Professional Documents
Culture Documents
Enterprise Wide Information Systems: Instructor: Richard W. Vawter
Enterprise Wide Information Systems: Instructor: Richard W. Vawter
University of
Southern California
Objective
To discuss the use of the Accelerated SAP approach
for conducting a rapid R/3 implementation
To explain how the Accelerated SAP Roadmap is used
to facilitate implementation.
To identify the tools and accelerators used for
performing ASAP.
To discuss the integration of the Roadmap with the R/3
Reference Model and the Implementation Guide (IMG).
University of
Southern California
Topics
Quick look at the Original R/3 Procedural Model
Overview of the ASAP methodology
The ASAP Roadmap
The Implementation Assistant
University of
Southern California
Organization and
Conceptual Design
Detailed Design
and System Set-Up
Establish
Global
Settings
Set Up System
Environment
Project
Preparation
Train Project
Team
Define
Functions and
Processes
Design
Interfaces and
Enhancements
Quality
Establish
Company
Structure
Conceptual
Design
Check
Establish
Master
Data
Perform
Final
Test
Preparations for
Going Live
Productive
Operation
Create
Interfaces and
Enhancements
Establish
Reporting
Establish
Archiving
Management
Establish
Archiving
Management
Create
Go - Live
Plan
Quality
Application
System
Train
Users
Create
Establish
User
System
Documentation Administration
Check
Set Up
Production
Environment
Transfer Data
to Production
System
Quality
Production
System
Check
Support
Productive
Operation
Optimize
System
Use
Perform
Final Test
Project Management
System Maintenance and Release Upgrade
Copyright, SAP AG.
University of
Southern California
University of
Southern California
Accelerated SAP
In 1996, SAP introduced Accelerated SAP.
Better suited for medium sized companies looking at a
Big Bang approach.
University of
Southern California
Topics
Quick look at the Original R/3 Procedural Model
Overview of the ASAP methodology
The ASAP Roadmap
The Implementation Assistant
University of
Southern California
University of
Southern California
Tools:
A navigation tool for the Roadmap, questionnaires, templates, and check lists.
Q&A database for documenting requirements.
R/3 Business Engineer tools for creating the Business Blueprint (conceptual
design) and for configuration.
All the services are available for ASAP projects, including consulting, training,
hotline, Early Watch, OSS, Info DB.
University of
Southern California
Implementation Assistant
Q&A Database
ASAP Roadmap
Knowledge Corner
BP Masterlist
Accelerators
Methodology
R/3
Resident
Tools
PC
Based
Tools
Service
Implementation
Guide
Reference Model
Profile Generator
Change Request
Management
Class Discussion
ASAP is a Tool designed to speed up the implementation
process. However, there are always other factors which
could affect the speed of an implementation.
Based upon your individual experience:
University of
Southern California
University of
Southern California
Topics
Quick look at the Original R/3 Procedural Model
Overview of the ASAP methodology
The ASAP Roadmap
The Implementation Assistant
University of
Southern California
University of
Southern California
Business
Blueprint
Realization
Final
Preparation
Go
Live
Authorizations
that will be req
Reports to be
written
Project
Plan
Scope
System
Performance
Evaluation
Business Process
Master List
Conversions
to be made
x
x
x
x
x
Req. Interfaces
identified
Bus. Processes
identified
x
x
x
x
x
Baseline
Scope
Org. Structure
defined
A Working
System
Business
Process
Procedures
Test Cases
End User
Training
Materials
Reports
written
Interfaces
established
Test Plan
Test mat.
Go-Live Plan
Conversion
made
University of
Southern California
Pct
Project Preparation
12%
Business Blueprint
15%
Realization
Baseline
Final Configuration
Integration Test
46%
Final Project
19%
12%
13%
21%
8%
100%
University of
Southern California
Topics
Quick look at the Original R/3 Procedural Model
Overview of the ASAP methodology
The ASAP Roadmap
The Implementation Assistant
University of
Southern California
University of
Southern California
ASAP Roadmap
Implementation Accelerators
Project Plan
Question and Answer Database
Issues Database
Business Process Procedures
Knowledge Corner
Glossary
Help
University of
Southern California
Phase
Phase
How-To
How-To
Work
Work Package
Package
Activity
Activity
Task
Task
Deliverable
Deliverable
Who
Who
Accelerators
Accelerators
How Tos
Accelerators
& Tools
Phase Information
Phase level information consists of the purpose of the
Phase, general instructions on how to complete it, and the
work packages that are organized to complete the phase.
Purpose
General
Instructions
Work Packages
University of
Southern California
Purpose
Activities
University of
Southern California
Activity Information
Activity level information consists of the purpose of the Activity, general
instructions on how to complete it, the trigger for starting this activity, the
input needed, the expected results, and any templates or accelerators that
can be used to complete the activity.
Trigger
Input
Output
Outcome
Tool/Accelerator
University of
Southern California
Task Information
Task level information consists of the purpose of the Task, the suggested
procedure for completing the task, the personnel responsible, and any
templates, accelerators, or How-Tos that can be used to complete the tasks.
Purpose
Task Procedure
Result(s)
Role(s)
Tool/Accelerator
University of
Southern California
University of
Southern California
Tools
University of
Southern California
University of
Southern California
Procedure
Tools/
Accelerators
Conduct Session 1
Develop Org Structure
Conduct Session 2
Q&A db
Enterprise Area Scope Document
Organization Structure Presentation Template
University of
Southern California