Professional Documents
Culture Documents
Assumptions :Given high pressure water hose jet power flowrate is 38 m/s
From the layout provided:
Total Area
= 20m x 8m
=160m
Total Area Flowrate; Q = Total Covered Area x No. Hose x Hose Flowrate
= (10m x 1 x 38 m/s)/1000 L/sec
= 0.38 L/sec
Maximum Capacity = 0.38 L/sec x 20%
= 0.456 L/sec
=15 GPM (nearest available sizing)