You are on page 1of 2
vr TEBODIN Record Reference: NC/DT/O8 Date: 22 June 2014 Document Transmittal Form Project Detail Musanada’s Project Number: 52420 Project Name: Al Shwaib Residential Complox The Engineer: Tebodin Middle East Contractor: Nae! General Contracting Est. Trans No: NCIDT/O8 Rev No: 00 ‘Subject Contact Documents a BH Tochrical Osta OO Guarantee OD Ceontfcate Test Rosut (ie Apcabe) TF statutory issues | C) Senoautes Gl submitas Report nar eae attachment | [samples B brawings CF catalogue Ml cos aoe O For FURTHER ‘seve D1 FoR INFORMATION Mi rorrecoro | rorreview cnet ACTION Detail : Only soft Copy ( 2 CD's) Contents in CD ‘+ Abu Dhabi Condlons of Contract ‘Volume 1 ~ Instton to Tenderers \Volume 1A Tender Addendum Volume 2~ Design and Buld Contact ‘Volume 3 Standard Spcieatons for Road & Bridge Costrction ised by Abu Dhab Municipality Rosd Section Speciation ‘Volume 3 - General Speciation or civ works issued by Abu Dhabi Sewerage sences Company | ADSSC) Volume 3- water specication ued by ADVIEA (3 Books) Volume 3 - Waterhouse connection, pariculr speciation; design guide nes, datasheet and preambles to bllof quant sued by ADWEA hooks) ‘Volume 3 Standard Electra Sections ised by AADCIAADC Volume 3 ~Parteuiar Speciation ‘Volume 3 ~ Standard Specifications for Bulldng Works oie 3 ~ Soll investigation Report Geotechnical (3 Books) Volume 4 ~ Bil of Quaniies ‘Volume 5 ~ Drawings , Book 1of3 , Book 2 of 3 and Book Sof3 Volume 6~ Musanada Poticies + Volume 7 — Asher Gude Lines, Issued By & Signature: Rebi Elias ~ Project Manager Naol General Contracting Est. Musanada Issued By & Signature: Issued to! Received by: je Gerard MeGrath ~ Project Manager eu ; Bullding Construction Management -Musanada | Tobodin Middle East | Roference Document: (Attach if any relevant Work Location: appicabe) = OLIN ILE. Lid. documents) AiShwab Distt Comments (Any): ] MBS TMT 190 ~ CS-24— Document Transmital Form Ver-0401 Fuly 2010 Page|t Distribution: Dl Musanada Ti Engineer Ti Contractor ‘Note: This document provides information or carfcation nly. f the Contractor considers the provided infomation as change to the ‘erignal Contract then the Contractor has to obtain the required approval as established in the Cordon of Contact. [TEBODIN ME. LTD.) aL SMAI ESIDENTIA COMPLEX FECEIVED ON 27 JUN 1H YOB.No, [SU No. | SEQ No, ‘too | 14 Dist | eRe. | SIGN, ‘ACTION DATE | NAME [REWAR&G) ‘MBS TMT 190 ~ CS-24— Document Transmittal Porm Ver-04 O1 July 2010, Page |2

You might also like