34 das

lun 06/04/15

dom 10/05/15

lun 20/04/15
lun 20/04/15
lun 23/03/15
lun 23/03/15
lun 23/03/15
lun 20/04/15
lun 20/04/15
lun 20/04/15
lun 20/04/15
dom 03/05/15
mi 22/04/15
mi 22/04/15
jue 23/04/15
jue 23/04/15
lun 20/04/15
lun 20/04/15
sb 25/04/15
sb 25/04/15
vie 01/05/15
vie 01/05/15
lun 20/04/15
lun 20/04/15
sb 25/04/15
jue 30/04/15
vie 01/05/15
dom 26/04/15
lun 04/05/15
lun 27/04/15
lun 27/04/15
dom 26/04/15
mar 28/04/15
mi 29/04/15
mi 29/04/15
jue 30/04/15
vie 01/05/15
sb 02/05/15
lun 06/04/15
lun 06/04/15
lun 06/04/15
lun 20/04/15
mi 08/04/15
mi 08/04/15
lun 13/04/15
lun 13/04/15

jue 07/05/15
jue 07/05/15
mi 25/03/15
mi 25/03/15
dom 12/04/15
mi 22/04/15
dom 10/05/15
lun 27/04/15
mi 22/04/15
mar 05/05/15
sb 25/04/15
sb 25/04/15
mar 28/04/15
mar 28/04/15
sb 25/04/15
sb 25/04/15
vie 01/05/15
vie 01/05/15
dom 03/05/15
dom 03/05/15
lun 04/05/15
mi 22/04/15
jue 30/04/15
vie 01/05/15
lun 04/05/15
mi 06/05/15
mi 06/05/15
mar 28/04/15
mar 28/04/15
mar 28/04/15
jue 30/04/15
dom 03/05/15
jue 30/04/15
vie 01/05/15
sb 02/05/15
dom 03/05/15
jue 30/04/15
mi 22/04/15
mi 08/04/15
mi 22/04/15
vie 10/04/15
vie 10/04/15
dom 19/04/15
jue 16/04/15

jue 16/04/15

sb 18/04/15

sb 18/04/15
jue 16/04/15
jue 16/04/15
jue 16/04/15
jue 16/04/15
mi 15/04/15
sb 18/04/15
mi 15/04/15
dom 19/04/15
dom 19/04/15
mi 08/04/15
mi 08/04/15
lun 13/04/15
jue 23/04/15
lun 13/04/15
mar 14/04/15
lun 13/04/15
vie 17/04/15
mar 21/04/15

dom 19/04/15
dom 19/04/15
dom 19/04/15
dom 19/04/15
dom 19/04/15
mi 22/04/15
mi 22/04/15
dom 19/04/15
lun 20/04/15
lun 20/04/15
vie 24/04/15
lun 13/04/15
mi 15/04/15
vie 24/04/15
jue 23/04/15
sb 18/04/15
jue 16/04/15
mi 22/04/15
jue 23/04/15

mi 22/04/15

jue 23/04/15

D
1

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

PROYECTO: CONSTRUCCION DE LA RED MATRIZ DE ALCANTARILLADO Y


EMPALME DE AGUA POTABLE A RED EXISTENTE PARA EL SECTOR SAN MARTIN
PREDIO PARCELA N21, DISTRITO PISCO, PROVINCIA PISCO

SISTEMA DE AGUA POTABLE


17 das
OBRAS PROVISIONALES
17 das
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
2 das
MOVILIZACION Y DESMOVIL. DE MAQUINARIAS Y EQUIPOS A LA OBRA
2 das
GUARDIAN PARA LA OBRA
20 das
SEALIZACION Y MANTENIMIENTO DE TRANSITO Y PEATONAL
2 das
CERCO DE MALLA HDP DE 1,00 M. ALTURA P/ LIMITE DE SEGURIDAD
20 das
TRABAJOS PRELIMINARES
7.38 das
TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO DE OBRA
2 das
TRAZOS Y REPLANTEOS FINALES DEL PROYECTO
2 das
MOVIMIENTO DE TIERRAS
3 das
EXCAVACION C/EQUIPO P/TUB. AGUA T. NORMAL 110MM
3 das
REFINE Y NIVELACION DE ZANJA
5 das
REFINE Y NIVELACION FONDO DE ZANJA P/TUB. 110MM
5 das
CAMA DE APOYO
5 das
CAMA DE APOYO E=0,10M ZANJA P/TUB. 110MM
5 das
RELLENO DE ZANJA
6 das
RELLENO ZANJA MAT. PRESTAMO. COMPACT. C/EQUIPO P/TUB. 110MM
6 das
ELIMINACION DE MATERIAL EXCEDENTE D=2.0KM
2 das
ELIMINACION DE MATERIAL SOBRANTE ZANJA T.N P/TUB. DE 110MM
2 das
SUMINISTRO E INSTALACIN DE TUBERIAS
14 das
TUBERIA DE PVC AGUA POTABLE C-7.5 UF 110MM SUMINISTRO
2 das
INSTALACION TUBERIA PVC P/AGUA POT. 110MM UF.
5 das
DRENAJE DE ZANJA C/BOMBEO P/TUBERIA DN 110MM
1 da
PRUEBA HIDRAULICA + DESINFECC. TUBERIA 110MM ZANJA TAPADA
3 das
SUMINISTRO E INSTALACIN DE ACCESORIOS
10 das
EMPALME DE TUBERIA A RED EXISTENTE
2 das
TEE DE PVC-UF DN 110mm x 110mm
1 da
TAPON PVC UF DE 110MM PARA AGUA
1 da
INSTALACION DE ACCESORIOS PVC UF 110MM
2 das
DADO DE CONCRETO f'c=140 kg/cm2 + ENCOF. P/ACCESORIO
2 das
SUMINISTRO E INSTALACIN DE VALVULAS
4 das
VALVULA COMPUERTA DE FIERRO FUNDIDO DE 110MM
1 da
INSTALACION DE VALVULA COMPUERTA FFDO. 110MM
1 da
CAJA PARA PROTECCION DE VALVULAS DE FFDO. 3"-10"
1 da
CONCRETO f'c=140 kg/cm2 P/ANCLAJE VALVULA 110MM + ENCOFRADO
1 da
SISTEMA DE ALCANTARILLADO
25 das
TRABAJOS PRELIMINARES
16 das
TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO DE OBRA
2 das
TRAZOS, REPLANTEOS FINALES DE PROYECTO
2 das
SEALIZACION Y MANTENIMIENTO DE TRANSITO Y PEATONAL
2 das
CERCO DE MALLA HDP DE 1,00 M. ALTURA P/ LIMITE DE SEGURIDAD
2 das
MOVIMIENTO DE TIERRAS
6 das
EXCAVACION C/EQ - S/EXPLOS. P. ALCANT. T. NATURAL H=1.50M TUB. 200MM 3 das
C/O
EXCAVACION C/EQ - S/EXPLOS. P. ALCANT. T. NATURAL H=2.00M TUB. 200MM 2 das
C/O
ENTIBADO DE ZANJA H=2-3 MT
1 da
REFINE Y NIVELACION DE ZANJA
3 das
REFINE Y NIVELACION FONDO DE ZANJA P/TUB. 200MM
3 das
CAMA DE APOYO
3 das
CAMA DE APOYO(GRAVA) DE E=10CM EN T.S. P/TUB. PVC-UF
3 das
RELLENO DE ZANJA
7 das
RELLENO ZANJA COMPACT. C/EQUIPO TUB. 200MM H=1.50M
4 das
RELLENO ZANJA COMPACT. C/EQUIPO TUB. 200MM H=2.00M
4 das
ELIMINACION DE MATERIAL EXCEDENTE D=2.0KM
1 da?
ELIMINACION DE MATERIAL EXCEDENTE DM=5KM
1 da?
BUZONES
16 das
BUZON TIPO A TERRENO NORMAL HASTA H=1.50M PROF.
5 das
BUZON TIPO A TERRENO NORMAL HASTA H=2.00M PROF.
2 das
EMPALME BUZON NUEVO ENTRADA - SALIDA
1 da
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
10 das
TUBERIA PVC U.F DESAGUE ISO 4435 S25 200MM SUMINISTRO
4 das
BOMBEO DE AGUA
3 das
INSTALACION TUBERIA P.V.C. DESAGUE U.F 200MM
5 das
PRUEBA HIDRAULICA + ESCORRENTIA DE TUBERIA PVC-UF A ZANJA
2 das
TAPADA
FIN DE LA OBRA
1 da

Proyecto: Cronograma
Fecha: jue 04/06/15

15 mar '15
J
L

29 mar '15
S

12 abr '15
J
L

26 abr '15
S

10 may '15
J
L

24 may '15
S

07 jun '15
J
L

21 jun '15
S

CARTEL. DE IDENTIFICACION DE OBRA DE 3.60 X 2.40M


MOVILIZACION Y DESMOVILIZACION DE EQUIPO
GUARDIAN PARA LA OBRA[13%]
CEMENTO PORTLAND TIPO I (42.5 kg) [113%],PINTURA ESMALTE [188%],CAPATAZ[8%],OPERARIO[8%],PEON[78%],MALLA HDP COLOR NARANJA DE 1M ALTURA P/CER
CAPATAZ[4%],PEON[38%],CERCO MALLA DE HDP DE 1.00M DE ALTURA P/LIMITE DE SEGURIDAD[37,600%],CACHACOS DE MADE

YESO EN BOLSAS DE 20 kg[18%],TOPOGRAFO[30%],CAPATAZ[3%],OFICIAL[61%],PEON[91%],TEODOLITO[30%],CLAVOS C/CABEZA PRECIO PROMEDIO[55%],CORDEL


PINTURA ESMALTE [4%],DIBUJANTE[78%],TOPOGRAFO[26%],CAPATAZ[3%],OFICIAL[26%],PEON[78%],JALONES[78%],MIRA TOPOGRAFICA[
CAPATAZ[8%],OFICIAL[76%],PEON[152%],CARGADOR RETROEXCAVADOR 62 HP 1 yd3[76%]
CAPATAZ[8%],PEON[76%]
CAPATAZ[9%],PEON[91%],ARENA GRUESA[2,275%]
CAPATAZ[9%],OFICIAL[91%],PEON[364%],COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP[137%],PISON MANUAL[91%],AGUA[182%]

CAPATAZ[9%],OFICIAL[91%],PEON[91%],CAMION VOLQUETE 4 X 2 140-210 HP 6 m3[91%],CARGADOR SOBRE LLANTAS 80-95 HP 1.5-1.75 yd3[91%

TUBO PVC AGUA A-7.5 UF 110MM[18,746%],ANILLO DE GOMA 110 MM[6,188%]


LUBRICANTE PARA TUBERIA PVC-UF[91%],CAPATAZ[6%],OPERARIO[65%],OFICIAL[65%],PEON[130%],AGUA[164%],TAPON PVC AGUA UNION FLEXIBLE
MOTOBOMBA 12 HP 4"[12%],CAPATAZ[9%],OFICIAL[186%]
OPERADOR DE EQUIPO LIVIANO[52%],CAPATAZ[5%],OPERARIO[52%],OFICIAL[52%],CAMION CISTERNA 4 X 2 (AGUA) 122 HP 1 500 gl[52%],MO

EMPALME DE TUBERIA A RED EXISTENTE


TEE PVC P/AGUA UNION FLEXIBLE DE (110 X 110MM)
TAPON PVC AGUA UNION FLEXIBLE 4" (110MM)
LUBRICANTE PARA TUBERIA PVC-UF[5%],CAPATAZ[7%],OPERARIO[71%],OFICIAL[71%],ANILLO DE GOMA 110 MM[1,000%]
CEMENTO PORTLAND TIPO I (42.5 kg) [9%],GASOLINA 84 OCTANOS[0%],OPERADOR DE EQUIPO PESADO[0%],CAPATAZ[3%],OPERARIO[31%],OFICIAL[

VALVULA COMPUERTA DE FF DN 110 mm C/ EMBONE A PVC ISO 4422[200%]


CAPATAZ[4%],OPERARIO[40%],OFICIAL[40%]
CEMENTO PORTLAND TIPO I (42.5 kg) [63%],GASOLINA 84 OCTANOS[1%],OPERADOR DE EQUIPO PESADO[1%],CAPATAZ[1%],OPERARIO[11%],OFI
CEMENTO PORTLAND TIPO I (42.5 kg) [126%],GASOLINA 84 OCTANOS[2%],OPERADOR DE EQUIPO PESADO[2%],CAPATAZ[3%],OPERARIO[28%],

YESO EN BOLSAS DE 20 kg[25%],TOPOGRAFO[42%],CAPATAZ[4%],OFICIAL[84%],PEON[126%],TEODOLITO[42%],CLAVOS C/CABEZA PRECIO PROMEDIO[76%],CORDEL [7,560%]


PINTURA ESMALTE [5%],DIBUJANTE[108%],TOPOGRAFO[36%],CAPATAZ[3%],OFICIAL[36%],PEON[108%],JALONES[36%],MIRA TOPOGRAFICA[108%],TEODOLITO[36%],C
CEMENTO PORTLAND TIPO I (42.5 kg) [151%],PINTURA ESMALTE [252%],CAPATAZ[7%],OPERARIO[7%],PEON[70%],MALLA HDP COLOR NARANJA DE 1M ALTURA P/CERCO[25,200%],PIEDRA CHA
CAPATAZ[5%],PEON[50%],CERCO MALLA DE HDP DE 1.00M DE ALTURA P/LIMITE DE SEGURIDAD[50,400%],CACHACOS DE MADERA[1,663%]
CAPATAZ[7%],OPERARIO[144%],PEON[72%],CARGADOR RETROEXCAVADOR 62 HP 1 yd3[72%]
CAPATAZ[8%],OPERARIO[155%],PEON[155%],CARGADOR RETROEXCAVADOR 62 HP 1 yd3[77%]

CAPATAZ[9%],OPERARIO[170%],OFICIAL[170%],PEON[85%],ACCESORIO PARA IZAJE Y MOVIMIENTO DE ENTIBADO METALICO[12,750%],PLANCHA METALICA DE 2.40X2.00 E=


CAPATAZ[8%],OPERARIO[81%],PEON[162%]
CAPATAZ[8%],PEON[81%],GRAVILLA[2,430%]
CAPATAZ[9%],OFICIAL[92%],PEON[832%],COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP[92%],PISO MANUAL[92%],AGUA[1,386%]
CAPATAZ[9%],OFICIAL[91%],PEON[820%],COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP[82%],PISO MANUAL[9%],AGUA[255%]
CAPATAZ[4%],PEON[44%],CAMION VOLQUETE 4 X 2 140-210 HP 6 m3[132%],CARGADOR SOBRE LLANTAS 80-95 HP 1.5-1.75 yd3[44%]

CEMENTO PORTLAND TIPO I (42.5 kg) [5,575%],GASOLINA 84 OCTANOS[27%],OPERADOR DE EQUIPO PESADO[39%],CAPATAZ[8%],OPERARIO[428%],OFICIAL[525%],PEON[463%],OPERADO


CEMENTO PORTLAND TIPO I (42.5 kg) [4,726%],GASOLINA 84 OCTANOS[20%],OPERADOR DE EQUIPO PESADO[77%],CAPATAZ[14%],OPERARIO[620%],OFICIAL[780%],PEON[747%],OPER
CAPATAZ[3%],OPERARIO[25%],PEON[25%],ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
TUBO PVC U.F DESAGUE ISO 4435 S25 200MM [24,786%],ANILLO DE GOMA 200 MM ALCANTARILLADO[4,131%]
MOTOBOMBA 12 HP 4"[24%],CAPATAZ[10%],OFICIAL[194%]
LUBRICANTE PARA TUBERIA PVC-UF[292%],CAPATAZ[5%],POPERARIO[51%],OFICIAL[51%],PEON[101%],WINCHA[152%],TEODOLITO[51%],AGUA[2,284%]
CEMENTO PORTLAND TIPO I (42.5 kg) [122%],YESO EN BOLSAS DE 20 kg[170%],CAPATAZ[6%],OPERARIO[61%],OFICIAL[61%],PEON[61%],AGUA[2,187%]

Tarea

Hito resumido

Divisin

Hito inactivo

Informe de resumen manual

Progreso

Hito

Progreso resumido

Divisin resumida

Resumen inactivo

Resumen manual

Fecha lmite

Resumen

Tareas externas

Hito externo

Tarea manual

Slo el comienzo

Tarea resumida

Resumen del proyecto

Tarea inactiva

Slo duracin

Slo fin

You created this PDF from an application that is not licensed to print to novaPDF printer
Pgina 1 (http://www.novapdf.com)

You might also like