You are on page 1of 3

Drilling Date

Cont Supervisor
PMC Supervisor
Weather
Temprature Start of Work
Temprature Completion of Work
Piling Rig

Pile No
Description as per Design
Northing
Easting
Cut off Level
Ground Level
Designed Toe Level
Depth of Pile

SOIL LOG
Top of Casing
Ground Level
Cut Off Level
Intermediate Level

Actual Toe Level

Dia of Pile -mm


Description as per Actual
Northing
Easting
Observed Ground Water Level
Drilling Start Time
Drilling Completed Time
Depth of Pile
Casing Top Level
Length of Casing Used

Working Load - t
Reinforcement Details
No of Cages
Length of Segment -1
Length of Segment -2
Length of Segment -3
Main Bar Dia
Helical Dia
Pitch
Cover
Concreting
Therotical Volume required
Millar Required as per above
Description about Miller-1
Start Time from Plant
Reaching Time at Pile Location
Start Time of Poring
Completion Time of Poring
No of Cubes prepared
Depth achived
Slump in mm
Temperature
Description about Miller-1
Start Time from Plant
Reaching Time at Pile Location
Start Time of Poring
Completion Time of Poring
No of Cubes prepared
Depth achived
Temperature
Slump in mm

You might also like