You are on page 1of 33

Complete Signaling Sequences in UTRAN

Appendix A: Complete Signaling Sequences in UTRAN


Complete signaling message sequence charts with Iu, Iub, Iur and Uu Protocols with focus
on the functional protocols RANAP, NBAP, RNSAP, RRC.

UTRAN and UMTS Radio Protocols

Complete Signaling Sequences in UTRAN

1. RRC Connection Setup into state CELL_DCH


A UE has entered the area of a RNC and triggers now radio contact. The reason for the radio access is a higher layer service request
coming from NAS protocols (e.g. MM, GMM, SM, CC, SMS, etc.). The following actions must be done:
1. Random access:
The UE accesses the RACH and sends the message RRC Connection Request.
2. DCH Allocation:
The RNC must now decide which channel to allocate. This decision is based upon the service the UE wants to have and upon the
actual congestion level. The DCH requires set up of a communication context in the Node B (Radio Link Setup) and conguration
of a AAL2 virtual channel that shall transport the established DCH. Additionally the channel between serving RNC and Node B must
be synchronized (Downlink Synchronization and Uplink Synchronization).
3. DCH Activation and RRC connection completion:
When the DCH is prepared, the RNC informs the UE about the successful established RRC Connection and gives the UE all information about its new dedicated channel DCH (e.g. transport formats, physical layer parameters, RLC conguration). Now the UE
will begin to send on the DCH and synchronize itself with the Node B. When this is successfully done, the UE and Node B will send
an indication about the successfully synchronized radio link (RRC Connection Setup Complete and Radio Link Restore Indication).
From the point of RRC states the UE begins the procedure in UTRA IDLE mode and leaves the procedure in CELL_DCH mode.

UTRAN and UMTS Radio Protocols

Complete Signaling Sequences in UTRAN

RRC Connection Establishment to RRC State CELL_DCH

Menu

RRC

RNC

Node B

UE
RACH:CCCH

RRC Connection Request

NBAP
start Rx

NBAP

ALCAP

ALCAP

DCH-FP

DCH-FP

RRC

Radio Link Setup

Radio Link Setup Response

Establishment Request

Establishment Confirmed

Downlink Synchronisation

Uplink Synchronisation

allocate RNTI,
select L1 and L2
parameters

NBAP

NBAP

ALCAP

ALCAP

DCH-FP

DCH-FP

start Tx

RRC

FACH:CCCH

RRC Connection Setup

NBAP

RRC

DCH:DCCH

UTRAN and UMTS Radio Protocols

RRC Connection Setup Complete

RRC
Radio Link Restore Indication

NBAP

RRC

Complete Signaling Sequences in UTRAN

2. RRC Connection Establishment to RRC state CELL_FACH


In the following sequence the UE again performs an access to get a RRC connection, but this time only a FACH is granted to the UE.
1. Random Access:
The UE access the RACH and sends RRC Connection Request. This message is received by the RNC. The RNC must again decide, which resources shall be granted to the UE. In the present case only the FACH/RACH will be accessible for the UE. Thus there
is no need to allocate any resource on Iub or Uu.
2. RRC connection establishment completion:
The RNC indicates now the successful establishment of the RRC connection with RRC Connection Setup. In this message the UE
gets the information to use the FACH/RACH as transport resources. The message itself is sent on the FACH. The UE will answer
with RRC Connection Setup Complete on the RACH, this message requires a last acknowledgement on the FACH.

UTRAN and UMTS Radio Protocols

Complete Signaling Sequences in UTRAN

RRC Connection Establishment to RRC State CELL_FACH

Menu

Node B

UE
RRC

RACH:CCCH

RRC Connection Request

RNC
RRC

allocate RNTI,

RRC

FACH:CCCH

RRC Connection Setup

RRC

RACH:DCCH

RRC Connection Setup Complete

RRC

FACH:CCCH

RLC acknowledgement for RRC Connection Setup Complete

UTRAN and UMTS Radio Protocols

RRC

RRC

RRC

Complete Signaling Sequences in UTRAN

3. Radio Access Bearer Establishment from CELL_DCH with DCH Setup - synchronized
The following procedure shows a radio access bearer setup triggered by the core network (MSC or SGSN). The UE is initially in RRC state
CELL_DCH. This means a DCH already exists for the UE. The radio access bearer requires a DCH. The procedure will show as general
case a soft handover situation, this means we will see two radio links (already existing) in two different Node B and one Node B belongs
to the serving RNC and the other Node B belongs to a drift RNC.
The procedure will be performed as so called synchronized radi link modication.
1. Radio Access Bearer Request
The core network will send the RANAP message RAB Assignment Request to the actual serving RNC of the UE. The RNC has to
analyze the quality of service parameter for the RAB. These abstract parameters have to be mapped onto physical parameters for
the setup of transport bearers on Iu, Iub, Iur and Uu.
2. Iu Bearer Setup and Radio Link Preparation
The serving RNC begins now to set up all the individual bearer services. First of all the Iu bearer must be set up when a circuit
switched service (Iu-CS) is wanted, for packet oriented services this is not necessary. Second the serving RNC triggers both Node
B to prepare the radio link needed for the UE (Radio Link Reconguration Prepare). Because there is already a DCH, this one will
simply be modied to fulll the requirements of the RAB. If both Node B have prepared the radio resources, they will send a Radio
Link Reconguration Ready message to the serving RNC back. Concurrently with this the serving RNC triggers the establishment
of AAL2 virtual channel resources for the radio link for Iub and Iur interfaces. These two ATM transport bearer resources require a
synchronization between serving RNC and the Node B at the endpoint. This is done with the Iub/Iur frame protocols (Uplink Synchronization and Downlink Synchronization).
3.Radio Bearer Setup Completion
Now that the radio link and the associated Iur/Iub transport bearer are established, it is time to change the DCH conguration. Therefore the serving RNC sends Radio Link Reconguration Commit to both Node B and the UE gets the Radio Bearer Setup message
from it. The UE and the Node B will now apply the new transport formats and physical channel conguration and try to decode each
other. If this is successful, the UE sends Radio Bearer Setup Complete to the serving RNC. This indicates a successful radio bearer
setup. Thus the serving RNC can return RAB Assignment Response back to the core network with a success indication inside.

UTRAN and UMTS Radio Protocols

Complete Signaling Sequences in UTRAN

Radio Access Bearer Establishment in state CELL_DCH with DCH required (synchronised) 1(2)

Menu

UE

Node B
Drift RNS

Node B
Serving RNS

Drift RNC

Serving RNC
RAB Assignment Request

RANAP

CN
RANAP

select Iu, Iub, Iur and


Uu bearer parameter

NBAP

Radio Link Reconfiguration Ready

NBAP
RNSAP

Radio Link Reconfiguration


Ready

Radio Link Reconfiguration Ready

NBAP

RNSAP

NBAP
Radio Link Reconfiguration Prepare

NBAP
NBAP

RNSAP

Radio Link Reconfiguration Prepare

Radio Link Reconfiguration


Prepare

ALCAP: Iu Transport
Bearer Setup (only Iu-CS)

NBAP

RNSAP

NBAP

ALCAP: Iur Transport


Bearer Setup

ALCAP: IubTransport
Bearer Setup

ALCAP: IubTransport
Bearer Setup
DCH-FP

Downlink Synchronisation

DCH-FP
DCH-FP

Uplink Synchronisation
Uplink Synchronisation

DCH-FP

UTRAN and UMTS Radio Protocols

Downlink Synchronisation

DCH-FP

DCH-FP
DCH-FP
DCH-FP

Complete Signaling Sequences in UTRAN

UTRAN and UMTS Radio Protocols

Complete Signaling Sequences in UTRAN

Radio Access Bearer Establishment in state CELL_DCH with DCH required (synchronised) 2(2)

Menu

Node B
Drift RNS

UE

NBAP

Node B
Serving RNS

DCH:DCCH

RNSAP

Radio Link Reconfiguration Commit

Serving RNC

Radio Link Reconfiguration


Commit

CN

RNSAP

NBAP
Radio Link Reconfiguration Commit

NBAP
RRC

Drift RNC

Radio Bearer Setup

NBAP
RRC

New Transport Formats will be applied on DCH


RRC

DCH:DCCH

Radio Bearer Setup Complete

RRC
RANAP

UTRAN and UMTS Radio Protocols

RAB Assignment Response

RANAP

Complete Signaling Sequences in UTRAN

4. Radio Bearer Setup in state CELL_DCH with DCH required - unsynchronized


The procedure presented before was synchronized. This means that before the radio link is really modied, the modication itself is
prepared in both Node B. The modication itself is done synchronized when the serving RNC sends the message Relocation Commit.
The following procedure is now unsynchronized, this means, both Node B will immediately modify the radio link without waiting for each
other.
1. Radio Access Bearer Request
The core network will send the RANAP message RAB Assignment Request to the actual serving RNC of the UE. The RNC has to
analyze the quality of service parameter for the RAB. These abstract parameters have to be mapped onto physical parameters for
the setup of transport bearers on Iu, Iub, Iur and Uu.
2. Iu Bearer Setup and Radio Link Preparation
The serving RNC begins now to set up all the individual bearer services. First of all the Iu bearer must be set up when a circuit
switched service (Iu-CS) is wanted, for packet oriented services this is not necessary. Now the serving RNC triggers both Node B to
modify the existing radio links (Radio Link Reconguration). Each Node B performs immediately the reconguration and returns the
message Radio Link Reconguration Response. Concurrently with this the serving RNC triggers the establishment of AAL2 virtual
channel resources for the radio link for Iub and Iur interfaces. These two ATM transport bearer resources require a synchronization
between serving RNC and the Node B at the endpoint. This is done with the Iub/Iur frame protocols (Uplink Synchronization and
Downlink Synchronization).
3.Radio Bearer Setup Completion
The serving RNC sends now the Radio Bearer Setup message to the UE. The UE and the Node B will now apply the new transport
formats and physical channel conguration and try to decode each other. If this is successful, the UE sends Radio Bearer Setup
Complete to the serving RNC. This indicates a successful radio bearer setup. Thus the serving RNC can return RAB Assignment
Response back to the core network with a success indication inside.

UTRAN and UMTS Radio Protocols

10

Complete Signaling Sequences in UTRAN

Radio Access Bearer Establishment in state CELL_DCH with DCH required (unsynchronised) 1(2)

Menu

UE

Node B
Drift RNS

Node B
Serving RNS

Drift RNC

Serving RNC
RAB Assignment Request

RANAP

CN
RANAP

select Iu, Iub, Iur and


Uu bearer parameter

NBAP

Radio Link Reconfiguration Response

NBAP
RNSAP

Radio Link Reconfiguration


Response

Radio Link Reconfiguration Response

NBAP

RNSAP

NBAP
Radio Link Reconfiguration Request

NBAP
NBAP

RNSAP

Radio Link Reconfiguration Request

Radio Link Reconfiguration


Request

ALCAP: Iu Transport
Bearer Setup (only Iu-CS)

NBAP

RNSAP

NBAP

ALCAP: Iur Transport


Bearer Setup

ALCAP: IubTransport
Bearer Setup

ALCAP: IubTransport
Bearer Setup
DCH-FP

DCH-FP

Downlink Synchronisation
Downlink Synchronisation

DCH-FP
DCH-FP

UTRAN and UMTS Radio Protocols

11

Uplink Synchronisation
Uplink Synchronisation

DCH-FP

DCH-FP
DCH-FP
DCH-FP

Complete Signaling Sequences in UTRAN

UTRAN and UMTS Radio Protocols

12

Complete Signaling Sequences in UTRAN

Radio Access Bearer Establishment in state CELL_DCH with DCH required (unsynchronised) 2(2)

Menu

Node B
Drift RNS

UE
RRC

DCH:DCCH

Node B
Serving RNS
Radio Bearer Setup

Drift RNC

Serving RNC

CN

RRC

New Transport Formats will be applied on DCH


RRC

DCH:DCCH

Radio Bearer Setup Complete

RRC
RANAP

UTRAN and UMTS Radio Protocols

13

RAB Assignment Response

RANAP

Complete Signaling Sequences in UTRAN

5.Radio Bearer Setup in RRC state CELL_FACH with DCH required


In the two radio bearer setup procedures before always a DCH already existed. Now we look to the radio bearer setup with DCH from
state CELL_FACH. This means currently there is no DCH before the radio bearer setup begins.
1. Radio Access Bearer Request
The core network requests the radio access bearer with the message RAB Assignment Request. The message contains the abstract
quality of service description of the transport resources required. The RNC maps these abstract parameters to the individual links.
2. Bearer Setup
The RNC triggers the setup of Iu bearer resources when circuit switched resources are needed. Next the DCH must be congured,
but currently there is no radio link. Hence the serving RNC sets up a communication context with one radio link in one of its Node B.
This is done with the message Radio Link Setup. The Node B acknowledges with Radio Link Setup Response. For the congured
DCH a transport resource on Iub is needed, hence the serving RNC congures an AAL2 virtual channel for DCH transport. This Iub
bearer is now synchronized between Node B and serving RNC.
3. Radio Bearer Setup Completion
The UE gets now the Radio Bearer Setup message in which it nds the conguration parameters for the DCH. So the UE applies
these parameters and tries to synchronize the radio link with the Node B. If this is successful, the UE shall send Radio Bearer Setup
Complete and the Node B shall issue Radio Link Restore Indication to the serving RNC. This concludes the radio bearer setup, thus
the serving RNC can acknowledge with RAB Assignment Response to the core network.

UTRAN and UMTS Radio Protocols

14

Complete Signaling Sequences in UTRAN

Radio Access Bearer Establishment in state CELL_FACH with DCH required

Menu

Node B
Drift RNS

UE

Node B
Serving RNS

Drift RNC

Serving RNC
RANAP

RAB Assignment Request

CN
RANAP

select Iu, Iub and


Uu bearer parameter
ALCAP: Iu Transport
Bearer Setup (only Iu-CS)
Radio Link Setup Request

NBAP

Radio Link Setup Response

NBAP

NBAP
NBAP

ALCAP: IubTransport
Bearer Setup
DCH-FP
DCH-FP
RRC

FACH:DCCH

DCH:DCCH

Uplink Synchronisation

Radio Bearer Setup

Radio Bearer Setup Complete

DCH-FP
DCH-FP
RRC

Radio Link Restore Indication

NBAP

RRC

Downlink Synchronisation

NBAP

RRC
RANAP

UTRAN and UMTS Radio Protocols

15

RAB Assignment Response

RANAP

Complete Signaling Sequences in UTRAN

6. Radio Bearer Setup in RRC state CELL_FACH with FACH required


If a UE gets a radio access bearer without DCH, then there is no need for dynamical transport bearer setup on Uu and Iub. This is because
the common transport channel resources are precongured by the operator via O&M. So the radio bearer setup is relatively simple in this
case.
1. Radio Access Bearer Request
The core network requests the radio access bearer with RAB Assignment Request. The serving RNC analyzes the abstract RAB
description inside and derives the individual link parameters for Iu, Iub and Uu.
2. Bearer Setup
In the present case the RAB requires no DCH and the UE will only get the FACH/RACH common transport channel resources. The
RACH and FACH radio transport channels are already congured during cell setup. The same holds for the Iub ATM transport resources associated with RACH and FACH. Thus the only bearer that might need dynamical conguration can be the Iu bearer, but
this is necessary for Iu-CS only. Hence the only thing to do is to tell the UE with Radio Bearer Setup to use FACH/RACH. The UE
acknowledges with Radio Bearer Setup Complete. This message will be acknowledged. This concludes the RAB setup.

UTRAN and UMTS Radio Protocols

16

Complete Signaling Sequences in UTRAN

Radio Access Bearer Establishment in state CELL_FACH with FACH required

Menu

Node B
Drift RNS

UE

Node B
Serving RNS

Drift RNC

Serving RNC
RANAP

RAB Assignment Request

CN
RANAP

select Iu, Iub and


Uu bearer parameter
ALCAP: Iu Transport
Bearer Setup (only Iu-CS)
RRC

RRC

RRC

FACH:DCCH

Radio Bearer Setup

RACH:DCCH

Radio Bearer Setup Complete

FACH:DCCH

RLC Acknowledgement for Radio Bearer Setup Complete

RRC

RRC

RRC

RANAP

UTRAN and UMTS Radio Protocols

17

RAB Assignment Response

RANAP

Complete Signaling Sequences in UTRAN

7. Soft Handover - Radio Link Addition and Deletion


Consider a UE that has multiple radio links with Node B directly connected to the actual serving RNC. So the UE is in a soft handover situation. The present case describes the procedure when one radio link between UE and a Node B connected to the serving RNC is deleted
and in the same procedure a new radio link between the UE and a Node B connected to a drift RNC is added.
1. Preparation of new radio link
First of all the serving RNC must prepare the new radio link that shall be added. Therefore a communication context within the new
Node B in the drift RNS has to be created, this happens with the Radio Link Setup message. It commands the Node B to decode the
UEs uplink scrambling code and to send data to the UE with a downlink scrambling code of the Node B. When the new radio link
is prepared the Node B acknowledges with Radio Link Setup Response. After this the Iur and Iub ATM transport resources must be
prepared. This resource is synchronized between Node B and serving RNC. Because the UE is already sending on its scrambling
code, the Node B can already detect the UEs signal, hence it will send Radio Link Restore Indication to the serving RNC.
2. Active Set Update
Now that the new radio link is prepared and the Node B already uplink data from the UE receives, the serving RNC must tell the UE
also to decode the new downlink scrambling code of the new Node B. Therefore the serving RNC sends Active Set Update to the
UE which will especially contain the new downlink scrambling code to decode. In the same message the UE can be advised to no
longer decode an obsolete, old downlink scrambling code. The UE acknowledges with Active Set Update Complete.
3. Deletion of the old radio link
The old radio link that is no longer decoded by the UE must now be released in the associated Node B. Hence the serving RNC
sends a Radio Link Deletion message to it. The Node B will remove the radio link. If this was the last radio link in the communication
context for the UE, the context is deleted too.

UTRAN and UMTS Radio Protocols

18

Complete Signaling Sequences in UTRAN

Soft Handover - Radio Link Addition and Deletion 1(2)

Menu

UE

Node B
Drift RNS

Node B
Serving RNS

Drift RNC

Serving RNC
decision to add and
delete a radio link

NBAP

Radio Link Setup Request

RNSAP

Radio Link Setup Request

RNSAP

NBAP

start Rx
NBAP

Radio Link Setup Response

NBAP
RNSAP

Radio Link Restore Indication

NBAP
RNSAP

DCH-FP

Downlink Synchronisation

Uplink Synchronisation

DCH-FP

start Tx

UTRAN and UMTS Radio Protocols

19

RNSAP

ALCAP: Iur Transport


Bearer Setup

ALCAP: IubTransport
Bearer Setup

NBAP

Radio Link Setup Response

Radio Link Restore Indication

RNSAP
DCH-FP
DCH-FP

CN

Complete Signaling Sequences in UTRAN

UTRAN and UMTS Radio Protocols

20

Complete Signaling Sequences in UTRAN

Soft Handover - Radio Link Addition and Deletion 2(2)

Menu

Node B
Drift RNS

UE
RRC

RRC

DCH:DCCH

Node B
Serving RNS

Drift RNC

Active Set Update

RRC

(add radio link X, delete radio link Y)


DCH:DCCH

Active Set Update Complete

RRC

Radio Link Deletion Request

NBAP

Serving RNC

NBAP

stop Rx and Tx

Radio Link Deletion Response

NBAP

ALCAP: IubTransport
Bearer Release

UTRAN and UMTS Radio Protocols

21

NBAP

CN

Complete Signaling Sequences in UTRAN

8. Hard Handover without Serving RNC Relocation


The following use case describes a hard handover, where the UE changes Node B and both Node B belong to drift RNC and not to the
serving RNC. The presented ow is therefore the most general one and can easily be reduced to cases where some RNC are equal.
1. Handover Decision and Preparation
The serving RNC decide upon the handover based on the radio measurements made by UE and Node B. Before the handover can
be started, the new radio link resources in the new (target) Node B must be prepared. Hence the serrving RNC triggers the setup
of a communication context together with a radio link (Radio Link Setup Request). When the radio resources in the target Node B
are prepared and the associated Iub ATM transport bearer resources between target Node B and target RNC is prepared, the serving RNC will be informed about it (Radio Link Setup Response). The serving RNC can now trigger the establishment of an Iur ATM
transport bearer. The Iub/Iur ATM transport bearer will be synchronized between target Node B and serving RNC.
2. Handover Execution
The UE begins handover execution when the serving RNC sends a reconguration message to it (Physical Channel Reconguration). The UE immediately begins to modify its radio links. Hence the old (source) Node B loses the radio contact and therefore
makes a Radio Link Failure Indication. In contrast to that the target Node B will now receive the signal of the UE and hence sends
a Radio Link Restore Indication. In the same way the UE indicates the successful reception of the target RNC radio signal with a
reconguration completion indication (Physical Channel Reconguration Complete).
3. Garbage Collection
It remains to remove the radio and Iub/Iur resources of the old radio link. Therefore the serving RNC sends a Radio Link Deletion
message to the source Node B. This message will delete the radio link and when it was the last radio link, the communication context
in the source Node B will be deleted too. Last the Iub/Iur ATM transport resources to and from the source Node B can be cleared.

UTRAN and UMTS Radio Protocols

22

Complete Signaling Sequences in UTRAN

Hard Handover between different RNC without S-RNC relocation 1(2)

Menu

Node B
Target RNS

UE

Node B
Source RNS

Target RNC

Source RNC

Serving RNC
Handover
Decision

NBAP

Radio Link Setup Request

RNSAP

Radio Link Setup Request

RNSAP

NBAP

start Rx
NBAP

Radio Link Setup Response

NBAP

ALCAP: IubTransport
Bearer Establishment
RNSAP

Radio Link Setup Response

RNSAP

ALCAP: IurTransport
Bearer Establishment

Downlink Synchronisation

DCH-FP

Uplink Synchronisation

DCH-FP

RRC

DCH:DCCH

DCH-FP
DCH-FP

Physical Channel Reconfiguration


Radio Link Failure Indication

NBAP

RRC
NBAP

RNSAP

UTRAN and UMTS Radio Protocols

23

Radio Link Failure Indication

RNSAP

Complete Signaling Sequences in UTRAN

UTRAN and UMTS Radio Protocols

24

Complete Signaling Sequences in UTRAN

Hard Handover between different RNC without S-RNC relocation 2(2)

Menu

Node B
Target RNS

UE

NBAP

Node B
Source RNS
Radio Link Restore Indication

Target RNC

DCH:DCCH

Serving RNC

NBAP

RNSAP

RRC

Source RNC

Radio Link Restore Indication

RNSAP

Physical Channel Reconfiguration Complete

RRC

RNSAP
Radio Link Deletion Request

NBAP

Radio Link Deletion Response

NBAP

Radio Link Deletion Request

RNSAP

NBAP
NBAP

ALCAP: IubTransport
Bearer Release
RNSAP

Radio Link Deletion Response

ALCAP: Iur Transport


Bearer Release

UTRAN and UMTS Radio Protocols

25

RNSAP

Complete Signaling Sequences in UTRAN

9. Hard Handover with Serving RNC Relocation


The following scenario shows a hard handover associated with a relocation of the serving RNC. The serving RNC at the begin of the procedure is labelled as source RNC, whereas the RNC that shall be the serving RNC at the end of the procedure is called target RNC. The
procedure is presented for the case that there is a signaling connection towards SGSN and MSC. A change of MSC (inter-MSC handover)
or a change of SGSN is not considered here.
1. Relocation Indication and Preparation
The decision to perform a relocation together with hard handover comes exclusively fromt the actual serving (source) RNC. The
Relocation Required message indicates the relocation to the core network. MSC and SGSN shall prepare the relocation and inform
the target RNC with Relocation Request. This triggers the target RNC to prepare the radio access bearer resources for the UE. In
detail this means for the target RNC to set up an Iu ATM transport bearer towards MSC, to allocate the radio link for the UE in the new
Node B (Radio Link Setup) and with this the associated Iub ATM transport bearer for the DCH is needed. The Iub transport bearer
must be synchronized. When all is done, the target RNC sends an acknowledgement (Relocation Request Acknowledge) back to
each core network domain.
2. Relocation Execution
To start relocation both CN domains must send Relocation Command to the source RNC. When this happened, the UE will get the a
message that indicates the new radio resources for it (Physical Channel Reconguration). So the UE now tunes to the new radio link
in the target Node B. Therefore the target Node B will send the Radio Link Restore Indication to target RNC, which will forward this
indication as Relocation Detect. In the same way the source Node B will loose the radio link and sends Radio Link Failure Indication
to the source RNC. When the UE concludes the radio link change, it will send Physical Channel Reconguration Complete on the
new resource to the target RNC. This triggers the Relocation Complete message to both CN domains.
3. Garbage Collection
The resources in the source RNC and source Node B are no longer needed. Thus the core network will delete all resources with Iu
Release Command.

UTRAN and UMTS Radio Protocols

26

Complete Signaling Sequences in UTRAN

Hard Handover between different RNC with S-RNC relocation 1(3)

Menu

UE

Node B
Target RNS

Node B
Source RNS

Target RNC

Source RNC

Relocation Required

RANAP
RANAP
RANAP
RANAP

SGSN

Relocation Required

Relocation Request

MSC
RANAP

RANAP
RANAP

Relocation Request

RANAP

ALCAP: Iu Transport
Bearer Establishment for Iu-CS

NBAP
NBAP

Radio Link Setup Request

NBAP

Radio Link Setup Response

NBAP

ALCAP: Iub Transport


Bearer Establishment

DCH-FP
DCH-FP

Downlink Synchronisation

DCH-FP

Uplink Synchronisation

DCH-FP
RANAP

RANAP

UTRAN and UMTS Radio Protocols

27

Relocation Request Acknowledge

RANAP

Relocation Request Acknowledge

RANAP

Complete Signaling Sequences in UTRAN

Hard Handover between different RNC with S-RNC relocation 2(3)

Menu

UE

Node B
Target RNS

Node B
Source RNS

Target RNC

Source RNC

Reloocation Command

RANAP
RANAP
Physical Channel Reconfiguration

RRC

NBAP

Relocation Detect

RANAP

Radio Link Failure Indication

Physical Channel Reconfiguration Complete

RANAP

Relocation Detect

RANAP

RANAP

NBAP

RRC
RANAP
RANAP

UTRAN and UMTS Radio Protocols

RANAP

NBAP
RANAP

RRC

Relocation Commnand

MSC

RRC

Radio Link Restore Indication

NBAP

SGSN

28

Relocation Complete
Relocation Complete

RANAP
RANAP

Complete Signaling Sequences in UTRAN

Hard Handover between different RNC with S-RNC relocation 3(3)

Menu

UE

Node B
Target RNS

Node B
Source RNS

Target RNC

Source RNC
RANAP
RANAP

SGSN
Iu Release Command

Iu Release Command

MSC
RANAP

RANAP

ALCAP: IuTransport
Bearer Release

NBAP
NBAP

Radio Link Deletion


Radio Link Deletion Response

NBAP
NBAP

ALCAP: IubTransport
Bearer Release

RANAP

RANAP

UTRAN and UMTS Radio Protocols

29

Iu Release Complete
Iu Release Complete

RANAP

RANAP

Complete Signaling Sequences in UTRAN

10. Switch from CELL_DCH to CELL_FACH with Drift RNC


Based on the trafc measurements for a radio bearer the serving RNC must decide whether the UE shall be kept in state CELL_DCH
utilizing a dedicated channel DCH or the UE must be sent to state CELL_FACH without a dedicated resource. In the present procedure
the UE is currently located in a cell belonging to a drift RNC. At the start of the procedure the UE has one radio link in this cell.
1 Preparation of new resources
When the serving RNC decides to switch the UEs state to CELL_FACH because there trafc is low, it is necessary to prepare the
FACH and RACH transport resources. Because the UE is actually located in a cell of a drift RNC, this requires the set up of ATM
transport resources for RACH and FACH and the remote allocation of bandwidth on these common transport channels. The latter is
achieved with the RNSAP messages Common Transport Channel Resource Request. The ATM resources are then established.
2 Radio Bearer modication
To activate the switching to CELL_FACH the UE must be informed about the change with respect to the transport channel modication. Hence the serving RNC sends the RRC message Transport Channel Reconguration via the still existing DCH to the UE. The
UE must now modify its radio conguration and when done conrm with Transport Channel Reconguration Complete.
3 Release of old resources
Now the resources associated with the obsolete DCH can be released.

UTRAN and UMTS Radio Protocols

30

Complete Signaling Sequences in UTRAN

Switch from CELL_DCH to CELL_FACH with Drift RNC

Menu

Node B
Drift RNS

UE

Node B
Serving RNS

Drift RNC

Serving RNC
decision to switch
from CELL_DCH to
CELL_FACH

RNSAP
RNSAP

Common Transport
Channel Resource Request
Common Transport
Channel Resource Response

RNSAP
RNSAP

ALCAP: IurTransport Bearer


Configuration if needed
RRC
RRC

DCCH:DCH

Transport Channel Reconfiguration

DCCH:RACH

Transport Channel Reconfiguration Complete

NBAP
NBAP

Radio Link Deletion Request


Radio Link Deletion Response

RRC
RRC
RNSAP

UTRAN and UMTS Radio Protocols

31

RNSAP

NBAP
NBAP

RNSAP

ALCAP: IubTransport
Bearer Release

Radio Link Deletion Request

Radio Link Deletion Response


ALCAP: IurTransport
Bearer Release

RNSAP

CN

Complete Signaling Sequences in UTRAN

11. Cell Update without Serving RNC Relocation


When the UE is in state CELL_FACH, it will perform cell reselection and with this must perform cell updates to keep the serving RNC informed about its location. In this situation it can happen, that the UE enters a cell not belonging to the serving RNC area. Thus the servin
g RNC must forward the cell update message to the serving RNC. In detail the procedure looks the following way:
1 Cell Update
The UE sends the RRC message Cell Update on RACH to the reselected cell. This message is received by the controlling RNC of
the cell which is not the serving RNC of the UE. Inside the message the UE indicates its U-RNTI composed of S-RNC-ID and SRNTI. From this the controlling RNC will know, that it is not the serving one for the UE. Hence the controlling RNC will forward the
cell update message inside of a RNSAP message to the corresponding S-RNC.
2 Common Transport Channel Resource Preparation
The serving RNC has to decide to perform a relocation or not. In the present case there will be no relocation. Therefore the S-RNC
triggers the foreign RNC to allocate resources for FACH/RACH. This is done with the RNSAP operation Common Transport Channel
Resource Request. Possibly this can mean, that ATM transport resources on Iur have to be set up.
3 Procedure Completion
The serving RNC can now indicate the successful cell update with RRC message Cell Update Complete. In this message the UE can
be told to recongure its radio resources (transport channel, physical channel, radio bearer). In the present case there is no reconiguration, which triggers the UE to complete the procedure with RRC message UTRAN Mobility Information Conrm. It remains to
release the common transport channel resources in the old radio subsystem, hence the S-RNC sends the RNSAP message Common Transport Channel Resource Release.

UTRAN and UMTS Radio Protocols

32

Complete Signaling Sequences in UTRAN

Cell Update to a new Drift RNC without Serving RNC Relocation in RRC state CELL_FACH

Menu

Node B
Target Drift RNS

UE
RRC

CCCH:RACH

Node B
Source Drift RNS

Target Drift RNC

Cell Update

RRC

RNSAP

Source Drift RNC

Serving RNC

Uplink Signaling Transfer


(RRC Message: Cell Update)

RNSAP

Decision NOT
to make relocation
RNSAP
RNSAP

Common Transport Channel Resource Request


Common Transport Channel Resource Response

RNSAP
RNSAP

ALCAP: IurTransport
Bearer Configuration if needed
RRC

RRC

Cell Update Complete

RRC

UTRAN Mobility Information Confirm

RRC

RNSAP

UTRAN and UMTS Radio Protocols

33

Common Transport Channel


Resource Release

RNSAP