Project Evaluated On Benefits To Cost Ratio
Project Evaluated On Benefits To Cost Ratio
Date :
1-Oct-14
Department :
Job :
Description of the ergonomic concern :
Why the Project is needed : One back injury was attributed to lifting pallets. An
Equation showed that the pallet weight exceeded the RWL.
Solution :
One Time
$3,150,000
Performance
Quality
Total
Costs
$3,150,000
One Time
Equipment
$50,000.00
Installation
Included
Training
$5,000.00
Utilities
Maintenance
Performance
Total
$55,000.00
Ratio
68
efits/Cost Ratio
Distribution
Selector
Annual
$20,000
$5,000
$25,000
Annual
$2,000.00
$3,000.00
$6,000.00
$11,000.00
2.2