You are on page 1of 3

c

c
s
s
v
m
l
l
n
p
a
p
o
p
p
a
o
.c
.c
c
c
s
l
m n
v
l
m
v
n
p
p
o
o
p
a
.c
c
s
c
s
l
v
m
m
l
n
a
p
p
o
.
p
a
p
.c
o
c
c
s
n
l
m
v
l
n
v
m
p
o
p
o
a
a
.
s
c
c
s
c
m
l
v
m n
n
a
p
.c
p
o
a
p
p
.c
c
s
s
m n
v
l
n
l
v
p
o
p
p
o
a
a
.c
s
c
s
c
m
v
l
m
v
n
n
a
p
.c
p
o
p
.c
p
c
c
s
s
n
l
v
l
v
p
o
p m
p
o
a
.c
a
.
s
c
c
c
v
m
l
m
v
n
n
o
p
a
.
p
o
p
.c
c
c
c
s
s
l
v
m n
l
p
p
o
p
p
o
a
.
a
.c
c
c
s
l
v
m
l
m
v
n
n
a
o
a
.c p
p
o
p
c
c
s
s
m
l
m n
v
l
p
p
o
p
p
a
.c
a
.c
s
c
l
v
m
v
l
n
n
a
o
a
p
p
.c
p
o
c
c
s
s
m n
l
m n
v
p
p
o
p
p
a
.c
.c
s
s
c
l
v
m
l
v
n
n
a
.c
p
o
a
p
o
.
p
c
c
c
s
s
v
m n
m n
l
v
p
p
o
p
a
.c
.c
s
c
s
c
l
v
m
l
n
p
a
.c
p
a
o
.c
p
p
o
c
c
s
l
v
m n
n
v
l
m
o
p
p
o
p
a
.c
c
s
s
c
m
l
m
v
l
n
a
.c p
p
a
o
p
.c
p
o
c
s
l
v
m n
l
v
o
m n
p
p
o
a
a
.
s
c
s
c
c
m
v
l
m
n

Arched GreenHouse

Material List:

Page 1 of 3

All Pipe is 1" Sch 40 PVC

(unless otherwise specified)

ASSEMBLE BASE FRAME:

Description

(Do Not Glue any Parts)


1. Slide 3 Slip T's (J) onto 148.5" Pipes (B)
and 2 Slip T's (J) onto 135" Pipes (A)
(Space as Noted on Drawing)
2. Connect Pipes at Corners with 3-Way's (K)
3. Drive 5 Stakes (M) into the Ground on
Each Long Side the Base.
Leave 2" of Stake Above Ground to Secure Base

A
2
138" Pipe
B
2
148-1/2" Pipe
C
5
228" Pipe
D
4
36" Pipe
E
4
72" Pipe
F
10
27" Pipe
G
2
67" Pipe
H
10
4" Pipe (1-1/4" Sch 40 PVC)
I 100-130 1-1/4" Snap Clamps 4" (Circo Item #13)
J
30
1" Slip-T's (Circo Item #63)
K
4
1" 3-way Connector (Circo Item #33)
L
8
1" 90 deg. Elbow
M
10
12+" Ground Stake (Wood or Metal)
P
1
20'x13'-4" Top Cover (Plastic,Netting or Shade)
S
2
12-1/2'x7' End Cover
T
1
78"x38" Door Cover
U
1
38"x38" Window Cover
W 100-130 Self Tapping Screws (3/4" Long)
Z
PVC Glue

27"

.c

Item Qty

(Do Not Glue any Parts)


1. Slide 2 Slip T's (J) onto Middle Arches
228" Pipes (C)
and 3 Slip T's (J) onto End Arches
228" Pipes (C)
(Space as noted on Drawing)
2. Assemble Arches To Base as Shown
3. Attach 36" Pipes (D) Between Arches,
Centered on Top as Shown to
Connect Arches Together.

Centered

INSTALL ARCHES:

36"
Spacing

.c

27"

Plans prepared by:

Dean Hunt/JC Designs

hunt4jc@ncws.com

December 2002

c
c
s
s
v
m
l
l
n
p
a
p
o
p
p
a
o
.c
.c
c
c
s
l
m n
v
l
m
v
n
p
p
o
o
p
a
.c
c
s
c
s
l
v
m
m
l
n
a
p
p
o
.
p
a
p
.c
o
c
c
s
n
l
m
v
l
n
v
m
p
o
p
o
a
a
.
s
c
c
s
c
m
l
v
m n
n
a
p
.c
p
o
a
p
p
.c
c
s
s
m n
v
l
n
l
v
p
o
p
p
o
a
a
.c
s
c
s
c
m
v
l
m
v
n
n
a
p
.c
p
o
p
.c
p
c
c
s
s
n
l
v
l
v
p
o
p m
p
o
a
.c
a
.
s
c
c
c
v
m
l
m
v
n
n
o
p
a
.
p
o
p
.c
c
c
c
s
s
l
v
m n
l
p
p
o
p
p
o
a
.
a
.c
c
c
s
l
v
m
l
m
v
n
n
a
o
a
.c p
p
o
p
c
c
s
s
m
l
m n
v
l
p
p
o
p
p
a
.c
a
.c
s
c
l
v
m
v
l
n
n
a
o
a
p
p
.c
p
o
c
c
s
s
m n
l
m n
v
p
p
o
p
p
a
.c
.c
s
s
c
l
v
m
l
v
n
n
a
.c
p
o
a
p
o
.
p
c
c
c
s
s
v
m n
m n
l
v
p
p
o
p
a
.c
.c
s
c
s
c
l
v
m
l
n
p
a
.c
p
a
o
.c
p
p
o
c
c
s
l
v
m n
n
v
l
m
o
p
p
o
p
a
.c
c
s
s
c
m
l
m
v
l
n
a
.c p
p
a
o
p
.c
p
o
c
s
l
v
m n
l
v
o
m n
p
p
o
a
a
.
s
c
s
c
c
m
v
l
m
n

Arched GreenHouse
Page 2 of 3

Hinge

ASSEMBLE DOOR & DOOR FRAME:

Fig. 1

1. Glue 2 Pieces of 1-1/4" PVC x 4" (H) Together


To Create Hinges as Shown. Make 4 Hinges.
2. Glue 1 Piece 1-1/4" x 4" (H) to 1 SnapClamp (I)
To Create Latches as Shown. Make 2 Latches
3. Slide a Slip-T (J) onto each Door Frame Side (E)
Locate 4" Down from Top.
4. Slide Hinges and Latch onto Door Frame Sides
Positioned as Shown in Fig. 3
5. Connect the Two Door Frames with 27" Pipe (F)
Assemble into Slip-T's on Arch and Base on
Front of GreenHouse.
6. Slide Door Side Pipe (G) Through Hinges on
Door Frame and Then Assemble Door as Shown
in Fig 1. with Middle Support Pipe (F) Located in
the Center of the Door. Adjust Latch as Needed.
7. Slide Hinges to Farthest Positions Up & Down
to Hold Door in Position Securely.

Fig. 3

Fig. 2

.c

Latch

Fig. 4

Latch

Hinge

Latch

Hinge

ASSEMBLE WINDOW & WINDOW FRAME:

1. Slide 2 Slip-T's (J) onto Window Frame Sides (E)


Locate 4" Down from Top and 27" Apart.
2. Slide Latch onto 27" Window Frame Top (F) and
2 Hinges onto 27" Window Frame Bottom (F)
Connect Top and Bottom Window Frame to Side
Window Frames and Assemble into Slip-T's on
Arch and Base on Back of GreenHouse.
3. Slide Window Bottom Pipe (F) Through Hinges on
Window Frame and Then Assemble Window as
Shown in Fig 4. Adjust Latch as Needed.
4. Slide Hinges to Farthes Positions Side to Side
To Hold Window in Position Securely.

.c

Plans prepared by:

Dean Hunt/JC Designs

hunt4jc@ncws.com

December 2002

c
c
s
s
v
m
l
l
n
p
a
p
o
p
p
a
o
.c
.c
c
c
s
l
m n
v
l
m
v
n
p
p
o
o
p
a
.c
c
s
c
s
l
v
m
m
l
n
a
p
p
o
.
p
a
p
.c
o
c
c
s
n
l
m
v
l
n
v
m
p
o
p
o
a
a
.
s
c
c
s
c
m
l
v
m n
n
a
p
.c
p
o
a
p
p
.c
c
s
s
m n
v
l
n
l
v
p
o
p
p
o
a
a
.c
s
c
s
c
m
v
l
m
v
n
n
a
p
.c
p
o
p
.c
p
c
c
s
s
n
l
v
l
v
p
o
p m
p
o
a
.c
a
.
s
c
c
c
v
m
l
m
v
n
n
o
p
a
.
p
o
p
.c
c
c
c
s
s
l
v
m n
l
p
p
o
p
p
o
a
.
a
.c
c
c
s
l
v
m
l
m
v
n
n
a
o
a
.c p
p
o
p
c
c
s
s
m
l
m n
v
l
p
p
o
p
p
a
.c
a
.c
s
c
l
v
m
v
l
n
n
a
o
a
p
p
.c
p
o
c
c
s
s
m n
l
m n
v
p
p
o
p
p
a
.c
.c
s
s
c
l
v
m
l
v
n
n
a
.c
p
o
a
p
o
.
p
c
c
c
s
s
v
m n
m n
l
v
p
p
o
p
a
.c
.c
s
c
s
c
l
v
m
l
n
p
a
.c
p
a
o
.c
p
p
o
c
c
s
l
v
m n
n
v
l
m
o
p
p
o
p
a
.c
c
s
s
c
m
l
m
v
l
n
a
.c p
p
a
o
p
.c
p
o
c
s
l
v
m n
l
v
o
m n
p
p
o
a
a
.
s
c
s
c
c
m
v
l
m
n

Arched GreenHouse

COVER AND SECURE THE ARCHED GREEN HOUSE:

1. Cover the Door with Covering (T) Use SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Door.
2. Cover the Window with Covering (U) Use SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Window.
3. Cover the Top with Covering (P) Using SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Top.
4. Cover the Ends with Covering (S) Using SnapClamps (I) Spaced 8 - 10" apart to Secure the Covering to the Ends.
5. Glue Fittings as Needed.
6. Screw Self Tapping Screw (W) into any Clamps, Hinges, or Latches as Needed.
7. Secure Green House to Gound with Stakes, Sandbags or Blocks.
8. Trim Excess Coverings.
These Plans are Free and Therfore we do not Warrent or Garauntee the Structure Built from Them.

.c

.c

Page 3 of 3

Plans prepared by:

Dean Hunt/JC Designs

hunt4jc@ncws.com

December 2002

You might also like