Professional Documents
Culture Documents
OGN Group
OGN Group
Safety Slide
Organisation
Shareholders
Operational companies
Support companies
77
Management Organisation
Dennis Clark
David Edwards
Chairman
Craig Melville
Graham Kennedy
Facilities
10
Facilities
11
Facilities
12
13
14
Capability
15
16
Offshore modules
Accommodation, Drilling, Process, Utility
17
18
19
ISO 14001:2004
OHSAS 18001:2007
ISO 9001:2008
02.11.11 OGN Group Share Fair Presentation, by Russell Harper
20
Projects
21
22
Topsides: 5575 tonne Topsides with full oil and gas processing, gas
compression, gas dehydration, MOL pumps, sandwash facilities,
produced water treatment, CFU polishing unit, chemical injection, power
generation, 50 man lifeboat, Local Equipment Room, HV/LV SWB & UPS,
HVAC Plant Room and Platform Crane.
Jacket: 5900 tonne 4 legged jacket with 12 skirt piles. 18 well slots
configured to allow a Jack-Up Rig access from the west side.
Incorporates two risers and two umbilical j-tubes for future subsea tiebacks. Initially supporting the 5575 tonne Topsides but also designed for
future 2000 tonne Mobile Drilling Unit.
Bridge: 100 metre long 450 tonne Bridge linking the new platform to the
existing Forties Alpha facilities. All interconnecting pipework and power
& controls cabling installed onshore to minimise the offshore hook-up.
Sliding end of bridge located at FASP end.
23
24
25
26
27
28
29
30
31
32
33
34
Supply Chain
35
36
37
38
39
40
Contact Us
www.ogn-group.com
info@ogn-group.com
russell.harper@ogn-group.com
craig.melville@ogn-group.com
41