You are on page 1of 8

32 DI

8 AI
32 DO
8 AO
CPU IM 151-8 PN/DP
HMI 15" Toch Screen on Profinet
Profinet Cable for 6 Panel appx 1500 Mtr to be
used.

Anode
Casting
Philips
Controller

Anode
Casting
Siemens
PLC

1
4
2
0
1

8
1
4
1
1

SCADA WinCC 7.2 4096 Power Tag License to be taken


WinCC 7.2 4096 Tag RT License (Operator Station
WinCC 7.2 4096 Tag RC License (Engineering Statio
Note: No control Panel is counted. If control Panel required then it will be chargeble extra.
Control Panel Charges
1
1500X1000X500 mm Size powder coated

EC CRANE
PLC PANEL
8 DI
4 AI
8 DO
2 AO
CPU 315-2PN/DP
Expansion Module ET 200 S
MMC 512 KB EEPROM
HMI TOUCH SCREEN 10"
Operator Panel Keypad type
Big Control Panel (2000X1200X1000)
Control Panel for Expansion Unit (500X500X500)
VFD SYSTEM < 25KW Rating
Profinet Cable In mtr (Daisy Chain)
Profinet Connector
POWER MODULE TO ET200S IO
BACK RACK SET FOR ET200S Module

Expansion-1
S1
6
1

1
1
1
2
2
1
1
200
2

100
2
2
7

Anode
Casting
Philips
Controller
Programing Charges
Commissioning Charges

Anode
Casting
Siemens
PLC

40000
65000
4000 INR Per Day from 4th Day for each Pan

Anode
preparation
Machine APM

Cathode
Stripping

9
1
7
0
1

7
0
4
0
1

Compacting & Scrap Anode


Strapping
washing
2
0
1
0
1

5
1
4
0
1

Total IO
1024
56
704
8

1792

T License (Operator Station)


License (Engineering Station)
will be chargeble extra.
1

Expansion-2
S2

Expansion-3 Expansion-4
S3
S4

Expansion-5
S5

1
1

1
1

1
1

1
1
100
2
2
5

5
1
1

1
1

1
100
2
3
3

Expansion-6
S-12

100
2
3
3

1
2
100
2
3
4

100
2
3
7

Anode
preparation
Machine APM

Cathode
Stripping

Compacting & Scrap Anode


Strapping
washing

E&C Crane

55000
50000
40000
50000
150000
om 4th Day for each Panel. Tentatively 10 Days will be required for Each Panel. Fro E&C Crane we re

Total Module

Unit Rate for


Module

Total Amout

32
7
22
1
6
1
1500

38200
46400
39800
76800
55800
287211
450

1222400
324800
875600
76800
334800
287211
675000

1
1

332158
391426

332158
391426

75000
appx

450000

Expansion-7 Expansion-8 Expansion-9


S21
+STST1
+STST2
8

3
1
1

100
2
2
11

100
2
3
5

100
2
1
2

Expansion-10 TOTAL IO
256
8
80
6

0
350

Total

450000
l. Fro E&C Crane we require 15 Days for commissioning.

Total Module
32
2
10
3
1
9
1
2
2
3
7
3
1100
20
22
47

Unit Rate for


Total Amount
Module
11300
28600
12800
32400
178900
19300
32800
124900
42500
95000
42000
250
2800
4500
6200

361600
57200
128000
97200
178900
173700
32800
249800
85000
285000
294000
0
275000
56000
99000
291400

Discount @ 30%
Applicable
yes
yes
yes
yes
yes
yes
yes
yes
yes
NO
NO
NO
yes
yes
yes
yes