1) Putting 50 Kg Turning in Mixer
Time Required is 4 Mins and 28 sec (5mins)
To fill the Mixer with 50kg of turning, a man fills a tub 13 times
and empties it 13 times in Mixer
(A Conical )
2) Heating the water and Pouring it in Mixer
Time required 49 Mins and 13 sec
A Tub 1 is kept bellow the geaser. It Takes 41mins and 2 sec to
fill the tub with 200 lit of water. The temperature of the water is
511C
The worker then fills another tub 2 which is kept on a trolley
with the help of a bucket (he fills the bucket from Tub1 and then
pours it in tub 2). The time taken is 2 Min and 6 sec
The tub 2 which is on trolley is taken near Mixer, Time taken is
54 sec
The water from tub2 is poured in Mixer using bucket. The time
taken is 2mins and 40 sec. The Temperature of the water drops
48.3
Proposal
o A Dedicated supervisor should be there to overlook this valuable
functioning