You are on page 1of 1

PROSEDUR START UP ENGINE FIRE PUMP

1. CEK SEMUA KONEKSI PENGKABELAN DARI PANEL DIESEL KE PANEL CONTROL


2. CEK SEMUA KONEKSI CONTROL DI CONTROL PANEL APAKAH SUDAH SESUAI PADA TEMPAT
YANG BENAR .
3. CEK KABEL ACCU APAKAH SUDAH BENAR PEMASANGANNYA ANTARA + (POSITIF) DAN
(NEGATIVE).
4. CEK POWER INCOMMING +/- 220V.
5. CEK AMPERE BATTERY CHARGER KEMASING-MASING BATTERY
6. SEBELUM MENGHIDUPKAN ENGINE DARI CONTROL PANEL, LEBIH BAIK LAKUKAN DAHULU
MENGHIDUPKAN ENGINE DARI UNIT ENGINE SENDIRI DENGAN LOW SPEED.
7. SETELAH SEMUA DIATAS DILAKUKAN, H IDUPKAN DARI CONTROL PANEL SECARA MANUAL.
8. SETELAH BERHASIL SECARA MANUAL LAKUKAN START SECARA AUTO DENGAN SETTING
PRESSURE SWITCH SESUAI DENGAN TEKANAN KERJA YANG DIINGINKAN.

PROSEDUR START UP JOCKEY FIRE PUMP & ELECTRIC FIRE PUMP


1.
2.
3.
4.
5.
6.

CEK SEMUA KONEKSI KABEL DIPANEL CONTROL


CEK SEMUA KONEKSI KABEL OUTGOING KE MOTOR APAKAH SUDAH TEPAT.
CEK VOLTAGE INCOMING POWER APAKAH SUDAH TEPAT
CEK PUTARAN MOTOR APAKAH SUDAH TEPAT
START SECARA MANUAL CEK AMPERE MOTOR APAKAH SUDAH SESUAI DENGAN NAME PLATE
TEST SECARA AUTO DENGAN SETTING PRESSURE SWITCH SESUAI DENGAN TEKANAN KERJA
YANG DIINGINKAN.

You might also like