Centro Penal La Reforma

San Jose, Costa Rica

62

1412920 (Q14-79068 Version 2)

28
Short Starter

MP

3
1

02/20/15

WT

1. Disclaimer: Due to the lack of inforamtion in the geotechnical report furnished to CST, the foundation design is
based on assumed soil design parameters that may not reflect actual conditions. The foundation design is preliminary
only. Do not use for construction until soil design parameters are verified by a soils analysis report. CST assumes no
liability and disclaims liability for the foundation design.
2. Maximum allowable differential settlement, measured from the center of the tank to the outer edge of foundation,
is 0.75 inch, based on a smooth, parabolic deflected shape of the slab. The subgrade must be prepared so that the
differential settlement does not exceed this value.
63' - 9"

#8 Splice = 78"
#6 Splice = 28"

6"
12"

12"

#5 @ 11" o.c. Splice = 23"

#6 @ 11" o.c.

Splice = 28"
#4

18"

2 - #6 Top Hoop Splice = 36"


3 - #6 Bottom

Splice = 36"

21"

ESPCI / ISO28765:2008

Glass Fused To Steel Tank


Foundation Design: ACI 318
f'c = 4,000 psi

IBC
Site Amp. Factor = 1.0
Ie = 1.0

22
2,787psf

100

1.0
AWWA D103-97

/ 4