You are on page 1of 14
KE RU I Kerui Oilfield Solutions (Singapore) Pte. Ltd. {1A ntorraonal Business Park, 49-14 ICONGIEP, Singpore 590095 “Tei. 8 88509660 Fax 5 66596659 vor erugrau.cam Copan Regsaton No, 2013167224 Wwerim 18-3/4” 15K Subsea Wellhead System Ke RU i Kerui Oilfield Solutions (Singapore) Pte. Ltd. {i iterasonal Busross Prk, 400-4 CONGSEP, Singapore 60095 “at 86599669 Fax 75 65596609 vor eruigraup.cam Company Reglstion No, 201316722 were Table of Contents Page WELLHEAD SYSTEM OVERVIEW...... Drilling Template. Flow Base/Guide Base Assembly 30"/36” Low Pressure Housing (LP Housing)... 18-3/4” High Pressure Housing (HP Housing). Casing Hanger ~ 13-3/8” & 9-5/8". 18-3/4” Pack-off or Annulus Seal Casing Hanger Spacer ... Gimbal Assembly... eae Clamp Assembly for Low Pressure HOUSINg.:.imnnmnnannnnanennennmnman nnn 8 C Plate ssusmuaiennensqeneinssennnniennsnnaioraeseinaiasamaienseminen is Clamp Assembly for High Pressure Housing. Emergency Pack-off.. Corrosion Cap... ‘SUBSEA WELLHEAD SYSTEM RUNNING TOOLS. Drilling Template Running Tool .. Flowbase/Guidebase (FGB) Hydraulic Running/Retrieving Tool... 30” Low Pressure Housing Hydraulic Running Tool (LPHART).... 30” Low Pressure Housing Mechanical Running Tool (LPMART) - Optional . 18-3/4” High Pressure Housing Hydraulic Actuated Running Tool (HART)... 18-3/4” High Pressure Housing Mechanical Actuated Running Tool (MART) - Optional 7 BOP Isolation Test TOO! .ujmnemneeimnnnaninnnininnnrinnimannennnmnnes 18 Casing Hanger and Packoff Single Trip Running Tool (STRT).. Pack Off Retrieval Too! (Ret)... Combination Tool .. Wear Bushing and Nominal Seat Protector. Jetting Tool... Mill and Flush Tool. Tool Basket... ‘SCOPE OF SUPPLY DRAWING. 18-3/4” 15 KSI Wellhead System... Rental TOOIS j.isnsnsainnnsnnsnsnnaniannsniananenenisiian annem 27 Pageiora7 Kerui Oilfield Solutions (Singapore) Pte. Ltd. 24 biernal Business Pe, 909-14 CONDIBP, Singapore 66005 “ol +85 66500680 Fox =85 B50 S680 wi Rerugyop com Company Rogistreon No, 207918724N Were WELLHEAD SYSTEM OVERVIEW The Wefic Subsea Wellhead System is a pressure containing vessel used to hang-off and seal the different casing strings in the drilling of subsea wells. It also provides the structural foundation for the connection of the Subsea Blowout Preventer stack as well as the attachment of the Christmas Tree. Structural strength is provided through the series of casing strings in the casing program. Initial foundation is provided by the drilling template. The Low Pressure Housing, used for running conductor strings, lands on the drilling template via a gimbal assembly and is cemented in place. The High Pressure Housing in turn, lands on the Low Pressure Housing and together forms the main structural backbone of the wellhead system. The High Pressure Housing is equipped with an external wellhead profile to match the wellhead connector on the BOP. Common wellhead profiles can be provided to suit customer’s requirements. The internal profile of the HP Housing is designed for hanging and sealing off the casing hangers. The casing hangers have a standard running and pack-off sealing profiles. This allows all hangers to be run by the Single Trip Running Tool as well as a standard pack-off to be used. Pack-offs have Metal-to-Metal seals with elastomeric backups. A separate Emergency Pack-off which seals on a different sealing area is also available in the event sealing problems are encountered at the standard sealing areas. eT Pagezora7 Kerui Oilfield Solutions (Singapore) Pte. Ltd. {A internat Busioss Pak, 40-14 ICONGIBP. SIngepor 600035 Tel, 2656069 9609 Fax “066629 6608 wn Kerugroup com Compary Registration No, 201910724N were 1.1 _ Drilling Template 1.1.1 Purpose Foundation support of the Subsea Wellhead system to maintain wellhead height above mudline. Template is also used as drill marker, 1.1.2 Description The Drilling Template provides primary guidance during the initial drilling operations. It also provides the structural support for the Low Pressure Housing during cementing, Land-off of the Low Pressure Housing on the Drilling Template provides a positive datum for control and verification of the level of the conductor string. Template also provides support for the BOP on the seabed, Pagesora7 KE RU I Ker ilfield Solutions (Singapore) Pte. Ltd. {A terran Busine Pek, 109-14 CONBIEP, Singapore 606096 “al 85 660 9660 Fox ~95 6360 5580 wie kougroup com Company Regieraion No 201818728N 1.2 Flow Base/Guide Base Assembly 1.2.1 Purpose Used for guidance of BOP stack purpose or to interface with Christmas Tree to direct the flow to flow line piping terminating at flow line connections in preparation for final make-up and connection to the flow lines. 1.2.2. Description The Drilling Template provides primary guidance during the initial drilling operations. It also provides the structural support for the Low Pressure Housing during cementing, Land-off of the Low Pressure Housing on the Drilling Template provides a positive datum for control and verification of the level of the conductor string. ‘Template also provides support for the BOP on the seabed, The Flow Base Assembly can be designed to act like a Permanent Guide Base to guide all equipment into the well using guideline or it can be designed to have flow lines to interface with future installation of Christmas Tree. Standard Flow Base does not have any flow lines attached. It has 4 guide posts with 6 feet radius from centre of the well. It is designed to run in with the dogs in the unlatch position where the dogs are retracted. Upon going over the 30”/36” Wellhead and landing on the top wellhead, weight will be added to the landing string to shear the pins inside the Flow Base Assembly to push the dogs into the cavity of the LP Housing. It can be of the retrieval or non-retrieval type. Page 40827 Kerui Oilfield Solutions (Singapore) Pte. Ltd. 3A Miratonal Busiress Pak, 49-14 ICONGIEP, Srigpore 605805 Tel "6565500660 rox 265 6850 580 ww kus com Compary Reglaton No, 207318724 Were 1.3 30”/36” Low Pressure Housing (LP Housing) 1.3.1 Purpose To provide primary structural foundation for wellhead system. 1.3.2. Description The Wefic Low Pressure Wellhead Housing is the primary structural housing for the subsea wellhead system. This housing is prepped for landing of the Wefic High Pressure Housing and together forms the main structure for bending and fatigue resistance of the wellhead. The internal diameter has an internal groove profile for the housing running tool as well as the appropriate seal areas to prevent pressure flow-back during cementing, Internal diameter also provides a locking profile for the High Pressure Housing as well as load shoulder and reaction surface to resist bending loads applied to the wellhead. Four cement return ports are also provided to direct cement returns away from the well. The Low Pressure Housing is welded to the conductor pipe. A gimbal is usually clamped onto the conductor pipe below the Low Pressure Housing for transferring vertical loads onto the Drilling Template. 1.4 — 18-3/4” High Pressure Housing (HP Housing) 14.1 Purpose For interface with the BOP stack and pressure =z. containment during the drilling phase, Also provides support and pack-off of all casing hangers. 1.4.2. Description The Wefic High Pressure Housing is the main housing for installation and packoff of the casing hangers. It can be prepped with customer specified wellhead profiles for interface with available industry wellhead connectors. The Wefic High Pressure Housing provides landing and lock-down profiles for the casing hangers. Independent landing profile for each casing hanger can be provided for high capacity applications. Page Star 2K Internal Busirons Pa, H00-16 CONGIEP, Singapore 600026 Ee | Kerui Oilfield Solutions (Singapore) Pte. Ltd. “Ta. 8 86509660 Fax 55 68596609 va erugrup cam Company Regsaton No, 201816722N 1.5 Casing Hanger — 13-3/8” & 9-5/8” 1.5.1 Purpose To hang various Casing strings inside the High Pressure Housing 1.5.2 Description The 13-3/8”, 9-5/8” and 7”casing hangers are used to run and hang their respective casing strings in the High Pressure Housing. All casing hangers are prepped with identical running profiles for running and installation by the standard single trip, casing hanger running tool. These Casing Hangers have huge capacity and each Hanger can hang up to 1 million pounds casing load. Generous flow- by areas are provided to enhance circulation for cementing, with each hanger having a minimum flow-by of 15.7 square inches. Hangers have 2 sealing areas designed for redundancy, These Casing Hangers also have tong neck provided for easy make up and can be supplied with customer’s preferred threaded connections to match the customer's casing string. The standard Casing Hanger comes with NACE compatible material. 1.6 18-3/4” Pack-off or Annulus Seal 1.6.1 Purpose Were 7° Casing Hanger 9.5/8" Casing Hanger 13-3/8" Casing Hanger The Pack-off or Annulus Seal is to isolate the annulus between 2 Casing strings. 1.6.2. Description Pack-off Assembly or Annulus Seal is an important component in the wellhead system, used to isolate the annulus between one casing string to the other, due to different pressure ratings of each casing, For Wefic system, the pack-off assembly is designed to take pressure up to 15,000 psi, The metal end cap seal when energized will give a metal to metal seal. Pages ofa7 Kerui Oilfield Solutions (Singapore) Pte. Ltd. 24 Ierraborl Business Pa, 09-16 ICONAIBP, Siizenre 05005 a. 765 66600660 Fax 06 680 6809 wneeruigroup om Conary Registaton No. 201316724N Were The pack-off is designed to be run together with the Casing Hanger in a weight-set single trip Running Tool to save time. The Running Too! will set the pack-off after the cementing operation using hydraulic pressure from the Running Tool and simultaneously energize and lock the pack-off and hanger to the High Pressure Housing in a single operation. Pack-off can be retrieved with the pack-off retrieval tool. 1.7 Casing Hanger Spacer 1.7.1 Purpose To maintain the Casing Hangers in the same elevation in the event certain casing strings are eliminated from the casing program. Maintenance of standard casing hanger elevations allows ease of tubing hanger or Christmas tree installation. 1.7.2. Description If the drilling program dictates a slim-hole operation with the elimination of the 13-3/8” casing string and casing hanger, a Casing Hanger Spacer is attached to the bottom of the 9-5/8”casing hanger. This spacer is sized so as to position the 9-5/8”casing hanger in the original 9-5/8”casing hanger position in the High Pressure Housing. Casing Hanger Spacer Page 7 of 27 Ke RU J Kerui Oilfield Solutions (Singapore) Pte. Ltd. 2A hierar Businoss Park, 400-16 ICONGIEP, Singapore 60005 ‘Tat 66699660 Fax +85 65698609 vou Aeagrup.com Company Regsaon No. 201318724N 1.8 Gimbal Assembly 1.8.1 Purpose To allow conductor pipe to land in a vertical position even though the Drilling Template may be sloping at an angle. It is usually attach to the conductor pipe and at any elevation the customer desire. 1.8.2. Description The Gimbal Assembly is designed to land on the funnel of the drilling Template in a vertical position even ‘though the template may be inclined at various angles. It allows the Conductor string to be disconnected from the Running Tool without having to wait on cement thus saving time for Rig to continue preparing for the next programme. The Gimbal Assembly also allow the LP Housing to be placed at any elevation from the seabed customer desired. 1.9 Clamp Assembly for Low Pressure Housing 1.9.1 Purpose To allow LP Housing to be placed safely at the Rotary table so running of the cement stinger string will be made easier. 1.9.2 Description The Clamp Assembly is designed to facilitate running of cement stinger and Running Tool. It is designed to take the combined weight of the cementing string and the Conductor string or up to @ maximum of 1 million pounds maximum. It is designed with skirt below that will insert into the Rotary table to act as centralizer, hence preventing the Conductor pipe to swing around. Page Sota KE RU I Kerui Oilfield Solutions (Singapore) Pte. Ltd. 2 bierronal Business Park, 09-14 ICONDIEP, Segapore 60009 “Tel +05 68599668 Fax +66 6669 SC09 won erulro.com Company Regisireson No, 201918728N were 1.10 C Plate 1.10.1 Purpose To facilitate running of it ing, or HP Housing, or Casing Hanger in a safe manner. 1.10.2 Description The C Plate is designed to allow running the cementing string through the LP Housing, HP Housing or Casing Hanger using dual set elevators. It is designed to be able to take the weight of the most or up to maximum of 750 thousand pounds. It is designed with stoppers below the plate that will prevent the plate from sliding during running operation. These stoppers can be shifted to match the different diameters of the Housing or Casing & _.. Hanger. 1.11 Clamp Assembly for High Pressure Housing 1.11.1 Purpose To allow HP Housing to be placed safely at the Rotary table so running of the cement stinger string will be made easier. 1.11.2 Description The Clamp Assembly for High Pressure Housing is designed to facilitate running of cement stinger and Running Tool. It is designed to take the weight of the cementing string of 20” Casing pipe up to 1 million pounds. It is designed with skirt below that will insert into the Rotary table to act as centralizer, hence preventing the Conductor pipe to swing around. Pages of 27 KE RU I | Kerui Oilfield Solutions (Singapore) Pte. Ltd. {A err Sunes Park, A914 ICON, Srswpor 65895 “a= 66500660 Fox *85 0550589 wr etroup com Company Reitaon No, 201316724 Were 1.12 Emergency Pack-off 1.12.1 Purpose To seal the annulus of 2 casings at another location, after the primary pack-off seal is unsuccessful. 1.12.2 Description The Emergency Pack-off is designed to seal like the primary pack-off but at a different location after the primary pack-off is unable to seal. It is designed to lock into the Casing Hanger and can be used in any Casing sizes. 1.13 Corrosion Cap 1.13.1 Purpose To prevent the internal of the High Pressure Housing and those Casing Hangers & Wear Bushing from corroding after the well is left behind. 1.13.2 Description The Corrosion Cap is designed to cover the well after the drilling & exploration phase has been completed. It provides a locking mechanism that when the handle is being push downward it will lock the Corrosion Cap automatically to the HP Wellhead. It is equipped with ports with ROV stab sub to allow corrosion inhibitor to be injected into the ID of the Wellhead and displaces the fluid that is in the wellhead. This Corrosion Cap is also equipped with anodes to prevent external corrosion. Page 10 127 KE RU I | Kerui Oilfield Solutions (Singapore) Pte. Ltd. 2 hlemsorl Businoss Pak, #9-16 ICONGIBR, Sigapore BIG “Tan60 B59 9669 F595 5569 we engroupenm Company Regstraton No, 201970724 2 SUBSEA WELLHEAD SYSTEM RUNNING TOOLS Paget of27 KE RU | Kerui Oilfield Solutions (Singapore) Pte. Ltd. ‘A iterator Busines Pak, 409-14 CONE, Singapore 60Ee05 “eu +65 6669 9668 Fax =96 65695509 wn kenagrop.com Company Regisireion No. 201016728N 2.1 Drilling Template Running Too! 2.1.1 Purpose The drilling template running tool is used for running of the subsea drilling template to its required location. 2.1.2 Description The running tool comprises a central mandrel with 6-5/8” API Regular Box thread top e connection and a back taper shoulder cylindrical body bottom. The mandrel is assembled into a cylindrical housing which is welded to structural cross beams and circular center centralizing ring with an outer 41” OD and four evenly spaced square blocks. The mandrel bottom taper shoulder will be coupled with the cylindrical housing to provide a maximum 5 degree inclination allowance for template installation and retrieval. The tool jays into the mating ‘s’ slots in the center ring of the drilling template and conveyed to the sea floor, The running tool has a tensile strength of 150,000 Ibs, (68,040 kg). Refer to figure 2.1 The drilling template running tool consist of a long stem with a cylindrical body fitted with external lugs which jay into (lock in) the drilling template's centre, The stem/body interface has a ball and socket arrangement to provide some freedom of movement between running string and tool to accommodate for seabed inclination of 10° max. If the drilling template is not run on guide wires, a suitable transponder will be fitted into the drilling template structure and serve as the primary means of guidance and for establishing the well geographical & Figure 2.1: Template Running Tool and Template Running Tool in the Template Page iz of27 Kerui Oilfield Solutions (Singapore) Pte. Ltd. 2A ero! Buena Prk, 808-14 ICONDIEP, Singapore 800095 8 8660 £690 waren igrap com Company Registmon No, 201910724 2.2. Flowbase/Guidebase (FGB) Hydraulic Running/Retrieving Tool 2.2.1. Purpose The FGB running tool is used for running and retrieving the flowbase/guidebase. 2.2.2. Description The running tool comprises a central mandrel with 6-5/8” API Regular Box thread top connection and bottom welded to a circular can type housing, The circular can has a lower ring welded to the can which houses an internal “” profile. This internal “!” will engage into the centre ring’s pin of the FGB in clockwise direction. Four hydraulic pistons in the running tool are activated by ROV hydraulic power to depress the FGB energising ring to collapse the lock ring to lock to the 30” housing external profile Page is 127

You might also like