Product X is made of two units of Y and three of Z. Y is made of one unit of A and two units
of B. Z is made of two units of A and four units of C.
Lead time for X is one week; Y, two weeks; Z, three weeks; A, two weeks; B, one week; and
C, three weeks. Current on-hand inventories of 19 X, 39 Y, 29 Z, 47 A, 102 B, and 750 C.
If 85 units of X are needed in week 10, develop a material resource planning schedule
showing when each item should be ordered and in what quantity.
To calculate the quantity of each item, to receive 85 units of X at the 10th week, prepare the MRP
schedule as shown below with formulas for the provided conditions:
Item A
Gross requirements
Scheduled receipts
Projected available
balance
Net requirements
Planned order receipts
Planned order releases
Gross requirements
Scheduled receipts
Projected available
balance
Net requirements
Planned order receipts
Planned order releases
Gross requirements
Scheduled receipts
Projected available
balance
Net requirements
Planned order receipts
Planned order releases
Gross requirements
OH = 47
Scheduled receipts
10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
85
0
19
19
19
19
19
19
19
19
19
19
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
66
132
0
66
66
0
0
0
39
39
39
39
39
39
39
39
39
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
93
0
0
0
0
0
0
0
93
93
0
198
0
0
0
0
0
0
29
29
29
29
29
29
29
29
29
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
169
338
0
0
0
93
0
0
0
0
169
169
0
0
0
0
0
0
47
47
47
47
47
47
0
0
0
0
0
0
0
0
0
0
291
291
93
93
0
0
0
0
0
0
291
93
Item B
Gross requirements
OH = 102 Scheduled receipts
Projected available
LT = 1
balance
SS = 0
Net requirements
Q = L4L
Planned order receipts
Planned order releases
Item C
Gross requirements
OH = 750 Scheduled receipts
Projected available
LT = 3
balance
SS = 0
Net requirements
Q = L4L
Planned order receipts
Planned order releases
0
0
0
0
0
0
0
0
0
0
0
0
186
0
0
0
0
0
0
0
102
102
102
102
102
102
102
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
84
676
0
84
84
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
750
750
750
750
750
750
(74)
(74)
(74)
(74)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
(74)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LT = 1
SS = 0
Q = L4L
Item Y
OH = 39
LT = 2
SS = 0
Q = L4L
Item Z
OH = 29
LT = 3
SS = 0
Q = L4L
LT = 2
SS = 0
Q = L4L
Projected available
balance
Net requirements
Planned order receipts