Professional Documents
Culture Documents
Low-Cost Plastic Biodigesters - Davis & Preston
Low-Cost Plastic Biodigesters - Davis & Preston
,._ ..-.,-_
r-.:
f,::
c,
Z.,;
i
:7
.
;<:
;I
il;
of PVC tube
thickness
1883
H
a) Joining
sheet together
(Fig. 2a)
are available
from old Dhaka in rolls,
generally 138 cm (54 inches) wide and
50 metres long. By joining sheets into a
tube, a digester of any capacity can be
constructed
to match the availability of
dung etc. or the gas requirements for an
individual household or cpmmunity. Three
biogas units have been constructed.
The
method used is shown in figures 2a-c.
Formulas
Circumference of circle=x
for half circle
x Diameter,
APA0
NEWS 36
CT.5
k
::;,
_I,
, ,<.
,;
_(
_.
,111
,.
.
__
Fig 1
gas outlet
PVC tent -
t,renh-\
\F
/I
f hod ing
leakage
January-February
1983
1983
ADAB
NEWS
37
Fig
Construction
al welding
of
sheets
-=
tube biogas
digester
tsgether
-y
-1 \
half circle
f,onrd
One
joi,n
b) construc!mg_
oullet
-//f/////////r
trench /
38 ADA0
NEWS
4
I
I
slurry
January-February
lS83
,i
. .
,,,,;,
1983
AOAB
NEWS 39
Table
Volume (ti) of tube digesters
in meters (see figure 2 a)
Width
Sheet
b_
2 m.
3 m.
4m
of
with
various length
Diameter
of Tube (m)
4 m.
6 m.
Length of Sheet
10m.
8 m.
--
1.27
1.91
.._.
2.55
3.18
0.95
1.27
2.86 5.09
4.30
7.64
5.73
7.16
10.19
1.59
7.96
11.94
15.92
0.64
5 m.
l(a)
--
(c)
12 m.
3.82
-
8.59
12.73
15.29
19.89
23.81
Table 1 (b)
Calculated inputs required and gas production obtained
tersof various sizes. (Data from San Domingo, Ref 2)
Expected
gas (ma)
Volume of
tube (ml)
40
Cooking
time
(hrs)
from diges-
Daily(kbpading
Fresh
Water
1:
dung
4
13
8
.25
Total Liveweight
of cattle
required
0.67
0.30
1.34
o,60
2.01
0.90
13
38
168
2.68
1.21
17
sd
224
3.35
5-
21
63
279
IO
6.70
3.02
10
42
559
15
20
10.10
13.40
4.50
15
63
126
-188
837
6.03
20
84
251
1117
ADAB
NEWS
1.51
--
-.-
56
112
January-February
1993
Table
Specifications and construction
unit at Maijdee
2
costs
Specifications
Volume of tube
Digester volume
dung(fresh)
Daily input
water
Expected gas
Cooking time
5.88 m3
,.3.9 m3
;I..
.-
1.7 m3
5.5 hrs
.:
(205 cft)
(135 cft)
(28 Srs)
(16 gallons)
( 61 cft)
5.5 hrs.
(TW
504
50
100
75
60
6
60
costs
Plastic 24 yds x Tk 21
Inlet and outlet RCC pipe (6ft)
Welding
Labour 3 man days
Pottery stove2
Gas tap
Gas pipe line (Tk I-50 ft) plus fittings
Gas light3
.,
-A
Notes
1)
Welding using a hot iron and flat drive belt. One man-day is assbryed, but it would
be quicker with experience, giving a margin for small scaie industry.
.I
.I
>facturec1,:
\
.S
..
&*i&
$ti
;-
.
i *&; j
; .;~I
ADA6
NEWS 41