fN; Engineering Inc. FABRICATED
PRODUCTS
Launchers and Receivers
From pipeline piaging components to fuly
valved and accessorized launchinglecevi
systems, S.UN. Engineering, nc. specializes in
the type of fabricated equipment that dow
conscious pipeliners demand, SUN's tradition
of applying personal sttention to each ard every
customer concemn is exhibited throughout the
engineering, manufacturing. and testing phases
of all fabricated equipment.
Launchers and receivers are pressure vessels
Used to introduce and remove pigs, spheres and
inspection tools from the pipeline. Savety and
durability is assured because each S.U.N.
vessel and fabricated component is designed,
engineered, manufactured, tested and
documented in complete accordance with the
latest revisions of one of the following American
Society of Mechanical Engineers (ASME) codes:
Boiler and Pressure Vessel Code,
Section VIll-Division 1
"831.3, Chemical Plant and Petroleum
Refinery Piping
B31 4, Liquid Transportation Systems for
Hydrocarbons, Liquid Petroleum Gas,
‘Anhydrous Ammonia, and Alcohols
B31 8, Gas Transmission and Distribution
Piping SystemsLaunchers and Receivers
Launchers and receivers are offerod with
the following, or a combination of the
following features:
Uni- or Bidirectional Operation
‘sHorizontal, Vertical, or Angled Orientation
Fixed or Sliding Leg Supports,
mSkid- Mounted Packages
Barrels Only
mValved and Accassorized Systems
Automated Systems
NACE Compliant Materials,
The following components and accessories
can be supplied with our equipment or as
after-market items:
mBarred Tees (Piggable)
Flow Tees (Piggable and Sphereable)
mPressure Gauges
mPressure Relef Valves.
(Required on BPV Code Vesse's)
Pig Passage Indicators
Scraper Switches
aVelve Actuators
Drain Pans
mLitting Davits and Hoists
‘mPig/Sphere Lifting Devices.
‘Rail Mounted Trays
‘Power Systems
For additional information about these or other
services, please contact our sales office. Our
statt will be eager to help!= Complete Pig
@ B Launching and Receiving
DW aes complete Pig Launching and
ecaeag Syste to meet our tol pggig
ees. These sysam pactages inclu Ne
LauncherRecever,Gosur, PIG SIG” Inicio
Broass Ping, Vahves, Handing Equipment
‘equi, and Skid Mounted io ese fi intalltion
Al sytem packages ae designate ipline
cede you aqui.
= Complete Pig System
ur sand Lancing and Reorving Syste
te complete packages. Al
_ssenibld std, and reat fr id inst
1 Usitsarefurishud with TOW Closures,
Units are uri wih the TOW PIGS,
stale.
1» Al mazes are prpaty szed ac located.
1 Bypass ping is brated and connected
io suo ttup
AL unts a sandlasted and prime cates
= Hand equoment&ofered fo handing
lager pigs
"Units designed, ested, ard inspectec to met
your code requireetts,
= 100% welt insetion
1-0. be
falets ne 5000.002.00
Cate: ebay 199)
oss tecogt
Seat:
sommtted to
ct product
yd inplanning, budgeting. and mestng your
individual apieaton nes
DW ca pow:
Systems designed 1 andl coroson
inspection as.
Auta pactages to simply
opecten
Sori mati,
ASME E3} 4, BU1.8 B13, ASE
Socion Vl Codes,
Special sure prearaion and tn
Horizontal, vertical, or sloped unis,ie a
Complete Pig Launching and Receiving Systems
Pig Launching
Soe
ule
1x18"
16x20"
20 x24"
28 428°
30 xa
36 x0"
ar x
Pig Receiving
Sier
xe
1x18"
1x20"
20" x28"
2028"
weet
wx"
ey
a
0
0
ar
en
re
50
¢
oF
ne
40
50°
oe
er
78
80°
H
ag
v2
32
52
56
sw
on
1T
30
Ie
3z
sr
se
ow
6s
Tr
L
ae
ze
ae
wT
wr
ser
or
oor
"
or
69
68"
ae
96"
10
wa"
be
w
cg
eg
6
a
6
14
108
sso
opr.
Weighs.
1250
‘4on0
8000
00
35880
52500
76300
oreo
=
=
Weighs
al)
1550
20100
76700
37700
360
e200
15350
@
TA Nilseni
e Complete Pig Launching and Receiving Systems nee
rane somguet mae
Sphere Laurching
Aepro
‘Siae 1 iit He L W__ WeightLbs:
Wx Ye UR 20" we 56 oO
ex 39 AT 2 ere Sy HD
weet ae ye a 3 oe on
wre ae 47 36 OE WOT SIT SD
xi" 48 47" ae aa TOC
ex" 57 SSeS" 9B A550)
Sphere Receiving
Set
me 30 ea
wx 397 aes rir SS . >
wee ae we ee eH S a
m2" 50a" THO. <
wrxao 70 su" we IT