You are on page 1of 3

POFD SUBANG

NILAI PEKERJAAN ( Rp)


Biaya
Biaya
Biaya
Biaya
Biaya
Biaya
Biaya

1,722,181,400

Umum
Pemeliharaan
Daya&Jasa
Pembinaan Bidang
Barang
Perjalanan
Pegawai

20.00%
2.50%
3.50%
10.00%
3.00%
6.00%

Nilai yang bisa diambil


a. Biaya Barang
b. Biaya Pegawai

344,436,280
43,054,535
60,276,349
172,218,140
51,665,442
103,330,884
947,199,770

39,007,409
757,759,816
796,767,225
38,000,000
50,000,000
15,000,000

Operasional (sdh terpakai u/Bali,Jogja,Cirebon)


Operasional yad
Pak Usman
Software ke PVT (Pak Romli)
Kelompok EF
SISA (yg bisa di share)

10%
5%

39,838,361
653,928,863

Bobot
1
2
3
4
5
6
7
8
9

Team Lead
Petrophysic
Engineering
Geology
Geofisik
Modeling
HSE
Surface Facility&Keekonomian
Administrasi
Total

10%
13%
16%
15%
10%
14%
6%
10%
6%

65,392,886
85,010,752
104,628,618
98,089,330
65,392,886
91,550,041
39,235,732
65,392,886
39,235,732

100%

653,928,863

STUDY LANGGAK
Bobot
5%
8%
10%
26%
13%
14%
24%
Engg&Res. Simulation
STUDY SUNGAI LILIN
Bobot
10%
Team Leader
9%
Geologist
5%
Geophysicist
13%
Petrophysicist
14%
Geology Modelling
25%
Reservoir Engineer
14%
Res. Simulation
Administrasi
8%
STUDY JAMBI MERANG
Bobot
Team leader
8
Petrofisika
14
Geofisika
15
Geologi
15
Pemodelan Geologi
18
Engineering
15
Simulasi Reservoir
15
STUDY ODIRA
Bobot
Team Lead
7%
Petrophysic
18%
Engineering
26%
Geology&Geofisik
28%
Modeling
15%
Administrasi
6%
EF
Team Leader
Nara Sumber
G&G
Petrophysic
Modelling

Edy
Heru
Priyo, Dede
Agus, Widyo
Sigit
BAW,Sugeng,Pamuji???
Azis, Danang
Pamuji

1
2
3
4
5
6

You might also like