The document is a fax informing operations and maintenance managers of an issue with the phase 2 PLC redundancy control system. Specifically, the redundancy processor in the secondary chassis is not working due to a mismatch between the control network file and the primary chassis card. To resolve this without a plant shutdown, engineers will take an image of the primary control network file, define a new path for the file in the redundancy card offline, and download the application to the processor using an RS232 communication. Once power is restored, the system will return to normal operation within a certain time period.
The document is a fax informing operations and maintenance managers of an issue with the phase 2 PLC redundancy control system. Specifically, the redundancy processor in the secondary chassis is not working due to a mismatch between the control network file and the primary chassis card. To resolve this without a plant shutdown, engineers will take an image of the primary control network file, define a new path for the file in the redundancy card offline, and download the application to the processor using an RS232 communication. Once power is restored, the system will return to normal operation within a certain time period.
The document is a fax informing operations and maintenance managers of an issue with the phase 2 PLC redundancy control system. Specifically, the redundancy processor in the secondary chassis is not working due to a mismatch between the control network file and the primary chassis card. To resolve this without a plant shutdown, engineers will take an image of the primary control network file, define a new path for the file in the redundancy card offline, and download the application to the processor using an RS232 communication. Once power is restored, the system will return to normal operation within a certain time period.
Maintenance Gen .Mgrs EW-Fields Gen .Mgrs Oct. 26, 2010 PHASE -2 PLC REDUNDANCY CONTROL SYSTEM
We refer to the above mentioned subject Kindly be
informed that, the problem of Ph II PLC in the secondary chasse, redundancy processor is out of serves due to redundancy module is disqualified with primary chasse and the control net file in control net card doesnt matched with primary card, this case need to plant shutdown about 2 Hr to make new control network file and downloaded to two processor at off-line mode. The flowing steps taking to solve problem and save plant running. 1- Taking the image from control net file (*.xc) from primary chasse by using RsNet works for control net program. 2- Defined new path for control net file in RSlogix 5000 for PH II application in redundancy card (off-line mode). 3- Defined RS 232 communication by using RS Linx to enable access to processor without shutdown network (plant shutdown). 4- Download PH II application to processor. 5- Restart power up chasse. Instrument Department
F.REF 181
6- The system takes certain time and bake to normal
operation. 7Instrument Team work 1- Eng / Ayman Ramadan El haron 2- Eng / Ahmed Farg Hassan 3- Eng / Ahmed Farouq Ell nakshpandy For your information & advice, Regards,
5100 12. Post Inspection Sampling Mandatory sampling and inspection after 100% visual inspection. Sampling plan as per ANSI/ASQ Z1.4 – 2008 (or ISO 2859-1): General Inspection Level – II, Single sampling plans for Normal inspection with an AQL of 0.65%. Batch releasing criteria: NMT the specified number of units contains visible particulates. Special level sampling (reduced sample quantity) for destructive inspections (for powder filled, lyophilized products, coloured containers, etc.). AQL Failure Is the test Destructive ? Investigation Re-inspection of 100% units Batch Rejection Yes No PerformAQLinspection Slide No. 12 13. Particle Separation, Identification and Characterization Manufacturers should have knowledge on their particulate matter rejections. Type of particles. Source of each particle type. Routine trend / capability of particulate rejections. Morphology of each type of particle. Chemistry of each particle type. Manufacturers should have comprehensive