Location Parking 5 3.0 Parking 4 3.0 Parking 3 3.0 Parking 2 3.0 Parking 1 4.0 4" 6" 4" 6" 4" 6" 4" 6" 4" 6"
Location Parking 5 3.0 Parking 4 3.0 Parking 3 3.0 Parking 2 3.0 Parking 1 4.0 4" 6" 4" 6" 4" 6" 4" 6" 4" 6"
SHERIDAN TOWERS
LOCATION
AIR WELLS
STAIR WELLS
EE ROOM
STORAGE ROOM
STP BLOWER ROOM
ELEVATOR
MAIL ROOM
CONVENIENCE STORE
LOCKER ROOM
TEL ROOM
CCTV ROOM
WATER STATION
PMO OFFICE
LAUNDRY ROOM
WET GARBAGE ROOM
DRY GARBAGE ROOM
PUMP ROOM
PARKING 5
4"
117.3
3.0
6"
67.6
15.6
36.0
37.8
32.4
PARKING 4
4"
117.3
37.8
32.4
12.0
3.0
6"
67.6
15.6
36.0
PARKING 3
4"
117.3
37.8
32.4
3.0
6"
67.6
15.6
36.0
PARKING 2
4"
117.3
37.8
32.4
67.5
12.0
12.0
3.0
6"
67.6
15.6
36.0
PARKING 1
4"
244.6
51.8
43.8
12.0
31.7
5.6
22.8
187.5
131.2
1,150
1,489
sqm
sqm
4" CHB =
6" CHB =
Mortar Mix Required =
Cement =
Fine Aggregates (S1) =
14,811
19,165
559
559
63
pcs
pcs
187.5
131.2
187.5
sqm
Cement =
Fine Aggregates (white sand) =
1,957
163
bags
cu.m.
Length + Sides =
Total 1"x4'x8' Styro=
Backer Rod =
Polyurethane Sealant =
Ordinary Black Pipes =
1,348
50
472
472
672.4
152.6
lm
pcs
pcs
tubes
lm (1" Ordinary Pipe)
lm (1-1/2" Ordinary Pipe)
198.7
187.5
131.2
400.3
4.0
6"
90.1
20.8
48.0
16.0
61.4
80.6
63.9
50.4
56.2
27.9
157.4
43.0
71.2
56.9
52.6
896.2
1:3 plastering
1:4 mortar
1,150.4
299.57813
1,488.6
258.433
558.0111
2,639.0
5277.908
DMCI HOMES
SHERIDAN TOWERS
LOCATION
AIR WELLS
STAIR WELLS
EE ROOM
STORAGE ROOM
STP BLOWER ROOM
ELEVATOR
MAIL ROOM
CONVENIENCE STORE
LOCKER ROOM
TEL ROOM
CCTV ROOM
WATER STATION
PMO OFFICE
LAUNDRY ROOM
WET GARBAGE ROOM
DRY GARBAGE ROOM
PUMP ROOM
PARKING 5
4"
117.3
3.0
6"
67.6
15.6
36.0
42.0
34.2
PARKING 4
4"
117.3
42.0
34.2
12.0
193.5
131.2
1,199
1,560
sqm
sqm
4" CHB =
6" CHB =
Mortar Mix Required =
Cement =
Fine Aggregates (S1) =
15,435
20,080
583
583
66
pcs
pcs
12.0
193.5
131.2
sqm
Cement =
Fine Aggregates (white sand) =
2,046
170
bags
cu.m.
Length + Sides =
Styro 6" =
Styro 4" =
Backer Rod =
Polyurethane Sealant =
Black Pipes =
1,347
lm
471
471
3.0
6"
67.6
15.6
36.0
pcs
tubes
PARKING 3
4"
117.3
42.0
34.2
3.0
6"
67.6
15.6
36.0
PARKING 2
4"
117.3
42.0
34.2
67.5
12.0
3.0
6"
67.6
15.6
36.0
PARKING 1
4"
244.6
56.0
45.6
12.0
31.7
5.6
41.3
193.5
198.7
193.5
131.2
424.7
4.0
6"
90.1
20.8
48.0
16.0
61.4
112.0
67.1
55.4
61.6
31.0
163.1
51.7
74.0
58.8
56.4
967.3
1:4 mortar
1:3 plastering
1:4 mortar
1,198.9
1,559.6
312.20313 270.7715
582.9747
2,758.5
5517.008
DMCI HOMES
SHERIDAN TOWERS
FLOOR TYPE
WITH SKY PATIO/ATRIUM
WITH OPENINGS
WITHOUT OPENINGS
PENTHOUSE
CHB LAYING
4"
6"
499.00
964.26
435.00
828.94
461.00
864.88
606.29
1,203.16
PLASTERING
4"
998.00
870.00
922.00
1,212.58
MORTAR
4,930.80
11,183.99
6,253.19
TOTAL PLASTERING
37,868.58
72,036.73
CEMENT
4"
6"
109,905.31
39,566
PLASTERING
6"
1,928.52
1,657.88
1,729.76
2,406.33
NO. OF FLOORS
8
16
16
1
CEMENT
S1 (1:4 RATIO)
11,184
1,267
WHITE SAND
32,972