JENIS PEKERJAAN

SATUAN

No

Galian Urugan dan Pemadatan


13.5 m3

BAHAN / UPAH / ALAT

A.

BAHAN

B.

UPAH

KOEF

1 Mandor
2 Pekerja

0.045
0.9

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN

No

A.

OH
OH

H. SATUAN
Rp.

95,000
65,000

Pondasi Batu Belah


3.5 m3

BAHAN / UPAH / ALAT

KOEF

SAT

H. SATUAN
Rp.

BAHAN
1 Batu belah 15 cm/20 cm
2 Pasir
3 Semen

B.

SAT

1.20
0.52
163

m3
m3
kg

85,000
130,000
1,500

0.075
0.075
0.75
1.5

OH
OH
OH
OH

95,000
80,000
65,000
65,000

UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Pekerja

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN

No

A.

0.3 m3

BAHAN / UPAH / ALAT

KOEF

SAT

H. SATUAN
Rp.

BAHAN
1 Kayu Kelas III
2 Paku 5cm-12cm
3 Minya Bekisting
4 Besi Beton Polos
5 Kawat Beton
6 Portland Cement
7 Pasir Beton
8 Kerikil

B.

Sloof

0.27
2
0.6
210
3
336
0.54
0.81

m3
kg
Ltr
kg
kg
kg
m3
m3

1,331,500

0.283
0.323
0.275
1.56
1.4
5.65

OH
OH
OH
OH
OH
OH

95,000
85,000
65,000
70,000
65,000
65,000

15,000
15,000
8,000
16,000
1,100
106,700
91,800

UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN

No

A.

0.5 m3

BAHAN / UPAH / ALAT

KOEF

SAT

H. SATUAN
Rp.

BAHAN
1 Kayu Kelas III
2 Paku 5cm-12cm
3 Minya Bekisting
4 Besi Beton Polos
5 Kawat Beton
6 Portland Cement
7 Pasir Beton
8 Kerikil
9 Plywood 9mm
10 Dolken kayu galam

B.

Kolom dan Balok dan Plat

0.4
4
2
315
4.5
336
0.54
0.81
3.5
20

m3
kg
Ltr
kg
kg
kg
m3
m3
lembar
batang

0.353
0.403
0.275
1.65
2.1
7

OH
OH
OH
OH
OH
OH

1,331,500
15,000
15,000
8,000
16,000
1,100
106,700
91,800
100,000
27,000

UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

95,000
85,000
65,000
70,000
65,000
65,000

JENIS PEKERJAAN
SATUAN

No

A.

Pasangan bata
7.5 m2

BAHAN / UPAH / ALAT

KOEF

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN

No

kg
m3
Buah

1,200
130,000
700

0.03
0.02
0.2
0.6

OH
OH
OH
OH

85,000
75,000
55,000
50,000

Plesteran 1:3
22 m2

BAHAN / UPAH / ALAT

KOEF

SAT

H. SATUAN
Rp.

BAHAN
1 Semen PC
2 Pasir

B.

43.5
0.08
140

UPAH
1 Mandor
2 Kepala Tukang Batu
3 Tukang Batu
4 Pekerja

A.

H. SATUAN
Rp.

BAHAN
1 Semen PC
2 Pasir
3 Batu Bata Merah
UK 22x11x4.5

B.

SAT

UPAH

0.155
0.023

Zak
m3

55,000
100,000

1 Mandor
2 Kepala Tukang Batu
3 Tukang Batu
4 Pekerja
C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN

No

A.

OH
OH
OH
OH

85,000
75,000
55,000
50,000

Pas. Homogenous toilet 20 cm x 25 cm


2 buah

BAHAN / UPAH / ALAT

KOEF

SAT

H. SATUAN
Rp.

BAHAN
1 Closet duduk
2 Perlengkapan
6% harga kloset

B.

0.015
0.01
0.1
0.3

1
0.06

buah
buah

500,000
206,000

0.015
0.8
1.5
2

OH
OH
OH
OH

85,000
75,000
55,000
50,000

UPAH
1 Mandor
2 Kepala Tukang Batu
3 Tukang Batu
4 Pekerja

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN

No

A.

Pengecatan
11 m2

BAHAN / UPAH / ALAT

KOEF

0.1
0.01

Kg
Bh

39,700
12,700

0.01
0.02
0.2
0.002

OH
OH
OH
OH

85,000
75,000
55,000
50,000

UPAH
1 Mandor
2 Kepala Tukang Cat
3 Tukang Cat
4 Pekerja

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN

No

A.

H. SATUAN
Rp.

BAHAN
1 Cat
2 Kuas

B.

SAT

Pemasangan kusen
2 unit

BAHAN / UPAH / ALAT

KOEF

SAT

H. SATUAN
Rp.

BAHAN
1 Kusen Alumunium

set

900,000

2 Skrup/Ripet
3 Sealent
B.

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN

No

BAHAN / UPAH / ALAT

0.03
0.2
2
0.6

OH
OH
OH
OH

85,000
75,000
65,000
50,000

Langit-langit

KOEF

SAT

H. SATUAN
Rp.

BAHAN
65,000

0.375
0.28
0.0163

lembar
kg
m3

15,000
803,000

0.025
0.04
0.4
0.3

OH
OH
OH
OH

95,000
85,000
70,000
65,000

UPAH
1 Mandor
2 Kepala Tukang
4 Tukang Kayu
6 Pekerja

C.

3,700
50,000

5.3 m2

1 Multiplek
2 Paku 5cm-12cm
3 Kaso-Kaso
B.

Buah
Tube

UPAH
1 Mandor
2 Kepala Tukang Kayu
3 Tukang Kayu
4 Pekerja

A.

2
0.06

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN

No

A.

16.4 m2

BAHAN / UPAH / ALAT

KOEF

SAT

H. SATUAN
Rp.

BAHAN
1 Keramik
6 Portland Cement
7 Pasir Beton
8 Semen Warna

B.

Lantai

2,500

26.5
10.4
0.045
1.94

buah
kg
m3
m3

1,200
106,700
8,000

0.045
0.045
0.45
0.9

OH
OH
OH
OH

95,000
85,000
65,000
65,000

UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
6 Pekerja

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JUMLAH
H. SATUAN Rp.

TOTAL HARGA
Rp.
-

62,775

0.6075
12.15

4,275
58,500
0

62,775
15,694
78,469
78,500

JUMLAH
H. SATUAN Rp.

1,059,750

TOTAL HARGA
Rp.
414,100

4.2
1.82
570.5

102,000
67,600
244,500
159,375
7,125
6,000
48,750
97,500

0.2625
0.2625
2.625
5.25

573,475
143,369
716,844
716,900

JUMLAH
H. SATUAN Rp.

2,509,150

TOTAL HARGA
Rp.
2,628,081

0.081
0.6
0.18
63
0.9
100.8
0.162
0.243

359,505
30,000
9,000
1,680,000
48,000
369,600
57,618
74,358
639,665

0.0849
0.0969
0.0825
0.468
0.42
1.695

26,885
27,455
17,875
109,200
91,000
367,250
-

3,267,746
980,324

4,248,070
4,248,000

JUMLAH
H. SATUAN Rp.

1,274,400

TOTAL HARGA
Rp.
4,606,176

0.2
2
1
157.5
2.25
168
0.27
0.405
1.75
10

532,600
60,000
30,000
2,520,000
72,000
369,600
57,618
74,358
350,000
540,000
792,665

0.1765
0.2015
0.1375
0.825
1.05
3.5

33,535
34,255
17,875
115,500
136,500
455,000
-

5,398,841
1,619,652
7,018,493
7,018,500

3,509,250

JUMLAH
H. SATUAN Rp.

TOTAL HARGA
Rp.
160,600

326.25
0.6
1050

52,200
10,400
98,000

45,050

0.225
0.15
1.5
4.5

2,550
1,500
11,000
30,000
0

205,650
51,413
257,063
257,100

JUMLAH
H. SATUAN Rp.

1,928,250

TOTAL HARGA
Rp.
10,825

3.41
0.506

8,525
2,300
22,525

0.33
0.22
2.2
6.6

1,275
750
5,500
15,000
-

33,350
13,340
46,690
46,700

JUMLAH
H. SATUAN Rp.

1,027,400

TOTAL HARGA
Rp.
512,360

2
0.12

500,000
12,360

243,775

0.03
1.6
3
4

1,275
60,000
82,500
100,000
-

756,135
189,034
945,169

945,200

JUMLAH
H. SATUAN Rp.

1,890,400

TOTAL HARGA
Rp.
4,097

3,970
127
13,450
850
1,500
11,000
100
-

17,547
8,774
26,321
26,400

JUMLAH
H. SATUAN Rp.

TOTAL HARGA
Rp.
510,400

500,000

290,400

7,400
3,000
177,550
2,550
15,000
130,000
30,000
-

687,950
206,385
894,335
894,400

JUMLAH
H. SATUAN Rp.

1,788,800

TOTAL HARGA
Rp.
41,664

6.15
4.592
0.26732

24,375
4,200
13,089
53,275

0.41
0.656
6.56
4.92

2,375
3,400
28,000
19,500
-

94,939
28,482
123,421

654,550

123,500

JUMLAH
H. SATUAN Rp.

TOTAL HARGA
Rp.
99,052

434.6
170.56
0.738
31.816

66,250
12,480
4,802
15,520
95,850

0.738
0.738
7.38
14.76

4,275
3,825
29,250
58,500
-

194,902
58,470
253,372

4,309,920

262,800

realistis
super pesimis
pesimis
super optimis

19,951,870.00
15,961,496.00
17,956,683.00
27,932,618.00

optimis

23,942,244.00

JENIS PEKERJAAN
SATUAN

No

A.

2 m3

BAHAN / UPAH / ALAT

KOEF

SAT

BAHAN
1 Kayu Kelas III
2 Paku 5cm-12cm
3 Minya Bekisting
4 Besi Beton Polos
5 Kawat Beton
6 Portland Cement
7 Pasir Beton
8 Kerikil
9 Plywood 9mm
10 Dolken kayu galam

B.

Kolom dan Balok dan Plat

0.5
3.2
1.6
157.5
2.25
336
0.54
0.81
2.8
32

m3
kg
Ltr
kg
kg
kg
m3
m3
lembar
batang

0.265
0.265
0.275
1.3
1.05
5.3

OH
OH
OH
OH
OH
OH

UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

H. SATUAN
Rp.

JUMLAH
H. SATUAN Rp.

TOTAL HARGA
Rp.
3,679,326

1,331,500
15,000
15,000
8,000
16,000
1,100
106,700
91,800
100,000
27,000

0.25
1.6
0.8
78.75
1.125
168
0.27
0.405
1.4
16

665,750
48,000
24,000
1,260,000
36,000
369,600
57,618
74,358
280,000
864,000
569,325

95,000
85,000
65,000
70,000
65,000
65,000

0.1325
0.1325
0.1375
0.65
0.525
2.65

25,175
22,525
17,875
91,000
68,250
344,500
-

4,248,651
1,274,595
5,523,246
7,018,500

14,037,000

JENIS PEKERJAAN
SATUAN

No

A.

m2

BAHAN / UPAH / ALAT

KOEF

SAT

H. SATUAN
Rp.

BAHAN
1 Genteng
2 Kuda-kuda
3 Pengapit Kuda-kuda
4 Gording
5 Reng
6 Bumbungan
7 Listplank
8 Talang
9 Pemasangan
10 Plafond
10 List Plafond

B.

atap-plafond

170,700

1.65
0.0128
0.0075
0.0132
0.008
0.25
0.45
0.066
0.45
1.39
0.08

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

7,360,000
262,500
6,910,400
117,300
72,900
191,000
161,700
39,200
125,000
132,000

0
0
0
0
0
0

OH
OH
OH
OH
OH
OH

95,000
85,000
65,000
70,000
65,000
65,000

UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

JENIS PEKERJAAN
SATUAN
JUMLAH
H. SATUAN Rp.

TOTAL HARGA
Rp.

No

786,785

A.

281,655
94,208
1,969
91,217
938
18,225
85,950
10,672
17,640
173,750
10,560

BAHAN / UPAH / ALAT

BAHAN
1 kran
2 instalasi air bersih
3 instalasi air kotor
4
5
6
7
8
9
10
10

B.

UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja

C.

ALAT

786,785

D.

SUBTOTAL

236,035

E.

OVERHEAD & PROFIT

1,022,820

F.

JUMLAH

G.

PEMBULATAN

N / UPAH / ALAT

PROFIT

saluran air
m2

KOEF

SAT

H. SATUAN JUMLAH TOTAL HARGA


Rp.
H. SATUAN Rp.
Rp.
38,660

0.1
0.4
0.22
0
0
0
0
0
0
0
0

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

48,000
28,000
103,000
-

4,800
11,200
22,660
-

0
0
0
0
0
0

OH
OH
OH
OH
OH
OH

95,000
85,000
65,000
70,000
65,000
65,000

38,660
11,598
50,258

JENIS PEKERJAAN
SATUAN

No

A.

m3

BAHAN / UPAH / ALAT

KOEF

SAT

H. SATUAN JUMLAH
Rp.
H. SATUAN Rp.

BAHAN
1 galian tanah
2 penutup
3 beton dan tembok dalam
4 urugan pasir
5
6
7
8
9
10
10

B.

septic tank

1.12
0.13
0.37
0.12
0
0
0
0
0
0
0

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

24,000
115,000
275,000
185,000
-

0
0
0
0
0
0

OH
OH
OH
OH
OH
OH

95,000
85,000
65,000
70,000
65,000
65,000

26,880
14,950
101,750
22,200
-

UPAH
1 Mandor
2 Kepala Tukang
3 Tukang Batu
4 Tukang Kayu
5 Tukang Besi
6 Pekerja

C.

ALAT

D.

SUBTOTAL

E.

OVERHEAD & PROFIT

F.

JUMLAH

G.

PEMBULATAN

TOTAL HARGA
Rp.
165,780

165,780
49,734
215,514