Safe Job Plan

Unit : DO MTO
WO #
1
Issued by : Ariel Cantero
Equipment ID : Others
Location : Shuiaba Port Control Room
E. Start : 01.08.2010

Priority : Urgent
Date

01.08.2010

Equipment Name :
L. Finish :

WORK SCOPE:

: 10cm elevation lift -up of existing FO panel

Job Scope

: Fixing the plinth at the bottom of panel

Sr.
No.
1

Execution by
Unit Contact
Contracts

: DO MTO Dept
: PAC
: HDEC

Steps

Hazards

Hazard Control

Apply and obtain


SWP

-NA

Manual lifting
using pallet jack
lift

- Pinch points
- Damage of control panel
during manual lifting.

- Use taglines while working control panel


- Control panel to be guyed during
lifting to control movement and striking
nearby structures to avoid damage.

House keeping

- Sharp edges

- Use leather gloves

Closing of
Permit

- Trip hazards
- NA

- Maintain good housekeeping


- NA

- Fill in the STAC


- Work to be carried out on the project
will be in accordance with the SWP.
- Use leather gloves