o ee
i E+ -i
Gr semram
= Ht
, =
+ For Pipeline which shall carry li
‘to vent out of the line when the I
we have to make sure that all airis allowed
filled with liquid
To achieve this a VENT connection with Valve is providedat the top most point
ofthe pipeline.
* Alsoarrangementis kept in the ‘VENT WITH VLAVE sf
pipelines et igen be 5
Stone ence geerrrcorninemne_-
To achive hina DRAIN 7)
SaecctonntsVavels provided a oe ||
at the lowest pointof the pipeline
+ Pipes are also slopped towards low
P
points. Ug
| AE