Record Reference: NC/DT/O8 Date: 22 June 2014
Document Transmittal Form
Project Detail Musanada’s Project Number: 52420
Project Name: Al Shwaib Residential Complox
The Engineer: Tebodin Middle East Contractor: Nae! General Contracting Est.
Trans No: NCIDT/O8 Rev No: 00
‘Subject Contact Documents
a BH Tochrical Osta OO Guarantee OD Ceontfcate Test Rosut
(ie Apcabe) TF statutory issues | C) Senoautes
Gl submitas Report nar eae
attachment | [samples B brawings CF catalogue Ml cos
aoe O For FURTHER
‘seve D1 FoR INFORMATION Mi rorrecoro | rorreview
cnet ACTION
Detail : Only soft Copy ( 2 CD's)
Contents in CD
‘+ Abu Dhabi Condlons of Contract
‘Volume 1 ~ Instton to Tenderers
\Volume 1A Tender Addendum
Volume 2~ Design and Buld Contact
‘Volume 3 Standard Spcieatons for Road & Bridge Costrction ised by Abu Dhab Municipality Rosd Section Speciation
‘Volume 3 - General Speciation or civ works issued by Abu Dhabi Sewerage sences Company | ADSSC)
Volume 3- water specication ued by ADVIEA (3 Books)
Volume 3 - Waterhouse connection, pariculr speciation; design guide nes, datasheet and preambles to bllof quant sued by ADWEA
hooks)
‘Volume 3 Standard Electra Sections ised by AADCIAADC
Volume 3 ~Parteuiar Speciation
‘Volume 3 ~ Standard Specifications for Bulldng Works
oie 3 ~ Soll investigation Report Geotechnical (3 Books)
Volume 4 ~ Bil of Quaniies
‘Volume 5 ~ Drawings , Book 1of3 , Book 2 of 3 and Book Sof3
Volume 6~ Musanada Poticies
+ Volume 7 — Asher Gude Lines,
Issued By & Signature:
Rebi Elias ~ Project Manager
Naol General Contracting Est. Musanada
Issued By & Signature: Issued to! Received by:
je
Gerard MeGrath ~ Project Manager eu ;
Bullding Construction Management -Musanada | Tobodin Middle East |
Roference Document: (Attach if any relevant Work Location: appicabe) = OLIN ILE. Lid.
documents) AiShwab Distt
Comments (Any): ]
MBS TMT 190 ~ CS-24— Document Transmital Form Ver-0401 Fuly 2010 Page|tDistribution:
Dl Musanada Ti Engineer Ti Contractor
‘Note: This document provides information or carfcation nly. f the Contractor considers the provided infomation as change to the
‘erignal Contract then the Contractor has to obtain the required approval as established in the Cordon of Contact.
[TEBODIN ME. LTD.)
aL SMAI ESIDENTIA COMPLEX
FECEIVED ON
27 JUN 1H
YOB.No, [SU No. | SEQ No,
‘too | 14
Dist | eRe. | SIGN,
‘ACTION
DATE | NAME [REWAR&G)
‘MBS TMT 190 ~ CS-24— Document Transmittal Porm Ver-04 O1 July 2010, Page |2