Professional Documents
Culture Documents
Case Study PDO Master Flo
Case Study PDO Master Flo
RCA Report
Date: 30.11.2011
Customer:
PDO Oman
Description:
8 -900# x 8-300#
Make::
Qty:
1 off
AD8001919
Findings:
The above valve was stripped and found with severe rust in the body cavity, bonnet , stem
and packing chamber cavity is filled with sand and debris
Due to Debris and rust formation on the stem and packing chamber sealing surfaces is
uneven,thus damaging sealing lips of the packings.
The choke seems to be handling very corrosive product.
There is no mechanical damage on any parts,
Root Cause of Failure
.Rust formation on Stem and Packing chamber sealing surfaces.
Stem OD sealing surfaces is attacked with corrosive product. and pitted.
Wear out, damage on packing sealing lips , hence preventing to seal.
Prepared By F. X. Rebello