Instruction For Installation AISI and TPU LINE
Instruction For Installation AISI and TPU LINE
3. Place the drilling template on the marked space for accurate drilling.
4. After placing, drill the openings in four corners of the template and place pins to
anchor the template in position.
5. After template anchoring, drill openings in the floor as marked on the template
with a vertical drill. Use a vacuum cleaner with water capability to remove the
excess water.
8. Fill openings with glue, Hilti RE500 is recommended. Place stud/strip pin into
the openings respecting the template marking. Pin sticked with RE500 can
withhold 500 kg of tensile strength.
9. Remove template after the installation of all elements and glue is cured.
10. Check the elements 2-3 hours after sticking, whether they hold in position,
remove the barriers. Full duty is recommended after 24 hours.
For its long lasting effect is this type of installation highly recommended for all type of
floor surface in the interiors and exteriors.
Drilling openings to the bitumen is possible with classic hammer drill.
Photo: