[COMPARITIVE STUDY ON BEHAVIOUR OF COMPOSITE BEAM &
Aim and Objective oF Projest” |aCc BEAM FOR HEAVYINDUSTRIAL LOADS
Project Highlights
Ti this project a two-storey industrial building is modelled using SAP 2000 . In first model, building is
‘modelled with a stee! beam and concrete slab over it. Shell joint offset command is used to model conerete
slab over steel beam, In second model the same building was modelled by taking RCC beams & conerete stab
‘construction, Forces for composite beam extracted from SAP 2000. Composite beam analyzed & designed as
per IS 11384 1985 (Reaffirmed 2003) using MS - Exec,
Results for most critical beam were taken and compared with RCC beam at same location
Results were compared in detail in terms of bending moment, shear, base reaction & cost. It was found that
cost of composite construction is less by around 10 %. Bending moment in composite construction is almost
35 % lesser than RCC construction, while the shear force is more in composite construction by around 15 %.
[Retwal Contribution oF TSO [Complete iterature review, Modelling and Preperation of project report
Tanguage and Tools used for Project | SAP 2000, MS - Excel & MS Word.
Current Status of
the Project
[Completed Partially Completed ‘To be Completed
His work is remarkable & useful, ean be used as reference in our ongoing
projects.