Professional Documents
Culture Documents
Tugas Gorong2 Pak Ismail
Tugas Gorong2 Pak Ismail
V1
Vg
V2
+10.20
+10.18
+10.18
8m
Diket :
V1 = V2 =
a=
Luas area irigasi =
0.7 m/det
1.25 l/det/ha
700 Ha
K=
Vg =
I=
H=
60
1.5
0.0003
0.0024
Hitung :
1. Elevasi downstream gorong-gorong
2. Kehilangan Energi
3. Elevasi Upstream gorong-gorong
4. Renana tebal gorong-gorong bila beban kendaraan 15 Ton
Penyelesaian :
1. Elevasi downstream gorong-gorong
Debit Q = a . Luas area irigasi =
875 L/det =
0.875
Q=A.V
0,875 m3/det = A . 0,7 m3/det
A = 0,875 m3/det =
0,7 m/det
1.25 m2
0.7
60
P = b + 2h.(m2 + 1)1/2
= ( 2h + h ).h
= 2h + 2,82h
= 3h = 2.39
= 4,82 h =
R = A/P =
V=
K=
4.30
3h2/4,82h = 0,62 h
V = K . R2/3 . I1/2
------>> I =
+10,18
0.0003
1/2
-->> 1,78 m
H = 0,9 m
=0,5
W = 0,30 m
B = 1,8 m
Bilangan Froude =
= 0.5
OK
B = 1,8 m
A = B.H =
P = B +2H =
0.016
W = 0,30 m
B = 1,8 m
Va2 . L
(K . R1/6)2 . R
A = B.H =
1,52 . 8
P =B +2H =
R = A/P=
0.0327 m
0.0635 m
0.064
7,5 Ton
BETON K225
1m
II
III
H=1m
2.88
T = H + W + H beton =
2,2 m
(1 . 1,8 ) m2
= 1.8
B = 1,8 m
+10.18
m/det
m
m3/det
0.727101
0.017321
=1
H = 0,9 m
1.59
(gorong2)
m2
60
0.7
3.57
m
11.08 m
H = 0,9 m
1.59
m2
3.57
0.45
2) . 0,9 . 1/2) } . 2
m2
m2 . 2400 kg/m3
Kg/m