806.94
#VALUE!
#VALUE!
-

95,000.00 = Rp.
19,000.00 = Rp.
Jumlah I = Rp.

45,444.48
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah III
JumlahI + II + III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

dia 300 mm
2,056,500.00 = Rp.
411,300.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
JumlahI + II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

dia 300 mm
1,725,500.00 = Rp.
345,100.00 = Rp.
Jumlah I = Rp.

95,000.00
19,000.00
#VALUE!
1,363.33
246.04
#VALUE!
11,128.32
2,029.60
7,324.96
1,703.41
#VALUE!
#VALUE!
2,056,500.00
411,300.00
#VALUE!
55,332.48
73,174.03
52,100.45
66,931.92
#VALUE!
#VALUE!
1,725,500.00
345,100.00
#VALUE!
-

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
JumlahI + II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PVC dia 300 mm


1,230,500.00 = Rp.
246,100.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
JumlahI + II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 250 mm
1,190,000.00 = Rp.
238,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 250 mm
995,000.00 = Rp.
199,000.00 = Rp.
Jumlah I = Rp.

55,332.48
73,174.03
52,100.45
66,931.92
#VALUE!
#VALUE!
1,230,500.00
246,100.00
#VALUE!
55,332.48
73,174.03
52,100.45
66,931.92
#VALUE!
#VALUE!
1,190,000.00
238,000.00
#VALUE!
54,779.16
72,442.29
51,579.45
66,262.60
#VALUE!
#VALUE!
995,000.00
199,000.00
#VALUE!

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 200 mm
467,900.00 = Rp.
93,580.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 200 mm
436,500.00 = Rp.
87,300.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 150 mm
306,900.00 = Rp.
61,380.00 = Rp.

54,225.83
71,710.55
51,058.44
65,593.28
#VALUE!
#VALUE!
467,900.00
93,580.00
#VALUE!
53,672.51
70,978.81
50,537.44
64,923.96
#VALUE!
#VALUE!
436,500.00
87,300.00
#VALUE!
53,119.18
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
306,900.00
61,380.00

Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 150 mm
260,300.00 = Rp.
52,060.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 300 mm
2,250,760.00 = Rp.
450,152.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 250 mm
1,150,750.00 = Rp.

#VALUE!
53,119.18
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
260,300.00
52,060.00
#VALUE!
53,119.18
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
2,250,760.00
450,152.00
#VALUE!
53,119.18
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
1,150,750.00

230,150.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 200 mm
570,400.00 = Rp.
114,080.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 150 mm
315,600.00 = Rp.
63,120.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 150 mm
235,900.00 = Rp.

230,150.00
#VALUE!
53,119.18
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
570,400.00
114,080.00
#VALUE!
53,119.18
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
315,600.00
63,120.00
#VALUE!
53,672.51
70,978.81
50,537.44
64,923.96
#VALUE!
#VALUE!
235,900.00

47,180.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

VC dia 150 mm
215,500.00 = Rp.
43,100.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 100 mm
127,000.00 = Rp.
25,400.00 = Rp.
Jumlah I = Rp.
61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

47,180.00
#VALUE!
53,119.18
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
215,500.00
43,100.00
#VALUE!
52,565.86
69,515.33
49,495.43
63,585.32
#VALUE!
#VALUE!
127,000.00
25,400.00
#VALUE!
52,565.86
69,515.33
49,495.43
63,585.32
#VALUE!

Jumlah I+II = Rp.


387,561.94 = Rp.

ia 100 mm
116,800.00 = Rp.
23,360.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II
375,321.94

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

VC dia 100 mm
107,900.00 = Rp.
21,580.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

ia 90 mm
83,400.00 = Rp.
16,680.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

#VALUE!
116,800.00
23,360.00
#VALUE!
52,565.86
69,515.33
49,495.43
63,585.32
#VALUE!
#VALUE!
107,900.00
21,580.00
#VALUE!
52,565.86
69,515.33
49,495.43
63,585.32
#VALUE!
#VALUE!
83,400.00
16,680.00
#VALUE!
52,012.53
68,783.59
48,974.42
62,916.01

- = Rp.
Jumlah = Rp.
Jumlah I+II = Rp.

ia 90 mm
74,100.00 = Rp.
14,820.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

VC dia 90 mm
65,100.00 = Rp.
13,020.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

dia 63 mm
40,700.00 = Rp.
8,140.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II
dia. 300 mm

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
#VALUE!
74,100.00
14,820.00
#VALUE!
52,012.53
68,783.59
48,974.42
62,916.01
#VALUE!
#VALUE!
65,100.00
13,020.00
#VALUE!
52,012.53
68,783.59
48,974.42
62,916.01
#VALUE!
#VALUE!
40,700.00
8,140.00
#VALUE!
51,459.21
68,051.85
48,453.42
62,246.69
#VALUE!
#VALUE!
-

61,824.00
83,532.00
58,083.00
75,289.00
33,920.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
25,950.00
Jumlah
PVC dia. 150 mm
61,824.00
83,532.00
58,083.00
75,289.00
25,950.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PVC dia. 150 mm


61,824.00
83,532.00
58,083.00
75,289.00
20,000.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PVC dia. 110 mm


61,824.00
83,532.00
58,083.00
75,289.00
17,000.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PVC dia. 90 mm
61,824.00
83,532.00
58,083.00
75,289.00
15,000.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

dia. 200 mm

PVC dia. 63 mm
61,824.00 = Rp.
83,532.00 = Rp.

53,848.70
66,240.88
44,259.25
59,101.87
33,920.00
#VALUE!
52,674.05
65,405.56
43,910.75
58,123.11
25,950.00
#VALUE!
37,094.40
33,412.80
26,137.35
26,351.15
25,950.00
#VALUE!
36,352.51
32,744.54
25,614.60
25,824.13
20,000.00
#VALUE!
35,610.62
32,076.29
25,091.86
25,297.10
17,000.00
#VALUE!
34,868.74
31,408.03
24,569.11
24,770.08
15,000.00
#VALUE!
34,126.85
30,739.78

58,083.00
75,289.00
13,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.

dia 63 mm
38,000.00 = Rp.
7,600.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

VC dia 63 mm
33,300.00 = Rp.
6,660.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,263,300.00 = Rp.
452,660.00 = Rp.
Jumlah I = Rp.

24,046.36
24,243.06
13,000.00
#VALUE!
38,000.00
7,600.00
#VALUE!
51,459.21
68,051.85
48,453.42
62,246.69
#VALUE!
#VALUE!
33,300.00
6,660.00
#VALUE!
51,459.21
68,051.85
48,453.42
62,246.69
#VALUE!
#VALUE!
2,263,300.00
452,660.00
#VALUE!
-

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,150,000.00 = Rp.
430,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,125,000.00 = Rp.
425,000.00 = Rp.
Jumlah I = Rp.

61,824.00 = Rp.
83,532.00 = Rp.
58,083.00 = Rp.

58,732.80
73,174.03
52,100.45
66,931.92
#VALUE!
#VALUE!
2,150,000.00
430,000.00
#VALUE!
57,805.44
72,442.29
51,579.45
66,262.60
#VALUE!
#VALUE!
2,125,000.00
425,000.00
#VALUE!
57,743.62
71,710.55
51,058.44
65,593.28
#VALUE!
#VALUE!
2,125,000.00
425,000.00
#VALUE!
57,681.79
71,491.03
50,902.14

75,289.00
Jumlah II
Jumlah I+II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

1,680,400.00 = Rp.
336,080.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,410,500.00 = Rp.
282,100.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,154,000.00 = Rp.
230,800.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,392.49
#VALUE!
#VALUE!
1,680,400.00
336,080.00
#VALUE!
57,496.32
70,978.81
50,537.44
64,923.96
#VALUE!
#VALUE!
1,410,500.00
282,100.00
#VALUE!
55,641.60
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
1,154,000.00
230,800.00
#VALUE!
55,023.36
68,051.85
48,453.42
62,246.69
#VALUE!

Jumlah I+II = Rp.

805,100.00 = Rp.
161,020.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

796,000.00 = Rp.
159,200.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

791,100.00 = Rp.
158,220.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
805,100.00
161,020.00
#VALUE!
57,187.20
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
796,000.00
159,200.00
#VALUE!
57,187.20
70,247.07
50,016.43
64,254.64
#VALUE!
#VALUE!
791,100.00
158,220.00
#VALUE!
57,187.20
70,247.07
50,016.43
64,254.64
#VALUE!

Jumlah I+II = Rp.

652,000.00 = Rp.
130,400.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

302,400.00 = Rp.
60,480.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

297,400.00 = Rp.
59,480.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
-

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
652,000.00
130,400.00
#VALUE!
56,568.96
69,515.33
49,495.43
63,585.32
#VALUE!
#VALUE!
302,400.00
60,480.00
#VALUE!
56,259.84
69,515.33
49,495.43
63,585.32
#VALUE!
#VALUE!
297,400.00
59,480.00
#VALUE!
56,259.84
69,515.33
49,495.43
63,585.32
-

Jumlah = Rp.
Jumlah I+II = Rp.

293,800.00 = Rp.
58,760.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

172,600.00 = Rp.
34,520.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

168,000.00 = Rp.
33,600.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
#VALUE!
293,800.00
58,760.00
#VALUE!
56,259.84
69,515.33
49,495.43
63,585.32
#VALUE!
#VALUE!
172,600.00
34,520.00
#VALUE!
55,641.60
68,783.59
48,974.42
62,916.01
#VALUE!
#VALUE!
168,000.00
33,600.00
#VALUE!
55,641.60
68,783.59
48,974.42
62,916.01
#VALUE!
#VALUE!

127,000.00 = Rp.
25,400.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00 = Rp.
15,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

220,300.00 = Rp.
44,060.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

127,000.00
25,400.00
#VALUE!
53,786.88
68,051.85
48,453.42
62,246.69
#VALUE!
#VALUE!
75,000.00
15,000.00
#VALUE!
53,786.88
68,051.85
48,453.42
62,246.69
#VALUE!
#VALUE!
220,300.00
44,060.00
#VALUE!
37,094.40
33,412.80
26,137.35
26,351.15
#VALUE!
#VALUE!
-

120,800.00 = Rp.
24,160.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

94,100.00 = Rp.
18,820.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,100.00 = Rp.
12,220.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II
a. 300 x 250 mm

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,082,300.00 = Rp.
216,460.00 = Rp.
Jumlah I = Rp.

120,800.00
24,160.00
#VALUE!
35,610.62
32,076.29
25,091.86
25,297.10
#VALUE!
#VALUE!
94,100.00
18,820.00
#VALUE!
35,239.68
31,742.16
24,830.48
25,033.59
#VALUE!
#VALUE!
61,100.00
12,220.00
#VALUE!
34,497.79
31,073.90
24,307.74
24,506.57
#VALUE!
#VALUE!
1,082,300.00
216,460.00
#VALUE!
-

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 300 x 200 mm
952,300.00 = Rp.
190,460.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 250 x 200 mm
590,300.00 = Rp.
118,060.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 250 x 160 mm
520,000.00 = Rp.
104,000.00 = Rp.
Jumlah I = Rp.

53,848.70
66,240.88
44,259.25
59,101.87
#VALUE!
#VALUE!
952,300.00
190,460.00
#VALUE!
53,848.70
66,240.88
44,259.25
59,101.87
#VALUE!
#VALUE!
590,300.00
118,060.00
#VALUE!
53,168.64
66,240.88
44,201.16
58,499.55
#VALUE!
#VALUE!
520,000.00
104,000.00
#VALUE!
-

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 200 x 150 mm
380,300.00 = Rp.
76,060.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 200 x 110 mm
310,500.00 = Rp.
62,100.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 150 x 110 mm
169,200.00 = Rp.
33,840.00 = Rp.
Jumlah I = Rp.

52,735.87
66,073.81
44,085.00
58,348.98
#VALUE!
#VALUE!
380,300.00
76,060.00
#VALUE!
52,674.05
65,405.56
43,910.75
58,123.11
#VALUE!
#VALUE!
310,500.00
62,100.00
#VALUE!
52,550.40
65,238.49
43,794.58
57,972.53
#VALUE!
#VALUE!
169,200.00
33,840.00
#VALUE!
-

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 150 x 63 mm
129,500.00 = Rp.
25,900.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 110 x 90 mm
95,600.00 = Rp.
19,120.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 110x63 mm
60,400.00 = Rp.
12,080.00 = Rp.
Jumlah I = Rp.

50,040.35
62,135.28
41,715.21
55,216.95
#VALUE!
#VALUE!
129,500.00
25,900.00
#VALUE!
48,986.86
60,827.17
40,837.00
54,054.49
#VALUE!
#VALUE!
95,600.00
19,120.00
#VALUE!
48,460.12
60,173.11
40,397.89
53,473.26
#VALUE!
#VALUE!
60,400.00
12,080.00
#VALUE!
-

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah I+II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

a. 90x63 mm
56,300.00 = Rp.
11,260.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,250,000.00 = Rp.
850,000.00 = Rp.
Jumlah I = Rp.
61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,750,000.00 = Rp.
750,000.00 = Rp.
Jumlah I = Rp.
61,824.00 = Rp.
83,532.00 = Rp.

47,933.38
59,519.06
39,958.78
52,892.03
#VALUE!
#VALUE!
56,300.00
11,260.00
#VALUE!
47,406.64
58,865.00
39,519.67
52,310.80
#VALUE!
#VALUE!
4,250,000.00
850,000.00
#VALUE!
60,216.58
81,276.64
55,875.85
65,727.30
#VALUE!
#VALUE!
3,750,000.00
750,000.00
#VALUE!
60,216.58
81,276.64

58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

3,750,000.00 = Rp.
750,000.00 = Rp.
Jumlah I = Rp.
61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,500,000.00 = Rp.
700,000.00 = Rp.
Jumlah I = Rp.
61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,000,000.00 = Rp.
600,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
-

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

55,875.85
65,727.30
#VALUE!
#VALUE!
3,750,000.00
750,000.00
#VALUE!
60,216.58
81,276.64
55,875.85
65,727.30
#VALUE!
#VALUE!
3,500,000.00
700,000.00
#VALUE!
58,980.10
79,606.00
54,714.19
65,727.30
#VALUE!
#VALUE!
3,000,000.00
600,000.00
#VALUE!
57,063.55
78,687.14
53,494.44
64,146.23
-

Jumlah = Rp.
Jumlah I+II = Rp.

2,500,000.00 = Rp.
500,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,000,000.00 = Rp.
400,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,500,000.00 = Rp.
300,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
#VALUE!
2,500,000.00
500,000.00
#VALUE!
54,210.37
74,752.79
50,819.72
60,938.92
#VALUE!
#VALUE!
2,000,000.00
400,000.00
#VALUE!
52,498.47
72,392.17
49,214.89
59,014.53
#VALUE!
#VALUE!
1,500,000.00
300,000.00
#VALUE!
51,357.20
70,818.43
48,145.00
57,731.61
#VALUE!
#VALUE!

61,824.00
83,532.00
58,083.00
75,289.00
87,170.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

800,000.00 = Rp.
160,000.00 = Rp.
Jumlah I = Rp.
61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,550.40
66,825.60
52,274.70
56,466.75
87,170.00
#VALUE!
50,695.68
65,154.96
44,723.91
54,208.08
#VALUE!
48,160.90
61,897.21
42,487.71
51,497.68
#VALUE!
46,640.03
59,942.56
41,146.00
49,871.43
#VALUE!
45,626.11
58,639.46
40,251.52
48,787.27
#VALUE!
800,000.00
160,000.00
#VALUE!
51,357.20
70,818.43
48,145.00
57,731.61
#VALUE!

Jumlah I+II = Rp.

1,000,000.00 = Rp.
200,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

600,000.00 = Rp.
120,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

800,000.00 = Rp.
160,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

850,000.00 = Rp.

#VALUE!
1,000,000.00
200,000.00
#VALUE!
51,357.20
70,818.43
48,145.00
57,731.61
#VALUE!
#VALUE!
600,000.00
120,000.00
#VALUE!
51,357.20
70,818.43
48,145.00
57,731.61
#VALUE!
#VALUE!
800,000.00
160,000.00
#VALUE!
51,357.20
70,818.43
48,145.00
57,731.61
#VALUE!
#VALUE!
850,000.00

170,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
-

=
=
=
=
=
=
Jumlah I+II =

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,000,000.00 = Rp.
200,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,500,000.00 = Rp.
300,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,700,000.00 = Rp.
1,140,000.00 = Rp.

170,000.00
#VALUE!
51,357.20
70,818.43
48,145.00
57,731.61
#VALUE!
1,000,000.00
200,000.00
#VALUE!
52,498.47
72,392.17
49,214.89
59,014.53
#VALUE!
#VALUE!
1,500,000.00
300,000.00
#VALUE!
54,210.37
74,752.79
50,819.72
60,938.92
#VALUE!
#VALUE!
5,700,000.00
1,140,000.00

Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,000,000.00 = Rp.
600,000.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

892,400.00 = Rp.
178,480.00 = Rp.
Jumlah I = Rp.
61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
57,063.55
78,687.14
53,494.44
64,146.23
#VALUE!
#VALUE!
3,000,000.00
600,000.00
#VALUE!
57,063.55
78,687.14
53,494.44
64,146.23
#VALUE!
#VALUE!
892,400.00
178,480.00
#VALUE!
36,476.16
45,942.60
32,526.48
36,138.72
#VALUE!
#VALUE!

622,400.00 = Rp.
124,480.00 = Rp.
Jumlah I = Rp.
61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

572,400.00 = Rp.
114,480.00 = Rp.
Jumlah I = Rp.
61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

355,100.00 = Rp.
71,020.00 = Rp.
Jumlah I = Rp.
61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

192,600.00 = Rp.
38,520.00 = Rp.

622,400.00
124,480.00
#VALUE!
35,857.92
42,601.32
32,526.48
36,138.72
#VALUE!
#VALUE!
572,400.00
114,480.00
#VALUE!
35,857.92
42,601.32
32,526.48
36,138.72
#VALUE!
#VALUE!
355,100.00
71,020.00
#VALUE!
34,003.20
41,766.00
31,945.65
33,880.05
#VALUE!
#VALUE!
192,600.00
38,520.00

Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

146,000.00 = Rp.
29,200.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

106,100.00 = Rp.
21,220.00 = Rp.
Jumlah I = Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II
Jumlah I+II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,824.00
83,532.00
58,083.00
75,289.00
Jumlah II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,824.00 = Rp.

#VALUE!
32,303.04
39,677.70
30,348.37
32,186.05
#VALUE!
#VALUE!
146,000.00
29,200.00
#VALUE!
31,282.94
38,424.72
29,390.00
31,169.65
#VALUE!
#VALUE!
106,100.00
21,220.00
#VALUE!
30,602.88
37,589.40
28,751.09
30,492.05
#VALUE!
#VALUE!
35,857.92
42,601.32
32,526.48
36,138.72
#VALUE!
2,163.84

58,083.00
64,134.00
45,000.00
2,500.00
1,200.00
Jumlah II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,824.00
58,083.00
64,134.00
45,000.00
2,500.00
1,200.00
Jumlah II

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,824.00
58,083.00
64,134.00
45,000.00
2,500.00
1,200.00
Jumlah II

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
31,850.31
579,060.00
1,251,120.00
Jumlah II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
1,251,120.00
33,735.28
820,820.10
579,060.00
6,500.00
9,250.00
9,250.00
9,250.00
9,250.00
250,000.00
14,850.00
4,250.00

=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,265.24
1,603.35
1,755.00
155.00
42.00
#VALUE!
2,040.19
2,149.07
1,475.08
1,665.00
150.00
39.60
#VALUE!
1,854.72
1,974.82
1,218.55
1,440.00
137.50
36.00
#VALUE!
11,815.56
6,370.06
127,393.20
25,022.40
#VALUE!
681,667.13
2,627,352.00
33,735.28
1,477,476.17
9,264,960.00
7,468,500.00
40,376,250.00
2,756,500.00
2,904,500.00
2,451,250.00
500,000.00
475,200.00
408,000.00

280,350.00
60,200.00
750,000.00
350,000.00
1,000,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
1,251,120.00
33,735.28
820,820.10
579,060.00
6,500.00
9,250.00
9,250.00
9,250.00
9,250.00
250,000.00
14,850.00
4,250.00
280,350.00
60,200.00
750,000.00
350,000.00
1,000,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
1,251,120.00
33,735.28
820,820.10
250,000.00
14,850.00
4,250.00
350,000.00
750,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48 = Rp.

280,350.00
120,400.00
750,000.00
350,000.00
1,000,000.00
500,000.00
#VALUE!
363,555.80
3,002,688.00
50,602.92
615,615.07
16,213,680.00
5,603,000.00
30,275,250.00
2,072,000.00
2,173,750.00
1,813,000.00
500,000.00
163,350.00
136,000.00
280,350.00
120,400.00
750,000.00
350,000.00
1,000,000.00
500,000.00
#VALUE!
124,972.31
1,563,900.00
25,301.46
533,533.06
500,000.00
148,500.00
229,500.00
350,000.00
750,000.00
500,000.00
#VALUE!
113,611.19

1,251,120.00
33,735.28
820,820.10
250,000.00
14,850.00
4,250.00
350,000.00
300,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
1,251,120.00
33,735.28
820,820.10
250,000.00
14,850.00
4,250.00
350,000.00
400,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
1,251,120.00
33,735.28
820,820.10
250,000.00
14,850.00
4,250.00
350,000.00
350,000.00
500,000.00
Jumlah

=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,444.48
1,251,120.00
33,735.28
820,820.10
250,000.00
14,850.00

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,563,900.00
11,807.35
533,533.06
500,000.00
801,900.00
4,250.00
350,000.00
300,000.00
500,000.00
#VALUE!
113,611.19
1,563,900.00
11,807.35
533,533.06
500,000.00
118,800.00
102,000.00
350,000.00
400,000.00
500,000.00
#VALUE!
113,611.19
1,376,232.00
10,120.58
492,492.06
500,000.00
103,950.00
102,000.00
350,000.00
350,000.00
500,000.00
#VALUE!
113,611.19
1,376,232.00
10,120.58
492,492.06
500,000.00
133,650.00

4,250.00
350,000.00
300,000.00
500,000.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

254,755.41 = Rp.

229,500.00
350,000.00
300,000.00
500,000.00
#VALUE!
-

47,583.33 = Rp.
16,654.17 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

19,333.33 = Rp.
6,766.67 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

57,100.00
5,828.96
#VALUE!
3,136.48
6,182.55
751.79
2,032.80
#VALUE!
#VALUE!
23,200.00
2,368.33
#VALUE!
3,136.48
6,182.55
751.79
2,032.80
#VALUE!
#VALUE!

45,666.67 = Rp.
15,983.33 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

55,000.00 = Rp.
19,250.00 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,666.67 = Rp.
25,083.33 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

112,166.67 = Rp.
39,258.33 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

54,800.00
5,594.17
#VALUE!
3,136.48
6,182.55
751.79
2,032.80
#VALUE!
#VALUE!
66,000.00
6,737.50
#VALUE!
6,272.96
12,365.10
1,503.58
406.56
#VALUE!
#VALUE!
86,000.00
8,779.17
#VALUE!
6,272.96
12,365.10
1,503.58
406.56
#VALUE!
#VALUE!
134,600.00
13,740.42
#VALUE!
7,841.21
15,456.38
1,879.47
511.97
#VALUE!
#VALUE!
-

2,750.00 = Rp.
962.50 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,833.33 = Rp.
4,841.67 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,300.00
336.88
#VALUE!
2,090.99
4,121.70
501.19
135.52
#VALUE!
#VALUE!
16,600.00
1,694.58
#VALUE!
2,090.99
4,121.70
501.19
135.52
#VALUE!
#VALUE!
#VALUE!
2,090.99
4,121.70
501.19
135.52
#VALUE!
#VALUE!
#VALUE!
2,090.99
4,121.70
501.19
135.52
#VALUE!
#VALUE!
-

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

24,500.00 = Rp.
8,575.00 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
3,136.48
6,182.55
751.79
203.28
#VALUE!
#VALUE!
#VALUE!
2,090.99
4,121.70
501.19
135.52
#VALUE!
#VALUE!
#VALUE!
4,704.72
9,273.83
1,127.68
308.68
#VALUE!
#VALUE!
29,400.00
3,001.25
#VALUE!
4,704.72
9,273.83
1,127.68
308.68
#VALUE!
#VALUE!
-

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
= Rp.
Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
1,742.49
20,608.50
2,505.96
112.93
#VALUE!
#VALUE!
#VALUE!
2,904.15
34,347.50
4,176.60
188.22
#VALUE!
#VALUE!
#VALUE!
580.83
6,869.50
835.32
376.45
#VALUE!
#VALUE!
#VALUE!
580.83
6,869.50
835.32
376.45
#VALUE!
#VALUE!

Oh

Pasir Urug

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

DAFTAR ANALISA HARGA SATUAN

K
PEKERJAAN PEMASANGAN PIPA
Pekerjaan Pengadaan dan Pemasangan Pipa GIP Medium A
1m' Pengadaan/Pemasangan Pipa GIP Medium A dia. 300 mm
1m' Pengadaan Pipa GIP Medium A dia. 300 mm
1.00
M1
Pipa GIP Medium A dia. 300 mm
1.00
Ls
Mobilisasi Ke Lokasi

1 m' Upah Pemasangan Pipa GIP


0.41
h/o
0.04
h/o
0.40
h/o
0.04
h/o
1.00
ls

Medum A dia. 300 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

@ Rp.
@ Rp.

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

1m' Pengadaan/Pemasangan Pipa GIP Medium A dia.250 mm


1m' Pengadaan Pipa GIP Medium A dia.250 mm
1.00
M1
Pipa GIP Medium A dia. 250 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa GIP


0.36
h/o
0.04
h/o
0.30
h/o
0.04
h/o
1.00
ls

@
@
@
@
@

Medium A dia. 250 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

1m' Pengadaan/Pemasangan Pipa GIP Medium A dia. 200 mm


1m' Pengadaan Pipa GIP Medium A dia. 200 mm
1.00
M1
Pipa GIP Medium A dia. 200
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa GIP


0.31
h/o
0.03
h/o
0.20
h/o
0.03
h/o

@
@
@
@

Medium A dia. 200 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor

Rp.
Rp.
Rp.
Rp.

1.00

ls

Alat Bantu

@ Rp.

1m' Pengadaan/Pemasangan Pipa GIP Medium A dia. 160 mm


1m' Pengadaan Pipa GIP Medium A dia.160 mm
1.00
M1
Pipa GIP Medium A dia. 160 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa GIP


0.21
h/o
0.03
h/o
0.15
h/o
0.03
h/o
1.00
ls

@
@
@
@
@

Medum A dia. 160 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

1m' Pengadaan/Pemasangan Pipa GIP Medium A dia.110 mm


1m' Pengadaan Pipa GIP Medium A dia.110 mm
1.00
M1
Pipa GIP dia 110 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa GIP


0.21
h/o
0.03
h/o
0.15
h/o
0.03
h/o
1.00
ls

@
@
@
@
@

Medium A dia. 110 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

1m' Pengadaan/Pemasangan Pipa GIP Medium A dia.90 mm


1m' Pengadaan Pipa GIP Medium A dia.90 mm
1.00
M1
Pipa GIP Medium A dia. 90 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa GIP


0.21
h/o
0.03
h/o
0.15
h/o
0.03
h/o
1.00
ls

@
@
@
@
@

Medium A dia. 90 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

1m' Pengadaan/Pemasangan Pipa GIP Medium A dia.63 mm


1m' Pengadaan Pipa GIP Medium A dia. 63 mm
1.00
M1
Pipa GIP Medium A dia. 63 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa GIP


0.21
h/o
0.03
h/o
0.15
h/o
0.03
h/o
1.00
ls

@
@
@
@
@

Medium A dia. 63 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Pekerjaan Pengadaan dan Pemasangan Pipa PVC RR Urug Pasir


1m' Pengadaan/Pemasangan Pipa PVC dia.300 mm
1m' Pengadaan Pipa PVC dia.300 mm
1.00
M1
Pipa PVC RR dia. 300 mm
1.00
Ls
Mobilisasi

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

1m' Pemasangan Pipa PVC dia.300 mm


0.90
M3
Galian tanah
0.45
M3
Urugan Pasir
0.50
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC


0.23
h/o
0.03
h/o
0.17
h/o
0.03
h/o
1.00
ls

@
@
@
@
@

dia. 300 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
1m' Pengadaan/Pemasangan Pipa PVC dia.250 mm
1m' Pengadaan Pipa PVC dia.250 mm
1.00
M1
Pipa PVC RR dia. 250 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia, 250 mm


0.85
M3
Galian tanah Biasa
0.55
M3
Urugan Pasir
0.40
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC


0.21
h/o
0.03
h/o
0.15
h/o
0.03
h/o
1.00
ls

dia. 250 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

2.00 1m' Pengadaan/Pemasangan Pipa PVC dia.200 mm


1m' Pengadaan Pipa PVC dia.200 mm
1.00
M1
Pipa PVC RR dia. 200 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia, 200 mm


0.80
M3
Galian tanah Biasa
0.50
M3
Urugan Pasir
0.30
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC


0.21
h/o
0.03
h/o
0.15
h/o
0.03
h/o
1.00
ls

@
@
@
@
@

dia. 200 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

1m' Pengadaan/Pemasangan Pipa PVC RR dia. 160 mm


1m' Pengadaan Pipa PVC RR dia.160 mm
1.00
M1
Pipa PVC RR dia. 160 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVCRR dia, 160 mm


0.80
M3
Galian tanah Biasa
0.50
M3
Urugan Pasir
0.30
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC


0.21
h/o
0.03
h/o
0.15
h/o
0.03
h/o

@
@
@
@

RR dia. 160 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor

Rp.
Rp.
Rp.
Rp.

1.00

ls

Alat Bantu

@ Rp.

1m' Pengadaan/Pemasangan Pipa PVC RR dia.110 mm


1m' Pengadaan Pipa PVC RR dia.110 mm
1.00
M1
Pipa PVC RR dia. 110 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC RR dia. 110 mm


0.56
M3
Galian tanah Biasa
0.25
M3
Urugan Pasir
0.28
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC


0.20
h/o
0.03
h/o
0.14
h/o
0.02
h/o
1.00
ls

@
@
@
@
@

RR dia. 110 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
1m' Pengadaan/Pemasangan Pipa PVC RR dia.90 mm
1m' Pengadaan Pipa PVC RR dia.90 mm
1.00
M1
Pipa PVC RR dia. 90 mm
1.00
Ls
Mobilisasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dan GIP dia. 90 mm


0.46
M3
Galian tanah Biasa
0.26
M3
Urugan Pasir
0.28
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC


0.19
h/o
0.03
h/o
0.14
h/o
0.02
h/o
1.00
ls

@
@
@
@
@

dan GIP dia. 90 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
1m' Pengadaan/Pemasangan Pipa PVC RR dia.63 mm
1m' Pengadaan Pipa PVC RR dia.63 mm
1.00
M1
Pipa PVC RR dia. 63 mm
1.00
Ls
Mobilisasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dan GIP dia. 63 mm


0.46
M3
Galian tanah Biasa
0.26
M3
Urugan Pasir
0.28
M3
Urugan Kembali

@ Rp.
@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC


0.19
h/o
0.03
h/o
0.14
h/o
0.02
h/o
1.00
ls

@
@
@
@
@

dan GIP dia. 63 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
Pekerjaan Pengadaan dan Pemasangan Pipa PVC RR Urug Tanah Biasa
1m' Pengadaan/Pemasangan Pipa PVC dia.300 mm
1m' Pengadaan Pipa PVC dia.300 mm
1.00
M1
Pipa PVC RR dia. 300 mm
1.00
Ls
Mobilisasi

@ Rp.
@ Rp.

1m' Pemasangan Pipa PVC dia.300 mm


0.90
M3
Galian tanah
0.90
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC


0.23
h/o
0.03
h/o
0.17
h/o
0.03
h/o
1.00
ls

@
@
@
@
@

dia. 300 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
1m' Pengadaan/Pemasangan Pipa PVC dia.250 mm
1m' Pengadaan Pipa PVC dia.250 mm
1.00
M1
Pipa PVC RR dia. 250 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia, 250 mm


0.85
M3
Galian tanah Biasa
0.85
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC dia. 250 mm

0.21
0.03
0.15
0.03
1.00

h/o
h/o
h/o
h/o
ls

Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

2.00 1m' Pengadaan/Pemasangan Pipa PVC dia.200 mm


1m' Pengadaan Pipa PVC dia.200 mm
1.00
M1
Pipa PVC RR dia. 200 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dia, 200 mm


0.80
M3
Galian tanah Biasa
0.80
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC


0.21
h/o
0.03
h/o
0.15
h/o
0.03
h/o
1.00
ls

@
@
@
@
@

dia. 200 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

1m' Pengadaan/Pemasangan Pipa PVC RR dia. 160 mm


1m' Pengadaan Pipa PVC RR dia.160 mm
1.00
M1
Pipa PVC RR dia. 160 mm
1.00
Ls
Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVCRR dia, 160 mm


0.60
M3
Galian tanah Biasa
0.60
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa PVC


0.21
h/o
0.03
h/o
0.15
h/o
0.03
h/o
1.00
ls

@
@
@
@
@

RR dia. 160 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

1m' Pengadaan/Pemasangan Pipa PVC RR dia.110 mm


1m' Pengadaan Pipa PVC RR dia.110 mm

Rp.
Rp.
Rp.
Rp.
Rp.

1.00
1.00

M1
Ls

Pipa PVC RR dia. 110 mm


Mobilisasi Ke Lokasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC RR dia. 110 mm


0.50
M3
Galian tanah Biasa
0.50
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC


0.20
h/o
0.03
h/o
0.14
h/o
0.02
h/o
1.00
ls

@
@
@
@
@

RR dia. 110 mm
Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
1m' Pengadaan/Pemasangan Pipa PVC RR dia.90 mm
1m' Pengadaan Pipa PVC RR dia.90 mm
1.00
M1
Pipa PVC RR dia. 90 mm
1.00
Ls
Mobilisasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dan GIP dia. 90 mm


0.46
M3
Galian tanah Biasa
0.46
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC


0.19
h/o
0.03
h/o
0.14
h/o
0.02
h/o
1.00
ls

@
@
@
@
@

dan GIP dia. 90 mm


Tukang Pipa
Kepala Tukang
Pekerja
Mandor
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.

JumlahI +
1m' Pengadaan/Pemasangan Pipa PVC RR dia.63 mm
1m' Pengadaan Pipa PVC RR dia.63 mm
1.00
M1
Pipa PVC RR dia. 63 mm
1.00
Ls
Mobilisasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa PVC dan GIP dia. 63 mm


0.46
M3
Galian tanah Biasa
0.46
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa PVC dan GIP dia. 63 mm


0.19
h/o
Tukang Pipa

@ Rp.

0.03
0.14
0.02
1.00

h/o
h/o
h/o
ls

Kepala Tukang
Pekerja
Mandor
Alat Bantu

@
@
@
@

Rp.
Rp.
Rp.
Rp.

JumlahI +
Pekerjaan Pengadaan dan Pemasangan Pipa HDPE
1m' Pengadaan/Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia.300 mm
1m' Pengadaan Pipa HDPE PE 100 PN 12,5 bar dia.300 mm
1.00
M1
Pipa HDPE dia. 300 mm
@ Rp.
1.00
Ls
Mobilisasi
@ Rp.

1m' Pemasangan Pipa HDPE dia.300 mm


0.90
M3
Galian tanah
0.90
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa HDPE dia. 300 mm


0.23
h/o
Tukang Pipa
0.03
h/o
Kepala Tukang
0.17
h/o
Pekerja
0.03
h/o
Mandor
1.00
ls
Alat Bantu
0.17
Titik
Penyambungan/Pengelasan Pipa

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
1m' Pengadaan/Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia.250 mm
1m' Pengadaan Pipa HDPE PE 100 PN 12,5 bar dia.250 mm
1.00
M1
Pipa HDPE dia. 250 mm
@ Rp.
1.00
Ls
Mobilisasi Ke Lokasi
@ Rp.

1 m' Pemasangan Pipa HDPE dia, 250 mm


0.85
M3
Galian tanah Biasa
0.85
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa HDPE dia. 250 mm


0.21
h/o
Tukang Pipa
0.03
h/o
Kepala Tukang
0.15
h/o
Pekerja
0.03
h/o
Mandor
1.00
ls
Alat Bantu
0.17
Titik
Penyambungan/Pengelasan Pipa

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
1m' Pengadaan/Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia.200 mm
1m' Pengadaan Pipa HDPE PE 100 PN 12,5 bar dia.200 mm
1.00
M1
Pipa HDPE dia. 200 mm
@ Rp.
1.00
Ls
Mobilisasi Ke Lokasi
@ Rp.

1 m' Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia, 200 mm


0.80
M3
Galian tanah Biasa
0.80
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia. 200 mm
0.21
h/o
Tukang Pipa
0.03
h/o
Kepala Tukang
0.15
h/o
Pekerja
0.03
h/o
Mandor
1.00
ls
Alat Bantu
0.17
Titik
Penyambungan/Pengelasan Pipa

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
1m' Pengadaan/Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia. 160 mm
1m' Pengadaan Pipa HDPE PE 100 PN 12,5 bar dia.160 mm
1.00
M1
Pipa HDPE dia. 160 mm
@ Rp.
1.00
Ls
Mobilisasi Ke Lokasi
@ Rp.

1 m' Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia, 160 mm


0.60
M3
Galian tanah Biasa
0.60
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m' Upah Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia. 160 mm
0.21
h/o
Tukang Pipa
0.03
h/o
Kepala Tukang
0.15
h/o
Pekerja
0.03
h/o
Mandor
1.00
ls
Alat Bantu
0.17
Titik
Penyambungan/Pengelasan Pipa

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
1m' Pengadaan/Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia.110 mm
1m' Pengadaan Pipa HDPE PE 100 PN 12,5 bar dia.110 mm
1.00
M1
Pipa HDPE dia. 110 mm
@ Rp.
1.00
Ls
Mobilisasi Ke Lokasi
@ Rp.

1 m' Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia. 110 mm


0.50
M3
Galian tanah Biasa
0.50
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m'Upah Pemasangan PipaHDPE PE 100 PN 12,5 bar dia. 110 mm


0.20
h/o
Tukang Pipa
0.03
h/o
Kepala Tukang
0.14
h/o
Pekerja
0.02
h/o
Mandor
1.00
ls
Alat Bantu
0.17
Titik
Penyambungan/Pengelasan Pipa

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
1m' Pengadaan/Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia.90 mm
1m' Pengadaan Pipa HDPE PE 100 PN 12,5 bar dia.90 mm
1.00
M1
Pipa HDPE dia. 90 mm
1.00
Ls
Mobilisasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia. 90 mm


0.46
M3
Galian tanah Biasa
0.46
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia. 90 mm


0.19
h/o
Tukang Pipa
0.03
h/o
Kepala Tukang
0.14
h/o
Pekerja
0.02
h/o
Mandor
1.00
ls
Alat Bantu
0.17
Titik
Penyambungan/Pengelasan Pipa

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +
1m' Pengadaan/Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia.63 mm
1m' Pengadaan Pipa HDPE PE 100 PN 12,5 bar dia.63 mm
1.00
M1
Pipa HDPE dia. 63 mm
1.00
Ls
Mobilisasi

@ Rp.
@ Rp.

1 m' Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia. 63 mm


0.46
M3
Galian tanah Biasa
0.46
M3
Urugan Kembali

@ Rp.
@ Rp.

1 m'Upah Pemasangan Pipa HDPE PE 100 PN 12,5 bar dia. 63 mm


0.19
h/o
Tukang Pipa

@ Rp.

0.03
0.14
0.02
1.00
0.17

h/o
h/o
h/o
ls
Titik

Kepala Tukang
Pekerja
Mandor
Alat Bantu
Penyambungan/Pengelasan Pipa

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I +

ATUAN

1,814,250.00
453,562.50
Jumlah I = Rp.

76,043.52
102,744.36
71,442.09
92,605.47
50,000.00
Jumlah III
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

31,177.84
4,109.77
28,576.84
3,704.22
50,000.00
117,568.67
2,385,381.17

1,291,500.00
322,875.00
Jumlah I = Rp.

1,291,500.00
322,875.00
1,614,375.00

76,043.52
102,744.36
71,442.09
92,605.47
40,000.00
Jumlah III
Jumlah I + II

=
=
=
=
=
=
=

1,814,250.00
453,562.50
2,267,812.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

27,375.67
3,698.80
21,432.63
3,333.80
40,000.00
95,840.89
1,710,215.89

1,088,550.00 = Rp.
272,137.50 = Rp.
Jumlah I = Rp.

1,088,550.00
272,137.50
1,360,687.50

76,043.52
102,744.36
71,442.09
92,605.47

=
=
=
=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

23,573.49
3,185.08
14,288.42
2,870.77

30,000.00 = Rp.
Jumlah III = Rp.
Jumlah I + II = Rp.

30,000.00
73,917.75
1,434,605.25

645,750.00
161,437.50
Jumlah I = Rp.

645,750.00
161,437.50
807,187.50

76,043.52
102,744.36
71,442.09
92,605.47
25,000.00
Jumlah III
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
25,000.00
57,165.39
864,352.89

276,750.00
69,187.50
Jumlah I = Rp.

276,750.00
69,187.50
345,937.50

76,043.52
102,744.36
71,442.09
92,605.47
12,500.00
Jumlah III
Jumlah I + II

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
12,500.00
44,665.39
390,602.89

227,550.00 = Rp.
56,887.50 = Rp.
Jumlah I = Rp.

227,550.00
56,887.50
284,437.50

76,043.52
102,744.36
71,442.09
92,605.47
10,000.00
Jumlah III
Jumlah I + II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
10,000.00
42,165.39
326,602.89

178,350.00 = Rp.
44,587.50 = Rp.
Jumlah I = Rp.

76,043.52
102,744.36
71,442.09
92,605.47
10,000.00
Jumlah III
Jumlah I + II

=
=
=
=
=
=
=

178,350.00
44,587.50
222,937.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
10,000.00
42,165.39
265,102.89

473,932.12 = Rp.
82,675.29 = Rp.
Jumlah I = Rp.

473,932.12
82,675.29
556,607.41

45,444.48
228,177.79
31,850.31
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

40,900.03
102,680.01
15,925.15
159,505.19

76,043.52
102,744.36
71,442.09
92,605.47
10,000.00
1.00
Jumlah I + II + III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,490.01
3,185.08
12,145.16
2,870.77
10,000.00
45,691.01
761,803.61

420,045.00 = Rp.
85,375.00 = Rp.
Jumlah I = Rp.

420,045.00
85,375.00
505,420.00

45,444.48 = Rp.
228,177.79 = Rp.
32,805.95 = Rp.

38,627.80
125,497.78
13,122.38

Jumlah II = Rp.

76,043.52
102,744.36
71,442.09
92,605.47
8,000.00
Jumlah III
Jumlah I + II+III

=
=
=
=
=
=
=

177,247.97

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
8,000.00
40,165.39
722,833.36

269,185.50 = Rp.
54,712.50 = Rp.
Jumlah I = Rp.

269,185.50
54,712.50
323,898.00

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

36,355.58
114,088.90
9,841.79
160,286.26

76,043.52
102,744.36
71,442.09
92,605.47
7,000.00
Jumlah III
Jumlah I + II+III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
7,000.00
39,165.39
523,349.65

172,815.00 = Rp.
35,125.00 = Rp.
Jumlah I = Rp.

172,815.00
35,125.00
207,940.00

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

36,355.58
114,088.90
9,841.79
160,286.26

76,043.52
102,744.36
71,442.09
92,605.47

=
=
=
=

Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35

6,000.00 = Rp.
Jumlah III = Rp.
Jumlah I + II = Rp.

6,000.00
38,165.39
406,391.65

84,255.00 = Rp.
17,125.00 = Rp.
Jumlah I = Rp.

84,255.00
17,125.00
101,380.00

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

25,448.91
57,044.45
9,211.91
91,705.26

76,043.52
102,744.36
71,442.09
92,605.47
5,000.00
Jumlah III
JumlahI + II + III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,904.53
2,718.62
9,801.85
2,268.83
5,000.00
34,693.83
227,779.10

53,812.50 = Rp.
8,750.00 = Rp.
Jumlah I = Rp.

53,812.50
8,750.00
62,562.50

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

20,995.35
60,238.94
9,021.64
90,255.92

76,043.52
102,744.36
71,442.09
92,605.47
4,000.00
Jumlah III
JumlahI + II + III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,752.44
2,690.87
9,701.84
2,245.68
4,000.00
33,390.84
186,209.26

27,162.50 = Rp.
8,750.00 = Rp.
Jumlah I = Rp.

27,162.50
8,750.00
35,912.50

45,444.48
228,177.79
32,805.95
Jumlah II

=
=
=
=

Rp.
Rp.
Rp.
Rp.

20,995.35
60,238.94
9,021.64
90,255.92

76,043.52
102,744.36
71,442.09
92,605.47
4,000.00
Jumlah III
JumlahI + II + III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,752.44
2,690.87
9,701.84
2,245.68
4,000.00
33,390.84
159,559.26

32,800.00 = Rp.
82,675.29 = Rp.
Jumlah I = Rp.

32,800.00
82,675.29
115,475.29

45,444.48 = Rp.
31,850.31 = Rp.
Jumlah II = Rp.

40,900.03
28,665.28
69,565.31

76,043.52
102,744.36
71,442.09
92,605.47
10,000.00
1.00
Jumlah I + II + III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,490.01
3,185.08
12,145.16
2,870.77
10,000.00
45,691.01
230,731.60

31,570.00 = Rp.
85,375.00 = Rp.
Jumlah I = Rp.

31,570.00
85,375.00
116,945.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

38,627.80
27,885.06
66,512.86

76,043.52
102,744.36
71,442.09
92,605.47
8,000.00
Jumlah III
Jumlah I + II+III

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
8,000.00
40,165.39
223,623.25

30,135.00 = Rp.
54,712.50 = Rp.
Jumlah I = Rp.

30,135.00
54,712.50
84,847.50

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

36,355.58
26,244.76
62,600.34

76,043.52
102,744.36
71,442.09
92,605.47
7,000.00
Jumlah III
Jumlah I + II+III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
7,000.00
39,165.39
186,613.23

18,245.00 = Rp.
35,125.00 = Rp.
Jumlah I = Rp.

18,245.00
35,125.00
53,370.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

27,266.69
19,683.57
46,950.26

76,043.52
102,744.36
71,442.09
92,605.47
6,000.00
Jumlah III
Jumlah I + II

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
6,000.00
38,165.39
138,485.64

17,015.00 = Rp.
17,125.00 = Rp.
Jumlah I = Rp.

17,015.00
17,125.00
34,140.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

22,722.24
16,402.98
39,125.21

76,043.52
102,744.36
71,442.09
92,605.47
5,000.00
Jumlah III
JumlahI + II + III

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,904.53
2,718.62
9,801.85
2,268.83
5,000.00
34,693.83
107,959.05

13,735.00 = Rp.
8,750.00 = Rp.
Jumlah I = Rp.

13,735.00
8,750.00
22,485.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

20,995.35
15,090.74
36,086.08

76,043.52
102,744.36
71,442.09
92,605.47
4,000.00
Jumlah III
JumlahI + II + III

=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,752.44
2,690.87
9,701.84
2,245.68
4,000.00
33,390.84
91,961.92

9,840.00 = Rp.
8,750.00 = Rp.
Jumlah I = Rp.

9,840.00
8,750.00
18,590.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

20,995.35
15,090.74
36,086.08

76,043.52 = Rp.

14,752.44

102,744.36
71,442.09
92,605.47
4,000.00
Jumlah III
JumlahI + II + III

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,690.87
9,701.84
2,245.68
4,000.00
33,390.84
88,066.92

980,000.00 = Rp.
82,675.29 = Rp.
Jumlah I = Rp.

980,000.00
82,675.29
1,062,675.29

45,444.48 = Rp.
31,850.31 = Rp.
Jumlah II = Rp.

40,900.03
28,665.28
69,565.31

76,043.52
102,744.36
71,442.09
92,605.47
10,000.00
500,000.00
Jumlah III
Jumlah I + II + III

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,490.01
3,185.08
12,145.16
2,870.77
10,000.00
83,333.33
129,024.34
1,261,264.94

744,500.00 = Rp.
85,375.00 = Rp.
Jumlah I = Rp.

744,500.00
85,375.00
829,875.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

38,627.80
27,885.06
66,512.86

76,043.52
102,744.36
71,442.09
92,605.47
8,000.00
450,000.00
Jumlah III

=
=
=
=
=
=
=
=

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
8,000.00
75,000.00
115,165.39

Jumlah I + II + III = Rp.

1,011,553.25

589,000.00 = Rp.
54,712.50 = Rp.
Jumlah I = Rp.

589,000.00
54,712.50
643,712.50

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

36,355.58
26,244.76
62,600.34

76,043.52
102,744.36
71,442.09
92,605.47
7,000.00
400,000.00
Jumlah III
Jumlah I + II + III

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
7,000.00
66,666.67
105,832.05
812,144.89

397,500.00 = Rp.
35,125.00 = Rp.
Jumlah I = Rp.

397,500.00
35,125.00
432,625.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

27,266.69
19,683.57
46,950.26

76,043.52
102,744.36
71,442.09
92,605.47
6,000.00
350,000.00
Jumlah III
Jumlah I + II + III

=
=
=
=
=
=
=
=

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,969.14
2,979.59
10,716.31
2,500.35
6,000.00
58,333.33
96,498.72
548,807.29

164,500.00 = Rp.
17,125.00 = Rp.
Jumlah I = Rp.

164,500.00
17,125.00
181,625.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.
76,043.52
102,744.36
71,442.09
92,605.47
5,000.00
300,000.00
Jumlah III
Jumlah I + II + III

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,904.53
2,718.62
9,801.85
2,268.83
5,000.00
50,000.00
84,693.83
282,721.81

114,300.00 = Rp.
8,750.00 = Rp.
Jumlah I = Rp.

114,300.00
8,750.00
123,050.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

20,995.35
15,090.74
36,086.08

76,043.52
102,744.36
71,442.09
92,605.47
4,000.00
250,000.00
Jumlah III
Jumlah I + II + III

=
=
=
=
=
=
=
=

22,722.24
16,402.98
39,125.21

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,752.44
2,690.87
9,701.84
2,245.68
4,000.00
41,666.67
75,057.50
234,193.59

64,500.00 = Rp.
8,750.00 = Rp.
Jumlah I = Rp.

64,500.00
8,750.00
73,250.00

45,444.48 = Rp.
32,805.95 = Rp.
Jumlah II = Rp.

20,995.35
15,090.74
36,086.08

76,043.52 = Rp.

14,752.44

102,744.36
71,442.09
92,605.47
4,000.00
200,000.00
Jumlah III
Jumlah I + II + III

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,690.87
9,701.84
2,245.68
4,000.00
33,333.33
66,724.17
176,060.25

79.08
7.56

65,750.00
16,437.50

2,750.00
687.50

91,641.84
228,177.79
32,805.95

(46,197.37)
(228,177.79)
-

61,824.00
83,532.00
58,083.00
75,289.00
2,000.00

(2,000.00)

DAFTAR HARGA SATUAN UPAH DAN BAHAN


SK GUBERNUR MALUKU UTARA TAHUN 2012
No.

JENIS UPAH / BAHAN

I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

UPAH KERJA
Pekerja
Tukang Pipa
Kepala Tukang Pipa
Mandor
Tukang Kayu Setengah Terampil
Tukang Kayu Terampil
Kepala Tukang Kayu
Tukang Besi Beton Setengah Terampil
Tukang Besi Beton Terampil
Tukang Besi IWF/Profil Setengah Terampil
Tukang Besi IWF/Profil Terampil
Kepala Tukang Besi Beton
Kepala Tukang Besi Konstruksi/Profil
Tukang Batu Setengah Terampil
Tukang Batu Terampil
Kepala Tukang Batu
Tukang Cat
Tukang Politur
Tukang Gali
Operator
Pembantu Operatur
Supir Truck
Kenek Truck
Mekanik

II.
A
1
2
3
4
5
6
7
B
1
2
3
C
1
2
3

Bahan
MINYAK PELUMAS
Solar
Bensin
Minyak Tanah
Pelumas / Oli
Gemuk / Fat
Aspal
Hotmix
KRAN / SARINGAN AIR
Avor / saringan Air
Kran Air
Floor Air
KUNCI PINTU
Kunci Pintu Kualitas Sedang
Kunci Pintu Kualitas Baik
Kunci Pintu Kualitas Istimewa

MEREK MODEL /
UKURAN

SATUAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

Lt
Lt
Lt
Lt
Kg
Ltr
M3
Bh
Bh
Bh
Bh
Bh
Bh

4
5
6
7
8
9
10
11
D
1
2
3
E
1
2
3
4
5
6
7
8
9
10
F
1
2
3
4
5
6
7
8

Gerndel Jendela
Kait Angin
Kertas Amplas
Lis Profil 5
Engsel Jendela Sedang
Engsel Jendela Baik
Engsel Pintu Kualitas Sedang
Engsel Pintu Kualitas Baik

G
1
2
3
4
5
6
H
1
2
3
4

MUR / BAUT/ ANGKER


Mur / Baut
Baut / Baugel
Angker / Baut
MEJA / KURSI / LEMARI
Meja Murid Standar
Kursi Murid Standar
Kursi Guru Standar
Meja Guru Standar
Lemari Buku / Arsip Standar
Papan Tulis Tripleks 2 cm Standar
Papan Data Lapis Formika
Meja Kursi Adimisrasi
meja Kursi Kepsek 1/2 Biro
Meja Kursi Tama Stadar
BATU KALI
Batu Bulat / Gunung / Kali
Batu Karang
Batu Belah 10 - 15 cm
Batu Pecah
Kerikil Beton / Bt. Pecah
Kerikil Beton / Bt. Pecah 1/2
Kerikil Halus
Kerikil Kasar
kerikil halus
PASIR TANAH
Pasir Urug
Pasir Pasangan
Pasir Beton
Sirtu
Tanah Urug
Pasir Halus
BATU BATA
Batu Bata Kls. 1
Batu Bata Merah
Paving Block
Tutup Manholle

KAPUR ADUK

Bh
Bh
Lembar
M
Bh
Bh

Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Psg
Psg
Psg

5/10 cm
5/7 cm
1/2 cm
0.5/1 cm
3/5 cm

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3/DRUM
M3
Bh
Bh
Bh
Bh

1
2
3
J
1
2

Kapur Sirih
Kapur Batu
Kapur Api
SEMEN
Semen PC
Semen warna
Semen Putih

K
1
2
3
4
5
6
7

SENG BAHAN ATAP


Seng Gelombang
Seng Gelombang
Seng Gelombang
Seng Plat
Seng Plat
Seng Plat
Atap Nipa Rumbia

L
1
2
3
M
1
N
1
2
3
4
5
6

BATAKO CETAK
Kwalitas 1 ( Pres )
Kwalitas 2
Kwalitas 3
IJUK
Ijuk
BAHAN KAYU
Kayu Balok Kls. I
Papan Kayu Kls. I
Kayu Balok Kls. II
Kayu Papan Kls. II
Kayu Dolken ( untuk Pondasi )
Pintu Panel Papan Kayu Kls. I
Kusen Lubang Udara Kayu Kls. I
BAMBU
Besar Mdl. 15 Cm
Sedang Mdl. 10 Cm
Kecil Mdl. 0.5 Cm
BETON CETAK
Lobang Air Tembika
BETON BUIS

O
1
2
3
P
1
Q
1
2
3
4
5
6
R
1
2
3

Kg
M3
KG/ DRUM
Kg
Kg
Kg

BJLS 0,20
BJLS 0,25
BJLS 0,30
BJLS 20
BJLS 0,25
BJLS 0,30

Bh
Bh
Bh
Kg
M3
M3
M3
M3
Batang
Bh
Bh
BTG
BTG
BTG
Disesuaikan
Mdl.
Mdl.
Mdl.
Mdl.
Mdl.
Mdl.

BAHAN LANTAI
Ubin Kualitas Baik
Ubin Kualitas Sedang
Ubin Kualitas Standar

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

10
15
16
20
25
30

Cm
Cm
Cm
Cm
Cm
Cm

x
x
x
x
x
x

1
1
1
1
1
1

10 x 20 Cm
20 x 20 Cm
20 x 20 Cm

Bh
M'
M'
M'
M'
M'
M'

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

4
5
6
7
8
R

Keramik Kualitas Baik


Keramik Kualitas Sedang
Keramik Kualitas Standar
Ubin Pc Abu-abu
Teraso
BAHAN BESI
Besi Beton

Besi
Besi
Besi
Besi
Besi
Besi
Besi
Besi
Besi
Besi
Besi
Besi

V
T
1
2
3
U
1
2
3
4
2
3
4
V
1
2

Ulir Ram Jendela


Plat
Plat
Plat
Plat
Plat
Plat
Siku
Siku
Siku
Siku
Siku

20
30
40
20
30

x
x
x
x
x

25
30
40
20
20

Cm
Cm
Cm
Cm
Cm

Diameter 12"
Diatas 12"
Ulir
2 mm = 120 x 240 mm
3 mm = 120 x 240 mm
(4' x 8') tbl. 0,9 mm
(4' x 8') tbl. 0,8 mm
(4' x 8') tbl. 0,3 mm
(4' x 8') tbl. 0,2 mm
30 x 30 x 3 cm
40 x 40 x 4 cm
50 x 50 x 5 cm
60 x 60 x 6 cm
100 x 100 x 10 mm

Gelagar Memanjang Plat Besi 6 mm & Pengelasan


Tangga Besi
PLAT STRIP
3/4' x 1/8 x 6 M
1' x 1/8 x 6 M
1' x 3/16 x 6 M

Bh
Bh
Bh
Dozz
Bh

Kg
Kg
Bh
M'
M'
M'
M'
Staf
Staf
Staf
Staf
Staf
Staf
Staf

LS
Lbr
Lbr
Lbr

PLAT ALUMINIUM
Ukuran 0.5 mm
Ukuran 0.6 mm
Ukuran 0.4 mm

Lbr
Lbr
Lbr

KAWAT
Ikat Beton ( bendrad )
Nyamuk Plastik ( Kasa )
Nyamuk kawat
Saringan Pasir ( Ayakan )
Kawat Duri
Pagar BRC
Kawat Bronjongan 4 mm
BAHAN LANGIT - LANGIT
Tekwood
Tripleks

Kg
M2
M2
M2
Rool
M1
Rool
3 mm uk. 122 x 244 cm
3 mm uk. 80 x 244 cm
2 mm uk. 122 x 244 cm
3 mm uk. 122 x 244 cm
6 mm uk. 122 x 244 cm
9 mm uk. 122 x 244 cm

3
4
5
6
7
8
9
10
S
1

Tripleks KM/WC
Hard Board
Soat Board
Playwood
Totalwood
Jabarwood Polos
Jabarwood Warna
Formika Polos
Formika Warna
BAHAN PIPA
Pipa Besi Galvanis Medium B

Pipa Besi Galvanis Medium A

Pipa PVC

4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa

GIP
GIP
GIP
GIP
GIP
GIP
GIP
GIP
GIP
GIP
PVC
PVC
PVC
PVC
PVC
PVC
PVC

20 mm uk. 122 x 244 cm


3mm
4 x 8 ( 3 mm )
4 x 8 ( 3 mm )
4x8
4x7
4x8
4x8
3x6
3x6

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

Dia 1/2" Medium B


Dia 3/4" Medium B
Dia 1" Medium B
Dia 11/4" Medium B
Dia 11/2" Medium B
Dia 2" Medium B
21/2" Medium B
Dia 3" Medium B
Dia 1/2" Medium A
Dia 3/4" Medium A
Dia 1" Medium A
Dia 11/4" Medium A
Dia 11/2" Medium A
21/2" Medium A
1/2" AW
1" AW
11/2" AW
21/2" D
4"
4" D
Ukr. Mdl. 8'
Ukr. Mdl. 6'
Ukr. Mdl. 4'
Ukr. Mdl. 3'
Ukr. Mdl. 3/4'
Ukr. Mdl. 2 1/2'
Ukr. Mdl. 2'
Ukr. Mdl. 2 1/2'
Ukr. Mdl. 1'
Ukr. Mdl. 1/2'
Ukr. Mdl. 8'
Ukr. Mdl. 6'
Ukr. Mdl. 4'
Ukr. Mdl. 3'
Ukr. Mdl. 3/4'
Ukr. Mdl. 2 1/2'
Ukr. Mdl. 2'

M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1

21
22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
E
1
2
3
4
5
6
7
8
9
10
Z
1

Pipa PVC
Pipa PVC
ACCESSORIES PIPA
Lem Pipa
Lubrikan
Paking Karet dia. 110 mm
Paking Karet dia. 90 mm
Pagar Pelindung Pipa
Clamp Pipa
Air Vent
Talang PVC Dia. 4" dan Klamp
Soket GIP Dia. 3/4"
Pipa GIP Dia. 3/4"
Pipa GIP Dia. 1/2"
Knie GIP Dia.3/4"
Over Hang GIP Dia.3/4"
Nepel GIP Dia. 3/4"
Nepel GIP Dia. 1/2"
Water Meter Dia. 1/2"
Stop Kran Dia 1/2"
Stop Kran Dia 3/4"
Aftap Kran Dia.3/4"
PIPA BESI PERSEGI
Pipa Listrik PVC
Klute PVC
Klute PVC
Klute PVC
Klute PVC
Klute PVC
Klute PVC
Klute PVC
Sook GIP
Sook GIP
Sook GIP
TEGEL KERAMIK
Tegal Semen

Tegal Porselin

Tegal Keramik

4
5
6
7

Mulia Putih Polos


Kdi Grend Master
Mass Roma 6
Accura vonda

Ukr. Mdl. 1'


Ukr. Mdl. 1/2'

M1
M1
Klg
Kg
BH
BH
UNIT
BH
BH
M1
Bh
M1
M1
BH
BH
BH
BH
BH
BH
BH
BH

Ukr. Mdl. 1/2'


Ukr. Mdl. 3/4'
Ukr. Mdl. 1'
Ukr. Mdl. 2 1/4'
Ukr. Mdl. 2 1/2'
Ukr. Mdl. 3'
Ukr. Mdl. 4'
Ukr. Mdl. 2 1/2'
Ukr. Mdl. 1'
Ukr. Mdl. 1/2'
30 x 30 Cm
20 x 20 Cm
10 x 20 Cm
10 x 10 Cm
10 x 20 cm
20 x 20 Cm
20 x 25 Cm
30 x 30 Cm
40 x 40 Cm
30 x 30 Polos
30 x 30 Polos
30 x 30 Polos
40 x 40 Polos

BTG
BTG
BTG
BTG
BTG
BTG
BTG
BTG
BTG
BTG

Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

8
9
10
11
12
G
1
2

6
H
1
2
3
4
5
6
7
8

10

11

masterina Marun
Kia Putih
Accura vonda
Accura Milinium Greend Pesso
Maesro Leonard Interium
BAHAN KACA
Kaca Raybend
Kaca Bening

Es / Kembang
BAHAN LISTRIK
Kabel
Kabel
Sekring
Sekring
Saklar Tunggal ( Baik / Broco )
Saklar Ganda
Kontak Tanam
Lampu TL

Lampu Jari-jari

Lampu Pijar

Lampu Neon ( Komplit )


Lampu Neon ( Komplit )
Lampu TL Lokal Putih
Lampu TL Lokal Warna
TL Bulat 20 W ( komplit )
TL Bulat 40 W ( komplit )
Down Light
Penangkal Petir
Box Sekring
MCB
Main Swict
Titik Lampu
ALAT PENGGANTUNG / PENGUNCI

40
20
20
30
30
3
5
2
3
5

x
x
x
x
x

40
20
20
30
30

Polos
Polos
Polos
Polos
Polos

M2
M2
M2
M2
M2

mm uk. 152 x 122


mm uk. 152 x 122
mm uk. 152 x 122
mm uk. 152 x 122
mm uk. 152 x 122
Ukr. Tbl. 3 mm

M2
M2
M2
M2
M2
M2

NM 2 x 1 1/2 mm
NM 3 x 1 1/2 mm
1 Phase
2 Phase

M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

10 Waat
20 Waat
40 Waat
100 Waat
7 Waat Philips
14 Waat Philips
18 Waat Philips
25 Waat Philips
5 Waat
10 Waat
25 Waat
40 Waat
60 Waat
75 Waat
100 Waat
TL 10 Waat
TL 20 Waat

1 Phaese

Bh
Bh
Tititk

10
11

KUNCI TANAM:
Unicn Elite ( Komplit )
Union Asli
Yale Daule
Tezah
Royal
Kuda Terang
PENGGANTUNG
Hak Angin
Engsel Kupu - kupu
Engsel Nilon Ex Lokal
Grendel
Kunci Gembok
Kunci Firo
BAHAN SANITAIR
Kloset Jongkok Lokal
Kloset Duduk
Wasthavel
Tempat Cuci 1 Lubang
Tempat Cuci 2 Lubang
Orinoer Lokal Putih
Orinoer Lokal Warna
Bath Tube
Floor Drain
Dob Bak Air Kuningan
Pompa Air
Pompa Air Tangan

ZB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ZC
1
2

BAHAN PAKU
Paku Campur
Paku Seng
Paku Asbes
Paku Kait
Paku Sumbat
paku Sekring
Paku Reng
Paku Tripleks
Paku Beton
Paku Ukuran 1-2 Cm
Paku Ukuran 3-4 Cm
Paku Ukuran 5-12 Cm
Paku Sirap
Paku Sekrup
Beud Seng
BAHAN FINISHING
Ampelas Kayu/Besi
Dumpul

1
2
3
4
5
6
Y
1
2
3
4
5
6
Z
1
2
3
4
5
6
7
8
9

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

INA / TOTO
INA / TOTO

Bh
NATIONAL
DRAGON

Kg
Kg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
LBR
Kg

3
4
5
6
7
8
9
10
11
12
ZD
1
2
3
4
5
1
2
3
4
5
6
7
8
15
16
17
18

Spirtus
Minyak Cat
Politur
Teak Oil
Oaker
Menie Kayu
Menie Besi
Cat Besi
Cat Tembok
Cat Kayu Mengkilat
BAHAN PIPA PVC
Pipa PVC dia. 20 mm
Pipa PVC dia. 25 mm
Pipa PVC dia. 32 mm
Pipa PVC dia. 40 mm
Pipa PVC dia. 50 mm
Pipa PVC dia. 63 mm
Pipa PVC dia. 75 mm
Pipa PVC dia. 90 mm
Pipa PVC dia. 110 mm
Pipa PVC dia. 160 mm
Pipa PVC dia. 200 mm
Pipa PVC dia. 250 mm
Pipa PVC dia. 300 mm
Pipa PVC dia. 350 mm
Pipa PVC dia. 400 mm
Pipa PVC dia. 500 mm
Pipa PVC dia. 600 mm

O
1
2
3
4
5
6
7
8
9
10
11
12
ZE
1
2
3
4
5

BAHAN PIPA HDPE


Pipa HDPE dia. 13 mm
Pipa HDPE dia. 16 mm
Pipa HDPE dia. 20 mm
Pipa HDPE dia. 25 mm
Pipa HDPE dia. 30 mm
Pipa HDPE dia. 40 mm
Pipa HDPE dia. 50 mm
Pipa HDPE dia. 65 mm
Pipa HDPE dia. 75 mm
Pipa HDPE dia. 100 mm
Pipa HDPE dia. 150 mm
Pipa HDPE dia. 200 mm
BAHAN PIPA GIP
Pipa GIP dia. 63 mm
Pipa GIP dia. 90 mm
Pipa GIP dia. 110 mm
Pipa GIP dia. 160 mm
Pipa GIP dia. 200 mm

BTL
Kg
Kg
Kg
Kg
Kg
Kg
Kg
1 Kg
1 Kg
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1

M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1

6
7
ZF
1
2
3

Pipa GIP dia. 250 mm


Pipa GIP dia. 300 mm
KABEL TANAH
kabel tanah 3 x 50 mm
Kabel tanah 4 x 16 mm
Kabel tanah 4 x 25 mm

ZG
1
2
3
4

PERALATAN
Dump Truck
Baby Roller
Stamper 0.17 Ton
Alat Bantu

ZG

BAHAN SOLAR CELL


Modul Surya 50 Wp Monocrystalline 12 Volt
Pompa DC-Submersible
MPPT
Sensor & Perlengkapan Pompa Lainnya
- Kabel Power 4x6 mm
- Kabel Array ke kontrol 2x6 mm
- Kabel Array 2x2.5 mm
- Well probe sensor
- Float Switch Surge Protector
- Float Switch & Well Probe Sensor Cable 2 x 1.5
- Acesorise pompa
Dudukan Modul Surya
Penangkal Petir standar

M2
M3
M1
M1
M1

Jam
Jam
Jam
Ls

Unit
Unit
Unit
Mtr
Mtr
Rol
Unit
Unit
Rol
Ls
Ls
Ls

BAHAN
UN 2012
HARGA
SATUAN (Rp.)
71,442.09
76,043.52
102,744.36
92,605.47
78,884.82
84,494.85
88,548.93
78,884.82
84,494.85
78,884.82
84,494.85
88,751.88
77,146.83
78,884.82
84,494.85
88,548.93
78,884.82
82,943.82
78,884.82
103,622.58
79,354.68
84,216.87
79,151.73
81,763.49

62,582.00
51,390.00
69,434.00
62,582.00
53,310.00
57,101.00

7,779.75
8,487.00
6,457.50
41,820.00
33,240.75
11,316.00
43,050.00
32,103.00
8,118.00
153,750.00
221,400.00
676,500.00

6,325.00
6,900.00
5,250.00
34,000.00
27,025.00
9,200.00

29.00

53,310.00
56,053.00
70,028.00
53,628.00
56,913.00
53,490.00
70,028.00

35,000.00
26,100.00
6,600.00
125,000.00
180,000.00
550,000.00

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

33,973.00
38,219.00
51,639.00
46,543.00
39,646.00
42,466.00
44,504.00
39,646.00
42,466.00
39,646.00
42,466.00
44,606.00
38,773.00
39,646.00
42,466.00
44,504.00
39,646.00
45,592.00
39,646.00
52,080.00
39,884.00
42,330.00
39,782.00
40,699.00

5,692.50
6,210.00
3,622.50
21,735.00
24,322.50

14,220.00
23,490.00
5,940.00
54,450.00
148,950.00
495,000.00

17,220.00
14,000.00
11,193.00
9,100.00
4,305.00
3,500.00
17,589.00
14,300.00
16,236.00
13,200.00
33,948.00
27,600.00
20,541.00
16,700.00
43,050.00
35,000.00
33,948.00
27,600.00
33,948.00
27,600.00
33,948.00
27,600.00
353,625.00
297,660.00
630,990.00
787,200.00
1,202,325.00
424,350.00
495,075.00
885,600.00
1,768,125.00
2,398,500.00
242,802.00
197,400.00
184,500.00
150,000.00
289,050.00
235,000.00
325,950.00
265,000.00
492,000.00
400,000.00
615,000.00
450,000.00
922,500.00
750,000.00
506,760.00
412,000.00
325,950.00 Err:512
215,250.00
175,000.00
369,000.00
300,000.00
430,500.00
350,000.00
647,595.00
175,000.00
#VALUE!
150,000.00
615,000.00
500,000.00
2,767.50
2,250.00
2,767.50
2,250.00
6,642.00
5,400.00
922,500.00
-

1.30
1.30
1.30
1.30
1.30

7,200.00
8,190.00
2,475.00
3,780.00
18,000.00

1.30
1.30

31,500.00

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

1.30

17,550.00
17,550.00
17,550.00
287,500.00
201,250.00
316,250.00
230,000.00
977,500.00
345,000.00
402,500.00
517,500.00
###
862,500.00
175,500.00
135,000.00
211,500.00
238,500.00
360,000.00
405,000.00
675,000.00
370,800.00
405,000.00
157,500.00
270,000.00
315,000.00
157,500.00
135,000.00
450,000.00
1,750.00
1,400.00
2,000.00

37,884.00
227,304.00
266,418.00
2,017.20
21,525.00
5,781.00
62,680.80
76,043.52
90,232.80
62,115.00
73,800.00
86,100.00
6,150.00
2,398.50
1,998.75
1,599.00
104,550.00
4,538,700.00
4,538,700.00
2,767,500.00
2,767,500.00
17,220.00
1,476,000.00
153,750.00
98,400.00
61,500.00
36,900.00
33,210.00
348,705.00
359,775.00
398,520.00
415,125.00
442,800.00
1,279.20
2,656.80
2,779.80

82,000.00
17,500.00
4,700.00

1.30
1.30
1.30
1.30
1.30
1.30
1.30

3,690,000.00
3,690,000.00
2,250,000.00
2,250,000.00
1,400,000.00

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

52,000.00
54,000.00
56,500.00

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

50,960.00
61,824.00
73,360.00
50,500.00
60,000.00
70,000.00
5,000.00

30,000.00
184,800.00
216,000.00
1,230.00
4,500.00
4,500.00

40,950.00
55,200.00
65,500.00
50,500.00
60,000.00
70,000.00
5,000.00

1,500.00
1,250.00
1,000.00
76,500.00
###
###
###
###
9,000.00

31,500.00
27,000.00
18,000.00

3,530.10
6,597.27
16,656.25
108,585.63
111,069.00
12,841.93
15,990.00
430,500.00
1,094,700.00
1,174,650.00
361,150.14
354,714.17
57,372.12
376,964.25
87,345.38
117,686.40
181,126.73
277,260.45
1,149,281.25
615,000.00
1,845,000.00
54,361.01
55,625.21
54,820.72
252,841.88
299,617.62
207,330.34
27,429.00
18,204.00
21,525.00
28,905.00
1,168,500.00
430,500.00
738,000.00
123,393.60
109,371.60
67,035.00
82,410.00
119,556.00
194,340.00

57,400.00
59,000.00
81,250.00
84,375.00
90,300.00

890,000.00
955,000.00

1.30
1.30
1.30
1.30
1.30 Err:512
1.30
1.30
1.30
9,500.00
1.30
10,000.00
1.30
10,250.00
1.30 209,500.00
1.30 274,390.00
1.30 225,860.00
1.30 221,835.00
1.30
35,880.00
1.30 235,750.00
1.30
54,625.00
1.30
73,600.00
1.30 113,275.00
1.30
19,550.00
1.30 718,750.00
1.30

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
22,300.00

950,000.00
600,000.00
100,320.00
88,920.00
54,500.00
67,000.00
97,200.00
158,000.00

31,625.00
34,787.50
34,284.38

158,125.00
187,378.13
129,662.50

1.30
1.30
1.30
1.30
1.30

15,000.00
12,000.00
17,500.00
19,500.00
950,000.00

1.30
1.30
1.30

600,000.00

1.30
1.30
1.30
1.30

60,000.00
82,500.00

88,000.00

104,500.00

623,118.00
131,118.00
103,935.00
111,930.00
111,930.00
119,925.00
95,940.00
103,935.00
119,925.00
135,915.00
99,630.00
110,700.00
137,760.00
178,965.00
202,950.00
246,000.00
309,345.00
377,610.00
105,780.00
140,835.00
193,110.00
247,230.00
278,595.00
512,910.00
22,324.50
24,354.00
41,943.00
34,501.50
191,898.43
36,900.00
144,320.00
139,810.00
137,965.00
88,150.00
23,780.00
83,025.00
67,650.00
56,990.00
56,170.00
58,527.50
32,800.00
31,570.00
30,135.00
18,245.00
17,015.00
13,735.00
9,840.00

106,600.00

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

121,000.00
231,000.00
65,000.00
70,000.00
70,000.00
75,000.00
60,000.00
65,000.00
75,000.00
85,000.00
81,000.00
90,000.00
112,000.00
145,500.00
165,000.00
200,000.00
251,500.00
307,000.00
86,000.00
114,500.00
157,000.00
201,000.00
226,500.00
417,000.00
30,000.00
-

4,715.00
3,382.50
61,500.00
67,650.00
36,900.00
30,750.00
615,000.00
43,050.00
270,600.00
93,910.50
30,750.00
73,800.00
56,170.00
30,750.00
7,163.52
6,765.00
5,535.00
430,500.00
36,900.00
44,280.00
24,600.00
4,920.00
6,150.00
12,300.00
30,750.00
33,825.00
43,050.00
49,200.00
16,482.00
10,455.00
6,519.00
5,251.33
79,742.44
83,146.08
83,243.33
105,026.63
83,632.31
99,191.81
60,293.06
92,968.01
81,687.38
78,769.97

1.30
1.30

1.30

4,000.00
5,000.00
10,000.00
25,000.00
27,500.00
35,000.00
40,000.00
13,400.00
8,500.00
5,300.00

55,000.00

1.30
1.30
1.30
6,750.00
1.30
5,500.00
1.30
6,700.00
1.30
8,750.00
1.30
4,100.00
1.30
6,500.00
1.30
4,700.00
1.30
5,200.00
1.30
3,100.00
1.30
1,200.00
1.30
1.30
1.30 Err:512
1.30 Err:512
1.30
1.30 Err:512
1.30 Err:512
1.30 Err:512
1.30 Err:512
1.30 Err:512
1.30 Err:512
1.30 Err:512
1.30 Err:512
1.30 Err:512

92,384.53
81,687.38
118,641.19
81,687.38
879,111.75
171,585.00
238,620.00
157,440.00
232,470.00
281,547.00
10,504.20
18,982.59
61,500.00
123,000.00
36,900.00
61,500.00
36,900.00
30,750.00
64,575.00
73,800.00
135,300.00
39,975.00
43,050.00
61,500.00
82,902.00
2,475.38
4,597.13
6,365.25
7,496.85
10,608.75
24,753.75
33,594.38
41,512.50
59,778.00
91,327.50
59,362.88
63,015.98
91,327.50
215,250.00
2,767,500.00
184,500.00
455,100.00
627,300.00
184,500.00
-

2.00

139,500.00
194,000.00
128,000.00
189,000.00
228,900.00

854,000.00
1,543,300.00
50,000.00
100,000.00
30,000.00
50,000.00
30,000.00
25,000.00
52,500.00
60,000.00
110,000.00
32,500.00
35,000.00
50,000.00
67,400.00
2,012.50
3,737.50
5,175.00
6,095.00
8,625.00
20,125.00
27,312.50
33,750.00
48,600.00
74,250.00
48,262.50
51,232.50
74,250.00
175,000.00
2,250,000.00
150,000.00

1.30 Err:512
1.30 Err:512
1.30 Err:512
1.30 Err:512
1.30 Err:512
1.30
1.30 126,500.00
1.30 176,000.00
1.30
37,900.00
1.30 101,750.00
1.30 154,500.00
1.30 269,500.00
1.30
1.30
3,500.00
1.30
5,000.00
1.30
50,000.00
1.30 100,000.00
1.30
30,000.00
1.30
50,000.00
1.30
30,000.00
1.30
25,000.00
1.30
52,000.00
1.30
60,000.00
1.30 110,000.00
1.30
32,000.00
1.30
35,000.00
1.30
50,000.00
1.30
67,400.00
1.30
1,750.00
1.30
3,250.00
1.30
4,500.00
1.30
5,300.00
1.30
5,300.00
1.30
60,000.00
1.30 110,000.00
1.30
25,000.00
1.30
36,000.00
1.30
55,000.00
1.30
35,750.00
1.30
37,950.00
1.30
55,000.00
1.30 175,000.00
1.30
###
1.30 150,000.00

1.30

139,113.00
335,790.00
99,138.00
215,865.00
151,905.00
83,148.00
18,450.00
11,992.50
10,793.25
12,300.00
18,450.00
215,865.00
276,750.00
2,232,450.00
1,845,000.00
473,550.00
669,735.00
1,691,250.00
1,894,200.00
3,382,500.00
19,434.00
12,300.00
799,500.00
246,000.00
24,477.00
32,472.00
24,600.00
15,190.50
15,190.50
15,190.50
15,190.50
20,787.00
28,290.00
13,591.50
12,792.00
15,590.25
9,993.75
11,832.60
12,152.40
7,011.00
30,135.00

15,000.00

10,000.00
15,000.00

225,000.00
1,815,000.00
1,500,000.00
385,000.00
544,500.00
1,375,000.00
1,540,000.00
2,750,000.00
15,800.00

19,900.00
26,400.00
20,000.00

23,000.00

5,700.00
24,500.00

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

87,000.00
210,000.00
62,000.00
135,000.00
95,000.00
52,000.00
6,500.00
7,500.00
6,750.00
6,500.00
15,500.00
135,000.00
225,000.00
###
###
385,000.00
544,500.00
###
###
363,000.00
15,800.00
500,000.00
200,000.00

9,500.00
19,850.00
19,850.00
9,500.00
9,500.00
9,500.00
9,500.00
13,000.00
18,300.00
8,500.00
8,000.00
9,750.00
6,250.00
7,400.00
7,600.00
2,500.00
16,500.00

28,659.00
28,659.00
50,737.50
43,050.00
34,378.50
30,750.00
30,750.00
43,050.00
50,577.60
121,401.00
4,916.31
7,702.26
11,172.09
16,477.08
25,999.74
27,162.50
78,056.78
53,812.50
84,255.00
172,815.00
269,185.50
420,045.00
473,932.12
1,349,476.05
1,735,351.65
2,742,143.55
4,356,660.00

3,321.00
4,305.00
6,273.00
8,179.50
12,915.00
19,926.00
31,734.00
44,772.00
65,067.00
97,293.00
200,059.50
312,235.50
178,350.00
227,550.00
276,750.00
645,750.00
1,088,550.00

23,300.00
23,300.00
41,250.00

25,000.00
25,000.00
35,000.00
10,540.00
19,740.00

150,000.00

458,100.00
1,519,000.00
2,363,800.00
3,772,900.00

75327.0728275

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.10
1.30
1.30
1.10
1.10
1.10
1.10
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

6,050.00
13,750.00
41,250.00
35,000.00
21,500.00
25,000.00
25,000.00
35,000.00
27,500.00
50,050.00
3,997.00
6,262.00
9,083.00
13,396.00
21,138.00
48,324.78
48,816.00
42,412.00
122,450.67
167,878.00
413,532.17
323,516.00
515,269.00
###
###
###
###

2,700.00
3,500.00
5,100.00
6,650.00
10,500.00
16,200.00
20,000.00
36,400.00
52,300.00
77,800.00
162,650.00
253,850.00

1,291,500.00
1,814,250.00
1.30
116,850.00
167,895.00
167,895.00
615,000.00
430,500.00
430,500.00
6,150.00
4,999,950.00
50,792,850.00
9,840,000.00
58,425.00
36,900.00
1,242,300.00
738,000.00
738,000.00
1,107,000.00
6,150,000.00
7,380,000.00
4,305,000.00

1.30
1.30

105,000.00
105,000.00

1.30
1.30
1.30

105,000.00
105,000.00
105,000.00

1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30

105,000.00
105,000.00
105,000.00
105,000.00
105,000.00
105,000.00
105,000.00
105,000.00
105,000.00

500000
350000
350000

Err:512

26,000.00
29,700.00
40,210.95
36,200.00
30,800.00
33,000.00
34,650.00
30,800.00
33,000.00
30,800.00
33,000.00
34,650.00
34,650.00
30,800.00
33,000.00
34,650.00
30,800.00
35,420.00

24,000.00
27,000.00
28,000.00
30,000.00
28,000.00
30,000.00
31,500.00
28,000.00
30,000.00
28,000.00
30,000.00
31,500.00
31,500.00
28,000.00
30,000.00
31,500.00
28,000.00
28,000.00

40,480.00
30,992.00
32,890.00
30,922.00
31,625.00

32,000.00
24,500.00
26,000.00
24,500.00
25,000.00

6,325.00
6,900.00
4,025.00
24,150.00
27,025.00

2,350.00
2,500.00
1,400.00
20,000.00
12,700.00

15,800.00
26,100.00
6,600.00

14,200.00
23,600.00
5,900.00

60,500.00
165,500.00
550,000.00

50,700.00
88,800.00

5,750.00

71,442.09
76,043.52
102,744.36
92,605.47
78,884.82
84,494.85
88,548.93
78,884.82
84,494.85
78,884.82
84,494.85
88,751.88
77,146.83
78,884.82
84,494.85
88,548.93
78,884.82
82,943.82
78,884.82
103,622.58
79,354.68
84,216.87
79,151.73
81,763.49
7,779.75
8,487.00
6,457.50
41,820.00
33,240.75
11,316.00
43,050.00
32,103.00
8,118.00
153,750.00
221,400.00
676,500.00

58,083.00
61,824.00
83,532.00
75,289.00
64,134.00
68,695.00
71,991.00
64,134.00
68,695.00
64,134.00
68,695.00
72,156.00
62,721.00
64,134.00
68,695.00
71,991.00
64,134.00
67,434.00
64,134.00
84,246.00
64,516.00
68,469.00
64,351.00
66,474.38

6,325.00
6,900.00
5,250.00
34,000.00
27,025.00
9,200.00

35,000.00
26,100.00
6,600.00
125,000.00
180,000.00
550,000.00

8,000.00
9,100.00
2,750.00
4,200.00
20,000.00

3,500.00
3,400.00
2,500.00
4,800.00
6,200.00

35,000.00

7,300.00

19,500.00
19,500.00
19,500.00

11,600.00
11,600.00
11,600.00

287,500.00
201,250.00
316,250.00
230,000.00
977,500.00
345,000.00
402,500.00
517,500.00
1,437,500.00
862,500.00

228,000.00
153,000.00
262,000.00
228,000.00
620,000.00
452,000.00
453,000.00
507,000.00
656,000.00
406,000.00

195,000.00
150,000.00
235,000.00
265,000.00
400,000.00
450,000.00
750,000.00
412,000.00
450,000.00

115,000.00
75,000.00
125,000.00
127,000.00
130,000.00
130,000.00
192,500.00
215,000.00
130,000.00

175,000.00
300,000.00
350,000.00
175,000.00
150,000.00
500,000.00

115,000.00
120,000.00
135,000.00
95,000.00
75,000.00
115,000.00

1,750.00
1,400.00
2,000.00

1,200.00
1,100.00
1,700.00

17,220.00
11,193.00
4,305.00
17,589.00
16,236.00
33,948.00
20,541.00
43,050.00
33,948.00
33,948.00
33,948.00
353,625.00
297,660.00
630,990.00
787,200.00
1,202,325.00
424,350.00
495,075.00
885,600.00
1,768,125.00
2,398,500.00
242,802.00
184,500.00
289,050.00
325,950.00
492,000.00
615,000.00
922,500.00
506,760.00
325,950.00
215,250.00
369,000.00
430,500.00
647,595.00
#VALUE! l
615,000.00
2,767.50
2,767.50
6,642.00
922,500.00
-

14,000.00
9,100.00
3,500.00
14,300.00
13,200.00
27,600.00
16,700.00
35,000.00

27,600.00
27,600.00
27,600.00
287,500.00
242,000.00
513,000.00
640,000.00
977,500.00
345,000.00
402,500.00
720,000.00
1,437,500.00
1,950,000.00
197,400.00
150,000.00
235,000.00
265,000.00
400,000.00
500,000.00
750,000.00
412,000.00
265,000.00
175,000.00
300,000.00
350,000.00
526,500.00
500,000.00
2,250.00
2,250.00
5,400.00
750,000.00

30,000.00
184,800.00
216,000.00
61,500.00
4,700.00
4,700.00

25,500.00
160,000.00
185,000.00
1,075.00
925.00
4,200.00

45,500.00
55,200.00
65,500.00
50,500.00
60,000.00
70,000.00
5,000.00

1,500.00
1,250.00
1,000.00
85,000.00

21,000.00

2,990,000.00
2,990,000.00
1,560,000.00
1,560,000.00
10,000.00

35,000.00
30,000.00
20,000.00

10,000.00
75,000.00
75,000.00

30,000.00
315,000.00
325,000.00
360,000.00
375,000.00
400,000.00

22,000.00
21,000.00
223,000.00
235,000.00
110,000.00

50,000.00
45,000.00
42,000.00

7,000.00
9,000.00
11,000.00

1,230.00

37,884.00
227,304.00
266,418.00
2,017.20
21,525.00
5,781.00
62,680.80
76,043.52
90,232.80
62,115.00
73,800.00
86,100.00
6,150.00
2,398.50
1,998.75
1,599.00
104,550.00
4,538,700.00
4,538,700.00
2,767,500.00
2,767,500.00
17,220.00
1,476,000.00
153,750.00
98,400.00
61,500.00
36,900.00
33,210.00
348,705.00
359,775.00
398,520.00
415,125.00
442,800.00
1,279.20
2,656.80
2,779.80

30,800.00
184,800.00
216,600.00
1,640.00
17,500.00
4,700.00

50,960.00
61,824.00
73,360.00
50,500.00
60,000.00
70,000.00
5,000.00

1,950.00
1,625.00
1,300.00
85,000.00
3,690,000.00
3,690,000.00
2,250,000.00
2,250,000.00
14,000.00
1,200,000.00
125,000.00
80,000.00
50,000.00
30,000.00

27,000.00
283,500.00
292,500.00
324,000.00
337,500.00
360,000.00
1,040.00
2,160.00
2,260.00

77,000.00
49,000.00
44,000.00
42,000.00

9,000.00
7,000.00
8,000.00
8,000.00
11,000.00

10,000.00
9,500.00
10,250.00
209,500.00
274,390.00
225,860.00
221,835.00
35,880.00
235,750.00
54,625.00
73,600.00
113,275.00
19,550.00
718,750.00

20,000.00
22,000.00
###

100,000.00
118,500.00
82,000.00
15,000.00
12,000.00
17,500.00
19,500.00
950,000.00

13,500.00
13,000.00
13,000.00
14,500.00
52,000.00

600,000.00

550,000.00

88,000.00
60,000.00
82,500.00
104,500.00

3,530.10
6,597.27
16,656.25
108,585.63
111,069.00
12,841.93
15,990.00
430,500.00
1,094,700.00
1,174,650.00
361,150.14
354,714.17
57,372.12
376,964.25
87,345.38
117,686.40
181,126.73
277,260.45
1,149,281.25
615,000.00
1,845,000.00
54,361.01
55,625.21
54,820.72
252,841.88
299,617.62
207,330.34
27,429.00
18,204.00
21,525.00
28,905.00
1,168,500.00
430,500.00
738,000.00
123,393.60
109,371.60
67,035.00
82,410.00
119,556.00
194,340.00

2,870.00
5,363.64
13,541.67
88,281.00
90,300.00

10,440.59
13,000.00
350,000.00
890,000.00
955,000.00
293,618.00
288,385.50
46,644.00
306,475.00
71,012.50
95,680.00
147,257.50
225,415.00
934,375.00
500,000.00
1,500,000.00
44,195.94
45,223.75
44,569.69

205,562.50
243,591.56
168,561.25
22,300.00
14,800.00
17,500.00
23,500.00
950,000.00
350,000.00
600,000.00
100,320.00
88,920.00
54,500.00
67,000.00
97,200.00
158,000.00

121,000.00
231,000.00
65,000.00
70,000.00
70,000.00
75,000.00
60,000.00
65,000.00
75,000.00
85,000.00

704,000.00
682,000.00
673,000.00
430,000.00
116,000.00
405,000.00
330,000.00
278,000.00
274,000.00
285,500.00
160,000.00
154,000.00
147,000.00
89,000.00
83,000.00
67,000.00
48,000.00

81,000.00
90,000.00
112,000.00
145,500.00
165,000.00
200,000.00
251,500.00
307,000.00
86,000.00
114,500.00
157,000.00
201,000.00
226,500.00
417,000.00
16,500.00
18,000.00
31,000.00
25,500.00
27,000.00
30,000.00
-

623,118.00
131,118.00
103,935.00
111,930.00
111,930.00
119,925.00
95,940.00
103,935.00
119,925.00
135,915.00
99,630.00
110,700.00
137,760.00
178,965.00
202,950.00
246,000.00
309,345.00
377,610.00
105,780.00
140,835.00
193,110.00
247,230.00
278,595.00
512,910.00
22,324.50
24,354.00
41,943.00
34,501.50
191,898.43
36,900.00
144,320.00
139,810.00
137,965.00
88,150.00
23,780.00
83,025.00
67,650.00
56,990.00
56,170.00
58,527.50
32,800.00
31,570.00
30,135.00
18,245.00
17,015.00
13,735.00
9,840.00

506,600.00
106,600.00
84,500.00
91,000.00
91,000.00
97,500.00
78,000.00
84,500.00
97,500.00
110,500.00
81,000.00
90,000.00
112,000.00
145,500.00
165,000.00
200,000.00
251,500.00
307,000.00
86,000.00
114,500.00
157,000.00
201,000.00
226,500.00
417,000.00
18,150.00
19,800.00
34,100.00
28,050.00
156,014.98
30,000.00
117,333.33
113,666.67
112,166.67
71,666.67
19,333.33
67,500.00
55,000.00
46,333.33
45,666.67
47,583.33
26,666.67
25,666.67
24,500.00
14,833.33
13,833.33
11,166.67
8,000.00

23,000.00
16,500.00

55,000.00

4,000.00
5,000.00
10,000.00
25,000.00
27,500.00
35,000.00
40,000.00
3,500.00
1,500.00
750.00

6,750.00
5,500.00
6,700.00
8,750.00
4,100.00
6,500.00
4,700.00
5,200.00
3,100.00
1,200.00

2,700.00
41,000.00
42,750.00
42,800.00
54,000.00
43,000.00
51,000.00
31,000.00
47,800.00
42,000.00
40,500.00

4,715.00
3,382.50
61,500.00
67,650.00
36,900.00
30,750.00
615,000.00
43,050.00
270,600.00
93,910.50
30,750.00
73,800.00
56,170.00
30,750.00
7,163.52
6,765.00
5,535.00
430,500.00
36,900.00
44,280.00
24,600.00
4,920.00
6,150.00
12,300.00
30,750.00
33,825.00
43,050.00
49,200.00
16,482.00
10,455.00
6,519.00
5,251.33
79,742.44
83,146.08
83,243.33
105,026.63
83,632.31
99,191.81
60,293.06
92,968.01
81,687.38
78,769.97

3,833.33
2,750.00
50,000.00
55,000.00
30,000.00
25,000.00
500,000.00
35,000.00
220,000.00
76,350.00
25,000.00
60,000.00
45,666.67
25,000.00
5,824.00
5,500.00
4,500.00
350,000.00
30,000.00
36,000.00
20,000.00

4,000.00
5,000.00
10,000.00
25,000.00
27,500.00
35,000.00
40,000.00
13,400.00
8,500.00
5,300.00

4,269.38
64,831.25
67,598.44
67,677.50
85,387.50
67,993.75
80,643.75
49,018.75
75,583.75
66,412.50
64,040.63

47,500.00
42,000.00
61,000.00
42,000.00
452,000.00
126,500.00
176,000.00
101,750.00
154,500.00
269,500.00
3,500.00
5,000.00
50,000.00
100,000.00
30,000.00
50,000.00
30,000.00
25,000.00
52,000.00
60,000.00
110,000.00
32,000.00
35,000.00
50,000.00
67,400.00
1,750.00
3,250.00
4,500.00
5,300.00
5,300.00
60,000.00
110,000.00
25,000.00
36,000.00
55,000.00
35,750.00
37,950.00
55,000.00
175,000.00
2,250,000.00
150,000.00

94,300.00
133,000.00
37,900.00
79,900.00
110,900.00
63,000.00

92,384.53
81,687.38
118,641.19
81,687.38
879,111.75
171,585.00
238,620.00
157,440.00
232,470.00
281,547.00
10,504.20
18,982.59
61,500.00
123,000.00
36,900.00
61,500.00
36,900.00
30,750.00
64,575.00
73,800.00
135,300.00
39,975.00
43,050.00
61,500.00
82,902.00
2,475.38
4,597.13
6,365.25
7,496.85
10,608.75
24,753.75
33,594.38
41,512.50
59,778.00
91,327.50
59,362.88
63,015.98
91,327.50
215,250.00
2,767,500.00
184,500.00
455,100.00
627,300.00
184,500.00
-

75,109.38
66,412.50
96,456.25
66,412.50
714,725.00
139,500.00
194,000.00
128,000.00
189,000.00
228,900.00

8,540.00
15,433.00
50,000.00
100,000.00
30,000.00
50,000.00
30,000.00
25,000.00
52,500.00
60,000.00
110,000.00
32,500.00
35,000.00
50,000.00
67,400.00
2,012.50
3,737.50
5,175.00
6,095.00
8,625.00
20,125.00
27,312.50
33,750.00
48,600.00
74,250.00
48,262.50
51,232.50
74,250.00
175,000.00
2,250,000.00
150,000.00
370,000.00
510,000.00
150,000.00

172,000.00
87,000.00
210,000.00
62,000.00
135,000.00
95,000.00
52,000.00
6,500.00
7,500.00
6,750.00
6,500.00
15,500.00
135,000.00
225,000.00
1,815,000.00
1,500,000.00
385,000.00
544,500.00
1,375,000.00
1,540,000.00
363,000.00
15,800.00
500,000.00
200,000.00
850,000.00

21,000.00
20,000.00
20,000.00

2,500.00
16,500.00

9,500.00
19,850.00
19,850.00
9,500.00
9,500.00
9,500.00
9,500.00
13,000.00
18,300.00
8,500.00
8,000.00
9,750.00
6,250.00
7,400.00
7,600.00

139,113.00
335,790.00
99,138.00
215,865.00
151,905.00
83,148.00
18,450.00
11,992.50
10,793.25
12,300.00
18,450.00
215,865.00
276,750.00
2,232,450.00
1,845,000.00
473,550.00
669,735.00
1,691,250.00
1,894,200.00
3,382,500.00
19,434.00
12,300.00
799,500.00
246,000.00
24,477.00
32,472.00
24,600.00
15,190.50
15,190.50
15,190.50
15,190.50
20,787.00
28,290.00
13,591.50
12,792.00
15,590.25
9,993.75
11,832.60
12,152.40
7,011.00
30,135.00

113,100.00
273,000.00
80,600.00
175,500.00
123,500.00
67,600.00
15,000.00
9,750.00
8,775.00
10,000.00
15,000.00
175,500.00
225,000.00
1,815,000.00
1,500,000.00
385,000.00
544,500.00
1,375,000.00
1,540,000.00
2,750,000.00
15,800.00
10,000.00
650,000.00
200,000.00

19,900.00
26,400.00
20,000.00
12,350.00
12,350.00
12,350.00
12,350.00
16,900.00
23,000.00
11,050.00
10,400.00
12,675.00
8,125.00
9,620.00
9,880.00
5,700.00
24,500.00

6,050.00
13,750.00
41,250.00
35,000.00
21,500.00
25,000.00
###
35,000.00
27,500.00
50,050.00
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa

PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC

dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.
dia.

3,997.00
6,262.00
9,083.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###

28,659.00
28,659.00
50,737.50
43,050.00
34,378.50
30,750.00
30,750.00
43,050.00
50,577.60
121,401.00
4,916.31
7,702.26
11,172.09
16,477.08
25,999.74
27,162.50
78,056.78
53,812.50
84,255.00
172,815.00
269,185.50
420,045.00
473,932.12
1,349,476.05
1,735,351.65
2,742,143.55
4,356,660.00
3,321.00
4,305.00
6,273.00
8,179.50
12,915.00
19,926.00
31,734.00
44,772.00
65,067.00
97,293.00
200,059.50
312,235.50
178,350.00
227,550.00
276,750.00
645,750.00
1,088,550.00

23,300.00
23,300.00
41,250.00
35,000.00
27,950.00
25,000.00
25,000.00
35,000.00
41,120.00
98,700.00
3,997.00
6,262.00
9,083.00
13,396.00
21,138.00
22,083.33
63,460.80
43,750.00
68,500.00
140,500.00
218,850.00
341,500.00
385,310.67
1,097,135.00
1,410,855.00
2,229,385.00
3,542,000.00

2,700.00
3,500.00
5,100.00
6,650.00
10,500.00
16,200.00
25,800.00
36,400.00
52,900.00
79,100.00
162,650.00
253,850.00
145,000.00
185,000.00
225,000.00
525,000.00
885,000.00

1,291,500.00
1,814,250.00
116,850.00
167,895.00
167,895.00
615,000.00
430,500.00
430,500.00
6,150.00
4,999,950.00
50,792,850.00
9,840,000.00
58,425.00
36,900.00
1,242,300.00
738,000.00
738,000.00
1,107,000.00
6,150,000.00
7,380,000.00
4,305,000.00

1,050,000.00
1,475,000.00
95,000.00
136,500.00
136,500.00

500,000.00
350,000.00
350,000.00
5,000.00

4,065,000.00
41,295,000.00
8,000,000.00
47,500.00
30,000.00
1,010,000.00
600,000.00
600,000.00
900,000.00
5,000,000.00
6,000,000.00
3,500,000.00

REKAP

1,761,992,000.00

TOTAL PNW
PERSEN

1,750,000,000.00
11,992,000.00

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###

6,325.00
6,900.00
5,250.00
###
###
9,200.00

###
###
###

###
###
6,600.00

###
###

###
###
###

###
###
###

###
9,100.00
3,500.00
###
###
###
###
###

###

###

###
###
###

###
###
###

###
###
###
###
###
###
###
###
###
###

###

###

###

###
###
###
###
###
###
###
###
###

###
###
###
###
###
###

###
###
###
###
###
###

###
###
###
###

###

###
###
###
###
###

###

###

###

1,640.00
###
###

###
###
###
###
###
###
###

1,950.00
###
###

###
###

###

###
###
###

###
###
###
###
###
###
###

###
###
###

###
###
###
###
###
###
###
###
###

1,040.00
2,160.00
2,260.00

###
###
###

2,870.00
5,363.64
###
###
###

###

###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###

###
###

###
###
###

###
###
###
###

###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###

###
###
###
###
###
###

###

###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
8,000.00

###
###

3,833.33
2,750.00

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
5,824.00
5,500.00
4,500.00
###
###
###
###

###
###
###
###
###
###
###
###
###
###

4,000.00
5,000.00
###
###
###
###
###
###
8,500.00
5,300.00

###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###

###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

8,540.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
2,012.50
3,737.50
5,175.00
6,095.00
8,625.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###

###
9,750.00
8,775.00
###
###
###

###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###

###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###

5,700.00
###

###
###
###
###
###
###
###
###
###
###

###
###
###
###

###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###

###
###
###
###
###

132,500
262,500
411,000
###
###
###

###
###
###

###
###
###

###
###
###

###
###
###

###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
28000
951000
###

###
###
###
###
###
###

Err:512

PEKERJAAN UMUM
Pekerjaan Finising HU
Pembuatan Manhol HU
uji coba sumur dkl
Pembuatan Manhol sm
jembatan pipa

130,200
271,800
394,500
###
###
###

Err:512
548,693

EKERJAAN UMUM
ekerjaan Finising HU
embuatan Manhol HU
ji coba sumur dkl
embuatan Manhol smur dkl
embatan pipa

DAFTAR ANALISA HARGA SATUAN

A.
1

Analisa Biaya Konstruksi Pekerjaan Persiapan


1M Pagar Sementara dari Kayu Setinggi 2 Meter
Bahan
1.25
Btg
Dolken Kayu 0 8-10/400 Cm
2.50
Kg
Semen Portland

Tenaga

0.01

M3

Pasir Beton

@ Rp.

0.01

M3

Koral Beton

@ Rp.

0.07
0.06
0.40

M
Kg
Lt

Kayu 5/7
Paku Biasa 2 " - 5 "
Residu

@ Rp.
@ Rp.
@ Rp.

0.20
Oh
Tukang Kayu
0.40
Oh
Pekerja
0.02
Oh
Kepala Tukang
0.02
Oh
Mandor
Pipa PVC Dia. 63 mm (Urugan Pasir)

1M Pagar Sementara dari


Bahan
1.25
2.50
1.20

Tenaga

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Seng Golombang Tinggi 2 Meter


Btg
Dolken Kayu 0 8-10/400 Cm
Kg
Semen Portland
Lbr
Seng Gelombang 3 " - 5 "

@ Rp.
@ Rp.
@ Rp.

0.01

M3

Pasir Beton

@ Rp.

0.01

Koral Beton

@ Rp.

0.07
0.06
0.45

M
Kg
Kg

Kayu 5/7
Paku Biasa 2 " - 5 "
Meni besi

@ Rp.
@ Rp.
@ Rp.

0.20
0.40
0.02
0.02

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

@
@
@
@

1M Pagar Sementara dari


Bahan
1.00
2.00
0.25

3
3

Rp.
Rp.
Rp.
Rp.

Kawat Duri Tinggi 1,8 Meter


Btg
Dolken Kayu 0 8-10/400 Cm
Kg
Semen Portland
Kg
Kawat Duri

@ Rp.
@ Rp.
@ Rp.

0.01

M3

Pasir Beton

@ Rp.

0.01
0.06

M
Kg

Koral Beton
Paku Biasa 2 " - 5 "

@ Rp.
@ Rp.

Tenaga

0.20
0.30
0.02
0.02

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

1M Pagar BRJ dari Kawat Ram Tinggi 1,5 Meter


Supl. SNI 7395 - 6.xx
Bahan
1.00
Btg
Kayu Dolken
2.00
Kg
Semen Portland
1.00
M
Pagar BRJ

Tenaga

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

0.01

M3

Pasir Beton

@ Rp.

0.01

Koral Beton

@ Rp.

0.06

Kg

Paku Campur

@ Rp.

2.84
0.03
0.14
0.01

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

5.00 Pengukuran dan Pemasangan Bouplank


SNI 2835 - 6.1
Bahan

Tenaga

0.01

M3

Kayu Kls. II

@ Rp.

0.02

Kg

Paku Campur

@ Rp.

0.01

M3

Papan Kayu Kls. II

@ Rp.

0.10
0.10
0.01
0.01

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran


Bahan
1.25
Btg
Dolken Kayu 0 8-10/400 Cm
0.18
0.85
1.10

M
Kg
Kg
3

Kayu
Kayu Biasa
Besi Strip

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

35.00

Tenaga

Semen Portland

@ Rp.

0.15

Pasir Pasang

@ Rp.

0.10

M3

Pasir Beton

@ Rp.

0.15
30.00
0.25
2.00

M3
Bh
Lbr
Bh

Koral Beton
Bata Merah
Seng Plat
Jendela Nako

@
@
@
@

0.08
0.15
0.06

M2
Bh
Lbr

Kaca Polos
Kunci Tanam
Plywood 4 mm

@ Rp.
@ Rp.
@ Rp.

2.00
1.00
2.00
0.30
0.05

Oh
Oh
Oh
Oh
Oh

Tukang Kayu
Tukang Batu
Pekerja
Kepala Tukang
Mandor

@
@
@
@
@

1 M2 Pembuatan Gudang Semen dan alat - alat


Bahan
1.70
Btg
Dolken Kayu 0

Tenaga

Kg

Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.

0.21
0.30
10.50

M3
Kg
Kg

Kayu
Paku Biasa
Semen Portland

@ Rp.
@ Rp.
@ Rp.

0.03

M3

Pasir Beton

@ Rp.

0.05
1.50

M
Lbr

Koral Beton
Seng Gelombang Bjls 32

@ Rp.
@ Rp.

2.00
1.00
0.20
0.05

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pembuatan Rumah Jaga / Konstruksi Kayu


Bahan
3.00
Btg
Dolken Kayu 0

Tenaga

8-10/400 Cm

Rp.
Rp.
Rp.
Rp.

8-10/400 Cm

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.28
0.70
1.50

M3
Kg
Lbr

Kayu
Paku Biasa
Seng Gelombang Bjls 32

@ Rp.
@ Rp.
@ Rp.

1.50
1.00
0.15

Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

0.05

Oh

Mandor

@ Rp.

Oh
Oh

Pekerja
Mandor

@ Rp.
@ Rp.

3.00 1 M2 Pembersihan Lokasi


SNI 2835 - 6
Tenaga

1 M2 Pembuatan Bedeng Buruh


Bahan
1.25
Btg

Tenaga

10

11

1.00
0.05

Dolken Kayu 0

8-10/400 Cm

@ Rp.

0.19
0.30
18.00

M
Kg
Kg

Kayu
Paku Biasa
Semen Portland

@ Rp.
@ Rp.
@ Rp.

0.03

M3

Pasir Beton

@ Rp.

0.05
1.50
1.35

M3
Lbr
Lbr

Koral Beton
Seng Gelombang Bjls 32
Plywood

@ Rp.
@ Rp.
@ Rp.

2.00
1.00
0.20
0.05

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pembuatan Bak Adukan Ukuran (40x50x20) Cm


Bahan

0.04
0.08
1.00

M3
Kg
Btg

Kayu Terentang
Paku Biasa
Kaso 5/7

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.30
0.00

Oh
Oh

Tukang Kayu
Mandor

@ Rp.
@ Rp.

1 M2 Pembuatan Stegger dari Bambu, Ukuran (40x50x20) Cm


Bahan
1.00
Btg
Bambu 0 6 -10/600 Cm
0.25
Kg
Tali Ijuk

Tenaga

0.02
0.00
0.25

Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

0.01

12

Tenaga

14

15

@ Rp.

0.15

M3

Batu Belah 15/20

@ Rp.

0.09

Batu Pecah 5/7

@ Rp.

0.01

M3

Pasir Pasang

@ Rp.

1.00
0.05

Oh
Oh

Pekerja
Mandor

@ Rp.
@ Rp.

Pekerja
Mandor

@ Rp.
@ Rp.

1 M3 Bongkaran Beton Bertulang


Tenaga
6.67
Oh
0.33
Oh

1 M3 Bongkaran Dinding Tembok Bata Merah


Tenaga
6.67
Oh
Pekerja
0.03
Oh
Mandor

1 M Pagar Kawat Jaring Galvanis, Tinggi 1.00 Meter


Bahan
0.43
Lbr
Pagar Kawat Jaring

Tenaga

16

Mandor

1 M2 Pembuatan Jalan Sementara


Bahan

13

Oh

0.04
0.00
0.04
0.00

Oh
Oh
Oh
Oh

Pekerja
Kepala Tukang
Tukang
Mandor

1 M Pagar Beton Pracetak (5x50x213) Cm


Bahan
0.99
Lbr
Panel Beton Pracetak
0.53
Btg
Kolom Beton Pracetak

Tenaga

@ Rp.
@ Rp.

@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.07

M3

Pasir Beton

@ Rp.

0.15
45.00

M
Kg

Koral 2/3
Semen Abu - abu

@ Rp.
@ Rp.

0.13
0.38
0.01

Oh
Oh
Oh

Tukang Batu
Pekerja
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

0.02

B.
1

Oh

Mandor

@ Rp.

PEKERJAAN TANAH
SNI 2835 : 2008 - 6.1
Galian Tanah Biasa sedalam 1 Meter
Tenaga
0.75
Oh
Pekerja
0.03
Oh
Mandor

@ Rp.
@ Rp.

SNI 2835 2008 - 6.5


Galian Tanah Cadas sedalam 1 Meter
Tenaga
1.50
Oh
Pekerja
0.06
Oh
Mandor

@ Rp.
@ Rp.

Untuk urugan kembali


Galian tanah 1 s/d 2 m =
Galian tanah 2 s/d 3 m =
Galian tanah 3 s/d 4 m =
Galian tanah 4 s/d 5 m =
Galian tanah 5 s/d 6 m =
Galian tanah 6 s/d 7 m =
Galian tanah 8 s/d 9 m =
Galian tanah 9 s/d 10 m =
Galian tanah 10 s/d 11 m =
Galian tanah 11 s/d 12 m =
Galian tanah 12 s/d 13 m =
Galian tanah 13 s/d 14 m =
Galian tanah 14 s/d 15 m =
Galian tanah 15 s/d 16 m =
Galian tanah 16 s/d 17 m =
Galian tanah 17 s/d 18 m =
Maka galian tanah dari 0 s/d 18 m adalah

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

Galian tanah 1 s/d 2 m =


Galian tanah 2 s/d 3 m =
Galian tanah 3 s/d 4 m =
Galian tanah 4 s/d 5 m =
Galian tanah 5 s/d 6 m =
Galian tanah 6 s/d 7 m =
Galian tanah 7 s/d 8 m =
Maka galian tanah dari 0 s/d 8 m adalah

x
x
x
x
x
x
x

Galian Tanah Biasa sedalam 2 Meter


Tenaga
0.53
Oh
Pekerja
1.65
Oh
Tukang Gali
0.17
Oh
Kepala Tukang
0.05
Oh
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Galian Tanah Biasa sedalam 3 Meter


Tenaga
0.74
Oh
Pekerja
3.40
Oh
Tukang Gali
0.34
Oh
Kepala Tukang
0.07
Oh
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Galian Tanah Keras sedalam 1 Meter


Tenaga
0.63
Oh
Pekerja
1.65
Oh
Tukang Gali
0.17
Oh
Kepala Tukang
0.06
Oh
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Galian Tanah Cadas sedalam 1 Meter


Tenaga
1.25
Oh
Pekerja
1.65
Oh
Tukang Gali
0.17
Oh
Kepala Tukang
0.13
Oh
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Galian Tanah Lumpur sedalam 1 Meter


Tenaga
0.82
Oh
Pekerja
1.65
Oh
Tukang Gali
0.17
Oh
Kepala Tukang
0.08
Oh
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Pekerjaan Srtipping Setinggi 1 Meter


Tenaga
0.05
Oh
Pekerja
1.65
Oh
Tukang Gali
0.17
Oh
Kepala Tukang
0.01
Oh
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

8.00 1 M3 Pembuangan Tanah Sejauh 150 Meter


Tenaga
0.52
Oh
Pekerja
0.05

Oh

Mandor

@ Rp.
@ Rp.

9.00 1 M3 Urugan Kembali dan Pemadatan Tanah


SNI 2835 : 2008 - 6.10
Tenaga
0.50
Oh
Pekerja
0.05
Oh
Mandor

10.00 1 M3 Pemadatan Tanah


Tenaga
0.50
0.45
0.25
0.05

Oh
Oh
Oh
Oh

11.00 1 M3 Urugan Pasir


SNI 2835 ; 2008 - 6.11
Bahan
1.20
Oh

Tenaga

0.30
0.01

Oh
Oh

12.00 1 M3 Urugan Sirtu


SNI 2835 ; 2008 - 6.11
Bahan
1.20
Oh

Tenaga

@ Rp.
@ Rp.

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Pasir Urug

@ Rp.

Pekerja
Mandor

@ Rp.
@ Rp.

Sirtu

@ Rp.

0.30
0.01

Oh
Oh

Pekerja
Mandor

@ Rp.
@ Rp.

12.00 Pemasangan Ijuk


AN - TAKSIRAN
Bahan
6.00

Ikat

Ijuk

@ Rp.

0.25

Oh

Pekerja

@ Rp.

0.03

Oh

Mandor

@ Rp.

Tenaga

17

1 M2 Perbaikan Jalan Hotmix, Tebal 25 Cm


Bahan
0.28
Oh
Batu Belah
0.03
Oh
Kerikil
0.05
Oh
Pasir
0.05
Oh
Hotmix

Tenaga

C
1

1.00
2.10
0.04
0.10

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Analisa Biaya Konstruksi Pekerjaan Pondasi


1 M3 Pasangan Susunan Batu Kali
Bahan

1.20

M3

Batu Belah 15 / 20

@ Rp.

Tenaga

0.78
0.30
0.04
0.04

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M3 Pasangan Pondasi Batu Kosong


SNI 2836 - 6.9
Bahan

Tenaga

1.20

M3

Batu Belah 15 cm/20cm

@ Rp.

0.43

Pasir Urug

@ Rp.

0.78
0.39
0.04
0.04

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

7.00 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 4 Ps


SNI 6837 - 6.2
Bahan

1.10

M3

Batu

@ Rp.

163.00

Kg

Semen Portland

@ Rp.

0.52

M3

Pasir Pasang

@ Rp.

Tenaga

1.50
0.60
0.06
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

8.00 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 5 Ps


Bahan

Tenaga

Tenaga

Batu Belah 15 / 20
Semen Portland

@ Rp.
@ Rp.

0.54

M3

Pasir Pasang

@ Rp.

1.50
0.60
0.06
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1.10
117.00

M3
Kg

Batu Belah 15 / 20
Semen Portland

@ Rp.
@ Rp.

0.56

M3

Pasir Pasang

@ Rp.

1.50
0.60
0.06
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 8 Ps


Bahan

Tenaga

10

M3
Kg

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 6 Ps


Bahan

1.10
136.00

1.10
91.00

M3
Kg

Batu Belah 15 / 20
Semen Portland

@ Rp.
@ Rp.

0.56

M3

Pasir Pasang

@ Rp.

1.50
0.60
0.06
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

1 M3 Pasangan Pondasi Batu Kali, 1 Kp : 1 Sm : 1 Ps

Rp.
Rp.
Rp.
Rp.

Bahan

Tenaga

11

Tenaga

Batu Belah 15 / 20
Kapur Pasang

@ Rp.
@ Rp.

0.23

M3

Semen Merah

@ Rp.

0.54

M3

Pasir Pasang

@ Rp.

1.50
0.60
0.06
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1.10
0.17

M3
Kg

Batu Belah 15 / 20
Kapur Pasang

@ Rp.
@ Rp.

0.17

M3

Semen Merah

@ Rp.

0.34

M3

Pasir Pasang

@ Rp.

1.50
0.60
0.06
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 1/4 Kp : 4 Ps


Bahan

Tenaga

13

M3
Kg

1 M3 Pasangan Pondasi Batu Kali, 1 Kp : 1 Sm : 2 Ps


Bahan

12

1.10
0.23

1.10
156.00

M3
Kg

Batu Belah 15 / 20
Semen Portland

@ Rp.
@ Rp.

0.03

M3

Kapur Pasang

@ Rp.

0.58

Pasir Pasang

@ Rp.

1.50
0.60
0.06
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M3 Pasangan Pondasi Batu Kali, 3 Pc : 3 Kp : 10 Ps


Bahan

1.10
61.00

M3
Kg

Batu Belah 15 / 20
Semen Portland

@ Rp.
@ Rp.

0.15

M3

Kapur Pasang

@ Rp.

0.49

Pasir Pasang

@ Rp.

Tenaga

14

Tenaga

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1.10
41.00

M3
Kg

Batu Belah 15 / 20
Semen Portland

@ Rp.
@ Rp.

0.13

M3

Kapur Pasang

@ Rp.

0.52

Pasir Pasang

@ Rp.

1.50
0.60
0.06
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

@
@
@
@

1 M3 Pasang Pondasi Siklop 40 % Batu Kali


Bahan
75.00
Kg
Besi Beton
202.00
Kg
Semen Portland

Tenaga

16

Oh
Oh
Oh
Oh

1 M3 Pasangan Pondasi Batu Kali, 1/4 Pc : 1 Kp : 4 Ps


Bahan

15

1.50
0.60
0.06
0.08

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.32

M3

Pasir Beton

@ Rp.

0.49
0.80

M
Kg

Koral Beton
Kawat Beton

@ Rp.
@ Rp.

3.00
0.85
0.09
0.15

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M3 Pasang Pondasi Sumuran Diameter 100 Cm


Bahan

Tenaga

0.45
280.00

M3
Kg

Batu Belah 15 / 20
Semen Portland

@ Rp.
@ Rp.

0.45

M3

Pasir Beton

@ Rp.

0.67

M3

Koral Beton

@ Rp.

2.38
0.30

Oh
Oh

Pekerja
Tukang Batu

@ Rp.
@ Rp.

0.03
0.08

17

Tenaga

Tenaga

@ Rp.
@ Rp.

0.02

M3

Pasir Urug Darat

@ Rp.

0.09

Pasir Beton

@ Rp.

0.15
60.50
45.00
0.90

M3
Kg
Kg
Kg

Koral Beton
Semen Portland
Besi Beton
Kawat Beton

@
@
@
@

Rp.
Rp.
Rp.
Rp.

0.03
0.12
0.09
0.24

M3
Kg
Lt
Kg

Kayu Kaso 5/7


Paku
Minyak Bekisting
Plamuur Tembok

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1.00
0.67
0.07
0.05

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Pembuatan Tiang Pancang (35x35) Cm, Beton Bertulang


Bahan

Kepala Tukang
Mandor

Pembuatan Tiang Pancang (40x40) Cm, Beton Bertulang


Bahan

18

Oh
Oh

0.02

M3

Pasir Urug Darat

@ Rp.

0.08

M3

Pasir Beton

@ Rp.

0.13
49.00
34.50
0.70

M3
Kg
Kg
Kg

Koral Beton
Semen Portland
Besi Beton
Kawat Beton

@
@
@
@

Rp.
Rp.
Rp.
Rp.

0.03
0.12
0.09
0.20

M3
Kg
Lt
Kg

Kayu Kaso 5/7


Paku
Minyak Bekisting
Plamuur Tembok

@
@
@
@

Rp.
Rp.
Rp.
Rp.

0.80
0.50
0.05
0.04

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Analisa Biaya Konstruksi Pekerjaan Beton


1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr

SNI 7394 - 6.2


Bahan

Tenaga

Kg

Semen Portland

@ Rp.

0.83

M3

Pasir Beton

@ Rp.

0.65

M3

Koral Beton

@ Rp.

6.00
1.00
0.10
0.30

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr


Bahan
197.00
Kg
Semen Portland

Tenaga

388.00

M3

Pasir Beton

@ Rp.

0.94

Koral Beton

@ Rp.

1.65
0.25
0.03
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

0.57

0.87

1.65
0.25
0.03
0.08

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.

Pasir Beton

@ Rp.

Koral Beton

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

3.00 1 M3 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr


Bahan
100.00
Kg
Semen Portland

Tenaga

@ Rp.

0.47

1 M3 Membuat Beton Tumbuk, 1 Pc : 4 Ps : 6 Kr


Bahan
173.00
Kg
Semen Portland

Tenaga

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.03

M3

Pasir Beton

@ Rp.

0.04

M3

Koral Beton

@ Rp.

1.15

Oh

Pekerja

@ Rp.

0.02
0.00
0.01

0.78

1.65
0.25
0.03
0.08

Oh
Oh
Oh
Oh

@ Rp.
@ Rp.
@ Rp.

@ Rp.

Pasir Beton

@ Rp.

Koral Beton

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.45

Pasir Beton

@ Rp.

0.90

M3

Koral Beton

@ Rp.

1.65
0.25
0.03
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 2.5 Kr


Bahan
352.00
Kg
Semen Portland

Tenaga

0.52

1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 4 Kr


Bahan
280.00
Kg
Semen Portland

Tenaga

Tukang Batu
Kepala Tukang
Mandor

1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 3 Kr


Bahan
232.00
Kg
Semen Portland

Tenaga

Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.56

M3

Pasir Beton

@ Rp.

0.70

Koral Beton

@ Rp.

1.65
0.25
0.03
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton Bertulang, 1 Pc : 5 Ps : 3 Kr


Bahan
357.00
Kg
Semen Portland

Rp.
Rp.
Rp.
Rp.

@ Rp.

Tenaga

Pasir Beton

@ Rp.

0.54

M3

Koral Beton

@ Rp.

1.65
0.25
0.03
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

0.47

0.78

1.65
0.25
0.03
0.08

Oh
Oh
Oh
Oh

@ Rp.
@ Rp.

Koral Beton

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.37

Pasir Beton

@ Rp.

0.74

M3

Koral Beton

@ Rp.

1.65
0.25
0.03
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Tiang Pancang Prestressed Beton


Bahan
440.00
Kg
Semen Portland

Tenaga

Rp.
Rp.
Rp.
Rp.

Pasir Beton

1 M3 Membuat Beton Bertulang, 1 Pc : 1 Ps : 2 Kr


Bahan
479.00
Kg
Semen Portland

Tenaga

10

M3

1 M3 Membuat Beton Bertulang, 1 Pc : 1,5 Ps : 2.5 Kr


Bahan
386.00
Kg
Semen Portland

Tenaga

0.42

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.50

M3

Pasir Beton

@ Rp.

0.80
2.46

M
Gln

Koral Beton
Rapidrant

@ Rp.
@ Rp.

1.65
0.25
0.03

Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

0.08

12

15

@ Rp.

M3

Pasir Beton

@ Rp.

0.81
1.00

M3
Ltr

Koral Beton
Puzzdith - 100 XR

@ Rp.
@ Rp.

1.65
0.25
0.03
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.54

M3

Pasir Beton

@ Rp.

0.81

Koral Beton

@ Rp.

2.00
0.35
0.04
1.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr


Bahan
291.00
Kg
Semen Portland

Tenaga

@ Rp.

0.54

1 M3 Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr


Bahan
336.00
Kg
Semen Portland

Tenaga

14

Mandor

1 M3 Membuat Beton dengan Puzzdith - 100 XR


Bahan
336.00
Kg
Semen Portland

Tenaga

13

Oh

0.47

0.93

2.00
0.35
0.04
1.00

Oh
Oh
Oh
Oh

M3

@ Rp.

Pasir Beton

@ Rp.

Koral Beton

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3 Kr


Bahan
367.00
Kg
Semen Portland
0.44

Rp.
Rp.
Rp.
Rp.

Pasir Beton

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Tenaga

16

Koral Beton 2/3

@ Rp.

2.00
0.35
0.04
1.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

@ Rp.

M3

Pasir Beton

@ Rp.

0.88

Koral Beton 2/3

@ Rp.

2.00
0.35
0.04
1.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

0.52

0.52

2.00
0.35
0.04
1.00

Oh
Oh
Oh
Oh

0.48

0.80
1.20

2.00
0.35
0.04
1.00

Rp.
Rp.
Rp.
Rp.

@ Rp.

Pasir Beton

@ Rp.

Koral Beton

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton Kedap Air dengan Strorox - 100


Bahan
400.00
Kg
Semen Portland

Tenaga

Rp.
Rp.
Rp.
Rp.

0.48

1 M3 Membuat Beton Bertulang 1 Pc : 1 Ps : 1 Kr


Bahan
615.00
Kg
Semen Portland

Tenaga

18

M3

1 M3 Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5 Kr


Bahan
400.00
Kg
Semen Portland

Tenaga

17

0.88

Rp.
Rp.
Rp.
Rp.

@ Rp.

Pasir Beton

@ Rp.

M3
Kg

Koral Beton
Strorox - 100

@ Rp.
@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

19

20

21

22

23

1 M' Memasang PVC Waterstop Lebar 150 mm


Bahan

1.05

M1

Waterstop Lebar 150 mm

@ Rp.

Tenaga

0.05
0.03
0.00
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M' Memasang PVC Waterstop Lebar 200 mm


Bahan

1.05

M1

Waterstop Lebar 200 mm

@ Rp.

Tenaga

0.05
0.03
0.00
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M' Memasang PVC Waterstop Lebar 230 mm


Bahan

1.05

M1

Waterstop Lebar 230 mm

@ Rp.

Tenaga

0.55
0.04
0.00

Oh
Oh
Oh

Pekerja
Tukang Batu
Mandor

@ Rp.
@ Rp.
@ Rp.

1 M' Memasang PVC Waterstop Lebar 250 mm


Bahan

1.05

M1

Waterstop Lebar 250 mm

@ Rp.

Tenaga

0.55
0.04
0.00

Oh
Oh
Oh

Pekerja
Tukang Batu
Mandor

@ Rp.
@ Rp.
@ Rp.

1 M' Memasang PVC Waterstop Lebar 300 mm


Bahan

1.05

M1

Waterstop Lebar 300 mm

@ Rp.

Tenaga

24

25

Pekerja
Tukang Batu
Mandor

@ Rp.
@ Rp.
@ Rp.

Bahan

1.05

M1

Waterstop Lebar 320 mm

@ Rp.

Tenaga

0.55
0.04
0.00

Oh
Oh
Oh

Pekerja
Tukang Batu
Mandor

@ Rp.
@ Rp.
@ Rp.

1 Kg Pembesian Dengan Besi Polos atau Besi Ulir


Bahan
1.05
Kg
Besi Beton ( Polos/ Ulir )
0.02
Kg
Kawat Beton

0.01
0.01
0.00
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Besi
Kepala Tukang
Mandor

1 Kg Kabel Presstressed Polos / Strands


Bahan
1.05
Kg
Besi Presstressed Polos
0.01
Kg
Kawat Beton

Tenaga

27

Oh
Oh
Oh

1 M' Memasang PVC Waterstop Lebar 320 mm

Tenaga

26

0.55
0.04
0.00

0.01
0.01
0.00
0.00

1 Kg Jaring Kawat Baja


Bahan
1.02
0.81

Tenaga

0.03
0.03

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Besi
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Kg
Kg

Besi Jaring Kawat Baja


Kawat Beton

@ Rp.
@ Rp.

Oh
Oh

Pekerja
Tukang Besi

@ Rp.
@ Rp.

0.00
0.00

28

10

11

Oh
Oh

Kepala Tukang
Mandor

@ Rp.
@ Rp.

1 M2 Pasangan Bekisting untuk Pondasi


Bahan

0.04
0.30
0.10

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.30
0.26
0.03
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bekisting untuk Sloof


Bahan

0.05
0.30
0.10

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.30
0.26
0.03
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bekisting untuk Kolom


Bahan

Tenaga

0.04
0.40
0.20

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.02
0.35
2.00

M3
Lbr
Btg

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m

@ Rp.
@ Rp.
@ Rp.

0.30
0.33
0.03
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

12

1 M2 Pasangan Bekisting untuk Balok


Bahan

Tenaga

13

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.02
0.35
2.00

M3
Lbr
Btg

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m

@ Rp.
@ Rp.
@ Rp.

0.32
0.33
0.03
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bekisting untuk Lantai


Bahan

Tenaga

14

0.04
0.40
0.20

0.04
0.40
0.20

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.02
0.35
6.00

M3
Lbr
Btg

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m

@ Rp.
@ Rp.
@ Rp.

0.32
0.33
0.03
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasangan Bekisting untuk Dinding


Bahan

Tenaga

0.03
0.40
0.20

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.02
0.35
3.00
4.00

M3
Lbr
Btg
Bh

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m
Formtie/ Penjaga jarak Bekisting/ Sp

@
@
@
@

0.32
0.33
0.03

Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

Rp.
Rp.
Rp.
Rp.

0.01

15

Tenaga

M3
Kg
Ltr

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

@ Rp.
@ Rp.
@ Rp.

0.02
0.35
2.00

M3
Lbr
Btg

Balok kayu Borneo


Plywood Tebal 9 mm
Dolken kayu Galam o - 8-10/4 m

@ Rp.
@ Rp.
@ Rp.

0.32
0.33
0.03
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.65

Pasir Beton

@ Rp.

0.65

M3

Koral Beton

@ Rp.

6.00
1.00
0.10
0.30

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M3 Membuat Beton dengan Mutu K275


Bahan
400.00
Kg
Semen Portland

Tenaga

@ Rp.

0.03
0.40
0.15

1 M3 Membuat Beton dengan Mutu K225


Bahan
388.00
Kg
Semen Portland

Tenaga

Mandor

1 M2 Pasangan Bekisting untuk Tangga


Bahan

Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.40

M3

Pasir Beton

@ Rp.

0.82

Koral Beton

@ Rp.

6.00
1.00
0.10
0.30

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Jembatan Cor

Rp.
Rp.
Rp.
Rp.

Bahan

0.03
0.60
0.50

M3
Kg
Btg

Kayu Terentang
Paku Biasa 2" - 5"
Dolken kayu Galam o - 8-10/4 m

@ Rp.
@ Rp.
@ Rp.

Tenaga

0.15
0.05
0.01
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 M3 Membuat Pondasi Beton Bertulang (150 Kg Besi dan Bekisting)


SNI 7394; 2008 - 6.28
Bahan

Tenaga

20

0.24
1.50
0.40
157.50
2.25
336.00

M3
Kg
Ltr
Kg
Kg
Kg

Papan Kayu Dolken


Paku Campur
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@
@

0.54

M3

Pasir Beton

@ Rp.

0.81

Koral Beton

@ Rp.

5.30
0.28
1.30
1.05
0.26
0.27

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 M3 Membuat Pondasi Beton Bertulang (200 Kg Besi dan Bekisting)


Bahan

Tenaga

0.27
2.00
0.60
200.00
3.00
323.00

M3
Kg
Ltr
Kg
Kg
Kg

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@
@

0.52

M3

Pasir Beton

@ Rp.

0.78

M3

Koral Beton

@ Rp.

4.85
0.35
1.56

Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu

@ Rp.
@ Rp.
@ Rp.

1.40
0.33
0.17

Oh
Oh
Oh

Tukang Besi
Kepala Tukang
Mandor

@ Rp.
@ Rp.
@ Rp.

21.00 1 M3 Membuat Balok Beton Bertulang (200 Kg Besi dan Bekisting)


Bahan

Tenaga

0.32
3.20
1.60
200.00
3.00
323.00

M3
Kg
Ltr
Kg
Kg
Kg

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@
@

0.52

M3

Pasir Beton

@ Rp.

0.78

M3

Koral Beton

@ Rp.

0.14
2.80
16.00

M
Lbr
Btg

Kayu Borneo balok


Plywood 9 mm
Dolken o - 8 Cm/ 4 m

@ Rp.
@ Rp.
@ Rp.

5.96
0.35
2.80
1.40
0.46
0.21

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22.00 1 M3 Membuat Balok Beton Bertulang (150 Kg Besi dan Bekisting)


Bahan

Tenaga

0.32
3.20
1.60
150.00
2.25
323.00

M3
Kg
Ltr
Kg
Kg
Kg

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@
@

0.52

M3

Pasir Beton

@ Rp.

0.78

M3

Koral Beton

@ Rp.

0.12
2.80
32.00

M
Lbr
Btg

Kayu Borneo balok


Plywood 9 mm
Dolken o - 8 Cm/ 4 m

@ Rp.
@ Rp.
@ Rp.

5.80
0.35
2.80
1.05

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi

@
@
@
@

Rp.
Rp.
Rp.
Rp.

0.42
0.19

Oh
Oh

Kepala Tukang
Mandor

@ Rp.
@ Rp.

23.00 1 M3 Membuat Dinding Beton Bertulang (150 Kg Besi dan Bekisting)


Bahan

Tenaga

24

0.24
3.20
1.60
150.00
2.25
323.00

M3
Kg
Ltr
Kg
Kg
Kg

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@
@

0.52

M3

Pasir Beton

@ Rp.

0.78

Koral Beton

@ Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.16
2.80
24.00

M
Lbr
Btg

Kayu Borneo balok


Plywood 9 mm
Dolken o - 8 Cm/ 4 m

@ Rp.
@ Rp.
@ Rp.

5.60
0.35
2.64
1.05
0.40
0.19

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 M3 Membuat Tangga Beton Bertulang (200 Kg Besi dan Bekisting)


Bahan

Tenaga

0.25
3.00
1.20
200.00
3.00
323.00

M3
Kg
Ltr
Kg
Kg
Kg

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@
@

0.52

M3

Pasir Beton

@ Rp.

0.78

Koral Beton

@ Rp.

0.11
2.50
14.00

M3
Lbr
Btg

Kayu Borneo balok


Plywood 9 mm
Dolken o - 8 Cm/ 4 m

@ Rp.
@ Rp.
@ Rp.

5.60
0.35

Oh
Oh

Pekerja
Tukang Batu

@ Rp.
@ Rp.

2.30
1.40
0.41
0.20

44

Tenaga

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.01
3.00
0.45
4.00

M3
Kg
Kg
Kg
Kg

Kayu Terentang
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@

0.01

M3

Pasir Beton

@ Rp.

0.01

Koral Beton

@ Rp.

0.06
0.02
0.02
0.02
0.01
0.00

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

1 M' Membuat Ring Balok Beton Bertulang ( 10 x 15 ) Cm


Bahan

Tenaga

E
1

Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 M' Membuat Kolom Penguat Beton Bertulang ( 11 x 11 ) Cm


Bahan

45

Oh
Oh
Oh
Oh

0.00
0.02
3.60
0.05
5.50

M3
Kg
Kg
Kg
Kg

Kayu Terentang
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland

@
@
@
@
@

0.01

M3

Pasir Beton

@ Rp.

0.02

Koral Beton

@ Rp.

0.10
0.03
0.03
0.03
0.01
0.01

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

@
@
@
@
@
@

Analisa Biaya Konstruksi Pekerjaan Besi dan Alluminium


1 Kg Pasang Rangka Atap Baja
Bahan
1.10
Kg
Besi Profil WF

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@ Rp.

Tenaga

0.08

Kg

Meni Besi

@ Rp.

0.01
0.06
0.01
0.00

Oh
Oh
Oh
Oh

Tukang Besi
Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Pintu Besi Baja


Bahan

1.00

M2

Pintu Besi Baja

@ Rp.

Tenaga

0.65
0.65
0.07
0.03

Oh
Oh
Oh
Oh

Tukang Besi Konstruksi


Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Jendela Besi


Bahan

1.00

M2

Jendela Besi

@ Rp.

Tenaga

1.05
1.05
0.11
0.01

Oh
Oh
Oh
Oh

Tukang Besi Konstruksi


Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Jendela Besi Tahan Api


Bahan

1.00

M2

Jendela Besi Tahan Api

@ Rp.

Tenaga

1.20
1.02
0.12
0.01

Oh
Oh
Oh
Oh

Tukang Besi Konstruksi


Pekerja
Kepala Tukang
Mandor

@
@
@
@

Pintu Gulung Besi

@ Rp.

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Pintu Gulung Besi


Bahan

1.00

M2

Tenaga

1.20
1.20
0.12
0.01

Oh
Oh
Oh
Oh

Tukang Besi Konstruksi


Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Pintu Lipat


Bahan

1.00

M2

Pintu Lipat

@ Rp.

Tenaga

1.05
1.05
0.11
0.01

Oh
Oh
Oh
Oh

Tukang Besi Konstruksi


Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Pintu Sunscreen Alluminium


Bahan

1.00

M2

Sunscreen Alluminium

@ Rp.

Tenaga

0.80
0.08
0.08
0.00

Oh
Oh
Oh
Oh

Tukang Besi Konstruksi


Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Pintu Rolling Door


Bahan

1.00

M2

Rolling Door

@ Rp.

Tenaga

1.50
1.05
0.11
0.01

Oh
Oh
Oh
Oh

Tukang Besi Konstruksi


Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Pintu Alluminium


Bahan

1.00

M2

Pintu Alluminium

@ Rp.

Tenaga

1.05
1.05
0.11

Oh
Oh
Oh

Tukang Besi Konstruksi


Pekerja
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

0.01

10

11

12

Mandor

@ Rp.

1 M2 Pasang Venetions Blinds


Bahan

1.00

M2

Venetion Blinds

@ Rp.

Tenaga

0.35
0.35
0.04
0.00

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Vertikal Blinds


Bahan

1.00

M2

Vertikal Blinds

@ Rp.

Tenaga

0.35
0.35
0.04
0.00

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

@
@
@
@

11.50

M'

Besi Strip 2x3

@ Rp.

1.20
1.20
0.01
0.00

Oh
Oh
Oh
Oh

Tukang Las
Pekerja
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Terali Besi


Bahan

Tenaga

13

Oh

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Kawat Harmonika


Bahan

Tenaga

1.10
0.02

M2
Kg

Kawat Harmonika
Paku Biasa 1/2" - 1"

@ Rp.
@ Rp.

0.00

M3

Kayu Kamper, Papan

@ Rp.

0.10
0.10
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

14

1 M2 Pasang Kawat Nyamuk


Bahan

Tenaga

15

Tenaga

Kawat Nyamuk
Paku Biasa 1/2" - 1"

@ Rp.
@ Rp.

0.00

M3

Kayu Kamper, Papan

@ Rp.

0.10
0.10
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1.10
0.02

M2
Kg

Kawat Nyamuk
Paku Biasa 1/2" - 1"

@ Rp.
@ Rp.

0.00

M3

Kayu Kamper, Papan

@ Rp.

0.10
0.10
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1.10
0.02

M2
Kg

Kawat Burung
Paku Biasa 1/2" - 1"

@ Rp.
@ Rp.

0.00

M3

Kayu Kamper, Papan

@ Rp.

0.10
0.10
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Kawat Burung


Bahan

Tenaga

17

M2
Kg

1 M2 Pasang Kawat Kassa


Bahan

16

1.10
0.02

Rp.
Rp.
Rp.
Rp.

1 M2 Pasang Jendela Nako dan Tralis


Bahan

1.10
0.02

M2
Kg

Jendela Nako
Paku Biasa 1/2" - 1" atau Skrup

@ Rp.
@ Rp.

0.03

M2

Besi Strip

@ Rp.

Tenaga

18

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

M3
Kg

Kayu Borneo, Papan


Flincote / Meni Besi

@ Rp.
@ Rp.

0.15
0.40
0.03
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.02
0.30

M3
Kg

Kayu Borneo, Papan


Flincote / Meni Besi

@ Rp.
@ Rp.

0.04
0.40
0.03
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 28


Bahan
0.30
Lbr
Seng Plat 3'x6' Bjls 28
0.10
Kg
Paku Biasa 1/2" - 1"

Tenaga

@
@
@
@

0.01
0.25

1 M' Pasang Talang Miring, Seng Bjls 28


Bahan
0.50
Lbr
Seng Plat 3'x6' Bjls 28
0.02
Kg
Paku Biasa 1/2" - 1"

Tenaga

20

Oh
Oh
Oh
Oh

1 M' Pasang Talang Datar, Seng Bjls 28


Bahan
0.50
Lbr
Seng Plat 3'x6' Bjls 28
0.02
Kg
Paku Biasa 1/2" - 1"

Tenaga

19

0.20
0.20
0.02
0.00

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.02
0.50

M3
Kg

Kayu Borneo, Papan


Besi Strip

@ Rp.
@ Rp.

0.15
0.25
0.03
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

21

1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 24


Bahan
0.30
Lbr
Seng Plat 3'x6' Bjls 24
0.10
Kg
Paku Biasa 1/2" - 1"

Tenaga

D
1

M3
Kg

Kayu Borneo, Papan


Besi Strip

@ Rp.
@ Rp.

0.15
0.25
0.03
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 1Ps


Bahan
140.00
Bh
Bata Merah 5x11x22 Cm
64.03
Kg
Semen Portland

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.06

M3

Pasir Pasang

@ Rp.

0.65
0.20
0.02
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 2Ps


Bahan
140.00
Bh
Bata Merah 5x11x22 Cm
43.50
Kg
Semen Portland

Tenaga

0.02
0.50

Analisa Biaya Konstruksi Pekerjaan Dinding

Tenaga

@ Rp.
@ Rp.

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.08

M3

Pasir Pasang

@ Rp.

0.65
0.20
0.02
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps


Bahan
140.00
Bh
Bata Merah 5x11x22 Cm

Rp.
Rp.
Rp.
Rp.

@ Rp.

32.95

Tenaga

@ Rp.

0.09

Pasir Pasang

@ Rp.

0.65
0.20
0.02
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

@ Rp.
@ Rp.

M3

Pasir Pasang

@ Rp.

0.65
0.20
0.02
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.10

M3

Pasir Pasang

@ Rp.

0.65
0.20
0.02
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 6Ps


Bahan
140.00
Bh
Bata Merah 5x11x22 Cm
22.20
Kg
Semen Portland

Tenaga

Rp.
Rp.
Rp.
Rp.

0.09

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps


Bahan
140.00
Bh
Bata Merah 5x11x22 Cm
22.20
Kg
Semen Portland

Tenaga

Semen Portland

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps


SNI 6897 ; 2008 - 6.4
Bahan
140.00
Bh
Batu Tella
26.55
Kg
Semen Portland

Tenaga

Kg

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.10

M3

Pasir Pasang

@ Rp.

0.65
0.20
0.02

Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.

0.03

10

@ Rp.
@ Rp.

M3

Pasir Pasang

@ Rp.

0.03

M3

Kapur Pasang

@ Rp.

0.65
0.20
0.02
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.03

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
18.95
Kg
Semen Portland

Tenaga

@ Rp.

0.09

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
27.80
Kg
Semen Portland

Tenaga

Mandor

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Kp : 10 Ps


Bahan
140.00
Bh
Bata Merah 5x11x22 Cm
10.08
Kg
Semen Portland

Tenaga

Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.04

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
14.37
Kg
Semen Portland

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Tenaga

11

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

@ Rp.
@ Rp.

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.05

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
8.32
Kg
Semen Portland

Tenaga

Rp.
Rp.
Rp.
Rp.

0.04

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
9.68
Kg
Semen Portland

Tenaga

13

M3

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
11.50
Kg
Semen Portland

Tenaga

12

0.04

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.05

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

14

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
6.50
Kg
Semen Portland

Tenaga

15

16

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.05

M3

Pasir Pasang

@ Rp.

0.02

Kapur Padam

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
27.80
Kg
Semen Portland

Tenaga

17

0.05

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
4.50
Kg
Semen Portland

Tenaga

@ Rp.
@ Rp.

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.03

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
18.95
Kg
Semen Portland
0.04

M3

Pasir Pasang

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.
@ Rp.

Tenaga

18

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.04

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
9.68
Kg
Semen Portland

Tenaga

@
@
@
@

0.04

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
11.50
Kg
Semen Portland

Tenaga

20

Oh
Oh
Oh
Oh

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
14.37
Kg
Semen Portland

Tenaga

19

0.32
0.10
0.01
0.02

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.05

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

21

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
8.32
Kg
Semen Portland

Tenaga

22

23

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.05

M3

Pasir Pasang

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
4.50
Kg
Semen Portland

Tenaga

24

0.05

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
6.50
Kg
Semen Portland

Tenaga

@ Rp.
@ Rp.

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.05

M3

Pasir Pasang

@ Rp.

0.02

Kapur Padam

@ Rp.

0.32
0.10
0.01
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Ps


Bahan
70.00
Bh
Bata Merah 5x11x22 Cm
0.02
Kg
Semen Merah/Bata Merah Tumbuk

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

0.02

M3

Pasir Pasang

@ Rp.

0.02

M3

Kapur Padam

@ Rp.

Tenaga

E
1

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran 1 Pc : 1 Ps, Tebal 15 mm


Bahan
12.92
Kg
Semen Portland
0.01

0.20
0.15
0.02
0.01

Oh
Oh
Oh
Oh

@
@
@
@

Rp.
Rp.
Rp.
Rp.

0.02

0.30
0.15
0.02
0.02

Oh
Oh
Oh
Oh

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

Pasir Pasang

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm


Bahan
6.48
Kg
Semen Portland

Tenaga

@ Rp.

Pasir Pasang

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm


SNI 2837 ; 2008 - 6.2
Bahan
10.22
Kg
Semen Portland

Tenaga

Oh
Oh
Oh
Oh

Analisa Biaya Konstruksi Pekerjaan Plesteran

Tenaga

0.32
0.10
0.01
0.02

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.02

M3

Pasir Pasang

@ Rp.

0.20
0.15

Oh
Oh

Pekerja
Tukang Batu

@ Rp.
@ Rp.

0.02
0.01

@ Rp.

M3

Pasir Pasang

@ Rp.

0.30
0.15
0.02
0.02

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

0.02

0.20
0.15
0.02
0.01

Oh
Oh
Oh
Oh

0.02

0.20
0.15
0.02
0.01

Oh
Oh
Oh
Oh

0.02

@ Rp.
@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

Pasir Pasang

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Plesteran 1 Pc : 8 Ps, Tebal 15 mm


Bahan
2.88
Kg
Semen Portland
3

Rp.
Rp.
Rp.
Rp.

Pasir Pasang

1 M2 Plesteran 1 Pc : 6 Ps, Tebal 15 mm


Bahan
3.68
Kg
Semen Portland

Tenaga

@ Rp.
@ Rp.

0.02

1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm


Bahan
4.32
Kg
Semen Portland

Tenaga

Kepala Tukang
Mandor

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm


SNI 2837 ; 2008 - 6.4
Bahan
6.24
Kg
Semen Portland

Tenaga

Oh
Oh

Pasir Pasang

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Tenaga

13

0.02

0.25
0.20
0.02
0.01

Oh
Oh
Oh
Oh

0.03

0.25
0.20
0.02
0.01

Oh
Oh
Oh
Oh

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

Pasir Pasang

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

Pasir Pasang

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm


Bahan
8.68
Kg
Semen Portland

Tenaga

16

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm


Bahan
10.80
Kg
Semen Portland

Tenaga

15

Oh
Oh
Oh
Oh

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm


Bahan
14.28
Kg
Semen Portland

Tenaga

14

0.20
0.15
0.02
0.01

Rp.
Rp.
Rp.
Rp.

@ Rp.

0.03

M3

Pasir Pasang

@ Rp.

0.25
0.20
0.02
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm


Bahan
7.29
Kg
Semen Portland

Rp.
Rp.
Rp.
Rp.

@ Rp.

Tenaga

20

@ Rp.

0.25
0.20
0.02
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

0.05
0.09
0.01
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.05
0.09
0.01
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 1"


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

23

Pasir Pasang

Memasang 1 M' Pipa Galvanis Diameter 3/4"


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

22

M3

Memasang 1 M' Pipa Galvanis Diameter 1/2"


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

21

0.03

0.05
0.09
0.01
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 2


Bahan
1.20
M'
Pipa Galvanis

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

35.0 % Harga Pipa Perlengkapan

Tenaga

24

0.11
0.18
0.02
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.14
0.23
0.02
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 1/2"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

27

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa Galvanis Diameter 4"


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

26

Oh
Oh
Oh
Oh

Memasang 1 M' Pipa Galvanis Diameter 3"


Bahan
1.20
M'
Pipa Galvanis
35.0 % Harga Pipa Perlengkapan

Tenaga

25

0.11
0.18
0.02
0.01

0.04
0.06
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 3/4"


Bahan
1.20
M'
Pipa PVC

@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

35.0 % Harga Pipa Perlengkapan

Tenaga

28

0.04
0.06
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.04
0.06
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 2"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

31

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 11/2"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

30

Oh
Oh
Oh
Oh

Memasang 1 M' Pipa PVC Tipe AW Diameter 1"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

29

0.04
0.06
0.01
0.00

0.05
0.09
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 21/2"


Bahan
1.20
M'
Pipa PVC

@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

35.0 % Harga Pipa Perlengkapan

Tenaga

32

0.04
0.06
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 M' Pipa PVC Tipe AW Diameter 3"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

0.08
0.14
0.01
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

2.00 Memasang 1 M' Pipa PVC Tipe AW Diameter 4"


Bahan
1.20
M'
Pipa PVC
35.0 % Harga Pipa Perlengkapan

Tenaga

34

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 Buah Bak Cuci Piring Stainless Steel


Bahan
1.00
Bh
Bak Cuci Stainless Steel
1.00
Set
Water Drain dan Asesories

Tenaga

35

0.08
0.14
0.01
0.00

0.03
0.30
0.03
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 Buah Bak Cuci Piring Teraso


Bahan
1.00
Bh
Bak Cuci Teraso

@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

@ Rp.

Tenaga

36

Bh
Kg

Water Drain dan Asesories


Semen Portland

@ Rp.
@ Rp.

0.00

M3

Pasir

@ Rp.

0.05
0.50
0.05
0.00

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Memasang 1 Buah Kran Diameter 3/4" atau 1/2"


Bahan
1.00
Bh
Kran Air
0.03
Bh
Seal Tape

Tenaga

37

1.00
20.00

0.01
0.10
0.01
0.01

Oh
Oh
Oh
Oh

Memasang 1 Buah Floor Drain


Bahan
1.00
Bh

Tenaga

0.01
0.10
0.01
0.01

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

@ Rp.
@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

Floor Drain

@ Rp.

Pekerja
Tukang Batu
Kepala Tukang
Mandor

@
@
@
@

Rp.
Rp.
Rp.
Rp.

SATUAN

17,220.00 = Rp.
2,017.20 = Rp.

21,525.00
5,043.00

430,500.00 = Rp.

2,152.50

492,000.00 = Rp.

4,428.00

2,767,500.00 = Rp.
12,792.00 = Rp.
= Rp.
Jumlah I
Rp.

199,260.00
767.52
233,176.02

84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,898.97
28,576.84
2,054.89
1,852.11
49,382.80
282,558.82

17,220.00 = Rp.
2,017.20 = Rp.
90,232.80 = Rp.

21,525.00
5,043.00
108,279.36

430,500.00 = Rp.

2,152.50

492,000.00 = Rp.

4,428.00

2,767,500.00 = Rp.
12,792.00 = Rp.
30,750.00 = Rp.
Jumlah I
Rp.

199,260.00
767.52
13,837.50
355,292.88

84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,898.97
28,576.84
2,054.89
1,852.11
49,382.80
404,675.68

17,220.00 = Rp.
2,017.20 = Rp.
1,168,500.00 = Rp.

17,220.00
4,034.40
292,125.00

430,500.00 = Rp.

2,152.50

492,000.00 = Rp.
12,792.00 = Rp.

4,428.00
767.52

=
=
=
=

=
=
=
=

Jumlah I
84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.

320,727.42

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,898.97
21,432.63
2,054.89
1,852.11
42,238.59
362,966.01
Supl. SNI 7395 - 6.xx

17,220.00 = Rp.
2,017.20 = Rp.
430,500.00 = Rp.

17,220.00
4,034.40
430,500.00

430,500.00 = Rp.

2,152.50

492,000.00 = Rp.

4,428.00

24,477.00 = Rp.
Jumlah I
Rp.

1,468.62
459,803.52

84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

239,796.38
2,028.96
14,579.42
1,315.00
257,719.76
717,523.28

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1M Pagar BRJ dari Kawat Ram Tinggi 1


Bahan

Tenaga

Pengukuran/Bouplang
SNI 2835 - 6.1
2,767,500.00 = Rp.

33,210.00

24,477.00 = Rp.

489.54

2,767,500.00 = Rp.

19,372.50

Jumlah I

Rp.

53,072.04

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,449.49
7,144.21
1,027.44
463.03
17,084.16
70,156.20

17,220.00 = Rp.

21,525.00

2,767,500.00 = Rp.
2,767,500.00 = Rp.
55,625.21 = Rp.

498,150.00
2,352,375.00
61,187.73

84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Pengukuran dan Pemasangan Bouplan


Bahan

2,017.20 = Rp.

70,602.00

369,000.00 = Rp.

55,350.00

430,500.00 = Rp.

43,050.00

492,000.00
2,767.50
73,800.00
200,000.00

Rp.
Rp.
Rp.
Rp.

73,800.00
83,025.00
18,450.00
400,000.00

180,000.00 = Rp.
180,000.00 = Rp.
63,250.00 = Rp.
Jumlah I
Rp.

14,400.00
27,000.00
3,795.00
3,722,709.73

84,494.85
84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

168,989.70
84,494.85
142,884.18
30,823.31
4,630.27
431,822.31
4,154,532.05

17,220.00 = Rp.

29,274.00

2,767,500.00 = Rp.
12,792.00 = Rp.
2,017.20 = Rp.

581,175.00
3,837.60
21,180.60

430,500.00 = Rp.

12,915.00

492,000.00 = Rp.
90,232.80 = Rp.
Jumlah I
Rp.

24,600.00
135,349.20
808,331.40

84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

=
=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

168,989.70
71,442.09
20,548.87
4,630.27
265,610.94
1,073,942.34

17,220.00 = Rp.

51,660.00

2,767,500.00 = Rp.
28,290.00 = Rp.
90,232.80 = Rp.
Jumlah I
Rp.

763,830.00
19,803.00
135,349.20
970,642.20

84,494.85 = Rp.
71,442.09 = Rp.
102,744.36 = Rp.

126,742.28
71,442.09
15,411.65

tidak ada di daftar

92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

4,630.27
218,226.29
1,188,868.49
SNI 2835 - 6

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah I
Rp.

71,442.09
4,630.27
76,072.36

17,220.00 = Rp.

21,525.00

2,767,500.00 = Rp.
12,792.00 = Rp.
2,017.20 = Rp.

514,755.00
3,837.60
36,309.60

430,500.00 = Rp.

12,915.00

492,000.00 = Rp.
90,232.80 = Rp.
63,250.00 = Rp.
Jumlah I
Rp.

24,600.00
135,349.20
85,387.50
834,678.90

84,494.85
71,442.09
102,744.36
92,605.47
Jumlah I
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

168,989.70
71,442.09
20,548.87
4,630.27
265,610.94
834,678.90

2,767,500.00
12,792.00
900.00
Jumlah I

=
=
=
=

Rp.
Rp.
Rp.
Rp.

99,630.00
1,023.36
900.00
101,553.36

84,494.85 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

25,348.46
138.91
25,487.36
127,040.72

61,500.00 = Rp.
76,500.00 = Rp.
Jumlah I
= Rp.

61,500.00
19,125.00
80,625.00

84,494.85 = Rp.
71,442.09 = Rp.
102,744.36 = Rp.

1,436.41
142.88
25,686.09

1 M2 Membersihkan Lapangan dan Pera


Tenaga

92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

1,203.87
28,469.26
109,094.26

325,950.00 = Rp.

48,892.50

492,000.00 = Rp.

44,280.00

369,000.00 = Rp.
Jumlah I
= Rp.

3,690.00
96,862.50

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
= Rp.

71,442.09
4,630.27
76,072.36
172,934.86

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah
Rp.

476,304.41
30,837.62
507,142.04

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah
Rp.

476,304.41
3,055.98
479,360.39

738,000.00 = Rp.
Jumlah I
Rp.

320,292.00
320,292.00

71,442.09
102,744.36
84,494.85
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,000.57
410.98
3,548.78
185.21
7,145.54
327,437.54

337,500.00 = Rp.
337,500.00 = Rp.

332,775.00
177,187.50

430,500.00 = Rp.

31,857.00

492,000.00 = Rp.
5,781.00 = Rp.
Jumlah I

71,832.00
260,145.00
873,796.50

84,494.85 = Rp.
71,442.09 = Rp.
102,744.36 = Rp.

10,561.86
26,790.78
1,232.93

=
=
=
=

92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

1,759.50
40,345.08
914,141.58

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah
Rp.

53,581.57
2,315.14
55,896.70

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah
Rp.

107,163.14
5,556.33
112,719.46

45,444.48
54,533.37
65,440.04
78,528.05
94,233.66
113,080.40
135,696.48
162,835.77
195,402.92
234,483.51
281,380.21
337,656.25
405,187.50
486,225.00
583,470.01
700,164.01

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,973,761.67

45,444.48
54,533.37
65,440.04
78,528.05
94,233.66
113,080.40
135,696.48
586,956.48

Galian Tanah
SNI 2835 - 6.1
Galian Tanah Biasa sedalam 1 Meter
Tenaga

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

37,578.54
130,159.95
14,610.57
4,815.48
187,164.55

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

52,509.94
268,208.39
30,106.64
6,760.20
357,585.16

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

44,651.31
130,159.95
14,610.57
5,741.54
195,163.37

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

89,302.61
130,159.95
14,610.57
11,575.68
245,648.82

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

58,796.84
130,159.95
14,610.57
7,686.25
211,253.62

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

3,572.10
130,159.95
14,610.57
463.03
148,805.66

71,442.09 = Rp.

36,864.12

Supl. SNI 2835 - 6.9

92,605.47 = Rp.
Jumlah
Rp.

4,630.27
41,494.39

1 M3 Pemadatan Tanah
Tenaga

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah
Rp.

35,721.05
4,630.27
40,351.32

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah

35,721.05
35,498.17
22,137.23
4,630.27
97,986.72

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

SNI 2835 - 6.11


215,250.00 = Rp.
Jumlah I
Rp.

258,300.00
258,300.00

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

21,432.63
926.05
22,358.68
280,658.68

647,595.00 = Rp.
Jumlah I
Rp.

777,114.00
777,114.00

71,442.09 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

21,432.63
926.05
22,358.68
799,472.68

104,550.00 = Rp.
Jumlah I
Rp.

627,300.00
627,300.00

71,442.09 = Rp.

17,860.52

92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

2,315.14
20,175.66
647,475.66

1 M3 Urugan Pasir
Bahan

Tenaga

Supl. SNI 2835 - 6.9


1 M3 Urugan Koral/kerikil
Bahan

289,050.00
325,950.00
369,000.00
350,000.00
Jumlah I

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

79,488.75
9,778.50
18,450.00
17,500.00
125,217.25

71,442.09
78,884.82
88,548.93
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,442.09
165,658.12
3,541.96
9,260.55
249,902.72
375,119.97

289,050.00 = Rp.
Jumlah I
Rp.

346,860.00
346,860.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

55,724.83
25,348.46
4,007.03
3,611.61
88,691.93
435,551.93

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

kosong di table

SNI 2836 - 6.9


1 M3 Pasangan Pondasi Batu Kosong
289,050.00 = Rp.

346,860.00

215,250.00 = Rp.
Jumlah I
Rp.

92,988.00
439,848.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

55,724.83
32,952.99
4,007.03
3,611.61
96,296.47
536,144.47

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Bahan

Tenaga

Pasangan batu Kali


289,050.00 = Rp.

317,955.00

2,017.20 = Rp.

328,803.60

369,000.00 = Rp.
Jumlah I
Rp.

191,880.00
838,638.60

1 M3 Pasangan Pondasi Batu Kali, 1 Pc :


Bahan

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,163.14
50,696.91
6,164.66
6,945.41
170,970.12
1,009,608.72

289,050.00 = Rp.
2,017.20 = Rp.

317,955.00
274,339.20

369,000.00 = Rp.
Jumlah I
Rp.

200,736.00
793,030.20

71,442.09
78,884.82
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,163.14
47,330.89
6,164.66
6,945.41
167,604.10
960,634.30

289,050.00 = Rp.
2,017.20 = Rp.

317,955.00
236,012.40

369,000.00 = Rp.
Jumlah I
Rp.

207,009.00
760,976.40

71,442.09
78,884.82
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,163.14
47,330.89
6,164.66
6,945.41
167,604.10
928,580.50

289,050.00 = Rp.
2,017.20 = Rp.

317,955.00
183,565.20

369,000.00 = Rp.
Jumlah I
Rp.

207,009.00
708,529.20

71,442.09
78,884.82
102,744.36
92,605.47
Jumlah II
Jumlah I + II

107,163.14
47,330.89
6,164.66
6,945.41
167,604.10
876,133.30

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Tenaga

289,050.00 = Rp.
37,884.00 = Rp.

317,955.00
8,675.44

21,525.00 = Rp.

4,929.23

369,000.00 = Rp.
Jumlah I
Rp.

200,736.00
532,295.66

71,442.09
78,884.82
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,163.14
47,330.89
6,164.66
6,945.41
167,604.10
699,899.76

289,050.00 = Rp.
37,884.00 = Rp.

317,955.00
6,440.28

21,525.00 = Rp.

3,659.25

369,000.00 = Rp.
Jumlah I
Rp.

125,460.00
453,514.53

71,442.09
78,884.82
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,163.14
47,330.89
6,164.66
6,945.41
167,604.10
621,118.63

289,050.00 = Rp.
2,017.20 = Rp.

317,955.00
314,683.20

37,884.00 = Rp.

1,212.29

369,000.00 = Rp.
Jumlah I
Rp.

215,496.00
849,346.49

71,442.09
78,884.82
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,163.14
47,330.89
6,164.66
6,945.41
167,604.10
1,016,950.59

289,050.00 = Rp.
2,017.20 = Rp.

317,955.00
123,049.20

37,884.00 = Rp.

5,568.95

369,000.00 = Rp.

181,548.00

=
=
=
=

=
=
=
=

=
=
=
=

Jumlah I

Rp.

628,121.15

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,163.14
47,330.89
6,164.66
6,945.41
167,604.10
795,725.25

289,050.00 = Rp.
2,017.20 = Rp.

317,955.00
82,705.20

37,884.00 = Rp.

4,962.80

369,000.00 = Rp.
Jumlah I
Rp.

192,987.00
598,610.00

71,442.09
78,884.82
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

107,163.14
47,330.89
6,164.66
6,945.41
167,604.10
766,214.10

15,990.00 = Rp.
2,017.20 = Rp.

1,199,250.00
407,474.40

430,500.00 = Rp.

137,760.00

492,000.00 = Rp.
27,429.00 = Rp.
Jumlah I
Rp.

241,080.00
21,943.20
2,007,507.60

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

214,326.27
71,820.62
8,733.27
13,890.82
308,770.98
2,316,278.58

289,050.00 = Rp.
2,017.20 = Rp.

130,072.50
564,816.00

430,500.00 = Rp.

193,725.00

492,000.00 = Rp.
Jumlah I
Rp.

329,640.00
1,218,253.50

71,442.09 = Rp.
84,494.85 = Rp.

170,032.17
25,348.46

71,442.09
78,884.82
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

=
=
=
=

=
=
=
=

102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

3,082.33
7,408.44
205,871.40
1,424,124.90

615,000.00 = Rp.

11,685.00

430,500.00 = Rp.

40,467.00

492,000.00
2,017.20
15,990.00
27,429.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

73,800.00
122,040.60
719,550.00
24,686.10

2,767,500.00
24,477.00
34,000.00
12,000.00
Jumlah I

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

88,560.00
2,937.24
3,060.00
2,880.00
1,089,665.94

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,442.09
56,611.55
6,883.87
4,630.27
139,567.79
1,229,233.73

615,000.00 = Rp.

9,840.00

430,500.00 = Rp.

34,440.00

492,000.00
2,017.20
15,990.00
27,429.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

61,500.00
98,842.80
551,655.00
19,200.30

2,767,500.00
12,792.00
34,000.00
12,000.00
Jumlah I

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

74,722.50
1,535.04
3,060.00
2,400.00
857,195.64

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

57,153.67
42,247.43
5,137.22
3,704.22
108,242.53
965,438.17
SNI 7394 - 6.2

1 M3 Membuat Beton dengan Mutu K22


Bahan

2,017.20 = Rp.

782,673.60

430,500.00 = Rp.

356,454.00

492,000.00 = Rp.
Jumlah I
Rp.

319,800.00
1,458,927.60
Tenaga

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

428,652.54
84,494.85
10,274.44
27,781.64
551,203.47
2,010,131.07

2,017.20 = Rp.

397,388.40

430,500.00 = Rp.

202,335.00

615,000.00 = Rp.
Jumlah I
Rp.

578,100.00
1,177,823.40

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,879.45
21,123.71
2,568.61
7,408.44
148,980.21
1,326,803.61

2,017.20 = Rp.

348,975.60

430,500.00 = Rp.

245,385.00

615,000.00 = Rp.
Jumlah I
Rp.

535,050.00
1,129,410.60

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,879.45
21,123.71
2,568.61
7,408.44
148,980.21
1,278,390.81

2,017.20 = Rp.

201,720.00

430,500.00 = Rp.

11,193.00

615,000.00 = Rp.
Jumlah I
Rp.

27,060.00
239,973.00

71,442.09 = Rp.

82,158.40

=
=
=
=

=
=
=
=

84,494.85 = Rp.
102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

1,689.90
205.49
555.63
84,609.42
324,582.42

2,017.20 = Rp.

467,990.40

430,500.00 = Rp.

223,860.00

615,000.00 = Rp.
Jumlah I
Rp.

479,700.00
1,171,550.40

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,879.45
21,123.71
2,568.61
7,408.44
148,980.21
1,320,530.61

2,017.20 = Rp.

564,816.00

430,500.00 = Rp.

193,725.00

615,000.00 = Rp.
Jumlah I
Rp.

553,500.00
1,312,041.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,879.45
21,123.71
2,568.61
7,408.44
148,980.21
1,461,021.21

2,017.20 = Rp.

710,054.40

430,500.00 = Rp.

241,080.00

615,000.00 = Rp.
Jumlah I
Rp.

430,500.00
1,381,634.40

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,879.45
21,123.71
2,568.61
7,408.44
148,980.21
1,530,614.61

2,017.20 = Rp.

720,140.40

=
=
=
=

=
=
=
=

=
=
=
=

430,500.00 = Rp.

180,810.00

615,000.00 = Rp.
Jumlah I
Rp.

332,100.00
1,233,050.40

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,879.45
21,123.71
2,568.61
7,408.44
148,980.21
1,382,030.61

2,017.20 = Rp.

778,639.20

430,500.00 = Rp.

202,335.00

615,000.00 = Rp.
Jumlah I
Rp.

479,700.00
1,460,674.20

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,879.45
21,123.71
2,568.61
7,408.44
148,980.21
1,609,654.41

2,017.20 = Rp.

966,238.80

430,500.00 = Rp.

159,285.00

615,000.00 = Rp.
Jumlah I
Rp.

455,100.00
1,580,623.80

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,879.45
21,123.71
2,568.61
7,408.44
148,980.21
1,729,604.01

2,017.20 = Rp.

887,568.00

430,500.00 = Rp.

215,250.00

615,000.00 = Rp.
25,000.00 = Rp.
Jumlah I
Rp.

492,000.00
61,500.00
1,656,318.00

71,442.09 = Rp.
84,494.85 = Rp.
102,744.36 = Rp.

117,879.45
21,123.71
2,568.61

=
=
=
=

=
=
=
=

=
=
=
=

92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

7,408.44
148,980.21
1,805,298.21

2,017.20 = Rp.

677,779.20

430,500.00 = Rp.

232,470.00

615,000.00 = Rp.
45,000.00 = Rp.
Jumlah I
Rp.

498,150.00
45,000.00
1,453,399.20

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

117,879.45
21,123.71
2,568.61
7,408.44
148,980.21
1,602,379.41

2,017.20 = Rp.

677,779.20

430,500.00 = Rp.

232,470.00

615,000.00 = Rp.
Jumlah I
Rp.

498,150.00
1,408,399.20

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

142,884.18
29,573.20
3,596.05
92,605.47
268,658.90
1,677,058.10

2,017.20 = Rp.

587,005.20

430,500.00 = Rp.

202,335.00

615,000.00 = Rp.
Jumlah I
Rp.

571,950.00
1,361,290.20

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

142,884.18
29,573.20
3,596.05
92,605.47
268,658.90
1,629,949.10

2,017.20 = Rp.

740,312.40

430,500.00 = Rp.

189,420.00

=
=
=
=

=
=
=
=

=
=
=
=

615,000.00 = Rp.
Jumlah I
Rp.

541,200.00
1,470,932.40

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

142,884.18
29,573.20
3,596.05
92,605.47
268,658.90
1,739,591.30

2,017.20 = Rp.

806,880.00

430,500.00 = Rp.

206,640.00

615,000.00 = Rp.
Jumlah I
Rp.

541,200.00
1,554,720.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

142,884.18
29,573.20
3,596.05
92,605.47
268,658.90
1,823,378.90

2,017.20 = Rp.

1,240,578.00

430,500.00 = Rp.

223,860.00

615,000.00 = Rp.
Jumlah I
Rp.

319,800.00
1,784,238.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

142,884.18
29,573.20
3,596.05
92,605.47
268,658.90
2,052,896.90

2,017.20 = Rp.

806,880.00

430,500.00 = Rp.

206,640.00

615,000.00 = Rp.
26,000.00 = Rp.
Jumlah I
Rp.

492,000.00
31,200.00
1,536,720.00

71,442.09
84,494.85
102,744.36
92,605.47

=
=
=
=

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.

142,884.18
29,573.20
3,596.05
92,605.47

Jumlah II
Jumlah I + II

Rp.
Rp.

268,658.90
1,805,378.90

250,000.00 = Rp.

Rp.

250,001.05
250,001.05

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,572.10
2,534.85
308.23
185.21
6,600.39
256,601.44

250,000.00 = Rp.

Rp.

250,001.05
250,001.05

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,572.10
2,534.85
308.23
185.21
6,600.39
256,601.44

250,000.00 = Rp.

Rp.

250,001.05
250,001.05

71,442.09 = Rp.
84,494.85 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

39,293.15
2,957.32
277.82
42,528.29
292,529.34

250,000.00 = Rp.

Rp.

262,500.00
262,500.00

71,442.09 = Rp.
84,494.85 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

39,293.15
2,957.32
277.82
42,528.29
305,028.29

250,000.00 = Rp.

262,500.00
262,500.00

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I

Jumlah I

Jumlah I

=
=
=
=

Rp.

71,442.09 = Rp.
84,494.85 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

39,293.15
2,957.32
277.82
42,528.29
305,028.29

250,000.00 = Rp.

Rp.

262,500.00
262,500.00

71,442.09 = Rp.
84,494.85 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

39,293.15
2,957.32
277.82
42,528.29
305,028.29

15,990.00 = Rp.
27,429.00 = Rp.
Jumlah I
Rp.

16,789.50
411.44
17,200.94

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

500.09
591.46
71.92
27.78
1,191.26
18,392.20

15,990.00 = Rp.
27,429.00 = Rp.
Jumlah I
Rp.

16,789.50
274.29
17,063.79

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

357.21
422.47
51.37
27.78
858.84
17,922.63

738,000.00 = Rp.

27,429.00 = Rp.
Jumlah I
Rp.

752,760.00
22,080.35
774,840.35

71,442.09 = Rp.
84,494.85 = Rp.

1,786.05
2,112.37

Jumlah I

=
=
=
=

=
=
=
=

102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

256.86
138.91
4,294.19
779,134.54

2,767,500.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.
Jumlah I
Rp.

110,700.00
3,837.60
3,400.00
117,937.60

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,432.63
21,968.66
2,671.35
463.03
46,535.67
164,473.27

17,220.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.
Jumlah I
Rp.

774.90
3,837.60
3,400.00
8,012.50

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,432.63
21,968.66
2,671.35
463.03
46,535.67
54,548.17

17,220.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

688.80
5,116.80
6,800.00

4,538,700.00 = Rp.

63,250.00 = Rp.
17,220.00 = Rp.
Jumlah I
Rp.

68,080.50
22,137.50
34,440.00
137,263.60

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

21,432.63
27,883.30
3,390.56
555.63
53,262.12
190,525.72

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,000.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

560.00
5,116.80
6,800.00

4,538,700.00 = Rp.

63,250.00 = Rp.
17,220.00 = Rp.
Jumlah I
Rp.

81,696.60
22,137.50
34,440.00
150,750.90

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
27,883.30
3,390.56
555.63
54,690.97
205,441.87

14,000.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

560.00
5,116.80
6,800.00

4,538,700.00 = Rp.

63,250.00 = Rp.
17,220.00 = Rp.
Jumlah I
Rp.

68,080.50
22,137.50
103,320.00
206,014.80

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
27,883.30
3,390.56
555.63
54,690.97
260,705.77

14,000.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

420.00
5,116.80
6,800.00

4,538,700.00 = Rp.

63,250.00 = Rp.
17,220.00 = Rp.
78,000.00 = Rp.
Jumlah I
Rp.

90,774.00
22,137.50
51,660.00
312,000.00
488,908.30

71,442.09 = Rp.
84,494.85 = Rp.
102,744.36 = Rp.

22,861.47
27,883.30
3,390.56

=
=
=
=

=
=
=
=

92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

555.63
54,690.97
543,599.27

14,000.00 = Rp.
12,792.00 = Rp.
34,000.00 = Rp.

420.00
5,116.80
5,100.00

4,538,700.00 = Rp.

63,250.00 = Rp.
17,220.00 = Rp.
Jumlah I
Rp.

68,080.50
22,137.50
34,440.00
135,294.80

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
27,883.30
3,390.56
555.63
54,690.97
189,985.77

2,017.20 = Rp.

782,673.60

430,500.00 = Rp.

279,825.00

615,000.00 = Rp.
Jumlah I
Rp.

399,750.00
1,462,248.60

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

428,652.54
84,494.85
10,274.44
27,781.64
551,203.47
2,013,452.07

2,017.20 = Rp.

806,880.00

430,500.00 = Rp.

172,200.00

615,000.00 = Rp.
Jumlah I
Rp.

504,300.00
1,483,380.00

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

428,652.54
84,494.85
10,274.44
27,781.64
551,203.47
2,034,583.47

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,000.00 = Rp.
12,792.00 = Rp.
17,220.00 = Rp.
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

369.60
7,675.20
8,610.00
16,654.80
10,716.31
4,224.74
513.72
648.24
16,103.02
32,757.82
SNI 7394 - 6.9

1 M3 Membuat Beton Bertulang (150 Kg


17,220.00
24,477.00
34,000.00
12,841.93
27,429.00
2,017.20

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,132.80
36,715.50
13,600.00
2,022,603.30
61,715.25
677,779.20

430,500.00 = Rp.

232,470.00

615,000.00 = Rp.
Jumlah I
Rp.

498,150.00
3,547,166.05

71,442.09
84,494.85
84,494.85
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

378,643.08
23,236.08
109,843.31
88,719.59
26,919.02
24,540.45
651,901.53
4,199,067.58

14,000.00
12,792.00
34,000.00
12,841.93
27,429.00
2,017.20

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,780.00
25,584.00
20,400.00
2,568,385.14
82,287.00
651,555.60

430,500.00 = Rp.

223,860.00

615,000.00 = Rp.
Jumlah I
Rp.

479,700.00
4,055,551.74

71,442.09 = Rp.
84,494.85 = Rp.
84,494.85 = Rp.

346,494.14
29,573.20
131,811.97

Bahan

Tenaga

84,494.85 = Rp.
102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

14,000.00
12,792.00
34,000.00
12,841.93
27,429.00
2,017.20

=
=
=
=
=
=

118,292.79
34,008.38
15,742.93
675,923.40
4,731,475.14

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,480.00
40,934.40
54,400.00
2,568,385.14
82,287.00
651,555.60

430,500.00 = Rp.

223,860.00

615,000.00 = Rp.

479,700.00

4,538,700.00 = Rp.

63,250.00 = Rp.
990.00 = Rp.
Jumlah I
Rp.

635,418.00
177,100.00
15,840.00
4,933,960.14

71,442.09
84,494.85
84,494.85
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

425,794.86
29,573.20
236,585.58
118,292.79
46,748.68
19,261.94
876,257.05
5,810,217.19

14,000.00
12,792.00
34,000.00
12,841.93
27,429.00
2,017.20

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,480.00
40,934.40
54,400.00
1,926,288.86
61,715.25
651,555.60

430,500.00 = Rp.

223,860.00

615,000.00 = Rp.

479,700.00

4,538,700.00 = Rp.

544,644.00
177,100.00
31,680.00
4,196,358.11

63,250.00 = Rp.
990.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
84,494.85
84,494.85

=
=
=
=

Rp.
Rp.
Rp.
Rp.

414,364.12
29,573.20
236,585.58
88,719.59

102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

14,000.00
12,792.00
34,000.00
12,841.93
27,429.00
2,017.20

=
=
=
=
=
=

43,152.63
17,132.01
829,527.14
5,025,885.24

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,360.00
40,934.40
54,400.00
1,926,288.86
61,715.25
651,555.60

430,500.00 = Rp.

223,860.00

615,000.00 = Rp.

479,700.00

4,538,700.00 = Rp.

63,250.00 = Rp.
990.00 = Rp.
Jumlah I
Rp.

726,192.00
177,100.00
23,760.00
4,368,866.11

71,442.09
84,494.85
84,494.85
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

400,075.70
29,573.20
223,066.40
88,719.59
41,097.74
17,872.86
800,405.50
5,169,271.60

14,000.00
12,792.00
34,000.00
12,841.93
27,429.00
2,017.20

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,500.00
38,376.00
40,800.00
2,568,385.14
82,287.00
651,555.60

430,500.00 = Rp.

223,860.00

615,000.00 = Rp.

479,700.00

4,538,700.00 = Rp.

63,250.00 = Rp.
990.00 = Rp.
Jumlah I
Rp.

476,563.50
158,125.00
13,860.00
4,737,012.24

71,442.09 = Rp.
84,494.85 = Rp.

400,075.70
29,573.20

84,494.85
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

194,338.16
118,292.79
41,611.47
18,706.30
802,597.62
5,539,609.86

14,000.00
12,792.00
34,000.00
27,429.00
2,017.20

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

28.00
127.92
102,000.00
12,343.05
8,068.80

430,500.00 = Rp.

2,583.00

615,000.00 = Rp.
Jumlah I
Rp.

5,535.00
130,685.77

71,442.09
84,494.85
84,494.85
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,286.53
1,689.90
1,689.90
1,689.90
616.47
277.82
10,250.50
140,936.27

14,000.00
12,792.00
34,000.00
27,429.00
2,017.20

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

42.00
255.84
122,400.00
1,371.45
11,094.60

430,500.00 = Rp.

3,874.50

615,000.00 = Rp.
Jumlah I
Rp.

9,225.00
148,263.39

71,442.09
84,494.85
84,494.85
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,144.21
2,788.33
2,788.33
2,788.33
1,027.44
463.03
16,999.67
165,263.06

15,990.00 = Rp.

17,589.00

=
=
=
=
=
=

30,750.00 = Rp.

Rp.

2,460.00
20,049.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

506.97
4,286.53
616.47
27.78
5,437.74
25,486.74

900,000.00 = Rp.

Rp.

900,000.00
900,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,145.44
46,437.36
6,678.38
2,963.38
106,224.56
1,006,224.56

650,000.00 = Rp.

Rp.

650,000.00
650,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

81,004.17
75,014.19
10,788.16
486.18
167,292.70
817,292.70

850,000.00 = Rp.

Rp.

850,000.00
850,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

92,576.20
73,013.82
12,329.32
555.63
178,474.97
1,028,474.97

960,000.00 = Rp.

960,000.00
960,000.00

Jumlah I
84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Jumlah I
77,146.83
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Jumlah I
77,146.83
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Jumlah I
77,146.83
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I

=
=
=
=

Rp.

77,146.83
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

92,576.20
85,730.51
12,329.32
555.63
191,191.66
1,151,191.66

550,000.00 = Rp.

Rp.

550,000.00
550,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

81,004.17
75,014.19
10,788.16
481.55
167,288.07
717,288.07

90,000.00 = Rp.

Rp.

90,000.00
90,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,717.46
5,715.37
8,219.55
370.42
76,022.80
166,022.80

780,000.00 = Rp.

Rp.

780,000.00
780,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

115,720.25
75,014.19
10,788.16
481.55
202,004.15
982,004.15

350,000.00 = Rp.

Rp.

350,000.00
350,000.00

77,146.83 = Rp.
71,442.09 = Rp.
102,744.36 = Rp.

81,004.17
75,014.19
10,788.16

Jumlah I
77,146.83
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Jumlah I
77,146.83
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Jumlah I
77,146.83
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I

=
=
=
=

92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

481.55
167,288.07
517,288.07

180,000.00 = Rp.

Rp.

180,000.00
180,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

29,573.20
25,004.73
3,596.05
162.06
58,336.04
238,336.04

240,000.00 = Rp.

Rp.

240,000.00
240,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

29,573.20
25,004.73
3,596.05
162.06
58,336.04
298,336.04

44,569.69 = Rp.
Jumlah I
Rp.

512,551.41
512,551.41

78,884.82 = Rp.
71,442.09 = Rp.
102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

94,661.78
85,730.51
1,232.93
55.56
181,680.79
694,232.19

70,000.00 = Rp.

77,000.00
255.84

Jumlah I
84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Jumlah I
84,494.85
71,442.09
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

12,792.00 = Rp.
2,767,500.00 = Rp.

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47

=
=
=
=

Rp.

4,981.50
82,237.34

Rp.
Rp.
Rp.
Rp.

7,144.21
8,449.49
1,027.44
46.30

Jumlah II
Jumlah I + II

Rp.
Rp.

16,667.44
98,904.78

80,000.00 = Rp.

88,000.00
255.84

12,792.00 = Rp.
4,538,700.00 = Rp.

Rp.

8,169.66
96,425.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,144.21
8,449.49
1,027.44
46.30
16,667.44
113,092.94

80,000.00 = Rp.

88,000.00
255.84

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

12,792.00 = Rp.
4,538,700.00 = Rp.

Rp.

8,169.66
96,425.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,144.21
8,449.49
1,027.44
46.30
16,667.44
113,092.94

60,000.00 = Rp.

66,000.00
255.84

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

12,792.00 = Rp.
4,538,700.00 = Rp.

Rp.

8,169.66
74,425.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,144.21
8,449.49
1,027.44
46.30
16,667.44
91,092.94

240,000.00 = Rp.

12,792.00 = Rp.

264,000.00
255.84

44,569.69 = Rp.
Jumlah I
Rp.

1,114.24
265,370.08

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,288.42
16,898.97
2,054.89
92.61
33,334.88
298,704.96

69,891.25 = Rp.
12,792.00 = Rp.

34,945.63
191.88

2,767,500.00 = Rp.

26,568.00
7,687.50
69,393.01

30,750.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,716.31
33,797.94
2,568.61
115.76
47,198.62
116,591.62

69,891.25 = Rp.
12,792.00 = Rp.

34,945.63
191.88

2,767,500.00 = Rp.

52,582.50
9,225.00
96,945.01

30,750.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,857.68
33,797.94
2,568.61
115.76
39,339.99
136,284.99

69,891.25 = Rp.
12,792.00 = Rp.

20,967.38
1,279.20

2,767,500.00 = Rp.

44,569.69 = Rp.
Jumlah I
Rp.

52,582.50
22,284.84
97,113.92

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II

10,716.31
21,123.71
2,568.61
115.76
34,524.39

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah I + II

Rp.

131,638.31

69,891.25 = Rp.
12,792.00 = Rp.

20,967.38
1,279.20

2,767,500.00 = Rp.

52,582.50
22,284.84
97,113.92

44,569.69 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,716.31
21,123.71
2,568.61
115.76
34,524.39
131,638.31

2,767.50 = Rp.
2,017.20 = Rp.

387,450.00
129,161.32

369,000.00 = Rp.
Jumlah I
Rp.

21,771.00
538,382.32

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

46,437.36
16,898.97
2,054.89
2,778.16
68,169.38
606,551.70

2,767.50 = Rp.
2,017.20 = Rp.

387,450.00
87,748.20

369,000.00 = Rp.
Jumlah I
Rp.

29,520.00
504,718.20

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

46,437.36
16,898.97
2,054.89
2,778.16
68,169.38
572,887.58

2,767.50 = Rp.

387,450.00

=
=
=
=

=
=
=
=

2,017.20 = Rp.

66,466.74

369,000.00 = Rp.
Jumlah I
Rp.

33,579.00
487,495.74

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

46,437.36
16,898.97
2,054.89
2,778.16
68,169.38
555,665.12

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

SNI 2836 - 6.2

1 M2 Pasangan Bata Merah Tebal 1 Bata


1,950.00 = Rp.
2,017.20 = Rp.

273,000.00
53,556.66

369,000.00 = Rp.
Jumlah I
Rp.

34,317.00
360,873.66

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

46,437.36
16,898.97
2,054.89
2,778.16
68,169.38
429,043.04

2,767.50 = Rp.
2,017.20 = Rp.

387,450.00
44,781.84

369,000.00 = Rp.
Jumlah I
Rp.

37,638.00
469,869.84

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

46,437.36
16,898.97
2,054.89
2,778.16
68,169.38
538,039.22

2,767.50 = Rp.
2,017.20 = Rp.

387,450.00
44,781.84

369,000.00 = Rp.
Jumlah I
Rp.

37,638.00
469,869.84

71,442.09 = Rp.
84,494.85 = Rp.
102,744.36 = Rp.

46,437.36
16,898.97
2,054.89

=
=
=
=

=
=
=
=

Bahan

Tenaga

92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

2,778.16
68,169.38
538,039.22

2,767.50 = Rp.
2,017.20 = Rp.

387,450.00
20,333.38

369,000.00 = Rp.

34,132.50

227,304.00 = Rp.

Rp.

6,250.86
448,166.74

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

46,437.36
16,898.97
2,054.89
2,778.16
68,169.38
516,336.12

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
56,078.16

369,000.00 = Rp.
Jumlah I
Rp.

10,332.00
260,135.16

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
293,862.64

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
38,225.94

369,000.00 = Rp.
Jumlah I
Rp.

14,022.00
245,972.94

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
279,700.42

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
28,987.16

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

=
=
=
=

=
=
=
=

369,000.00 = Rp.
Jumlah I
Rp.

14,760.00
237,472.16

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
271,199.64

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
23,197.80

369,000.00 = Rp.
Jumlah I
Rp.

15,867.00
232,789.80

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
266,517.28

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
19,526.50

369,000.00 = Rp.
Jumlah I
Rp.

16,605.00
229,856.50

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
263,583.98

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
16,783.10

369,000.00 = Rp.
Jumlah I
Rp.

18,081.00
228,589.10

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II

=
=
=
=

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48

Jumlah I + II

Rp.

262,316.58

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
13,111.80

369,000.00 = Rp.
Jumlah I
Rp.

18,450.00
225,286.80

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
259,014.28

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
9,077.40

369,000.00 = Rp.

18,450.00

227,304.00 = Rp.

Rp.

3,409.56
224,661.96

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
258,389.44

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
56,078.16

369,000.00 = Rp.
Jumlah I
Rp.

10,332.00
260,135.16

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
293,862.64

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
38,225.94

369,000.00 = Rp.
Jumlah I
Rp.

14,022.00
245,972.94

=
=
=
=

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

=
=
=
=

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
279,700.42

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
28,987.16

369,000.00 = Rp.
Jumlah I
Rp.

14,760.00
237,472.16

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
271,199.64

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
23,197.80

369,000.00 = Rp.
Jumlah I
Rp.

15,867.00
232,789.80

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
266,517.28

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
19,526.50

369,000.00 = Rp.
Jumlah I
Rp.

16,605.00
229,856.50

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
263,583.98

=
=
=
=

=
=
=
=

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
16,783.10

369,000.00 = Rp.
Jumlah I
Rp.

18,081.00
228,589.10

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
262,316.58

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
13,111.80

369,000.00 = Rp.
Jumlah I
Rp.

18,450.00
225,286.80

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
259,014.28

2,767.50 = Rp.
2,017.20 = Rp.

193,725.00
9,077.40

369,000.00 = Rp.

18,450.00

227,304.00 = Rp.

Rp.

3,409.56
224,661.96

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
258,389.44

2,767.50 = Rp.
21,525.00 = Rp.

193,725.00
387.45

369,000.00 = Rp.

6,642.00

227,304.00 = Rp.

4,091.47
204,845.92

=
=
=
=

=
=
=
=

Jumlah I
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Jumlah I

=
=
=
=

Rp.

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,861.47
8,449.49
1,027.44
1,389.08
33,727.48
238,573.40

2,017.20 = Rp.

26,062.22

369,000.00 = Rp.
Jumlah I
Rp.

4,797.00
30,859.22

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,288.42
12,674.23
1,541.17
926.05
29,429.87
60,289.09

2,017.20 = Rp.

20,623.85

369,000.00 = Rp.

7,380.00

=
=
=
=

Jumlah I

Rp.

28,003.85

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,432.63
12,674.23
1,541.17
1,389.08
37,037.10
65,040.95

2,017.20 = Rp.

13,071.46

369,000.00 = Rp.
Jumlah I
Rp.

7,011.00
20,082.46

71,442.09 = Rp.
84,494.85 = Rp.

14,288.42
12,674.23

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Plesteran
SNI 6837 - 6.2

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm


Bahan

Tenaga

102,744.36 = Rp.
92,605.47 = Rp.
Jumlah II
Rp.
Jumlah I + II
Rp.

1,541.17
926.05
29,429.87
49,512.32

2,017.20 = Rp.

12,587.33

369,000.00 = Rp.
Jumlah I
Rp.

8,856.00
21,443.33

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,432.63
12,674.23
1,541.17
1,389.08
37,037.10
58,480.43

2,017.20 = Rp.

8,714.30

369,000.00 = Rp.
Jumlah I
Rp.

8,118.00
16,832.30

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,288.42
12,674.23
1,541.17
926.05
29,429.87
46,262.17

2,017.20 = Rp.

7,423.30

369,000.00 = Rp.
Jumlah I
Rp.

8,487.00
15,910.30

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,288.42
12,674.23
1,541.17
926.05
29,429.87
45,340.16

2,017.20 = Rp.

5,809.54

369,000.00 = Rp.
Jumlah I
Rp.

8,856.00
14,665.54

=
=
=
=

=
=
=
=

=
=
=
=

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,288.42
12,674.23
1,541.17
926.05
29,429.87
44,095.40

2,017.20 = Rp.

28,805.62

369,000.00 = Rp.
Jumlah I
Rp.

8,487.00
37,292.62

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,860.52
16,898.97
2,054.89
1,157.57
37,971.95
75,264.56

2,017.20 = Rp.

21,785.76

369,000.00 = Rp.
Jumlah I
Rp.

9,594.00
31,379.76

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,860.52
16,898.97
2,054.89
1,157.57
37,971.95
69,351.71

2,017.20 = Rp.

17,509.30

369,000.00 = Rp.
Jumlah I
Rp.

10,332.00
27,841.30

71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

17,860.52
16,898.97
2,054.89
1,157.57
37,971.95
65,813.24

2,017.20 = Rp.

14,705.39

=
=
=
=

=
=
=
=

=
=
=
=

369,000.00 = Rp.
Jumlah I
Rp.
71,442.09
84,494.85
102,744.36
92,605.47
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

47,583.33 = Rp.
16,654.17 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

19,333.33 = Rp.
6,766.67 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

45,666.67 = Rp.
15,983.33 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

55,000.00 = Rp.

10,332.00
25,037.39
17,860.52
16,898.97
2,054.89
1,157.57
37,971.95
63,009.34
57,100.00
5,828.96
62,928.96
3,136.48
6,182.55
751.79
2,032.80
12,103.62
75,032.58
23,200.00
2,368.33
25,568.33
3,136.48
6,182.55
751.79
2,032.80
12,103.62
37,671.96
54,800.00
5,594.17
60,394.17
3,136.48
6,182.55
751.79
2,032.80
12,103.62
72,497.79
66,000.00

19,250.00 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,666.67 = Rp.
25,083.33 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

112,166.67 = Rp.
39,258.33 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,750.00 = Rp.
962.50 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

13,833.33 = Rp.

6,737.50
72,737.50
6,272.96
12,365.10
1,503.58
406.56
20,548.20
93,285.70
86,000.00
8,779.17
94,779.17
6,272.96
12,365.10
1,503.58
406.56
20,548.20
115,327.37
134,600.00
13,740.42
148,340.42
7,841.21
15,456.38
1,879.47
511.97
511.97
148,852.38
3,300.00
336.88
3,636.88
2,090.99
4,121.70
501.19
135.52
6,849.40
10,486.28
16,600.00

4,841.67 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.

1,694.58
18,294.58
2,090.99
4,121.70
501.19
135.52
6,849.40
25,143.98
#VALUE!
2,090.99
4,121.70
501.19
135.52
#VALUE!
#VALUE!
#VALUE!
2,090.99
4,121.70
501.19
135.52
6,849.40
6,849.40
#VALUE!
3,136.48
6,182.55
751.79
203.28
10,274.10
10,274.10
-

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

24,500.00 = Rp.
8,575.00 = Rp.
Jumlah I
Rp.
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.

#VALUE!
2,090.99
4,121.70
501.19
135.52
6,849.40
6,849.40
#VALUE!
4,704.72
9,273.83
1,127.68
308.68
15,414.91
15,414.91
29,400.00
3,001.25
32,401.25
4,704.72
9,273.83
1,127.68
308.68
15,414.91
47,816.16
#VALUE!
1,742.49
20,608.50
2,505.96
112.93
24,969.88
24,969.88
-

= Rp.
= Rp.
Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,000.00 = Rp.
10,000.00 = Rp.

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Jumlah I
58,083.00
68,695.00
83,532.00
75,289.00
Jumlah II
Jumlah I + II

Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.
Rp.
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

#VALUE!
2,904.15
34,347.50
4,176.60
188.22
41,616.47
41,616.47
50,000.00
250.00
50,250.00
580.83
6,869.50
835.32
376.45
8,662.10
58,912.10
#VALUE!
580.83
6,869.50
835.32
376.45
8,662.10
8,662.10

395 - 6.xx
dari Kawat Ram Tinggi 1,5 Meter
1.00
2.00

Btg
Kg

Dolken Kayu 0 8-10/400 Cm


Semen Portland

1.00

Pagar BRJ

0.01

Pasir Beton

0.01
0.06

M3
Kg

Koral Beton
Paku Biasa 2 " - 5 "

0.28
0.03
0.14
0.01

Oh
Oh
Oh
Oh

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

0.01

M3

Kayu 5/7

0.02

Kg

Paku Biasa 2" - 5 "

0.01

M3

Kayu Papan 3/20

n/Bouplang

dan Pemasangan Bouplank

sihkan Lapangan dan Peralatan


1.00
0.05

Oh
Oh

Pekerja
Mandor

@ Rp.
@ Rp.

Biasa sedalam 1 Meter


0.40
0.04

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

835 - 6.9
0.50
-

Oh
Oh

Pekerja
Tukang Gali

Oh

Kepala Tukang

0.05

Oh

Mandor

1.20

Oh

Pasir Urug

0.30
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

1.20

Oh

Batu Pecah Uk 1 x 1

835 - 6.9

Koral/kerikil

n Pondasi Batu Kosong


1.20

M3

Batu Belah 15 / 20

0.30

Pasir Urug

0.78
0.30
0.04
0.04

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.10
163.00

M3
Kg

Batu Belah 15 / 20
Semen Portland

0.52

M3

Pasir Pasang

atu Kali

n Pondasi Batu Kali, 1 Pc : 4 Ps

1.50
0.60
0.06
0.08

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor

t Beton dengan Mutu K225


388.00

Kg

Semen Portland

0.65

M3

Pasir Beton

0.65

M3

Koral Beton

6.00
1.00
0.10
0.30

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

t Beton Bertulang (150 Kg Besi dan Bekisting)


0.20
1.50
0.40
150.00
2.25
323.00

M3
Kg
Ltr
Kg
Kg
Kg

Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland

0.52

M3

Pasir Beton

0.78

Koral Beton

3.21
1.61
0.16

Oh
Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

n Bata Merah Tebal 1 Bata, 1 Pc : 4Ps


140.00
26.55

Bh
Kg

Bata Merah 5x11x22 Cm


Semen Portland

0.09

M3

Pasir Pasang

0.65
0.20
0.02
0.03

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

n 1 Pc : 2 Ps, Tebal 15 mm
8.52

Kg

Semen Portland

0.02

M3

Pasir Pasang

0.20
0.15
0.02
0.01

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

Oh

Pasir Urug

Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Kepala Tukang
Mandor