SATUAN
No
A.
BAHAN
B.
UPAH
KOEF
1 Mandor
2 Pekerja
0.045
0.9
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
No
A.
OH
OH
H. SATUAN
Rp.
95,000
65,000
KOEF
SAT
H. SATUAN
Rp.
BAHAN
1 Batu belah 15 cm/20 cm
2 Pasir
3 Semen
B.
SAT
1.20
0.52
163
m3
m3
kg
85,000
130,000
1,500
0.075
0.075
0.75
1.5
OH
OH
OH
OH
95,000
80,000
65,000
65,000
UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
No
A.
0.3 m3
KOEF
SAT
H. SATUAN
Rp.
BAHAN
1 Kayu Kelas III
2 Paku 5cm-12cm
3 Minya Bekisting
4 Besi Beton Polos
5 Kawat Beton
6 Portland Cement
7 Pasir Beton
8 Kerikil
B.
Sloof
0.27
2
0.6
210
3
336
0.54
0.81
m3
kg
Ltr
kg
kg
kg
m3
m3
1,331,500
0.283
0.323
0.275
1.56
1.4
5.65
OH
OH
OH
OH
OH
OH
95,000
85,000
65,000
70,000
65,000
65,000
15,000
15,000
8,000
16,000
1,100
106,700
91,800
UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
No
A.
0.5 m3
KOEF
SAT
H. SATUAN
Rp.
BAHAN
1 Kayu Kelas III
2 Paku 5cm-12cm
3 Minya Bekisting
4 Besi Beton Polos
5 Kawat Beton
6 Portland Cement
7 Pasir Beton
8 Kerikil
9 Plywood 9mm
10 Dolken kayu galam
B.
0.4
4
2
315
4.5
336
0.54
0.81
3.5
20
m3
kg
Ltr
kg
kg
kg
m3
m3
lembar
batang
0.353
0.403
0.275
1.65
2.1
7
OH
OH
OH
OH
OH
OH
1,331,500
15,000
15,000
8,000
16,000
1,100
106,700
91,800
100,000
27,000
UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
95,000
85,000
65,000
70,000
65,000
65,000
JENIS PEKERJAAN
SATUAN
No
A.
Pasangan bata
7.5 m2
KOEF
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
No
kg
m3
Buah
1,200
130,000
700
0.03
0.02
0.2
0.6
OH
OH
OH
OH
85,000
75,000
55,000
50,000
Plesteran 1:3
22 m2
KOEF
SAT
H. SATUAN
Rp.
BAHAN
1 Semen PC
2 Pasir
B.
43.5
0.08
140
UPAH
1 Mandor
2 Kepala Tukang Batu
3 Tukang Batu
4 Pekerja
A.
H. SATUAN
Rp.
BAHAN
1 Semen PC
2 Pasir
3 Batu Bata Merah
UK 22x11x4.5
B.
SAT
UPAH
0.155
0.023
Zak
m3
55,000
100,000
1 Mandor
2 Kepala Tukang Batu
3 Tukang Batu
4 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
No
A.
OH
OH
OH
OH
85,000
75,000
55,000
50,000
KOEF
SAT
H. SATUAN
Rp.
BAHAN
1 Closet duduk
2 Perlengkapan
6% harga kloset
B.
0.015
0.01
0.1
0.3
1
0.06
buah
buah
500,000
206,000
0.015
0.8
1.5
2
OH
OH
OH
OH
85,000
75,000
55,000
50,000
UPAH
1 Mandor
2 Kepala Tukang Batu
3 Tukang Batu
4 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
No
A.
Pengecatan
11 m2
KOEF
0.1
0.01
Kg
Bh
39,700
12,700
0.01
0.02
0.2
0.002
OH
OH
OH
OH
85,000
75,000
55,000
50,000
UPAH
1 Mandor
2 Kepala Tukang Cat
3 Tukang Cat
4 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
No
A.
H. SATUAN
Rp.
BAHAN
1 Cat
2 Kuas
B.
SAT
Pemasangan kusen
2 unit
KOEF
SAT
H. SATUAN
Rp.
BAHAN
1 Kusen Alumunium
set
900,000
2 Skrup/Ripet
3 Sealent
B.
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
No
0.03
0.2
2
0.6
OH
OH
OH
OH
85,000
75,000
65,000
50,000
Langit-langit
KOEF
SAT
H. SATUAN
Rp.
BAHAN
65,000
0.375
0.28
0.0163
lembar
kg
m3
15,000
803,000
0.025
0.04
0.4
0.3
OH
OH
OH
OH
95,000
85,000
70,000
65,000
UPAH
1 Mandor
2 Kepala Tukang
4 Tukang Kayu
6 Pekerja
C.
3,700
50,000
5.3 m2
1 Multiplek
2 Paku 5cm-12cm
3 Kaso-Kaso
B.
Buah
Tube
UPAH
1 Mandor
2 Kepala Tukang Kayu
3 Tukang Kayu
4 Pekerja
A.
2
0.06
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
No
A.
16.4 m2
KOEF
SAT
H. SATUAN
Rp.
BAHAN
1 Keramik
6 Portland Cement
7 Pasir Beton
8 Semen Warna
B.
Lantai
2,500
26.5
10.4
0.045
1.94
buah
kg
m3
m3
1,200
106,700
8,000
0.045
0.045
0.45
0.9
OH
OH
OH
OH
95,000
85,000
65,000
65,000
UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
6 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JUMLAH
H. SATUAN Rp.
TOTAL HARGA
Rp.
-
62,775
0.6075
12.15
4,275
58,500
0
62,775
15,694
78,469
78,500
JUMLAH
H. SATUAN Rp.
1,059,750
TOTAL HARGA
Rp.
414,100
4.2
1.82
570.5
102,000
67,600
244,500
159,375
7,125
6,000
48,750
97,500
0.2625
0.2625
2.625
5.25
573,475
143,369
716,844
716,900
JUMLAH
H. SATUAN Rp.
2,509,150
TOTAL HARGA
Rp.
2,628,081
0.081
0.6
0.18
63
0.9
100.8
0.162
0.243
359,505
30,000
9,000
1,680,000
48,000
369,600
57,618
74,358
639,665
0.0849
0.0969
0.0825
0.468
0.42
1.695
26,885
27,455
17,875
109,200
91,000
367,250
-
3,267,746
980,324
4,248,070
4,248,000
JUMLAH
H. SATUAN Rp.
1,274,400
TOTAL HARGA
Rp.
4,606,176
0.2
2
1
157.5
2.25
168
0.27
0.405
1.75
10
532,600
60,000
30,000
2,520,000
72,000
369,600
57,618
74,358
350,000
540,000
792,665
0.1765
0.2015
0.1375
0.825
1.05
3.5
33,535
34,255
17,875
115,500
136,500
455,000
-
5,398,841
1,619,652
7,018,493
7,018,500
3,509,250
JUMLAH
H. SATUAN Rp.
TOTAL HARGA
Rp.
160,600
326.25
0.6
1050
52,200
10,400
98,000
45,050
0.225
0.15
1.5
4.5
2,550
1,500
11,000
30,000
0
205,650
51,413
257,063
257,100
JUMLAH
H. SATUAN Rp.
1,928,250
TOTAL HARGA
Rp.
10,825
3.41
0.506
8,525
2,300
22,525
0.33
0.22
2.2
6.6
1,275
750
5,500
15,000
-
33,350
13,340
46,690
46,700
JUMLAH
H. SATUAN Rp.
1,027,400
TOTAL HARGA
Rp.
512,360
2
0.12
500,000
12,360
243,775
0.03
1.6
3
4
1,275
60,000
82,500
100,000
-
756,135
189,034
945,169
945,200
JUMLAH
H. SATUAN Rp.
1,890,400
TOTAL HARGA
Rp.
4,097
3,970
127
13,450
850
1,500
11,000
100
-
17,547
8,774
26,321
26,400
JUMLAH
H. SATUAN Rp.
TOTAL HARGA
Rp.
510,400
500,000
290,400
7,400
3,000
177,550
2,550
15,000
130,000
30,000
-
687,950
206,385
894,335
894,400
JUMLAH
H. SATUAN Rp.
1,788,800
TOTAL HARGA
Rp.
41,664
6.15
4.592
0.26732
24,375
4,200
13,089
53,275
0.41
0.656
6.56
4.92
2,375
3,400
28,000
19,500
-
94,939
28,482
123,421
654,550
123,500
JUMLAH
H. SATUAN Rp.
TOTAL HARGA
Rp.
99,052
434.6
170.56
0.738
31.816
66,250
12,480
4,802
15,520
95,850
0.738
0.738
7.38
14.76
4,275
3,825
29,250
58,500
-
194,902
58,470
253,372
4,309,920
262,800
realistis
super pesimis
pesimis
super optimis
19,951,870.00
15,961,496.00
17,956,683.00
27,932,618.00
optimis
23,942,244.00
JENIS PEKERJAAN
SATUAN
No
A.
2 m3
KOEF
SAT
BAHAN
1 Kayu Kelas III
2 Paku 5cm-12cm
3 Minya Bekisting
4 Besi Beton Polos
5 Kawat Beton
6 Portland Cement
7 Pasir Beton
8 Kerikil
9 Plywood 9mm
10 Dolken kayu galam
B.
0.5
3.2
1.6
157.5
2.25
336
0.54
0.81
2.8
32
m3
kg
Ltr
kg
kg
kg
m3
m3
lembar
batang
0.265
0.265
0.275
1.3
1.05
5.3
OH
OH
OH
OH
OH
OH
UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
H. SATUAN
Rp.
JUMLAH
H. SATUAN Rp.
TOTAL HARGA
Rp.
3,679,326
1,331,500
15,000
15,000
8,000
16,000
1,100
106,700
91,800
100,000
27,000
0.25
1.6
0.8
78.75
1.125
168
0.27
0.405
1.4
16
665,750
48,000
24,000
1,260,000
36,000
369,600
57,618
74,358
280,000
864,000
569,325
95,000
85,000
65,000
70,000
65,000
65,000
0.1325
0.1325
0.1375
0.65
0.525
2.65
25,175
22,525
17,875
91,000
68,250
344,500
-
4,248,651
1,274,595
5,523,246
7,018,500
14,037,000
JENIS PEKERJAAN
SATUAN
No
A.
m2
KOEF
SAT
H. SATUAN
Rp.
BAHAN
1 Genteng
2 Kuda-kuda
3 Pengapit Kuda-kuda
4 Gording
5 Reng
6 Bumbungan
7 Listplank
8 Talang
9 Pemasangan
10 Plafond
10 List Plafond
B.
atap-plafond
170,700
1.65
0.0128
0.0075
0.0132
0.008
0.25
0.45
0.066
0.45
1.39
0.08
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
7,360,000
262,500
6,910,400
117,300
72,900
191,000
161,700
39,200
125,000
132,000
0
0
0
0
0
0
OH
OH
OH
OH
OH
OH
95,000
85,000
65,000
70,000
65,000
65,000
UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
JENIS PEKERJAAN
SATUAN
JUMLAH
H. SATUAN Rp.
TOTAL HARGA
Rp.
No
786,785
A.
281,655
94,208
1,969
91,217
938
18,225
85,950
10,672
17,640
173,750
10,560
BAHAN
1 kran
2 instalasi air bersih
3 instalasi air kotor
4
5
6
7
8
9
10
10
B.
UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja
C.
ALAT
786,785
D.
SUBTOTAL
236,035
E.
1,022,820
F.
JUMLAH
G.
PEMBULATAN
N / UPAH / ALAT
PROFIT
saluran air
m2
KOEF
SAT
0.1
0.4
0.22
0
0
0
0
0
0
0
0
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
48,000
28,000
103,000
-
4,800
11,200
22,660
-
0
0
0
0
0
0
OH
OH
OH
OH
OH
OH
95,000
85,000
65,000
70,000
65,000
65,000
38,660
11,598
50,258
JENIS PEKERJAAN
SATUAN
No
A.
m3
KOEF
SAT
H. SATUAN JUMLAH
Rp.
H. SATUAN Rp.
BAHAN
1 galian tanah
2 penutup
3 beton dan tembok dalam
4 urugan pasir
5
6
7
8
9
10
10
B.
septic tank
1.12
0.13
0.37
0.12
0
0
0
0
0
0
0
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
24,000
115,000
275,000
185,000
-
0
0
0
0
0
0
OH
OH
OH
OH
OH
OH
95,000
85,000
65,000
70,000
65,000
65,000
26,880
14,950
101,750
22,200
-
UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja
C.
ALAT
D.
SUBTOTAL
E.
F.
JUMLAH
G.
PEMBULATAN
TOTAL HARGA
Rp.
165,780
165,780
49,734
215,514