The following are the lists, which was handed over to Mr. N.

Kalita, Senior Support Engineer,


Dibrugarh and work required explained1. Daily Progress Report upto June 2015 format copy.(To report upto date work done)
Work in progress from Ch.200-Ch.2500, Ch.4600-Ch.5300, Ch.7900-Ch.8100
and Ch.8400-Ch.8530. Actual work carried out during the day to be given.
Item wise cumulative progress up to June 2015 (copy along with attached).
2. Monthly Progress Report upto June 2015.
BOQ Item wise cumulative progress up to June 2015 (copy along with attached).
For sending all monthly progress report similarity.
3. Physical Progress Bar Chart upto June 2015.
Chainage wise progress up to June 2015 (copy along with attached).
Bar Chart Table (copy along with attached).These charts shows progress of
individual works.
4. Mid-Term Report June 2015
Only Physical progress with item wise upto June 2015 (copy along with
attached). This shows how gist of physical progress is reported.
Revised estimated quantity included (copy along with attached).This shows that
estimated approved quantity is to be verified at site.
5. Photograph of important site work to be sent by Whats app to FREMAA address every
day.
6. Information about any important position of work will have to be urgently reported by E
mail / SMS to PMC. In case it is very important the massage is to be copied to EO(T),
FREMAA (Contact list of PMC and FREMAA officers attached).
7. As advised of Mr.Chattopadhya, Senior Support Engineer, PMC a copy of MOM of
discussion in June 2015 was attached a hard copy. Many requirements of work and
reporting, monitoring at site are recorded there.
8. Also a copy of BID document of DTP Dyke Dibrugarh for helping to follow Technical
specification at site work was handed over to refer to the document for supervising all
works. The site engineer needs to make any question on any issue from PMC (Mr.
Chottopadhaya and Mr. Kakati) at any time. In addition, whenever PMC experts visit
Dibrugarh, the Site Engineer can get all clarification or advice on works. He can also
contact over E mail / Phone to properly discharge his duties, which were explained to
him during discussion on 29th September 2015 at PMC, Guwahati office (Discussion Mr.
Chattopadhya, Senior Support Engineer, PMC and Mr. Kakati , Senior Support Engineer,
PMC)