Engineers Office

Single Door to Double Door in Main Entrance.


Increase in size of Door Step.
Additional Door in General Work Area
Additional Window in HSE manager
Additional Double Door in the corridor.
Increase in incomer Size from 100A to 125A

Satellite Office (2nos)


Additional Window in Inspectors
Additional Window in Assistant R.E.

Main Office (G+1)


Single Door to Double Door in Main Entrance.
Removal of 5 wall panels and 1 single door
Additional 6 double doors in the corridors.
Additional window in the Document control (first floor)
Additional window in the Technical Service Manager (first floor)
Additional door in the Design Manager Room (first floor)
Increase in incomer Size from 100A to 125A