= a ow Mush Pov Mai
1 Sona tf oo te fo th ee of
“The sae information can be present ia erent ay
sing th prt ein fist agin (E4. 8409. win fo
ccovatncts Toeninion fa bare
2 — p= (6 Ori -9+81
+41 a Poston) 45)
ayant 0481
ay 9D —tos-+ 8)
Haart toed)
att nigh Fla art tose tans} 5H)
gation 5550) provider a generalised (and theoretical rigorout) mean of
imerpsting the boom hole Mowing prewar response when he wel produc
any rier when thus hoc shut afer a pend of production I so
spplcable (by using a negate g) othe equivalent ineetivity and pressure alo
ide in well where mater being injected for pressure mainienance or Witt
Roodins
uation (5.5) can therefore be used to ovate ky S and the desinage radius
{or the distance fan impermeable Base) fom ie botemhole owing shat
fpemurerxponss and a Enovedge ofthe rate varations.
‘Chapter 6 wll del exclusively wih this topic By way of a iotrodution to this,
ir foena stine rvsont hier with summary othe Most common tes
‘redution und injection test in ueren be
58 Testing Production and Injection Wells
Production wells ae almost lavaraby texted under Bowing conditions (@ > 0)
‘Only Tthe escrvoir peer [ low enouah for production to reiue arial Mt
{Gownhots pump, eth might tbe preferable conduct an injection fest (= OS
‘Ths would be in order to avold mechani! ities ansocited wth ving he
presure gage nthe well il theses equipment sti operational and
SS sencraly achieved by pumping down diel or reervic crude
‘Water Injection welc ae aul testo hy ijecton, although very occasional
production (bck Now) tess may be performed
‘String Irom stabilised conditions, pm over the whole drainage area
at £20, gon a well text wil involve puting the wal om production Ot
Inicction chert a sonstant vate gat downhole conditions of as operating
Condions often dictator at @ soqucboe of Tater jars -a ef time periods
Filly fakes lla tet
“Phe formar ance Tle toa constant rate text, the
“with a well on production, the mensurement of the bottom ole flowing
a8 a merate
premute put) a decreasing ten ~comstlues a pressure drawdown rest, wil
the cate of injection, the measurement in this case am increasing trend —
"The well i
y shut in (g = 0) a th end of the production oF injection
psig andthe bottom Bole prestare measurement I continued
‘Whoa producing wel sth in the bottom hole posse (0) es, nd the
reste mecturement fe rlerre to 4 bul ‘est fr PBU we the declining
Presure toyonse wish follows the shutting in of an injection wll i called
ar al ff tn! for PEO)
“The method of btuining RLS and r, oF the distance so a permeability
boundary fom prose measurements during production oF injstion (Pei ad
‘Guing shuts ju), ae described in detail n Chap. 6.
t's also common peacice to calculate the following three addtional pars
sneer the test dat
Well protest inde
(6560)