You are on page 1of 3
(ersoveeT#o| REV | DESCRIPTION @ VIETSOVPETRO | RESEARCH AND ENGINEERING INSTITUTE FOR OIL AND GAS. MIETSOVPETRO | Peseronanonconncusni PROJECT NAME RC9RC5 WELLHEAD PLATFORM DATASHEET FOR PRESSURE REGULATOR VALVE RC9RC5-001-RC5TS-TP1-DS-01 DOCUMENT TITLE DOCUMENT No. CONTROLLE PRO. | MANAGER | sre | ROORCS oc. No | ReSRCS.00+-RCSTS-TPH-05.01 WELLHEAD PLATFORM [= : 1 Sa DATASHEET FOR Pace | aes Woes l PRESSURE REGULATOR VALVE Notes: {.VTA denotes Vendor to Advice, valve datasheet shall be completed by Vendor & incicates information that wil be supalied with Vendor's quotation, 2.Vendor shall furnish detailed cross sectional drawing with dimensions and verity that nominated materials are suitable for the proposed service 3 Test pressure shall be in accordance with ASME B16,34 and valve inspection and testing procedure shall be in accordance with AP! 588 / API 6D, refer to Specification for Manual Valves BKT-001-TS-TP1-SP-02, 4. PCV size shell be defined by Vendor, Vendor shall furnish sizing calculation and confirm the sized base on the gwen process data, The calculation sheet shall be sumvitied to COMPANY review and approval IFPCV size calculated by Vendor is smaller than Line Size, Valves with opposite Flanges and Reducers, Gasket, Bolt/nuts (accordance with Piping Materials Specification Doc. No. BKT-001-TS-TP1-SP.01.) willbe ‘supplied by Vendor. 5.Al boll & nuts shall be coated with Xyien Fluorocarbon Coated. 6. Other requirement shail be in accordance with the folowing documents: ‘+ Piping Ciass Specification : BKT-001.7S-TP1-$P.01, + Specification for Manual Valves - BKT-001-75-TP1-SP-02, + Technical Specification for Painting : BKT-001-GEN-AZ7-SP-01 "323 a emce weinenoriaronm [P= Nefpemotonacererosay| Serre | onvasneer For pressure recuLaror vaLvE [= 0 ae See rae zea Tae Seva feces rosso ca cence [Hpi icaar se of OTERO San Hoe tte jencearrosre fo wa (ara Cran Sat 7 fn tasayiGiw — ice Ree Se ie es 7 [Fed Produced Gas pss a — a [ae Tomo = a . ee 7 ae save oo conomions [iz operating Tempers 3 = ws fea en oy Sova ems ie fos vos Sg om we Te fsmctoe ta ma ie hee me 1 [ov ened sa a} on ee mee to Tana [im pena Soap, San oor | EEes ener Rama tie ong TTC Ea ponte ion ser hae [Sanat ins | waasTo aia © taal WR pasa eiaioa Toot a opie SU Pa 26 [Stem Gung [Ramer Fors Yes 7 3 ar EEF CER eu efecto Asn aTesSN aa Ea te A Ea 3 ai Bima TE a Sethe Sao ‘34 [Self Connection _[Extemat Connection Yes. No St eer a aT ACTUATOR }35 Sprig Ran aie Es. ar [apg un RETO al Sr fssug cae anasto wea 2s ae or ah or a2 ide TERT eS 7 eect Ta Tad oe ae Te | 45 ome TE B60 TS fae Ta rscrase Ferien — via (ae [teste i wm 324

You might also like