You are on page 1of 1

1. Why MAL & EAL are kept open during HC?

2. Why RB isolation dampers are to be kept locked open during HC?


3. Why is pressure equalization between V1 & V2 allowed during HC?
4. Why suppression pool is not filled with water?
5. How RB leak test is done? discuss RB proof test & EAL leak test.
6. Why OPRDs are not installed during HC?
7. WHY CV IS NOT FILLED WITH WATER?
8. WHY DNM COOLING CAPABILITY TEST IS REQD AND HOW IS IT DONE?
9. WHY FM PUMP IS TO BE STARTED BEFORE PPP STARTING?
10. WHAT WILL HAPPEN DURING UNBALANCED MODE OF OPERATION?
11. WHY MONITORING OF E/S METAL TEMP IS REQD?
12. WHERE TO FIND ALL TEST REPORTS?