D.2. EXTENSION OF 1 KM. OF LT 3 PHASE 4 WIRE LINE AT 60 M SPAN ON 7.

5M RCC POLES,
WITH 7/2.59 MM ACSR FOR PHASEAND NEUTRAL ,140KG W.L. & 75 KG/Sq.M W.P.
Quantity

Description

Rate

Per

Amount

2,401

43218

18

7.5 M RCC pole

18

Base Plates

91

1638

21

Back Clamps

73

1533

21

LT 3 phase cross arms (Angle)

592

12432

54

LT pin insulator with pin (11+32)

43

2322

Earthing device

1682

6728

21

Aluminium knobs

21

Set

441

18

LT shackle with hardware (10+33)

43

774

Stay set complete

866

Set

5196

Guy insulators

13

Set

78

21,480

87638

4.08

7/2.59 mm ACSR

Concreting

783

Loc

1566

Earthing (Coil)

910

Loc

3640

Cost of materials
Contingencies 1%
Labour as per Statement A (II)
Transport as per Statement B (3321+942)
Estt. & Supervision charges 15%
Total
Or Say Rs.

167204
1672
168876
19460
4263
192599
28890
221489