RITES — OC — PBI - SYSTRA
(GENERAL CONSULTANTS FOR BANGALORE METRO RAIL PROJECT
3" Floor, BMTC Complex, KH Road, Shanthinagar, Bangalore-560 027
‘Phone: +91.90-22969500 Fax: +91-80-22960499
Ref: GC/UG1/1.1-UG1-202/20111 | % 9 31" October 2011
To
Mr. Y. V. Rajendra Chowdary, Project Manager,
Coastal - TTS JV,
#2265, 22° Cross, 9" Main,
BSK 2" Stage,
Bangalore-560 070.
Dear Sir,
Contract: BMR/UG-NS Design and Construct Underground Stations and Tunnels
‘Sub: Geotechnical Parameters for the Design
Ref: 1) Coastal-TTS JV/UG-4/NS/11-12/53 dated 23 Jun 2011
2) Coastal-TTS JV/UG-1/NS/11-12/377 dated 14" September 2011
3) Coastal-TTS JV/UG-4/NS/11-12/447 dated 20" September 2011
4) Coastal TTS JV/UG-4/NS/11-12/644 dated 12" October 2011
GC wishes to record the following events on this issue as follows;
Tho meeting was held on 29 October 2011 regarding the geotechnical parameters among BMRC, GC and
JV, and each party agreed that the design would be conducted according to the following table subject to
the note.
‘SI.No._| Description C'(kpa)_| _#(Des.) E(MPa)
1 | Made Ground (Fili Material) | 0 20 «(5 |
2 | Clayey sit 3 25 5272
‘3_| Sandy Silt 0 33 5t27z
4 [Silly Sand and Gravely | “30 38 80
Sand to Very Poor Rock
Mass
5 __| Highly Weathered Granite | 80 a 230
6 | Moderately Weathered to | 260 50 1120
Fresh Granite
Note:
-z= depth from the ground level
*30kpa for Silty Sand and Gravely Sand to Very Poor Rock Mass is to be used only for piling design.
‘20kpa for Silly Sand and Gravely Sand to Very Poor Rock Mass is to be used for PDA (Potential
‘Damage Assessment).
Yours me SEL
Nigel Butterfield
Project Manager-UG
CC to: Mr. N.P. Sharma (CE- D&UG) BMRCL
Mr. M.C. Barcham (PD-GC)
Mr. Y. Tezuka (CSE - UG)
Mr. Ramana Murthy (CRE-UG)