You are on page 1of 1

FOR WASHING STATION, ROUTING OF SOCKET

POWER AND LIGHTING CABLE


COMING FROM V8100 E-ROOM
REFER DRAWING PS14333-V8100-EL-LAA1-0003_0

TENTATIVE
LOCATION OF
1PHASE SOCKET AT
WASHING STATION

.
.LK(15APR2015)

SHEET WORK OPENING FOR WATER


LINES, CABLE IN CONDUITS TO PASS
THROUGH OR CIVIL WORK CORE
CUTTING TO CARRY OUT FOR THE
PASS.

CEMENT WALL 3 10 MTS X 5 MTS


HEIGHT
CEMENT WALL 1 - 6
MTS X 5 MTS
HEIGHT

CEMENT WALL 2
-- 10 MTS X 5 MTS
HEIGHT

Tie -in points for


washing station

UTILITY LINES

EXISTING PIPE RACK TO BE


UTILISED FOR RUNNING THE
UTILITY LINES ALONG TILL THE
SHEET WORK OPENINGS

EXISTING PIPE RACK


AND TRAY TO BE
USED FOR CABLE
TRAY TO WASHING
STATION WHEREVER
POSSIBLE.

FROM HERE TO WASHING STATION,


ADEQUATELY DESIGNED STEEL SUPPORT
FLOOR MOUNTED TO BE UTILISED FOR
PNUMATIC AIR/WATER LINES ALONG WITH GRP
CABLE TRAY, WITH 300mm DISTANCE.

CEMENT BLAST
PROOF WALLS - 4
MTS X 5 MTS
HEIGHT

You might also like