1.

0 PRESUPUESTO DE OBRA
Item

Descripcin

Und.

Metrado

Precio S/.

01

OBRAS PRELIMINARES

01.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

est

1.00

16,213.8800

01.02

CAMPAMENTO DE OBRA (ALMACEN)

m2

80.00

158.6142

01.03

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m

1.00

592.9010

01.04

TRAZO, NIVELACION Y REPLANTEO (Ejecucin de obra)

km

2.20

111.9227

01.05

LIMPIEZA Y DESFORESTACION R= 1.0 Ha/da

ha

2.20

100.0913

01.06

CONTROL TROPOGRAFICO

km

2.16

1,385.5029

01.07

DEMARCACION DE TALUDES

km

2.20

135.0140

01.08

TRANSPORTE DE MATERIALES A OBRA

glb

1.00

9,816.0300

02

MOVIMIENTO DE TIERRAS

02.01

CORTE EN MATERIAL SUELTO R=540 m3/da

m3

41,382.59

4.0977

02.02

CORTE EN ROCA SUELTO R=250 m3/da

m3

1,240.00

16.5094

02.03

CONFORMACION DE TERRAPLENES R= 920 m3/da

m3

6,048.00

4.2469

02.04

PERFILADO Y COMPACION DE SUB-RASANTE EN ZONAS-CORTE R=3220 m2/da

m2

9,200.00

1.2455

02.05

EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES R.S.

m3

225.00

13.4708

02.06

EXCAVACION DE CUNETAS EN MATERIAL SUELTO

2,110.00

0.6208

02.07

EXCAVACION DE CUNETAS EN ROCA SUELTO

50.00

11.1934

03

CONFORMACION DE SUPERFICIE DE RODADURA

03.01

EXTRACCION Y APILAMIENTO DE MATERIAL AFIRMADO EN CANTERA R=530 m3/da

m3

2,592.00

4.2222

03.02

ZARANDEADO R=350 m3/da

m3

1,814.40

3.7651

03.03

CARGUIO DE MATERIAL AFIRMADO R= 750 m3/da

m3

311.40

2.0487

03.04

TRANSPORTE DE MATERIAL AFIRMADO (DM)

m3k

18,144.00

2.8000

03.05

EXTENDIDO, NIVELADO Y COMPACTADO DE MATERIAL AFIRMADO

m3

2,592.00

5.9513

03.06

RIEGO

m3

1,728.00

2.5924

04

OBRAS DE ARTE

04.01

MURO DE CONTENCIN

04.01.01

TRAZO, NIVELACION Y REPLANTEO PRELIMINAR

m2

10.78

1.6222

04.01.02

EXCAVACION PARA ESTRUCTURAS

m3

10.78

13.7522

04.01.03

ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA D=30m

m3

10.78

8.0220

04.01.04

CONCRETO SIMPLE f'c=175 kg/cm2+ 50% P.M.

m3

34.84

201.1186

04.01.05

ENCOFRADO Y DESENCOFRADO

m2

46.72

121.5846

04.01.06

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

12.37

11.2455

04.01.07

RELLENO COMPACTADO MANUAL- CON MATERIAL FILTRO

m3

2.86

74.2980

04.02

DISPADOR DE ENERGIA

04.02.01

TRAZO Y REPLANTEO

m2

11.75

4.2882

04.02.02

EXCAVACION PARA ESTRUCTURAS

m3

7.76

13.7522

04.02.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

7.76

10.6961

04.02.04

CONCRETO F'C=140 KG/CM2 +30% PM

m3

4.70

185.5588

04.02.05

CONCRETO 1:10 +30% P.G. PARA UA

m3

3.06

148.9857

04.02.06

ENCOFRADO Y DESENCOFRADO

m2

4.79

121.5846

04.03

BADEN L=6M (4 UND)

04.03.01

TRAZO Y REPLANTEO

m2

118.96

4.2882

04.03.02

EXCAVACION PARA ESTRUCTURAS

m3

50.67

13.7522

04.03.03

ELIMINACION MATERIAL EXCEDENTE

m3

50.67

7.8692

04.03.04

CONCRETO 1:10 +30% P.G. PARA UA

m3

14.98

148.9857

04.03.05

ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60

kg

884.11

5.9379

04.03.06

ENCOFRADO Y DESENCOFRADO

m2

26.16

121.5846

04.03.07

CONCRETO f'c=175 kg/cm2

m3

35.69

302.7993

04.03.08

JUNTAS ASFALTICAS

20.00

4.7433

05

PUENTE (L=10m)

05.01

TRAZO Y REPLANTEO

m2

225.00

4.2882

05.02

EXCAVACION MANUAL PARA ESTRUCTURAS

m3

253.50

17.1137

05.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

253.50

10.6961

05.04

ENCOFRADO Y DESENCOFRADO

m2

313.75

121.5846

05.05

CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.

m3

178.56

195.2258

05.06

ACERO DE REFUERZO fy=4200 kg/cm2

kg

9,446.92

5.4188

05.07

CONCRETO f'c= 210 kg/cm2 EN LOSA

m3

57.24

639.5150

05.08

RELLENO CON MATERIAL SELECCIONADO

m3

52.50

14.9602

05.09

BARANDAS DE ACERO

24.00

38.1745

05.10

APOYO MOVIL DE NEOFRENO

2.00

1,167.4144

05.11

APOYO FIJO

2.00

1,301.5144

1.0 PRESUPUESTO DE OBRA


05.12

CONSTRUCCION DE ACCESO AUXILIAR PARA PASO DE VEHICULOS

06

POSTES KILOMETRICOS

glb

1.00

1,680.6700

06.01

INSTALACIONDE POSTES KILOMETRICOS (Inc. suministros)

07

ENSAYOS DE CONTROL DE CALIDAD

4.00

106.4650

07.01
07.02

ENSAYO DE MEC. DE SUELOS-MAT. AFIRMADO

1.00

500.0000

ENSAYO DE CONTROL DE COMPACTACION

9.00

50.0000

07.03

ENSAYOS DE RESISTENCIA DEL CONCRETO

24.00

50.0000

08

PLAN DE MANEJO AMBIENTAL

08.01

MEDIDAS DE MITIGACION

08.01.01

RECUPERACION DE CULTIVOS AFECTADOS

ha

2.17

1,328.9202

08.01.02

ESTABILIZACION DE CURSOS DE AGUA

m2

2.17

250.9126

08.02

MEDIDAS DE CONTROL

08.02.01

CONSTRUCCION DE POZO DE RESIDUOS

m3

16.50

18.7954

08.02.02

RECOLECCION MANUAL DE RESIDUOS SLIDOS DEL AREA CIRCUNDANTE

m3

11.00

12.5907

08.02.03

CONSTRUCCION RELLENO DE SEGURIDAD

m3

4.50

45.7661

08.02.04

LETRINAS MOVILES

1.00

575.0780

08.02.05

LETRINAS TEMPORALES

1.00

114.1100

09

MEDIDAS DE PREVENCION

09.01

EQUIPO DE PROTECCION PERSONAL

glb

1.00

3,494.2000

09.02

ELABORACION DE PROCEDIMIENTOS DE SEGURIDAD AMBIENTAL

glb

1.00

500.0000

09.03

PROGRAMA DE INDUCCION AL PERSONAL

1.00

525.0000

09.04

CAPACITACION EN TEMAS AMBIENTALES

1.00

525.0000

09.05

REUNION INFORMATIVA DEL PLAN DE MANEJO AMBIENTAL

1.00

1,005.0000

10

FORTALECIMIENTO DE LA CONSERVACION DE CAMINOS

10.01

CAPACITACION EN GESTION VIAL

glb

1.00

2,000.0000

10.02

CONFORMACION Y CAPACITACION DEL COMITE DE MANTENIMIENTO

glb

1.00

1,500.0000

PRESUPUESTO DE OBRA
Parcial S/.
43,068.0949
16,213.8800
12,689.1360
592.9010
246.2299
220.2009
2,992.6863
297.0308
9,816.0300
232,089.4342
169,573.4390
20,471.6560
25,685.2512
11,458.6000
3,030.9300
1,309.8880
559.6700
89,121.9418
10,943.9424
6,831.3974
637.9652
50,803.2000
15,425.7696
4,479.6672
38,611.4042
13,291.2168
17.4873
148.2487
86.4772
7,006.9720
5,680.4325
139.1068
212.4923
2,150.5180
50.3864
106.7171
83.0017
872.1264
455.8962
582.3902
23,169.6694
510.1243
696.8240
398.7324
2,231.8058
5,249.7568
3,180.6531
10,806.9070
94.8660
177,138.2513
964.8450
4,338.3230
2,711.4614
38,147.1683
34,859.5188
51,190.9701
36,605.8386
785.4105
916.1880
2,334.8288
2,603.0288

PRESUPUESTO DE OBRA
1,680.6700
425.8600
425.8600
2,150.0000
500.0000
450.0000
1,200.0000
4,771.9944
3,428.2371
2,883.7568
544.4803
1,343.7573
310.1241
138.4977
205.9475
575.0780
114.1100
6,049.2000
3,494.2000
500.0000
525.0000
525.0000
1,005.0000
3,500.0000
2,000.0000
1,500.0000

CRONOGRAMA DE EJECUCION DE OBRA


Obra
Entidad
Lugar

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO


MUNICIPALIDAD DISTRITAL DE PARAS
AYACUCHO CANGALLO DISTRITO DE PARAS
PRIMER MES

Descripcin

Item

1ra Sem.
01

OBRAS PRELIMINARES

01.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

01.02

CAMPAMENTO DE OBRA (ALMACEN)

01.03

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m

01.04

TRAZO, NIVELACION Y REPLANTEO (Ejecucin de obra)

01.05

LIMPIEZA Y DESFORESTACION R= 1.0 Ha/da

01.06

CONTROL TROPOGRAFICO

01.07

DEMARCACION DE TALUDES

01.08

TRANSPORTE DE MATERIALES A OBRA

02

MOVIMIENTO DE TIERRAS

02.01

CORTE EN MATERIAL SUELTO R=540 m3/da

02.02

CORTE EN ROCA SUELTO R=250 m3/da

02.03

CONFORMACION DE TERRAPLENES R= 920 m3/da

02.04

PERFILADO Y COMPACION DE SUB-RASANTE EN ZONAS-CORTE R=3220 m2/da

02.05

EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES R.S.

02.06

EXCAVACION DE CUNETAS EN MATERIAL SUELTO

02.07

EXCAVACION DE CUNETAS EN ROCA SUELTO

03

CONFORMACION DE SUPERFICIE DE RODADURA

03.01

EXTRACCION Y APILAMIENTO DE MATERIAL AFIRMADO EN CANTERA R=530 m3/da

03.02

ZARANDEADO R=350 m3/da

03.03

CARGUIO DE MATERIAL AFIRMADO R= 750 m3/da

03.04

TRANSPORTE DE MATERIAL AFIRMADO (DM)

03.05

EXTENDIDO, NIVELADO Y COMPACTADO DE MATERIAL AFIRMADO

03.06

RIEGO

04

OBRAS DE ARTE

04.01

MURO DE CONTENCIN

04.01.01

TRAZO, NIVELACION Y REPLANTEO PRELIMINAR

04.01.02

EXCAVACION PARA ESTRUCTURAS

04.01.03

ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA D=30m

04.01.04

CONCRETO SIMPLE f'c=175 kg/cm2+ 50% P.M.

04.01.05

ENCOFRADO Y DESENCOFRADO

04.01.06

RELLENO COMPACTADO CON MATERIAL PROPIO

04.01.07

RELLENO COMPACTADO MANUAL- CON MATERIAL FILTRO

04.02

DISPADOR DE ENERGIA

04.02.01

TRAZO Y REPLANTEO

04.02.02

EXCAVACION PARA ESTRUCTURAS

04.02.03

ELIMINACION DE MATERIAL EXCEDENTE

04.02.04

CONCRETO F'C=140 KG/CM2 +30% PM

04.02.05

CONCRETO 1:10 +30% P.G. PARA UA

04.02.06

ENCOFRADO Y DESENCOFRADO

04.03

BADEN L=6M (4 UND)

04.03.01

TRAZO Y REPLANTEO

04.03.02

EXCAVACION PARA ESTRUCTURAS

04.03.03

ELIMINACION MATERIAL EXCEDENTE

04.03.04

CONCRETO 1:10 +30% P.G. PARA UA

04.03.05

ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60

04.03.06

ENCOFRADO Y DESENCOFRADO

04.03.07

CONCRETO f'c=175 kg/cm2

04.03.08

JUNTAS ASFALTICAS

05

PUENTE (L=10m)

05.01

TRAZO Y REPLANTEO

05.02

EXCAVACION MANUAL PARA ESTRUCTURAS

05.03

ELIMINACION DE MATERIAL EXCEDENTE

05.04

ENCOFRADO Y DESENCOFRADO

05.05

CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.

05.06

ACERO DE REFUERZO fy=4200 kg/cm2

05.07

CONCRETO f'c= 210 kg/cm2 EN LOSA

05.08

RELLENO CON MATERIAL SELECCIONADO

05.09

BARANDAS DE ACERO

05.10

APOYO MOVIL DE NEOFRENO

05.11

APOYO FIJO

05.12

CONSTRUCCION DE ACCESO AUXILIAR PARA PASO DE VEHICULOS

06

POSTES KILOMETRICOS

06.01

INSTALACIONDE POSTES KILOMETRICOS (Inc. suministros)

07

ENSAYOS DE CONTROL DE CALIDAD

07.01

ENSAYO DE MEC. DE SUELOS-MAT. AFIRMADO

07.02

ENSAYO DE CONTROL DE COMPACTACION

07.03

ENSAYOS DE RESISTENCIA DEL CONCRETO

08

PLAN DE MANEJO AMBIENTAL

08.01

MEDIDAS DE MITIGACION

2da Sem.

3ra Sem.

SEGUNDO MES
4ta Sem.

5ta Sem.

6ta Sem.

7ma Sem.

TERCER MES
8va Sem.

9na Sem.

10ma Sem.

11ma Sem.

CUARTO MES
12ma Sem.

13ra Sem.

14ta Sem.

15ta Sem.

CRONOGRAMA DE EJECUCION DE OBRA


Obra
Entidad
Lugar

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO


MUNICIPALIDAD DISTRITAL DE PARAS
AYACUCHO CANGALLO DISTRITO DE PARAS
PRIMER MES

Descripcin

Item

1ra Sem.
08.01.01

RECUPERACION DE CULTIVOS AFECTADOS

08.01.02

ESTABILIZACION DE CURSOS DE AGUA

08.02

MEDIDAS DE CONTROL

08.02.01

CONSTRUCCION DE POZO DE RESIDUOS

08.02.02

RECOLECCION MANUAL DE RESIDUOS SLIDOS DEL AREA CIRCUNDANTE

08.02.03

CONSTRUCCION RELLENO DE SEGURIDAD

08.02.04

LETRINAS MOVILES

08.02.05

LETRINAS TEMPORALES

09

MEDIDAS DE PREVENCION

09.01

EQUIPO DE PROTECCION PERSONAL

09.02

ELABORACION DE PROCEDIMIENTOS DE SEGURIDAD AMBIENTAL

09.03

PROGRAMA DE INDUCCION AL PERSONAL

09.04

CAPACITACION EN TEMAS AMBIENTALES

09.05

REUNION INFORMATIVA DEL PLAN DE MANEJO AMBIENTAL

10

FORTALECIMIENTO DE LA CONSERVACION DE CAMINOS

10.01

CAPACITACION EN GESTION VIAL

10.02

CONFORMACION Y CAPACITACION DEL COMITE DE MANTENIMIENTO

2da Sem.

3ra Sem.

SEGUNDO MES
4ta Sem.

5ta Sem.

6ta Sem.

7ma Sem.

TERCER MES
8va Sem.

9na Sem.

10ma Sem.

11ma Sem.

CUARTO MES
12ma Sem.

13ra Sem.

14ta Sem.

15ta Sem.

MES

QUINTO MES
16ta Sem.

17ma Sem.

18va Sem.

19na Sem.

20ma Sem.

MES

QUINTO MES
16ta Sem.

17ma Sem.

18va Sem.

19na Sem.

20ma Sem.

CRONOGRAMA DE VALORIZACION DE OBRA


CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO
Obra
Entidad MUNICIPALIDAD DISTRITAL DE PARAS
AYACUCHO- CANGALLO DISTRITO DE PARAS
Lugar
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
03.04
03.05
03.06
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.02
04.02.01
04.02.02

Descripcin
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
CAMPAMENTO DE OBRA (ALMACEN)
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
TRAZO, NIVELACION Y REPLANTEO (Ejecucin de obra)
LIMPIEZA Y DESFORESTACION R= 1.0 Ha/da
CONTROL TROPOGRAFICO
DEMARCACION DE TALUDES
TRANSPORTE DE MATERIALES A OBRA

166.26035
PRIMER MES
Monto
%

Parcial S/.
43,068.0949
16,213.8800
12,689.1360
592.9010
246.2299
220.2009
2,992.6863
297.0308

16,213.8800
12,689.1360
592.9010
246.2299
220.2009
498.7811
297.0308

100.00%
100.00%
100.00%
100.00%
100.00%
16.67%
100.00%

9,816.0300

9,816.0300

100.00%

MOVIMIENTO DE TIERRAS

232,089.4342

CORTE EN MATERIAL SUELTO R=540 m3/da

169,573.4390

CORTE EN ROCA SUELTO R=250 m3/da

20,471.6560

CONFORMACION DE TERRAPLENES R= 920 m3/da

25,685.2512

PERFILADO Y COMPACION DE SUB-RASANTE EN ZONAS-CORTE R=3220 m2/da

11,458.6000

EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES R.S.

3,030.9300

EXCAVACION DE CUNETAS EN MATERIAL SUELTO

1,309.8880

EXCAVACION DE CUNETAS EN ROCA SUELTO

89,121.9418

EXTRACCION Y APILAMIENTO DE MATERIAL AFIRMADO EN CANTERA R=530 m3/da

10,943.9424

CARGUIO DE MATERIAL AFIRMADO R= 750 m3/da

606.19

20.00%

637.9652
50,803.2000

EXTENDIDO, NIVELADO Y COMPACTADO DE MATERIAL AFIRMADO

15,425.7696
4,479.6672

OBRAS DE ARTE

38,611.4042

MURO DE CONTENCIN

13,291.2168

TRAZO, NIVELACION Y REPLANTEO PRELIMINAR

16.67%

6,831.3974

TRANSPORTE DE MATERIAL AFIRMADO (DM)

RIEGO

28,262.24

559.6700

CONFORMACION DE SUPERFICIE DE RODADURA

ZARANDEADO R=350 m3/da

SEGUNDO MES
Monto
%

17.4873

17.4873

100.00%

148.2487

148.2487

100.00%

86.4772

86.4772

100.00%

CONCRETO SIMPLE f'c=175 kg/cm2+ 50% P.M.

7,006.9720

7,006.9720

100.00%

ENCOFRADO Y DESENCOFRADO

5,680.4325

5,680.4325

100.00%

RELLENO COMPACTADO CON MATERIAL PROPIO

139.1068

139.1068

100.00%

RELLENO COMPACTADO MANUAL- CON MATERIAL FILTRO

212.4923

212.4923

100.00%

50.3864

50.3864

100.00%

106.7171

106.7171

100.00%

EXCAVACION PARA ESTRUCTURAS


ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA D=30m

DISPADOR DE ENERGIA
TRAZO Y REPLANTEO
EXCAVACION PARA ESTRUCTURAS

2,150.5180

TERCER MES
Monto
%

665.0414

22.22%

665.0414

22.22%

37,682.99

22.22%

37,682.99

22.22%

11,458.60

100.00%

606.19

20.00%

606.19

20.00%

CRONOGRAMA DE VALORIZACION DE OBRA


CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO
Obra
Entidad MUNICIPALIDAD DISTRITAL DE PARAS
AYACUCHO- CANGALLO DISTRITO DE PARAS
Lugar
Item
04.02.03
04.02.04
04.02.05
04.02.06
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
05.09
05.10
05.11
05.12
06
06.01
07
07.01
07.02
07.03
08

Descripcin
ELIMINACION DE MATERIAL EXCEDENTE

166.26035
PRIMER MES
Monto
%

Parcial S/.

SEGUNDO MES
Monto
%

83.0017

83.0017

100.00%

CONCRETO F'C=140 KG/CM2 +30% PM

872.1264

872.1264

100.00%

CONCRETO 1:10 +30% P.G. PARA UA

455.8962

455.8962

100.00%

ENCOFRADO Y DESENCOFRADO

582.3902

582.3902

100.00%

TERCER MES
Monto
%

BADEN L=6M (4 UND)

23,169.6694

TRAZO Y REPLANTEO

510.1243

127.531075

25.00%

127.53

25.00%

EXCAVACION PARA ESTRUCTURAS

696.8240

174.206

25.00%

174.21

25.00%

ELIMINACION MATERIAL EXCEDENTE

398.7324

99.6831

25.00%

99.68

25.00%

CONCRETO 1:10 +30% P.G. PARA UA

2,231.8058

557.95145

25.00%

557.95

25.00%

ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60

5,249.7568

1312.4392

25.00%

1,312.44

25.00%

ENCOFRADO Y DESENCOFRADO

3,180.6531

795.163275

25.00%

795.16

25.00%

10,806.9070

2701.72675

25.00%

2,701.73

25.00%

94.8660

23.7165

25.00%

23.72

25.00%

CONCRETO f'c=175 kg/cm2


JUNTAS ASFALTICAS
PUENTE (L=10m)
TRAZO Y REPLANTEO

177,138.2513
964.8450

964.8450

100.00%

EXCAVACION MANUAL PARA ESTRUCTURAS

4,338.3230

4,338.3230

100.00%

ELIMINACION DE MATERIAL EXCEDENTE

2,711.4614

2,711.4614

100.00%

ENCOFRADO Y DESENCOFRADO

38,147.1683

38,147.1683

100.00%

CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.

34,859.5188

34,859.5188

100.00%

ACERO DE REFUERZO fy=4200 kg/cm2

51,190.9701

38393.227575

75.00%

CONCRETO f'c= 210 kg/cm2 EN LOSA

36,605.8386

240

20.00%

RELLENO CON MATERIAL SELECCIONADO


BARANDAS DE ACERO

785.4105
916.1880

APOYO MOVIL DE NEOFRENO

2,334.8288

APOYO FIJO

2,603.0288

CONSTRUCCION DE ACCESO AUXILIAR PARA PASO DE VEHICULOS

1,680.6700

POSTES KILOMETRICOS
INSTALACIONDE POSTES KILOMETRICOS (Inc. suministros)
ENSAYOS DE CONTROL DE CALIDAD

425.8600
425.8600
2,150.0000

ENSAYO DE MEC. DE SUELOS-MAT. AFIRMADO

500.0000

ENSAYO DE CONTROL DE COMPACTACION

450.0000

ENSAYOS DE RESISTENCIA DEL CONCRETO

1,200.0000

PLAN DE MANEJO AMBIENTAL

4,771.9944

500.00

100.00%

240

20.00%

240

20.00%

CRONOGRAMA DE VALORIZACION DE OBRA


CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO
Obra
Entidad MUNICIPALIDAD DISTRITAL DE PARAS
AYACUCHO- CANGALLO DISTRITO DE PARAS
Lugar
Item

Descripcin

166.26035
PRIMER MES
Monto
%

Parcial S/.

08.01
08.01.01

MEDIDAS DE MITIGACION

3,428.2371

RECUPERACION DE CULTIVOS AFECTADOS

2,883.7568

08.01.02

ESTABILIZACION DE CURSOS DE AGUA

08.02

MEDIDAS DE CONTROL

08.02.01

CONSTRUCCION DE POZO DE RESIDUOS

310.1241

08.02.02

RECOLECCION MANUAL DE RESIDUOS SLIDOS DEL AREA CIRCUNDANTE

138.4977

08.02.03
08.02.04
08.02.05
09
09.01
09.02
09.03
09.04
09.05
10
10.01
10.02

CONSTRUCCION RELLENO DE SEGURIDAD


LETRINAS MOVILES
LETRINAS TEMPORALES
MEDIDAS DE PREVENCION
EQUIPO DE PROTECCION PERSONAL
ELABORACION DE PROCEDIMIENTOS DE SEGURIDAD AMBIENTAL
PROGRAMA DE INDUCCION AL PERSONAL
CAPACITACION EN TEMAS AMBIENTALES
REUNION INFORMATIVA DEL PLAN DE MANEJO AMBIENTAL
FORTALECIMIENTO DE LA CONSERVACION DE CAMINOS
CAPACITACION EN GESTION VIAL
CONFORMACION Y CAPACITACION DEL COMITE DE MANTENIMIENTO

SEGUNDO MES
Monto
%

TERCER MES
Monto
%

544.4803
1,343.7573

Monto Mensual

205.9475
575.0780
114.1100
6,049.2000
3,494.2000
500.0000
525.0000
525.0000
1,005.0000
3,500.0000
2,000.0000
1,500.0000

310.12

100.00%

205.9475
575.0780
114.1100

100.00%
100.00%
100.00%

3,494.2000
500.0000
525.0000

100.00%
100.00%
100.00%

502.5

91,851.31

50.00%

56,445.23

164,401.18

E VALORIZACION DE OBRA

CUARTO MES
Monto
%

665.0414

QUINTO MES
Monto

22.22%

498.78105

16.67%

37,682.99

22.22%

28,262.24

16.67%

20,471.66

100.00%
25,685.25

100.00%

606.19

20.00%

10,943.9424

100.00%

6,831.3974

100.00%

637.9652

100.00%

50,803.2000

100.00%

15,425.7696

100.00%

4,479.6672

100.00%

606.19

20.00%

1,309.89

100.00%

559.67

100.00%

E VALORIZACION DE OBRA

CUARTO MES
Monto
%

QUINTO MES
Monto

127.531075

25.00%

127.531075

25.00%

174.206

25.00%

174.206

25.00%

99.6831

25.00%

99.6831

25.00%

557.95145

25.00%

557.95145

25.00%

1312.4392

25.00%

1312.4392

25.00%

795.163275

25.00%

795.163275

25.00%

2701.72675

25.00%

2701.72675

25.00%

23.7165

25.00%

23.7165

25.00%

12797.742525

25.00%

36,605.8386

100.00%

785.4105

100.00%

916.1880

100.00%

2,334.8288

100.00%

2,603.0288

100.00%

1,680.6700

100.00%

425.8600

100.00%

225

50.00%

225

50.00%

240

20.00%

240

20.00%

E VALORIZACION DE OBRA

CUARTO MES
Monto
%

QUINTO MES
Monto
2,883.7568

100.00%

544.4803

100.00%

138.4977

100.00%

525.0000
502.5

100.00%
50.00%

2,000.0000
1,500.0000

212,528.94

71,699.53

100.00%
100.00%

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

N
01.01

01.02

01.03

01.04

01.05

01.06

271.644444

Partidas
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
Materiales
MOVILIZACION Y DESMOVILIZACION
CAMPAMENTO DE OBRA (ALMACEN)
Mano de Obra
OFICIAL
PEON
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
CLAVOS PARA CALAMINA
MADERA 2X3"
TABLONES DE MADERA 2X6"
ARPILLERA
CALAMINA DE 1.83mx0.83mx2.7mm
Equipos
HERRAMIENTAS MANUALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
Mano de Obra
PEON
Materiales
ALAMBRE NEGRO # 8
CLAVOS PARA MADERA CON CABEZA DE 5"
CARTEL DE OBRA
MADERA 3x4"
Equipos
HERRAMIENTAS MANUALES
TRAZO, NIVELACION Y REPLANTEO (Ejecucin de obra)
Mano de Obra
TOPOGRAFO
OFICIAL
PEON
Materiales
YESO EN BOLSAS DE 18 kg
ESTACA DE MADERA
Equipos
HERRAMIENTAS MANUALES
TEODOLITO
NIVEL TOPOGRFICO
LIMPIEZA DE TERRENOR= 1.0 Ha/da
Mano de Obra
OPERARIO
PEON
Equipos
HERRAMIENTAS MANUALES
CONTROL TROPOGRAFICO
Mano de Obra
TOPOGRAFO
PEON
Materiales
CEMENTO PORTLAND TIPO I (42.5 kg)
HORMIGON (PUESTO EN OBRA)

Und.

Cantidad

Precio Unitario
S/

glb

1.0000

16,213.8800

hh
hh

640.0000
1,280.0000

5.3400
3.8200

20.0000
8.0000
666.4000
480.0000
80.0000
71.2000

6.3000
8.0000
1.8000
1.6000
6.0000
21.0000

%MO

3.0000

8,307.2000

hh

2.0000

3.8200

kg
kg
u
p2

10.0000
5.0000
1.0000
1.0000

4.8000
6.5000
500.0000
2.6600

%MO

27.5000

7.6400

hh
hh
hh

0.0352
0.0352
0.0704

9.0300
5.3400
3.8200

bls
p2

0.8580
116.1600

12.0000
2.0000

3.0000
0.0352
0.0352

0.7748
50.0000
30.0000

1.7600
52.8000

6.8700
3.8200

3.0000

213.7872

hh
hh

24.6858
74.0571

9.0300
3.8200

bls
m3

0.4320
0.0583

26.0000
25.0000

kg
kg
p2
p2
m
pza

%MO
he
he

hh
hh
%MO

Costo Parcial (S/.)


16,213.8800
16,213.8800
8,307.2000
3,417.6000
4,889.6000
4,132.7200
126.0000
64.0000
1,199.5200
768.0000
480.0000
1,495.2000
249.2160
249.2160
7.6400
7.6400
583.1600
48.0000
32.5000
500.0000
2.6600
2.1010
2.1010
0.7748
0.3179
0.1880
0.2689
242.6160
10.2960
232.3200
2.8392
0.0232
1.7600
1.0560
213.7872
12.0912
201.6960
6.4136
6.4136
505.8109
222.9128
282.8981
373.4095
11.2320
1.4575

Mes 01
CANT.
COSTO

Mes 02
CANT.
COSTO

Mes 03
CANT.
COSTO

Mes 04
CANT.

0.5

8106.94

640.00
1,280.00

3,417.60
4,889.60

20.00
8.00
666.40
480.00
80.00
71.20

126.00
64.00
1,199.52
768.00
480.00
1,495.20

3.00

249.22

2.00
0.00
10.00
5.00
1.00
1.00
0.00
27.50

7.64
0.00
48.00
32.50
500.00
2.66
0.00
2.10

0.04
0.04
0.07

0.32
0.19
0.27

0.86
116.16
0.00
3.00
0.04
0.04

10.30
232.32
0.00
0.02
1.76
1.06

1.76
52.80

12.09
201.70

3.00

6.41

4.1143
12.34285

37.152129
47.149687

5.4857333333
16.4571333333

49.536172
62.8662493333

5.4857333333
16.4571333333

49.536172
62.8662493333

5.4857333333
16.4571333333

0.072
0.0097166667

1.872
0.2429166667

0.096
0.0129555556

2.496
0.3238888889

0.096
0.0129555556

2.496
0.3238888889

0.096
0.0129555556

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

01.07

01.08

02.01

02.02

02.03

271.644444

Partidas
ESTACA DE MADERA TORNILLO TRATADA
PINTURA ESMALTE METALIT MADERA ESMALTEX CON COLOR
Equipos
HERRAMIENTAS MANUALES
NIVEL TOPOGRAFICO CON TRIPODE
TEODOLITO
DEMARCACION DE TALUDES
Mano de Obra
TOPOGRAFO
PEON
Materiales
YESO EN BOLSAS DE 18 kg
PLASTICO
PINTURA ESMALTE SINTETICO
Equipos
HERRAMIENTAS MANUALES
WINCHA DE 50 m
TRANSPORTE DE MATERIALES A OBRA
Materiales
FLETE POR TRASNPORTE DE MATERIALES PARAS - OBRA
CORTE EN MATERIAL SUELTO R=540 m3/da
Mano de Obra
OPERARIO
PEON
CONTROLADOR OFICIAL
Equipos
HERRAMIENTAS MANUALES
TRACTOR DE ORUGAS DE 190-240 HP
CORTE EN ROCA SUELTO R=250 m3/da
Mano de Obra
OFICIAL
PEON
CONTROLADOR OFICIAL
Materiales
CORDON DETONANTE 3 p
FULMINANTE
DINAMITA SEMEXA 60
Anfo NITROSEM
BARRENO 5' X 1/8"
Equipos
HERRAMIENTAS MANUALES
COMPRESORA NEUMATICA 87 HP 250-330 PCM
TRACTOR DE ORUGAS DE 190-240 HP
MARTILLO NEUMATICO DE 25 kg
CONFORMACION DE TERRAPLENES R= 920 m3/da
Mano de Obra
PEON
CONTROLADOR OFICIAL
Equipos
HERRAMIENTAS MANUALES
CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000 gl

Und.
p2
gal

Cantidad

Precio Unitario
S/

Costo Parcial (S/.)

108.0000
0.4320

3.2000
35.0000

%MO
he
hm

3.0000
24.6858
24.6858

505.8109
35.0000
50.0000

hh
hh

8.8000
17.6000

9.0300
3.8200

bls
m
gal

2.2000
11.0000
0.4400

12.0000
1.0000
40.0000

%MO
he

5.0000
1.1000

146.6960
80.0000

146.6960
79.4640
67.2320
55.0000
26.4000
11.0000
17.6000
95.3348
7.3348
88.0000

glb

1.0000

9,816.0300

9,816.0300
9,816.0300

hh
hh
hh

124.1478
612.4623
153.1156

6.8700
3.8200
5.3400

%MO
hm

5.0000
612.4623

4,010.1387
270.0000

hh
hh
hh

79.3600
317.4400
19.8400

5.3400
3.8200
5.3400

m
u
kg
kg
u

620.0000
620.0000
93.0000
186.0000
4.9600

2.0000
2.0000
8.0000
6.2000
320.0000

5.0000
39.6800
25.7920
79.3600

1,742.3488
120.0000
270.0000
12.0000

345.3408
29.0304

3.8200
5.3400

5.0000
29.0304

1,474.2242
120.0000

%MO
hm
hm
hm

hh
hh
%MO
hm

345.6000
15.1200
2,113.4673
15.1743
864.0030
1,234.2900

4,010.1387
852.8954
2,339.6060
817.6373
165,565.3279
200.5069
165,364.8210
1,742.3488
423.7824
1,212.6208
105.9456
5,964.4000
1,240.0000
1,240.0000
744.0000
1,153.2000
1,587.2000
12,764.8774
87.1174
4,761.6000
6,963.8400
952.3200
1,474.2242
1,319.2019
155.0223
24,211.2792
73.7112
3,483.6480

Mes 01
CANT.
COSTO
18
57.6
0.072
2.52

Mes 02
CANT.
COSTO
24
76.8
0.096
3.36

Mes 03
CANT.
COSTO
24
76.8
0.096
3.36

0.6666666667
3.3720726667
5.4857333333 192.0006666667
5.4857333333 274.2866666667

0.6666666667
3.3720726667
5.4857333333 192.0006666667
5.4857333333 274.2866666667

0.6666666667
5.4857333333
5.4857333333

142.149231
27.5884
189.532308
27.5884
189.532308
389.934331 136.1027333333 519.9124413333 136.1027333333 519.9124413333
136.272884 34.0256888889 181.6971786667 34.0256888889 181.6971786667

27.5884
136.1027333333
34.0256888889

33.4178225
1.1111111111
27560.8035 136.1027333333

1.1111111111
136.1027333333

0.5
4.1143
4.1143

2.5290545
144.0005
205.715

8.8000
17.6000

79.464
67.232

2.2000
11.0000
0.4400

26.4
11
17.6

5.0000
1.1000

7.3348
88

1.0000

9816.03

20.6913
102.07705
25.5192666667
0.8333333333
102.07705

44.5570966667
1.1111111111
36747.738 136.1027333333

44.5570966667
36747.738

Mes 04
CANT.
24
0.096

79.3600
317.4400
19.8400
620.0000
620.0000
93.0000
186.0000
4.9600
5.0000
39.6800
25.7920
79.3600

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

02.04

02.05

02.06

02.07

03.01

03.02

271.644444

Partidas
RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 ton
TRACTOR DE ORUGAS DE 190-240 HP
MOTONIVELADORA DE 125 HP
PERFILADO Y COMPACION DE SUB-RASANTE EN ZONAS-CORTE R=3220 m2/da
Mano de Obra
PEON
CONTROLADOR OFICIAL
Equipos
HERRAMIENTAS MANUALES
CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000 gl
RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 ton
MOTONIVELADORA DE 125 HP
EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES R.S.
Mano de Obra
OFICIAL
PEON
Equipos
HERRAMIENTAS MANUALES
EXCAVACION DE CUNETAS EN MATERIAL SUELTO
Mano de Obra
PEON
Equipos
HERRAMIENTAS MANUALES
MOTONIVELADORA DE 125 HP
EXCAVACION DE CUNETAS EN ROCA SUELTO
Mano de Obra
OFICIAL
PEON
CONTROLADOR OFICIAL
Materiales
CORDON DETONANTE 3 p
FULMINANTE
DINAMITA SEMEXA 60
Anfo NITROSEM
BARRENO 5' X 1/8"
Equipos
HERRAMIENTAS MANUALES
COMPRESORA NEUMATICA 87 HP 250-330 PCM
MARTILLO NEUMATICO DE 25 kg
EXTRACCION Y APILAMIENTO DE MATERIAL AFIRMADO EN CANTERA R=530 m3/da
Mano de Obra
PEON
CONTROLADOR OFICIAL
Equipos
HERRAMIENTAS MANUALES
TRACTOR DE ORUGAS DE 190-240 HP
ZARANDEADO R=350 m3/da
Mano de Obra
PEON
Equipos
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3

Und.

Cantidad

Precio Unitario
S/

hm
hm
hm

42.9408
29.0304
29.0304

170.0000
270.0000
190.0000

hh
hh

91.0800
11.0400

3.8200
5.3400

%MO
hm
hm
hm

3.0000
23.0000
23.0000
23.0000

406.8792
120.0000
170.0000
190.0000

36.0000
720.0000

5.3400
3.8200

%MO

3.0000

2,942.6400

hh

6.7520

3.8200

%MO
hm

5.0000
6.7520

25.7926
190.0000

hh
hh
hh

1.3350
8.0000
0.1650

5.3400
3.8200
5.3400

m
u
kg
kg
u

50.0000
50.0000
1.2500
3.7500
0.1000

2.0000
2.0000
8.0000
6.2000
320.0000

5.0000
1.6700
4.4600

38.5700
120.0000
12.0000

hh
hh

39.1392
39.1392

3.8200
5.3400

%MO
hm

5.0000
39.1392

358.5150
270.0000

hh

25.9459

3.8200

hm

25.9459

185.0000

hh
hh

%MO
hm
hm

Costo Parcial (S/.)

Mes 01
CANT.
COSTO

Mes 02
CANT.
COSTO

Mes 03
CANT.
COSTO

Mes 04
CANT.

7,299.9360
7,838.2080
5,515.7760
406.8792
347.9256
58.9536
11,052.2064
12.2064
2,760.0000
3,910.0000
4,370.0000
2,942.6400
192.2400
2,750.4000
88.2792
88.2792

91.0800
11.0400

347.9256
58.9536

3.0000
23.0000
23.0000
23.0000

12.206376
2760
3910
4370

7.2
144

38.448
550.08

7.2
144

38.448
550.08

7.2
144

38.448
550.08

7.2
144

0.6

17.65584

0.6

17.65584

0.6

17.65584

0.6

25.7926
25.7926
1,284.1696
1.2896
1,282.8800
38.5700
7.1289
30.5600
0.8811
265.2500
100.0000
100.0000
10.0000
23.2500
32.0000
255.8485
1.9285
200.4000
53.5200
358.5150
149.5117
209.0033
10,585.5098
17.9258
10,567.5840
99.1133
99.1133
6,732.2565
4,799.9915

39.1392
39.1392
5.0000
39.1392

25.9459
25.9459

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

N
03.03

03.04

03.05

03.06

04.01.01

04.01.02

04.01.03

04.01.04

271.644444

Partidas
ZARANDA DE FIERRO DE CONSTRUCCION FY:4200 KG/CM2
CARGUIO DE MATERIAL AFIRMADO R= 750 m3/da
Mano de Obra
PEON
CONTROLADOR OFICIAL
Equipos
CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3
TRANSPORTE DE MATERIAL AFIRMADO (DM)
Materiales
TRANSPORTE DE MATERIAL DE AFIRMADO
EXTENDIDO, NIVELADO Y COMPACTADO DE MATERIAL AFIRMADO
Mano de Obra
OPERARIO
PEON
CONTROLADOR OFICIAL
Equipos
HERRAMIENTAS MANUALES
RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 ton
MOTONIVELADORA DE 125 HP
RIEGO
Mano de Obra
PEON
CONTROLADOR OFICIAL
Equipos
HERRAMIENTAS MANUALES
CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000 gl
TRAZO, NIVELACION Y REPLANTEO PRELIMINAR
Mano de Obra
TOPOGRAFO
PEON
Materiales
YESO EN BOLSAS DE 18 kg
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
Equipos
HERRAMIENTAS MANUALES
TEODOLITO
EXCAVACION PARA ESTRUCTURAS
Mano de Obra
PEON
Equipos
HERRAMIENTAS MANUALES
ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA D=30m
Mano de Obra
PEON
Equipos
HERRAMIENTAS MANUALES
CONCRETO SIMPLE f'c=175 kg/cm2+ 50% P.M.
Mano de Obra
OPERARIO
OFICIAL
PEON

Und.

Cantidad

Precio Unitario
S/

Costo Parcial (S/.)

0.5443

3,550.0000

hh
hh

3.3320
1.6504

3.8200
5.3400

hm

3.3320

185.0000

21.5413
12.7282
8.8131
616.4200
616.4200

18,144.0000

2.8000

50,803.2000
50,803.2000

8.0352
122.0832
40.6944

6.8700
3.8200
5.3400

%MO
hm
hm

5.0000
40.6944
40.6944

738.8677
170.0000
190.0000

hh
hh

34.5600
34.5600

3.8200
5.3400

%MO
hm

5.0000
34.5600

316.5696
120.0000

hh
hh

0.0431
0.3450

9.0300
3.8200

bls
p2

0.5390
0.2156

12.0000
2.8000

%MO
he

5.0000
0.1725

1.7071
50.0000

36.9603

3.8200

5.0000

141.1883

21.5600

3.8200

5.0000

82.3592

82.3592
82.3592
4.1180
4.1180

30.9693
15.4829
185.8122

6.8700
5.3400
3.8200

1,005.2404
212.7591
82.6787
709.8026

m3k

hh
hh
hh

hh
%MO

hh
%MO

hh
hh
hh

Mes 01
CANT.
COSTO

1,932.2650

Mes 04
CANT.
0.5443

3.3320

18,144.0000

8.0352
122.0832
40.6944
5.0000
40.6944
40.6944

316.5696
132.0192
184.5504
4,163.0285
15.8285
4,147.2000

141.1883
141.1883
7.0594
7.0594

Mes 03
CANT.
COSTO

3.3320
1.6504

738.8677
55.2018
466.3578
217.3081
14,686.9274
36.9434
6,918.0480
7,731.9360

1.7071
0.3892
1.3179
7.0717
6.4680
0.6037
8.7104
0.0854
8.6250

Mes 02
CANT.
COSTO

34.5600
34.5600
5.0000
34.5600

0.0431
0.3450

0.389193
1.3179

0.5390
0.2156

6.468
0.60368

5.0000
0.1725

0.085355
8.625

36.9603

141.188346

5.0000

7.059415

21.5600

82.3592

5.0000

4.11796

30.9693
15.4829
185.8122

212.759091
82.678686
709.802604

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

271.644444

Partidas

Und.

Cantidad

Precio Unitario
S/

Materiales
PIEDRA MEDIANA
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GASOLINA 84 OCTANOS

m3
m3
bls
gal

15.6780
10.4520
174.2000
10.4520

50.0000
50.0000
26.0000
13.0000

3.0000

1,005.2404

hh
hh
hh

29.9008
44.8512
149.5040

6.8700
5.3400
3.8200

kg
kg
kg
pl
p2

37.3760
37.3760
23.3600
23.3600
467.2000

4.7000
4.8000
6.3000
120.0000
2.8000

5.0000

1,016.0292

5.4972
16.4929

5.3400
3.8200

%MO
hm

3.0000
5.4972

92.3579
8.0000

hh
hh

1.5252
1.5252

5.3400
3.8200

m3

3.7180

50.0000

%MO
hm

3.0000
1.5252

13.9709
8.0000

hh
hh

0.3760
0.7520

9.0300
3.8200

bls
p2

0.3525
0.7050

12.0000
2.8000

%MO
he
he

5.0000
0.4700
0.4700

6.2679
50.0000
30.0000

26.6059

3.8200

Equipos
04.01.05

HERRAMIENTAS MANUALES
ENCOFRADO Y DESENCOFRADO

%MO
Mano de Obra

OPERARIO
OFICIAL
PEON

04.01.06

04.02.01

04.02.02

Materiales
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO # 8
CLAVOS PARA MADERA CON CABEZA DE 3"
TRIPLAY DE 4' X 8' X 19 mm
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
Equipos
HERRAMIENTAS MANUALES
RELLENO COMPACTADO CON MATERIAL PROPIO
Mano de Obra
OFICIAL
PEON
Equipos
HERRAMIENTAS MANUALES
PLANCHA COMPACTADORA
04.01.07
Mano de Obra
OFICIAL
PEON
Materiales
MATERIAL DE PRESTAMO SELECCIONADO OBRA
Equipos
HERRAMIENTAS MANUALES
PLANCHA COMPACTADORA
TRAZO Y REPLANTEO
Mano de Obra
TOPOGRAFO
PEON
Materiales
YESO EN BOLSAS DE 18 kg
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
Equipos
HERRAMIENTAS MANUALES
TEODOLITO
NIVEL TOPOGRFICO
EXCAVACION PARA ESTRUCTURAS
Mano de Obra
PEON
Equipos

%MO

hh
hh

hh

Costo Parcial (S/.)


5,971.5760
783.9000
522.6000
4,529.2000
135.8760
30.1572
30.1572
1,016.0292
205.4185
239.5054
571.1053
4,613.6000
175.6672
179.4048
147.1680
2,803.2000
1,308.1600
50.8015
50.8015
92.3579
29.3550
63.0029
46.7483
2.7707
43.9776
13.9709
8.1446
5.8263
185.9000
185.9000
12.6207
0.4191
12.2016
6.2679
3.3953
2.8726
6.2040
4.2300
1.9740
37.9134
0.3134
23.5000
14.1000
101.6345
101.6345
5.0817

Mes 01
CANT.
COSTO
15.6780
10.4520
174.2000
10.4520

783.9
522.6
4529.2
135.876

3.0000

30.157212

29.9008
44.8512
149.5040

205.418496
239.505408
571.10528

37.3760
37.3760
23.3600
23.3600
467.2000

175.6672
179.4048
147.168
2803.2
1308.16

5.0000

50.80146

5.4972
16.4929

29.355048
63.002878

3.0000
5.4972

2.770737
43.9776

1.5252
1.5252

8.144568
5.826264

3.7180

185.9

3.0000
1.5252

0.419127
12.2016

0.3760
0.7520

3.39528
2.87264

0.3525
0.7050

4.23
1.974

5.0000
0.4700
0.4700

0.313395
23.5
14.1

26.6059

101.634538

Mes 02
CANT.
COSTO

Mes 03
CANT.
COSTO

Mes 04
CANT.

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

N
04.02.03

04.02.04

04.02.05

04.02.06

04.03.01

271.644444

Partidas
HERRAMIENTAS MANUALES
ELIMINACION DE MATERIAL EXCEDENTE
Mano de Obra
PEON
Equipos
HERRAMIENTAS MANUALES
CONCRETO F'C=140 KG/CM2 +30% PM
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
PIEDRA MEDIANA
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GASOLINA 84 OCTANOS
Equipos
HERRAMIENTAS MANUALES
MEZCLADORA CONCRETO TROMPO 8HP 9 P3
CONCRETO 1:10 +30% P.G. PARA UA
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
PIEDRA GRANDE DE 8"
CEMENTO PORTLAND TIPO I (42.5 kg)
GASOLINA 84 OCTANOS
HORMIGON (PUESTO EN OBRA)
Equipos
HERRAMIENTAS MANUALES
MEZCLADORA CONCRETO TROMPO 8HP 9 P3
ENCOFRADO Y DESENCOFRADO
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO # 8
CLAVOS PARA MADERA CON CABEZA DE 3"
TRIPLAY DE 4' X 8' X 19 mm
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
Equipos
HERRAMIENTAS MANUALES
TRAZO Y REPLANTEO
Mano de Obra
TOPOGRAFO
PEON
Materiales
YESO EN BOLSAS DE 18 kg

Und.
%MO

Cantidad

Precio Unitario
S/

5.0000

101.6345

20.6936

3.8200

5.0000

79.0496

hh
hh
hh

1.0443
1.0443
12.5335

6.8700
5.3400
3.8200

m3
m3
bls
gal

1.4100
1.6779
23.2932
1.4100

50.0000
50.0000
26.0000
13.0000

3.0000
1.5665

60.6289
20.0000

hh
hh
hh

1.3599
1.3599
13.5999

6.8700
5.3400
3.8200

m3
bls
gal
m3

1.5422
9.3177
0.9180
2.6683

25.0000
26.0000
13.0000
25.0000

%MO
hm

1.0000
1.3599

68.5560
20.0000

hh
hh
hh

3.0656
4.5984
15.3280

6.8700
5.3400
3.8200

kg
kg
kg
pl
p2

3.8320
3.8320
2.3950
2.3950
47.9000

4.7000
4.8000
6.3000
120.0000
2.8000

%MO

5.0000

104.1692

hh
hh

3.8067
7.6134

9.0300
3.8200

bls

3.5688

12.0000

hh
%MO

%MO
hm

Costo Parcial (S/.)


5.0817
79.0496
79.0496
3.9525
3.9525
60.6289
7.1743
5.5766
47.8780
778.3482
70.5000
83.8950
605.6232
18.3300
33.1489
1.8189
31.3300
68.5560
9.3425
7.2619
51.9516
359.4567
38.5550
242.2602
11.9340
66.7075
27.8836
0.6856
27.1980
104.1692
21.0607
24.5555
58.5530
473.0125
18.0104
18.3936
15.0885
287.4000
134.1200
5.2085
5.2085
63.4577
34.3745
29.0832
62.8109
42.8256

Mes 01
CANT.
COSTO
5.0000
5.081725

20.6936

79.049552

5.0000

3.95248

1.0443
1.0443
12.5335

7.174341
5.576562
47.87797

1.4100
1.6779
23.2932
1.4100

70.5
83.895
605.6232
18.33

3.0000
1.5665

1.818867
31.33

1.3599
1.3599
13.5999

9.342513
7.261866
51.951618

1.5422
9.3177
0.9180
2.6683

38.555
242.2602
11.934
66.7075

1.0000
1.3599

0.68556
27.198

3.0656
4.5984
15.3280

21.060672
24.555456
58.55296

3.8320
3.8320
2.3950
2.3950
47.9000

18.0104
18.3936
15.0885
287.4
134.12

5.0000

5.20846

Mes 02
CANT.
COSTO

Mes 03
CANT.
COSTO

Mes 04
CANT.

0.951675
1.90335

8.59362525
7.270797

0.951675
1.90335

8.59362525
7.270797

0.951675
1.90335

0.8922

10.7064

0.8922

10.7064

0.8922

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

04.03.02

04.03.03

04.03.04

04.03.05

04.03.06

04.03.07

271.644444

Partidas
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
Equipos
HERRAMIENTAS MANUALES
TEODOLITO
NIVEL TOPOGRFICO
EXCAVACION PARA ESTRUCTURAS
Mano de Obra
PEON
Equipos
HERRAMIENTAS MANUALES
ELIMINACION MATERIAL EXCEDENTE
Mano de Obra
PEON
Equipos
HERRAMIENTAS MANUALES
CONCRETO 1:10 +30% P.G. PARA UA
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
PIEDRA GRANDE DE 8"
CEMENTO PORTLAND TIPO I (42.5 kg)
GASOLINA 84 OCTANOS
HORMIGON (PUESTO EN OBRA)
Equipos
HERRAMIENTAS MANUALES
MEZCLADORA CONCRETO TROMPO 8HP 9 P3
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
Mano de Obra
OPERARIO
OFICIAL
Materiales
ALAMBRE NEGRO RECOCIDO # 16
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
Equipos
HERRAMIENTAS MANUALES
ENCOFRADO Y DESENCOFRADO
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO # 8
CLAVOS PARA MADERA CON CABEZA DE 3"
TRIPLAY DE 4' X 8' X 19 mm
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
Equipos
HERRAMIENTAS MANUALES
CONCRETO f'c=175 kg/cm2

Und.

Cantidad

Precio Unitario
S/

p2

7.1376

2.8000

%MO
he
he

5.0000
4.7584
4.7584

63.4577
50.0000
30.0000

173.7272

3.8200

5.0000

663.6379

101.3400

3.8200

3.0000

387.1188

hh
hh
hh

6.6571
6.6571
66.5771

6.8700
5.3400
3.8200

m3
bls
gal
m3

7.5499
45.6141
4.4940
13.0626

25.0000
26.0000
13.0000
25.0000

1.0000
6.6571

335.6077
20.0000

hh
hh

26.6117
26.6117

6.8700
5.3400

kg
kg

141.4576
1,326.1650

4.7000
3.2000

5.0000

324.9289

hh
hh
hh

16.7424
25.1136
83.7120

6.8700
5.3400
3.8200

kg
kg
kg
pl
p2

20.9280
20.9280
13.0800
13.0800
261.6000

4.7000
4.8000
6.3000
120.0000
2.8000

5.0000

568.9067

hh
%MO

hh
%MO

%MO
hm

%MO

%MO

Costo Parcial (S/.)


19.9853
383.8449
3.1729
237.9200
142.7520
663.6379
663.6379
33.1819
33.1819
387.1188
387.1188
11.6136
11.6136
335.6077
45.7343
35.5489
254.3245
1,759.7011
188.7475
1,185.9666
58.4220
326.5650
136.4981
3.3561
133.1420
324.9289
182.8224
142.1065
4,908.5787
664.8507
4,243.7280
16.2464
16.2464
568.9067
115.0203
134.1066
319.7798
2,583.3000
98.3616
100.4544
82.4040
1,569.6000
732.4800
28.4453
28.4453

Mes 01
CANT.
COSTO

Mes 02
CANT.
COSTO
1.7844
4.99632

Mes 03
CANT.
COSTO
1.7844
4.99632

Mes 04
CANT.
1.7844

1.25
1.1896
1.1896

79.322125
59.48
35.688

1.25
1.1896
1.1896

79.322125
59.48
35.688

1.25
1.1896
1.1896

43.4318

165.909476

43.4318

165.909476

43.4318

1.25

8.29547375

1.25

8.29547375

1.25

25.335

96.7797

25.335

96.7797

25.335

0.75

2.903391

0.75

2.903391

0.75

1.664275
1.664275
16.644275

11.43356925
8.8872285
63.5811305

1.664275
1.664275
16.644275

11.43356925
8.8872285
63.5811305

1.664275
1.664275
16.644275

1.887475
11.403525
1.1235
3.26565

47.186875
296.49165
14.6055
81.64125

1.887475
11.403525
1.1235
3.26565

47.186875
296.49165
14.6055
81.64125

1.887475
11.403525
1.1235
3.26565

0.25
1.664275

0.83901925
33.2855

0.25
1.664275

0.83901925
33.2855

0.25
1.664275

6.652925
6.652925

45.70559475
35.5266195

6.652925
6.652925

45.70559475
35.5266195

6.652925
6.652925

35.3644
331.54125

166.21268
1060.932

35.3644
331.54125

166.21268
1060.932

35.3644
331.54125

1.25

4.06161125

1.25

4.06161125

1.25

4.1856
6.2784
20.928

28.755072
33.526656
79.94496

4.1856
6.2784
20.928

28.755072
33.526656
79.94496

4.1856
6.2784
20.928

5.232
5.232
3.27
3.27
65.4

24.5904
25.1136
20.601
392.4
183.12

5.232
5.232
3.27
3.27
65.4

24.5904
25.1136
20.601
392.4
183.12

5.232
5.232
3.27
3.27
65.4

1.25

7.11133375

1.25

7.11133375

1.25

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

271.644444

Partidas

Und.

Cantidad

Precio Unitario
S/

Mano de Obra
OPERARIO
OFICIAL
PEON

hh
hh
hh

15.8606
15.8606
190.3455

6.8700
5.3400
3.8200

m3
m3
bls
gal

10.7070
18.2019
309.0754
10.7070

50.0000
50.0000
26.0000
13.0000

3.0000
11.8955

920.7777
20.0000

hh
hh

1.6000
4.8000

5.3400
3.8200

m3
gal

0.0400
2.6600

17.0000
25.0000

%MO

3.0000

26.8800

hh
hh

7.2000
14.4000

9.0300
3.8200

bls
p2

6.7500
13.5000

12.0000
2.8000

5.0000
9.0000
9.0000

120.0240
50.0000
30.0000

1,081.6085

3.8200

5.0000

4,131.7445

676.0085

3.8200

5.0000

2,582.3525

hh
hh
hh

200.8000
301.2000
1,004.0000

6.8700
5.3400
3.8200

kg
kg
kg

251.0000
251.0000
156.8750

4.7000
4.8000
6.3000

Materiales
PIEDRA MEDIANA
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GASOLINA 84 OCTANOS

04.03.08

05.01

05.02

05.03

05.04

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA CONCRETO TROMPO 8HP 9 P3
JUNTAS ASFALTICAS
Mano de Obra
OFICIAL
PEON
Materiales
ARENA FINA
ASFALTO RC-250
Equipos
HERRAMIENTAS MANUALES
TRAZO Y REPLANTEO
Mano de Obra
TOPOGRAFO
PEON
Materiales
YESO EN BOLSAS DE 18 kg
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
Equipos
HERRAMIENTAS MANUALES
TEODOLITO
NIVEL TOPOGRFICO
EXCAVACION MANUAL PARA ESTRUCTURAS
Mano de Obra
PEON
Equipos
HERRAMIENTAS MANUALES
ELIMINACION DE MATERIAL EXCEDENTE
Mano de Obra
PEON
Equipos
HERRAMIENTAS MANUALES
ENCOFRADO Y DESENCOFRADO
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO # 8
CLAVOS PARA MADERA CON CABEZA DE 3"

%MO
hm

%MO
he
he

hh
%MO

hh
%MO

Costo Parcial (S/.)


920.7777
108.9623
84.6956
727.1198
9,620.5964
535.3500
910.0950
8,035.9604
139.1910
265.5333
27.6233
237.9100
26.8800
8.5440
18.3360
67.1800
0.6800
66.5000
0.8064
0.8064
120.0240
65.0160
55.0080
118.8000
81.0000
37.8000
726.0012
6.0012
450.0000
270.0000
4,131.7445
4,131.7445
206.5872
206.5872
2,582.3525
2,582.3525
129.1176
129.1176
6,823.1840
1,379.4960
1,608.4080
3,835.2800
30,982.8125
1,179.7000
1,204.8000
988.3125

Mes 01
CANT.
COSTO

Mes 02
CANT.
COSTO

Mes 03
CANT.
COSTO

Mes 04
CANT.

3.96515
3.96515
47.586375

27.2405805
21.173901
181.7799525

3.96515
3.96515
47.586375

27.2405805
21.173901
181.7799525

3.96515
3.96515
47.586375

2.67675
4.550475
77.26885
2.67675

133.8375
227.52375
2008.9901
34.79775

2.67675
4.550475
77.26885
2.67675

133.8375
227.52375
2008.9901
34.79775

2.67675
4.550475
77.26885
2.67675

0.75
2.973875

6.90583275
59.4775

0.75
2.973875

6.90583275
59.4775

0.75
2.973875

0.4
1.2

2.136
4.584

0.4
1.2

2.136
4.584

0.4
1.2

0.01
0.665

0.17
16.625

0.01
0.665

0.17
16.625

0.01
0.665

0.75

0.2016

0.75

0.2016

0.75

3.6
7.2

32.508
27.504

3.6
7.2

3.375
6.75

40.5
18.9

3.375
6.75

2.5
4.5
4.5

3.0006
225
135

2.5
4.5
4.5

540.80425

2065.872235

540.80425

2.5

103.2936125

2.5

338.00425

1291.176235

338.00425

2.5

64.5588125

2.5

100.4
150.6
502

689.748
804.204
1917.64

100.4
150.6
502

125.5
125.5
78.4375

589.85
602.4
494.15625

125.5
125.5
78.4375

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

05.05

05.06

05.07

05.08

05.09

271.644444

Partidas
TRIPLAY DE 4' X 8' X 19 mm
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
Equipos
HERRAMIENTAS MANUALES
CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
PIEDRA MEDIANA
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
GASOLINA 84 OCTANOS
Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO TROMPO 8 HP 9 p3
ACERO DE REFUERZO fy=4200 kg/cm2
Mano de Obra
OPERARIO
OFICIAL
Materiales
ALAMBRE NEGRO RECOCIDO # 16
ALAMBRE NEGRO # 8
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
Equipos
HERRAMIENTAS MANUALES
CONCRETO f'c= 210 kg/cm2 EN LOSA
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
ACEITE PARA MOTOR MULTIGRADO
ARENA GRUESA
PIEDRA ZARANDEADA
CEMENTO PORTLAND TIPO I (42.5 kg)
GASOLINA 84 OCTANOS
Equipos
HERRAMIENTAS MANUALES
MEZCLADORA CONCRETO TROMPO 8HP 9 P3
VIBRADOR DE CONCRETO
RELLENO CON MATERIAL SELECCIONADO
Mano de Obra
OFICIAL
PEON
Equipos
HERRAMIENTAS MANUALES
PLANCHA COMPACTADORA
BARANDAS DE ACERO
Mano de Obra

Und.
pl
p2

Cantidad

Precio Unitario
S/

156.8750
3,137.5000

120.0000
2.8000

5.0000

6,823.1840

hh
hh
hh

79.3521
79.3521
793.5921

6.8700
5.3400
3.8200

m3
m3
bls
gal

53.5680
136.9555
651.7440
53.5680

50.0000
50.0000
26.0000
13.0000

3.0000
71.4240

4,000.4109
50.0000

hh
hh

568.7046
1,136.4645

6.8700
5.3400

kg
kg
kg

944.6920
944.6920
9,919.2660

4.7000
4.8000
3.2000

5.0000

9,975.7210

hh
hh
hh

22.8960
45.7920
228.9600

6.8700
5.3400
3.8200

gal
m3
m3
bls
gal

2.8620
24.0408
48.6540
1,144.8000
28.6200

72.0000
50.0000
60.0000
26.0000
13.0000

5.0000
22.8960
22.8960

1,276.4520
20.0000
15.0000

23.3310
116.6655

5.3400
3.8200

5.0000
23.3310

570.2497
8.0000

%MO

%MO
hm

%MO

%MO
hm
hm

hh
hh
%MO
hm

Costo Parcial (S/.)


18,825.0000
8,785.0000
341.1592
341.1592
4,000.4109
545.1489
423.7402
3,031.5218
27,167.9030
2,678.4000
6,847.7750
16,945.3440
696.3840
3,691.2123
120.0123
3,571.2000
9,975.7210
3,907.0006
6,068.7204
40,716.2252
4,440.0524
4,534.5216
31,741.6512
498.7860
498.7860
1,276.4520
157.2955
244.5293
874.6272
34,464.2040
206.0640
1,202.0400
2,919.2400
29,764.8000
372.0600
865.1826
63.8226
457.9200
343.4400
570.2497
124.5875
445.6622
215.1605
28.5125
186.6480
185.7256

Mes 01
CANT.
COSTO

Mes 02
CANT.
COSTO

Mes 03
CANT.
COSTO
78.4375
9412.5
1568.75
4392.5

Mes 04
CANT.
78.4375
1568.75

2.5

170.5796

2.5

39.67605
39.67605
396.79605

272.5744635
211.870107
1515.760911

39.67605
39.67605
396.79605

26.784
68.47775
325.872
26.784

1339.2
3423.8875
8472.672
348.192

26.784
68.47775
325.872
26.784

1.5
35.712

60.0061635
1785.6

1.5
35.712

284.3523
568.23225

1953.500301
3034.360215

284.3523
568.23225

472.346
472.346
4959.633

2220.0262
2267.2608
15870.8256

472.346
472.346
4959.633

2.5

249.393025

2.5

11.448
22.896
114.48

78.64776
122.26464
437.3136

11.448
22.896
114.48

1.431
12.0204
24.327
572.4
14.31

103.032
601.02
1459.62
14882.4
186.03

1.431
12.0204
24.327
572.4
14.31

2.5
11.448
11.448

31.9113
228.96
171.72

2.5
11.448
11.448

11.6655
58.33275

62.29377
222.831105

11.6655
58.33275

2.5
11.6655

1425.62425
93.324

2.5
11.6655

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

Partidas

N
OPERARIO
PEON

05.10

05.11

05.12

06.01

07.01

07.02

07.03

08.01.01

271.644444

Materiales
CEMENTO PORTLAND TIPO I (42.5 kg)
SOLDADURA CELLOCORD P 3/16"
TUBO FIERRO GALVANIZADO ESTANDAR ISO-I 2"
Equipos
HERRAMIENTAS MANUALES
MOTOSOLDADORA DE 250 A
APOYO MOVIL DE NEOFRENO
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
NEOPRENO INC/. PLANCHA METAL, D=1/8" + ANCLAJE DE 3/8"
Equipos
HERRAMIENTAS MANUALES
APOYO FIJO
Mano de Obra
OPERARIO
OFICIAL
PEON
Materiales
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
NEOPRENO INC/. PLANCHA METAL, D=1/8" + ANCLAJE DE 3/8"
Equipos
HERRAMIENTAS MANUALES
CONSTRUCCION DE ACCESO AUXILIAR PARA PASO DE VEHICULOS
Materiales
ACCESO VEHICULAR PROVICIONAL
INSTALACIONDE POSTES KILOMETRICOS (Inc. suministros)
Mano de Obra
OFICIAL
PEON
Materiales
ARENA GRUESA
CEMENTO PORTLAND TIPO I (42.5 kg)
POSTES KILOMETRICOS
ENSAYO DE MEC. DE SUELOS-MAT. AFIRMADO
Materiales
ENSAYOS DE COMPACTACION PROCTOR MODIFICADO
ENSAYO DE CONTROL DE COMPACTACION
Materiales
ENSAYOS DE CONTROL DE COMPACTACION
ENSAYOS DE RESISTENCIA DEL CONCRETO
Materiales
ENSAYO DE ROTURA A LA COMPRESION DEL CONCRETO
RECUPERACION DE CULTIVOS AFECTADOS
Mano de Obra
OPERARIO

Und.

Cantidad

Precio Unitario
S/

Costo Parcial (S/.)

hh
hh

12.7992
25.6008

6.8700
3.8200

bls
kg
m

1.2000
1.2000
2.4000

26.0000
15.0000
120.0000

5.0000
12.7992

185.7256
30.0000

hh
hh
hh

8.0000
8.0000
4.0000

6.8700
5.3400
3.8200

m2

1.7600

1,260.5000

%MO

3.0000

112.9600

hh
hh
hh

8.0000
8.0000
4.0000

6.8700
5.3400
3.8200

kg
m2

8.9400
1.7600

30.0000
1,260.5000

%MO

3.0000

112.9600

112.9600
54.9600
42.7200
15.2800
2,486.6800
268.2000
2,218.4800
3.3888
3.3888

glb

1.0000

1,680.6700

1,680.6700
1,680.6700

hh
hh

5.3332
10.6668

5.3400
3.8200

m3
bls
u

0.2160
0.9936
4.0000

50.0000
26.0000
80.0000

69.2265
28.4793
40.7472
356.6336
10.8000
25.8336
320.0000

1.0000

500.0000

500.0000
500.0000

9.0000

50.0000

450.0000
450.0000

24.0000

50.0000

1,200.0000
1,200.0000

hh

4.3400

6.8700

692.9678
29.8158

%MO
hm

Mes 01
CANT.
COSTO

Mes 02
CANT.
COSTO

87.9305
97.7951
337.2000
31.2000
18.0000
288.0000
393.2623
9.2863
383.9760
112.9600
54.9600
42.7200
15.2800
2,218.4800
2,218.4800
3.3888
3.3888

1.0000

Mes 03
CANT.
COSTO
6.3996
43.965252
12.8004
48.897528

Mes 04
CANT.
6.3996
12.8004

0.6
0.6
1.2

15.6
9
144

0.6
0.6
1.2

2.5
6.3996

4.64314
191.988

2.5
6.3996

4
4
2

27.48
21.36
7.64

4
4
2

0.88

1109.24

0.88

1.5

1.6944

1.5

4
4
2

27.48
21.36
7.64

4
4
2

4.47
0.88

134.1
1109.24

4.47
0.88

1.5

1.6944

1.5

1.0000

1680.67

500

4.5

4.8

240

4.8

240

4.8

240

4.8

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

271.644444

Partidas

N
PEON

Und.

Cantidad

Precio Unitario
S/

hh

173.6000

3.8200

u
u

434.0000
651.0000

2.0000
2.0000

%MO

3.0000

692.9678

hh
hh

0.0868
0.3472

6.8700
3.8200

2,170.0000

0.2500

3.0000

1.9226

hh

26.4000

3.8200

4.1250

50.0000

%MO

3.0000

100.8480

35.2000

3.8200

3.0000

134.4640

hh
hh

5.1431
30.8570

5.3400
3.8200

1.1250

50.0000

%MO

3.0000

145.3379

hh
hh

4.0000
16.0000

6.8700
3.8200

kg
kg
u
p2
pza

0.4000
0.6000
0.2500
100.0000
8.0000

6.3000
8.0000
50.0000
2.8000
23.0000

3.0000

88.6000

4.0000
16.0000

6.8700
3.8200

Materiales
PLANTONES DE CACAO
PLANTONES DE MANI

08.01.02

08.02.01

08.02.02

08.02.03

08.02.04

08.02.05

Equipos
HERRAMIENTAS MANUALES
ESTABILIZACION DE CURSOS DE AGUA
Mano de Obra
OPERARIO
PEON
Materiales
ESQUEJE DE PASTO ELEFANTE
Equipos
HERRAMIENTAS MANUALES
CONSTRUCCION DE POZO DE RESIDUOS
Mano de Obra
PEON
Materiales
SEAL VERTICAL INFORMATIVA
Equipos
HERRAMIENTAS MANUALES
RECOLECCION MANUAL DE RESIDUOS SLIDOS DEL AREA CIRCUNDANTE
Mano de Obra
PEON
Equipos
HERRAMIENTAS MANUALES
CONSTRUCCION RELLENO DE SEGURIDAD
Mano de Obra
OFICIAL
PEON
Materiales
SEAL VERTICAL INFORMATIVA
Equipos
HERRAMIENTAS MANUALES
LETRINAS MOVILES
Mano de Obra
OPERARIO
PEON
Materiales
CLAVOS PARA MADERA CON CABEZA DE 3"
CLAVOS PARA CALAMINA
SEAL VERTICAL INFORMATIVA
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO
CALAMINA GALVANIZADA N22
Equipos
HERRAMIENTAS MANUALES
LETRINAS TEMPORALES
Mano de Obra
OPERARIO
PEON
Materiales

u
%MO

hh
%MO

%MO

hh
hh

Costo Parcial (S/.)

Mes 01
CANT.
COSTO

663.1520
2,170.0000
868.0000
1,302.0000
20.7890
20.7890
1.9226
0.5963
1.3263
542.5000
542.5000
0.0577
0.0577
100.8480
100.8480
206.2500
206.2500
3.0254
3.0254

26.4000

100.848

4.1250

206.25

3.0000

3.02544

2.57155
15.4285
0
0.5625
0
1.5

13.732077
58.93687
0
28.125
0
2.1800685

4.0000
16.0000

27.48
61.12

0.4000
0.6000
0.2500
100.0000
8.0000

2.52
4.8
12.5
280
184

3.0000

2.658

4.0000
16.0000

27.48
61.12

134.4640
134.4640
4.0339
4.0339
145.3379
27.4642
117.8737
56.2500
56.2500
4.3601
4.3601
88.6000
27.4800
61.1200
483.8200
2.5200
4.8000
12.5000
280.0000
184.0000
2.6580
2.6580
88.6000
27.4800
61.1200
13.8520

Mes 02
CANT.
COSTO

Mes 03
CANT.
COSTO

Mes 04
CANT.

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

09.01

09.02

09.03

09.04

09.05

10.01

10.02

271.644444

Partidas
ALAMBRE NEGRO RECOCIDO # 16
CLAVOS PARA MADERA CON CABEZA DE 3"
SEAL VERTICAL INFORMATIVA
Equipos
HERRAMIENTAS MANUALES
PLASTICO
EQUIPO DE PROTECCION PERSONAL
Materiales
CINTA DE SEGURIDAD
VIVERES
MEDICAMENTOS
Equipos
CASCO AMARILLO
CASCO BLANCO
BOTAS DE SEGURIDAD
GUANTES DE CUERO
CHALECOS DE SEGURIDAD
LENTES DE PROTECCION
ELABORACION DE PROCEDIMIENTOS DE SEGURIDAD AMBIENTAL
Mano de Obra
CONSULTOR (ING. SANITARIO - AMBIENTAL)
PROGRAMA DE INDUCCION AL PERSONAL
Mano de Obra
ESPECIALISTA AMBIENTAL
Materiales
MANUAL DE CAPACITACION
Equipos
PROYECTOR MULTIMEDIA
COMPUTADORA ( LAPTOP)
CAPACITACION EN TEMAS AMBIENTALES
Mano de Obra
ESPECIALISTA AMBIENTAL
Materiales
MANUAL DE CAPACITACION
Equipos
PROYECTOR MULTIMEDIA
COMPUTADORA ( LAPTOP)
REUNION INFORMATIVA DEL PLAN DE MANEJO AMBIENTAL
Mano de Obra
ESPECIALISTA AMBIENTAL
Materiales
MANUAL DE CAPACITACION
Equipos
PROYECTOR MULTIMEDIA
COMPUTADORA ( LAPTOP)
REFRIGERIO
CAPACITACION EN GESTION VIAL
Materiales
CAPACITACION EN GESTION VIAL
CONFORMACION Y CAPACITACION DEL COMITE DE MANTENIMIENTO

Und.

Cantidad

Precio Unitario
S/

kg
kg
u

0.1000
0.1400
0.2500

4.7000
6.3000
50.0000

%MO
m

3.0000
9.0000

88.6000
1.0000

rll
mes
glb

1.0000
2.0000
1.0000

85.0000
624.6000
300.0000

u
u
par
par
u
u

20.0000
4.0000
20.0000
20.0000
20.0000
20.0000

est

Costo Parcial (S/.)


0.4700
0.8820
12.5000
11.6580
2.6580
9.0000

Mes 01
CANT.
COSTO
0.1000
0.47
0.1400
0.882
0.2500
12.5
3.0000
9.0000

2.658
9

1.0000
2.0000
1.0000

85
1249.2
300

18.0000
25.0000
20.0000
15.0000
25.0000
10.0000

1,634.2000
85.0000
1,249.2000
300.0000
1,860.0000
360.0000
100.0000
400.0000
300.0000
500.0000
200.0000

20.0000
4.0000
20.0000
20.0000
20.0000
20.0000

360
100
400
300
500
200

1.0000

500.0000

500.0000
500.0000

1.0000

500

1.0000

200.0000

1.0000

200

20.0000

10.0000

20.0000

200

u
u

0.5000
0.5000

50.0000
200.0000

0.5000
0.5000

25
100

1.0000

200.0000

20.0000

10.0000

u
u

0.5000
0.5000

50.0000
200.0000

1.0000

200.0000

0.5

100

40.0000

10.0000

20

200

u
u
glb

0.5000
0.5000
40.0000

50.0000
200.0000
7.0000

200.0000
200.0000
400.0000
400.0000
405.0000
25.0000
100.0000
280.0000

0.25
0.25
20

12.5
50
140

glb

1.0000

2,000.0000

2,000.0000
2,000.0000

200.0000
200.0000
200.0000
200.0000
125.0000
25.0000
100.0000
200.0000
200.0000
200.0000
200.0000
125.0000
25.0000
100.0000

1,500.0000

Mes 02
CANT.
COSTO

Mes 03
CANT.
COSTO

Mes 04
CANT.

CRONOGRAMA DE ADQUISICION DE INSUMOS


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad

MUNICIPALIDAD DISTRITAL DE PARAS

Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

Partidas
CONFORMACION Y CAP. DEL COMITE DE MANTENIMIENTO

271.644444

Und.
est

MONTO MENSUAL
MONTO TOTAL

Cantidad
1.0000

Precio Unitario
S/
1,500.0000

Costo Parcial (S/.)

Mes 01
CANT.
COSTO

Mes 02
CANT.
COSTO

Mes 03
CANT.
COSTO

91,851.31

56,445.23

164,401.18

Mes 04
CANT.

1,500.0000

858,924.36

212,528.94

Mes 04
COSTO

CANT.

Mes 05
COSTO

0.5

8106.94

49.536172
62.8662493333

4.1143
12.34285

37.152129
47.149687

2.496
0.3238888889

0.072
0.0097166667

1.872
0.2429166667

Mes 04
COSTO
76.8
3.36

Mes 05
COSTO
18
57.6
0.072
2.52

CANT.

3.3720726667
192.0006666667
274.2866666667

0.5
4.1143
4.1143

2.5290545
144.0005
205.715

189.532308
519.9124413333
181.6971786667

20.6913
102.07705
25.5192666667

142.149231
389.934331
136.272884

44.5570966667
36747.738

0.8333333333
102.07705

33.4178225
27560.8035

345.3408
29.0304

1319.2019
155.0223

5.0000
29.0304

73.7112
3483.6480

423.7824
1212.6208
105.9456
1240
1240
744
1153.2
1587.2
87.11744
4761.6
6963.84
952.32

Mes 04
COSTO

Mes 05
CANT.
COSTO
42.9408
7299.9360
29.0304
7838.2080
29.0304
5515.7760

38.448
550.08

7.2
144

38.448
550.08

17.65584

0.6

17.65584

6.7520

25.79264

5.0000
6.7520

128.963
1282.88

1.3350
8.0000
0.1650

7.1289
30.56
0.8811

50.0000
50.0000
1.2500
3.7500
0.1000

100
100
10
23.25
32

5.0000
1.6700
4.4600

1.9285
200.4
53.52

149.511744
209.003328
17.92575
10567.584

99.113338
4799.9915

Mes 04
COSTO
1932.265

12.72824
8.813136
616.42

50803.2

55.201824
466.357824
217.308096
36.943385
6918.048
7731.936

132.0192
184.5504
15.82848
4147.2

CANT.

Mes 05
COSTO

Mes 04
COSTO

CANT.

Mes 05
COSTO

Mes 04
COSTO

CANT.

Mes 05
COSTO

8.59362525
7.270797

0.951675
1.90335

8.59362525
7.270797

10.7064

0.8922

10.7064

Mes 04
COSTO
4.99632

Mes 05
CANT.
COSTO
1.7844
4.99632

79.322125
59.48
35.688

1.25
1.1896
1.1896

79.322125
59.48
35.688

165.909476

43.4318

165.909476

8.29547375

1.25

8.29547375

96.7797

25.335

96.7797

2.903391

0.75

2.903391

11.43356925
8.8872285
63.5811305

1.664275
1.664275
16.644275

11.43356925
8.8872285
63.5811305

47.186875
296.49165
14.6055
81.64125

1.887475
11.403525
1.1235
3.26565

47.186875
296.49165
14.6055
81.64125

0.83901925
33.2855

0.25
1.664275

0.83901925
33.2855

45.70559475
35.5266195

6.652925
6.652925

45.70559475
35.5266195

166.21268
1060.932

35.3644
331.54125

166.21268
1060.932

4.06161125

1.25

4.06161125

28.755072
33.526656
79.94496

4.1856
6.2784
20.928

28.755072
33.526656
79.94496

24.5904
25.1136
20.601
392.4
183.12

5.232
5.232
3.27
3.27
65.4

24.5904
25.1136
20.601
392.4
183.12

7.11133375

1.25

7.11133375

Mes 04
COSTO

CANT.

Mes 05
COSTO

27.2405805
21.173901
181.7799525

3.96515
3.96515
47.586375

27.2405805
21.173901
181.7799525

133.8375
227.52375
2008.9901
34.79775

2.67675
4.550475
77.26885
2.67675

133.8375
227.52375
2008.9901
34.79775

6.90583275
59.4775

0.75
2.973875

6.90583275
59.4775

2.136
4.584

0.4
1.2

2.136
4.584

0.17
16.625

0.01
0.665

0.17
16.625

0.2016

0.75

0.2016

32.508
27.504
40.5
18.9
3.0006
225
135

2065.872235
103.2936125

1291.176235
64.5588125

689.748
804.204
1917.64
589.85
602.4
494.15625

Mes 04
COSTO
9412.5
4392.5
170.5796

272.5744635
211.870107
1515.760911
1339.2
3423.8875
8472.672
348.192
60.0061635
1785.6

1953.500301
3034.360215
2220.0262
2267.2608
15870.8256
249.393025

78.64776
122.26464
437.3136
103.032
601.02
1459.62
14882.4
186.03
31.9113
228.96
171.72

62.29377
222.831105
1425.62425
93.324

CANT.

Mes 05
COSTO

Mes 04
COSTO
43.965252
48.897528

CANT.

Mes 05
COSTO

15.6
9
144
4.64314
191.988

27.48
21.36
7.64
1109.24
1.6944

27.48
21.36
7.64
134.1
1109.24
1.6944

5.3332
10.6668

28.479288
40.747176

0.2160
0.9936
4.0000

10.8
25.8336
320

225

4.5

225

240

4.8

240

4.3400

29.8158

Mes 04
COSTO

Mes 05
CANT.
COSTO
173.6000
663.152
434.0000
651.0000

868
1302

3.0000

20.789034

0.0868
0.3472

0.596316
1.326304

2,170.0000

542.5

3.0000

0.057678

35.2000

134.464

3.0000

4.03392

2.57155
15.4285

13.732077
58.93687

0.5625

28.125

1.5

2.1800685

Mes 04
COSTO

CANT.

Mes 05
COSTO

1.0000

200

20.0000

200

0.5000
0.5000

25
100

0.5

100

20

200

0.25
0.25
20

12.5
50
140

1.0000

2000

Mes 04
COSTO

212,528.94
858,924.36

Mes 05
CANT.
COSTO
1.0000
1500

71,699.53

REQUERIMIENTO Y CRONOGRANA DE PERSONAL


Obra

CONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIO

Entidad MUNICIPALIDAD DISTRITAL DE PARAS


Lugar

AYACUCHO - CANGALLO DISTRITO DE PARAS

Und.

DESCRIPCION

Und.

Total

1er. MES

2do. MES

3er. MES

4to. MES

5to. MES

Saldo

OBSERVACION

ING SUPERVISOR

MES

2.50

0.5

0.5

0.5

0.5

0.5

Por Contratar

ING RESIDENTE

MES

5.00

Por Contratar

ASISTENTE ADMINISTRATIVO

MES

5.00

Por Contratar

MAESTRO DE OBRA

MES

5.00

Por Contratar

ALMACENERO

MES

5.00

Por Contratar

TOPOGRAFO

HH

44.95

8.99

8.99

8.99

8.99

8.99

Por Contratar

OPERARIO

HH

1,179.11

235.82

235.82

235.82

235.82

235.82

Por Contratar

OFICIAL

HH

2,519.55

377.93

503.91

755.86

503.91

377.93

Por Contratar

PEON

HH

9,139.90

1,370.98

1,827.98

2,741.97

1,827.98

1,370.98

Por Contratar

10

CONTROLADOR OFICIAL

HH

329.47

65.89

65.89

65.89

65.89

65.89

Por Contratar

11

ESPECIALISTA AMBIENTAL

3.00

3.00

Por Contratar

12

CONSULTOR (ING. SANITARIO - AMBIENTAL)

est

1.00

1.00

Por Contratar

REQUERIMIENTO Y CRONOGRANA DE MAQUINARIA


Proyecto: Construiccion Trocha comunidad de hospicio
Entidad : Municipalidad distrital de Paras
Lugar : ayacucho-cangallo distrito de paras
EQUIPOS
Unidad

Cantidad

1er Mes

3er Mes

2do Mes

5to Mes

Recurso

MEZCLADORA CONCRETO TROMPO 8HP 9 P3

hm

115.7990

28.9498

28.9498

4to Mes

28.9498

28.9498

2.00

CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000 gl

hm

86.59

21.65

21.65

21.65

21.65

3.00

PROYECTOR MULTIMEDIA

1.50

4.00

COMPUTADORA ( LAPTOP)

1.50

6.00

COMPRESORA NEUMATICA 87 HP 250-330 PCM

hm

41.35

7.00

RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 ton

hm

106.64

8.00

CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3

hm

29.28

9.00

TRACTOR DE ORUGAS DE 190-240 HP

hm

706.42

10.00

MARTILLO NEUMATICO DE 25 kg

hm

83.82

1.50
1.50
41.35
26.66

26.66

26.66

141.28

141.28

141.28

26.66

29.28
141.28

141.28

83.82

11.00

MOTOSOLDADORA DE 250 A

hm

12.80

12.00

VIBRADOR DE CONCRETO

hm

22.90

5.72

12.80

13.00

ZARANDA DE FIERRO DE CONSTRUCCION FY:4200 KG/CM2

0.54

0.54

14.00

MOTONIVELADORA DE 125 HP

hm

99.48

15.00

PLANCHA COMPACTADORA

hm

30.35

16.00

NIVEL TOPOGRAFICO CON TRIPODE

he

38.95

38.95

17.00

TEODOLITO

hm

39.12

39.12

5.72

5.72

7.59

7.59

5.72

99.48
7.59

7.59

TO Y CRONOGRANA DE MAQUINARIA

Saldo

Obra

: CONSTRUCCIN TROCHA CARROZABLE

Departamento

: AYACUCHO PROVINCAI DE CANGALLO DISTRITO DE PARAS

Periodo

MES 1

Promedio Mano
de Obra x mes:

5.5
Semana

Semana

Dia 1-6
OP

OF

a) N de das tiles
0

Semana

Dia 8-13
PE

OP

OF

b)
N de obreros
c) compensacin
econmica
d)
dedas
MOx=S/.)
= Total
(N de
( b x c )
Montos Totales
por mes

Semana

Dia 15-20
PE

OP

OF

Dia 22-27
PE

OP

OF
6

240

180

120

240

180

120

240

180

120

240

180

360

360

180

120

720

180

360

720

180

4,120.00

Por tanto, la cantidad de mano de obra promedio mensual trabajando en el proyecto es:

Obra

: CONSTRUCCIN TROCHA CARROZABLE

Departamento

: AYACUCHO

Provincia

: DE CANGALLO

Distrito

Periodo

MES 1

Promedio Mano
de Obra x mes:

6
Semana

Semana

Dia 1-6
OP

OF

Dia 8-13
PE

OP

OF

: PARAS

Semana

Dia 15-20
PE

OP

OF

Semana
Dia 22-27

PE

OP

OF

a) N de das tiles
b)
N de obreros
c) compensacin
econmica
d)
dedas
MOx=S/.)
= Total
(N de
( b x c )
Montos Totales
por mes

40

30

20

40

30

20

40

30

20

40

30

60

60

30

20

120

30

60

120

30

610.00

Por tanto, la cantidad de mano de obra promedio mensual trabajando en el proyecto es:

5
9

2
6

15

CRONOGRAMA : USO DEL INSUMO MANO DE OBRA (Dias laborables)

MES 2
6.75
Semana

Semana

Dia 22-27

Dia 29-30
PE

OP

OF

Dia 1-4
PE

OP

OF

2
4

120

80

60

480

240

60

Semana

40

160

160

480

Semana

Dia 6-11
PE

OP

OF

4
4

120

80

240

120

320

480

Semana

Dia 13-18
PE

OP

OF

6
4

Dia 20-25
PE

OP

OF

6
2

180

120

540

240

8
PE

11

240

180

120

240

180

120

480

360

120

480

1,080

1,320

7,100.00

l proyecto es:

CRONOGRAMA : USO DEL INSUMO MANO DE OBRA (Dominical)

MES 2
9.2
Semana

Dia 22-27

Semana

Dia 29-30
PE

OP

OF

Semana

Dia 1-4
PE

OP

OF

Dia 6-11
PE

OP

OF

Semana

Semana

Dia 13-18
PE

OP

OF

Dia 20-25
PE

OP

OF

PE

11

20

40

30

20

40

30

20

40

30

20

40

30

20

80

120

30

80

80

90

40

80

60

20

80

180

220

1,080.00

l proyecto es:

8
10

143

200.2

7
14

22

###

13.35

19

###

20

1200

laborables)

MES 3
5
Semana

Dia 27-30
OP

OF

Dia 1-2
PE

OP

OF

6
1

Semana

Semana

PE

OP

Dia 4-9
PE

OP

OF

10

Semana

Dia 11-16
OF

6
2

11

Semana

Dia 18-23
PE

OP

6
3

12

OF

Dia 25-30
PE

OP

OF

13

240

180

120

240

180

120

240

180

120

240

180

120

240

180

120

240

180

240

360

480

240

360

240

240

180

360

360

360

540

360

360

3,960.00

minical)

MES 3
5.2
Semana

Dia 27-30
OP

OF

Semana

Dia 1-2
PE

OP

OF

10

Dia 4-9
PE

OP

OF

Semana

11

Dia 11-16
PE

OP

OF

Semana

12

Dia 18-23
PE

OP

OF

Semana

13

Dia 25-30
PE

OP

OF

40

30

20

40

30

20

40

30

20

40

30

20

40

30

40

60

40

40

30

60

60

60

90

60

60

660.00

5
2

5
10

14

Promedio General

Semana

13

Dia 25-30

Total
PE

84
3
120
360
15,180.0

Promedio General

Semana

13

Dia 25-30
PE

Total

13
3
20
60
2,350.0

17,530.0

17,431.28

2.2 CALCULO MANO DE OBRA


ITEM

CONCEPTO
1.00 REMUNERACIN BASICA VIGENTE
Establecido por el Gobieno Local mediante norma municipal
2.00 SEGURO DE SALUD (9&RBV)
3.00 SEGURO DE ACCIDENTES (1.58% RBV)
4.00 ONP/AFP (11.5% RBV)
COSTO DIA HOMBRE (DH)
COSTO HORA HOMBRE (HH)
COSTO MES HOMBRE (MH)

ANO DE OBRA
CATEGORIA
OFICIAL

OPERARIO

PEON

45

35

25

4.05

3.15

2.25

0.71

0.55

0.4

5.18
54.94
6.87

4.03
42.73
5.34

2.88
30.53
3.82

1648.20

1281.90

915.90