tell me about go live/cutovers "stop all the loads into the system.

Perform any manual activities like creating table entries etc


Transport all objects
After transports, validate whether all the objects have been moved successfully
Do any manual loadings into the system/ Any data initializations etc
After complete setup of the production system, resume all data loadings."
ASAP methodology
"ASAP methodology include following steps.
1. Project preparation
This phase defines the project objectives and scope, number of resources require
d for the project and training for the resources.
2. Blue print
This phase defines architecture view of a system and all functional requirements
defined to run the project.
3. Realization
This phase all the functional requirements are developed and all the functionali
ty are tested.
4. Final preparation
This phase user acceptance test is performed and system is set for go live.
5. Go live
This phase all the objects are moved to production system and perform all cut ov
er activities
6. Support
This phase, any bugs in the system are identified and fine-tuning the applicatio
n standards.
"
good ABAP program standards and qurey building standards
"Name convention
"
what is ADSO
ADSO consoldates DSO and infocube.
what are the docments in projects
"While gathering business requirement do
cuments
functional requirement document is created.
After the Blue print, architecture view of a document is defined
technical document is created.
"