‘TARANG PROJECTS AND CONSULTANT LIMITED
Unaudited Financi
sults forth quartor onded on 0th September 2015
(Rupees in Lace)
3] Parlours ‘Timanthe | Procoding 3 [Covenpona|Voarto aa] Previous
| ‘ded |monthe ended] ing | igre for| gues for | ear ended
tannsrisy [on a0086) | months | current’ | the | s.anzots
cnaedin | pero | previous
previous | ended | yeorondea
year | 20082046 | 300.044
(eaten)
Teaued | “Uravated | Uravated | Unawaed | Unavatea | Rader
[Sates income fom Operations ‘ata «67 27| aoa] Teno] 15.05] _ 350507]
lp-Other neon T23] traf —z0] —_a09] aso] 22.51
Fetaincome aoa.ae| aes 99] 1.88] —Tae.a7] —vo.6i| —se07 5
7 [rota expendiize a01a7| 483.04] 783] Tas 31] 1524] a5 a]
ls) Purchace /Subcorivad Job Wore 2a1-7e| 473.76] 0.00] —res.5i] — 0.00] 350600
[pyEmployeos Cost 2.09 40a] ——s1f aan] 508] 1300]
=} Adrinaation Expanes & Other Expenae Bal ‘Saal aval a1 25] 9.38] 26]
[ay Depreaation 327 ‘Oza 000 —— 0.44] 0.00] 2]
3 [Pot before mieest CT 20 Sif 40s] rte] 4.37] 69.13
= Tneror 3.09 9.06] 800] 0-00] 0.00] — oo
5 [Prot air iron bu before Exceptional lems Oa) 20 Sts[__ 409] 716 37] 63-1]
@ [xcegtonal tems 7.09 3.06] 00] 0-00] ——o.00]—o.00]
7 [Prt (Loss () fom Orinary Aves before wx SO) Zo B.is|__405[ 7.16 a7] 31
5 [Tax Bepense 700 ‘3.00 00] v.00] ——o.0o] to
1 |Net Prot (Lane) rom Orsay Aces aera ED Zo 3.16405] 7.0] a7] aa
0 [extaovanary tems T09 ‘0.96 —a00] 0-00] ——~o.00]— 0.00]
1 JNet Prot (ross ore pereao TO) Fa 3.15] 40s] ro] a7] a2
"2 [atin euiy sae capa ace vate OTHE BEEPS] —ca40 oo) raagoq] 14a0.0{ tea000] 1440.00] 144000
Ta fResen, z z S|
Ta fers 5 0.39
15 [Poo sarahoung
[> Number of shares EAS] eB] TEAR — ARTO RTA] eT
[Percentage of sharshoag To0.0o| 100.00] — 100.00] — 100.00] —Too.0q] — 10000
76 [Prometers ana promoter group
[srarenaaeg
fs Pledgedseumbered
Numero shares Ta 36] oao| apo] na]
erage of sh Te a arn eT oR ca ‘0.00 oaol ooo) oo] ao
[Porcoriag of shares (asa fe Total share capa oThe re ooo] aco] ovo] 00] 000
lb Norancunbered
‘umber of Shaves 7 7 7 7 a a
[Porcoriage of snares (as 0% oT Ds Tota sharohaiing of promaler, i
Seen 2.09 nq] oof oo] o.aal- 000
[Percoriage of shares (asa thelial shave capial oie tod ooo] aco ooo] ool 000
lesmpany)
Notes
4. The above results were reviewed by Auelt Commitee and taken on record by the Board of Directors
atts meeting held on 14.11.2015.
2, Previous period figures have been regrouped / restated wherever considered necessary
3. During the quarter there were no complaints received from the investors and there were no complaints
pending atthe beginning ofthe quarer
4 Provision for taxation is made atthe end of the year
For Tarang Projects and Consultant Limited
Director
Place: Ghaziabad
Date: 14.11.2018,