Application of Blast Based M2L Model in Barrick Zaldivar
Application of Blast Based M2L Model in Barrick Zaldivar
in Barrick Zaldivar
Carlos Muoz, Jair Alarcn, Felipe Contreras, Daniel Toro
BBS & Technology Management, Orica Mining Services-LatinAmerica
Richard Palape, Javier Estay
Mine Superintendence, Barrick Zaldivar
Projects Development
M2L-2da etapa
M2L Project
KPI SERVICES
M2L-1ra etapa
M2L
(43)
M2L
(>64)
Baseline M2L
CMZ & OMS (>6)
2007
2008
2009
2010
2011
2012
4)
Objectives
Value creation in mine to plant proccesses from drill and blast improvement.
The focus;
1 Crusher
Shovel performance
Dumpleach recovery
Wall Control
VOD
00
24
VOD
00
23000
10900000
2212
0
765
1118
40000000000
11213098
0
700
23
0
2200 0
2100
2000
1900
1800
1700
1600
1500
1400
1300
1200
1100
1000
900
800
Vp
SD
SD==1.17
1.17
60
5000
400
600
500
300
200
100
80
60
40
20
0
1
10
100
Tamao (mm)
Habitual
ptima
1000
50
1.800
45
1.600
40
1.400
35
1.200
30
1.000
25
800
20
600
15
400
10
200
2.000
mes 0
mes 1
mes 2
mes 3
mes 4
mes 5
mes 6
mes 7
mes 8
mes 9
mes 10
mes 11
mes 12
mes 13
mes 14
mes 15
mes 16
mes 17
mes 18
mes 19
mes 20
mes 21
mes 22
mes 23
mes 24
mes 25
mes 26
mes 27
mes 28
mes 29
mes 30
mes 31
mes 32
mes 33
mes 34
mes 35
mes 36
Metallurgical test
3)
Objectives
P80 3
Shovel performance 3,750-3,850 (ton/h)
(current 3,650 ton/h)
1 Crusher performance 3200 TPHef
(current 3,000 ton/h)
Increase Dumpleach recovery
ALT LPlazo
CLO
BT
SIL
B3095 M42
3%
30%
67%
Dureza
Blanda
Semi dura
Blanda
Long term
Geology
C. Uniaxial(Mpa)
0-25
25-75
0-25
Drill data
Design &
modelling
D&B design
methods
Short term
Geology
Geotechnics data
apply to D&B
BLOQUES CPlazo
Alta Ley (A)
Dump Leach (DL)
B3095 M42
43%
57%
Fragmentation
Results &
Benefits
Vibration &
KPIStability
1 crusher
performance
Dumpleach
Shovel
performance
Demoblast results
Demoblast results
Demoblast results
Dump Leach (Kelsall)
Projected benefits