You are on page 1of 1
Bhabha Atomic Research Cente Human Resource Development Division OCES-2014 PROJECT SYNOPSIS (To be submitted by 17" July, 2015) Dixipiine Cia Enginesrng Date Name oF TSO [Mist Roshan Srivastava [SCN NEROATTED Name oF Guide | Sudin Sharma Division NRPSED [Designation [ S07 Bnail 1D [sadingibareara.gov.in [eterhone No [COMPARITIVE STUDY ON BEHAVIOUR OF COMPOSITE BEAM & Aim and Objective oF Projest” |aCc BEAM FOR HEAVYINDUSTRIAL LOADS Project Highlights Ti this project a two-storey industrial building is modelled using SAP 2000 . In first model, building is ‘modelled with a stee! beam and concrete slab over it. Shell joint offset command is used to model conerete slab over steel beam, In second model the same building was modelled by taking RCC beams & conerete stab ‘construction, Forces for composite beam extracted from SAP 2000. Composite beam analyzed & designed as per IS 11384 1985 (Reaffirmed 2003) using MS - Exec, Results for most critical beam were taken and compared with RCC beam at same location Results were compared in detail in terms of bending moment, shear, base reaction & cost. It was found that cost of composite construction is less by around 10 %. Bending moment in composite construction is almost 35 % lesser than RCC construction, while the shear force is more in composite construction by around 15 %. [Retwal Contribution oF TSO [Complete iterature review, Modelling and Preperation of project report Tanguage and Tools used for Project | SAP 2000, MS - Excel & MS Word. Current Status of the Project [Completed Partially Completed ‘To be Completed His work is remarkable & useful, ean be used as reference in our ongoing projects. ‘Guides Remarks eee a signature To Shri V. Lakshmi Narsimhan Project Coordination Section, Training School, Anushakti Nagar, Mumbai 400094 of Guide

You might also like