You are on page 1of 2

TAM DAO 05 JACK UP RIG PROJECT

INSULATION RESISTANCE CABLE TEST


WORK INSTRUCTION
I.

Document No

QA-GK002-WI-EI-001

Rev

Date

29/July/2015

Purpose

This instruction is established as a guideline for applying insulation resistance cable testing
method as per required by ABS MODU RULE 2014.
II.
Reference
ABS MODU RULE: ABS Rules for Building and Classing Mobile Offshore Drilling Units
2014
IEC 60092- 350 2008-02: General construction and test methods of power, control and
instrumentation cables for shipboard and offshore applications.
Measurement equipment manufacturers instructions.
Cable installation manual for power and control cables issued by the manufacturer.
III.

Procedure
1.
2.
3.

4.

Name
Signature
Date

The insulation resistance shall be measured at ambient temperature using a DC voltage of


500V to 1000V for cables rated 2400 volts or less as recommended by the manufacturer.
The measurement shall in general be effected 1 min after application of a voltage. Measuring
equipment shall have valid calibration certificate.
The connection procedure in carrying out the test on different types of cables shall be as
follows:
- For single-core cables with metallic covering, the insulation resistance measurement shall
be performed between the conductor and the metallic covering.
- For cable having equal or more than two conductors, with or without metallic covering,
the insulation measurement shall be performed in turn between each conductor and all
other conductors connected together and to the metallic covering, if any.
The measurement values of the insulation resistance shall be recorded in the prepared form
and they shall not be less than the value given in the table below.
Ampere range
Ohm minimum requirement
Up to 5 amperes load
2 M
10 amperes load
1 M
25 amperes load
400.000
50 amperes load
250.000
100 amperes load
100.000
200 amperes load
50.000
Over 200 amperes load
25.000
Prepared
Approved
Approved
Approved
by PV Shipyard
by PV Shipyard
by ABS
by VSP

TAM DAO 05 JACK UP RIG PROJECT

INSULATION RESISTANCE CABLE TEST


WORK INSTRUCTION

Document No

QA-GK002-WI-EI-001

Rev

Date

29/July/2015

You might also like