Innovation in HMR Project by L&T Metro Rail (Hyderabad) Limited
Mr. VB Gadgil, CE & MD, L&T Metro Rail (Hyderabad) Limited
‘onstruction Equipment forms the backbone of any Metro
Project. All Metro Projects are equipment intensive
in comparison to residential projects, which are more
our intensive. Metro Projects are constructed in an urban
pvironment right in the middle of the road. Itis therefore
nperative that we use the right set of equipment to erect the
ructures taking into consideration safety and quality thereby
ausing minimum inconvenience to the general public
In general, the superstructure works of any Metro Project,
re done using precast technology. There are designated yards
here these segments are cast under strict supervision. After
ne segments are cast they are lifted using Gantry Cranes of high
spacity and transported to the erection site using trailers. These
egments are then lfted and placed in position using custom
ult erection tackles (called Launching girders). An alternative
vethod would have been constructing the entire superstructure
sing staging and formwork followed by cast-in-situ
onstruction. This would have caused a great deal of hindrance
» the general traffic and public. Further, this would require
uge quantity of structural steel for staging works and additional
sorkmen would be required for cast-in-situ construction.
novation in Hyderabad Metro Rail Project
HMRP)
Hyderabad Metro Rail Project is 72 km elevated Metro
roject including 64 stations and 3 depots criss-crossing through
ve heart of the city. Since the project is an elevated one, we
ave ensured that the inconvenience to the general public is
tnimized. We have adopted the concept of Pre-cast Pre
ressed Technology in this project. We have been provided land
n temporary basis in Uppal and Qutubullapur by Hyderabad
letro Rail Limited (PSE) wherein we have established our
re-cast Yards for both the Viaduct as well as Stations. It's the
argest Pre-Cast Yard in nia,
‘The Pre-cast segments are cast in these Yards and then
ansported to the site and erected at place using erection
ickles called Launching Girders (LGs). Since the traffic is peak
sting day time, we transport these segments only during night
2. between 11 pm and 6 am.
‘The LGs are designed considering the sharp curves across
le city. We have introduced a hinge box also in the LGs so as
to negotiate through these curves. We have also introduced
Under slung LGs to take care of erection of Station viaduct
construction activity. We are taking utmost care by testing the
LGs 25% more than the allowed Maximum load. All the Safety
and Quality checklist is verified before transporting the LGs to
the designated Viaduct location.
‘Another unique thing we have adopted is for Station
Construction. Station construction, in almost all Metros, is being
constructed by cast-in-situ method. This has caused a lot of
inconvenience to the general public. The method of construction
is generally slow due to sequencing of operations.
In HMRP, we have introduced the concept of Spine and
Wing for Concourse level of the stations. This is the first time
this concept has been adopted in india. The station box rests
(on a row of single piers (10 nos.) and is of balanced cantilever
type. The segments which are cast at the Pre-cast yards are
transported and erected using custom-built Launching girders.
‘The segments are then pre-stressed/ post tensioned in both
directions thus making the whole box act as a single system. The
very concept of this system has eliminated the construction of
‘Major Equipment Deployed In The Project
Ea
Batching Plant - 60 cim/hr 4
Batching Plant - 30 cum/hr 2
Transit Mixers 68
Boom placer 13
75 T Gantry Cranes 16
50T Gantry Cranes 2
207 Gantry Cranes 2
10 T Gantry Cranes 13
Cranes- 150/200 T cap 4
Cranes- 75/40/20 T cap 58
Piling Rigs 9
Power Generators 142
RMS units 2
‘Stone Crushers 2
Wheel loaders 9
Rail Cum Road (RRV) 2
Flash Butt Welding 1
Launching Girders 30
Track Masteradditional columns at station locations which would have caused
great inconvenience to public.
The pre-cast/pre-stressed technology adopted in this
Project has helped in reduction the total construction time,
thereby reducing the overall cost and also ensuring strict
adherence to quality and safety standards.
Erection Works for Station Elements- Spine and Wing
Other Important Technicol Features:
1. The trains will be using Regenerative Electric Braking thereby
converting the momentum into electrical energy and feeding
back to power supply system while braking, As a contribution
towards the CDM this will reduce the energy requirement
from the gr.
2. The advanced signalling & Train Control technology,
‘Communication Based Train Control (CBTC), is adopted for
Hyderabad Metro to control the trains. Hyderabad Metro would
be firstin India to claim train control by CBTC technology.
3. Hyderabad Metro Rail Project is using “Track Master’ - A
Unique instrument for checking the parameters of Track and to
enhance the quality of track installation. This has been procured
from M/s. Trimble USA. This instrument is being used in India
for the second time after Chennai; L&T is the first to introduce
this technology in india, both in Chennai & Hyderabad,
4, Simulation Study is based on Track Design. This type of
designing the Track is being adopted for the first time in
the Country. In this process, prior to the Track design, the.
probable speed of train in a particular stretch is determined
by carrying out a simulation study. Based on this data the
Track is accordingly designed only for that particular speed
in that particular stretch. This avoids designing the Track for
much higher speeds than required.
This process has the following advantages:
1. Better ride comfort to the passengers.
|. Reduces the Rail and Wheel wear.
Il Reduces loading on the Viaduct and
IV. Increases the productivity in Track installation.
The innovative concepts adopted in HNRP ensured speedy
construction and no inconvenience to the general public.