Realignment section (km 425.450 426.

050):
The proposed ROW boundary is not shown, so the Horizontal alignment, OGL
survey and Vertical Alignment design is still pending.
Channagiri Bypass (km 482.600-486.100):
The proposed ROW boundary has not finalized, so the Horizontal alignment, OGL
survey and Vertical Alignment design is still pending.
Holehonnur Bypass (km 508.800-511.600):
The proposed ROW boundary has not finalized, so the Horizontal alignment, OGL
survey, Vertical Alignment design, Major, and Minor Bridge design is still pending.
Shimoga Bypass (km 519.750-523.650):
The proposed ROW boundary has not finalized, so the Horizontal alignment, OGL
survey, Vertical Alignment design, and Flyover design is still pending.