TAT CaF
8474L 036
JOp. Center JOBN® 7
JOp. Center Doc. N°,
[DOCUMENT CLASS TX IFEED Doc. NT Cid
rSUIENT ——PETROVIETRAM
Fechnip AE a
LOEATION DUNG GUAT Nitrogen System Unit 036
Operating Manual
G.viGuy
Witten by
ISSUE FOR REVIEWVIETNAM OIL AND GAS CORPORATION
(PETROVIETNAM)
DUNG QUAT REFINERY
OPERATING MANUAL
VOLUME 20
NITROGEN SYSTEM
UNIT 036
BOOK 1/1
8474L-036-ML-001-A
keptVIETNAM OIL AND GAS CORPORATION (PETROVIETNAM) _] April 2007
DUNG QUAT REFINERY Rev. :A
OPERATING MANUAL Chapter 1
UNIT 36 Page 1
1. BASIS OF DESIGN
DUTY OF THE PLANT
FEED CHARACTERISTICS
PRODUCT SPECIFICATION
MATERIAL BALANCES
BATTERY LIMIT CONDITIONS.
DESIGN FEATURE
2. DESCRIPTION OF PROCESS
DESCRIPTION OF UNIT CONTROL
UTILITY, CHEMICAL AND CATALYST REQUIREMENTS
4.1 UTILITY CoNsUMPTION
4.2 CHEMICAL CONSUMPTION AND HANDLING
5. DRAWINGS
5.1 PLOT PLAN
5.2 PROCESS FLOW DIAGRAMS AND MATERIAL SELECTION DIAGRAMS
5.3 PIPING AND INSTRUMENTATION DIAGRAMS
5.4 OTHER DRAWINGS
aebeRe‘VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM)
‘April 2007
ee DUNG QUAT REFINERY Rev. A
Technip th OPERATING MANUAL Chapter 4
— UNIT 36 Page :2
FOREWORD
For information related to:
+ Process description and Material Balance
+ Control and Shutdown philosophy
- Safety
= _ Normal operation
+ Start-up and Shutdown
Refer to attached Vendor Data Book doc. 8474L-036-A0401-4112-001-001, especially the
sections:
“Control System description, operating principles, functional design specification”
“Operation and Maintenance manuals"
“Installation, Start-up and commissioning”1
VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM)
DUNG QUAT REFINERY
‘OPERATING MANUAL
UNIT 36
‘Apri 2007
Rev:
Chapter
Page
ab
BASIS OF DESIGN
DUTY OF THE PLANT
The Nitrogen unit consists of a gaseous and liquid nitrogen generation unit with associated
liquid nitrogen storage and vaporization facilities.
‘The unit is a package designed to provide the following:
+ Gaseous nitrogen (GAN) to process users in normal operation
+ Liquid nitrogen (LIN) sent to cryogenic liquid storage
+ Liquid vaporization to meet peak loads and start-up/shutdown demands.
‘The unit is made of the following elements:
Cryogenic Nitrogen Generator Unit (A-3603)
Nitrogen is generated by cryogenic air separation to a purity of 99.7% by volume.
The cryogenic separation unit has a single, multistage centrifugal type compressor (a spare
rotor is also provided and kept in warehouse) with inter plus after-coolers. Regenerative,
molecular sieve towers (two in parallel) are included for the removal of carbon dioxide and
moisture.
Nitrogen Generation Unit is designed to provide both liquid and gaseous products
simultaneously.
The nitrogen generation design capacity is as follows:
Nm®fh (atm / °C)
Liquid Nitrogen 647
Gaseous Nitrogen 367
Total 994
The ratio of liquid to gaseous nitrogen production is variable up to the maximum liquid
production rates indicated above.
The LIN production rate will allow storage vessels to be fl
led in 10 days approximately.
Liquid Storage and Vaporization
Air separation unit liquid nitrogen product is sent to the Plant Liquid Nitrogen Storage Vessels,
\V-3601A/B (2 x 50% capacity) and the CCR Regeneration Liquid Nitrogen Storage Vessels,
V-3602A/B/C (3 x 33% capacity). From each pair of storage vessels, liquid nitrogen is sent,
when required, to ambient air vaporizers A-3601-E-01 and A-3602-E-02.
To prevent the possibility of cross contamination from refinery process sources, CCR
Regeneration nitrogen is provided as a separate dedicated system. Vaporized gaseous CCR
Regeneration nitrogen operates at a higher pressure than the Plant nitrogen header.
Plant Li Storage, AB
Vaporized plant liquid nitrogen is normally not required in normal refinery operation, liquid
storage provides a butfer capacity for emergency and high consumption operations such as
start-up, shutdown, peak nitrogen blanketed tank in-breathing and maintenance.
Nitrogen storage vessels, V-3601AVB, are each sized to hold 53 m? minimum liquid nitrogen.
This ensures storage capacity for 4 days of operation approximately, based on normal demand
plus one CCR unit shutdown and re-start-up.12
‘VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM)
DUNG QUAT REFINERY
OPERATING MANUAL
UNIT 38
‘April 2007
‘These storage vessels are provided with hose connections for liquid nitrogen to be both
imported and exported by road tanker.
Pl Nitrogen Vaporization, 1
Vaporization of liquid nitrogen is achieved by heat exchange with ambient air in vaporizer
‘A-3601-E-01
‘The design requirements for vaporized plant nitrogen are as follows:
N*M (tatm /0°C)
‘Short duration peak for max tank in-breathing (20 minutes) 12,000
Long duration for plant start-up (12 hours) 41,500
Supply of gaseous nitrogen to the refinery is ensured with a pressure control valve on the
vaporizer outlet line. The vaporizer is designed to supply gaseous nitrogen at a minimum
pressure of 7.5 kg/omég downstream of pressure control valve on a continuous basis.
CCR Regeneration Liquid Nitrogen Storage, V-3602//B/C_
Nitrogen storage vessels, V-3602A/BIC, are each sized to hold 40 m? minimum liquid nitrogen.
This ensures storage capacity for 2 CCR regeneration cycles (2x48 hours) when demand is at
peak.
These storage vessels are provided with suitable hose connections for liquid nitrogen to be
both imported and exported by road tanker.
Regens Jguid Nitrogen Vapori \-9602-E-01
\Vaporization of liquid nitrogen shall be achieved by heat exchange with ambient air in vaporizer
‘A-3602-E-01.
‘The normal requirement for vaporized CCR nitrogen is 95.1 NmY%n, Each month, a peak
requirement of 800 Nm*h is required for a two day period,
The design requirements for vaporized plant nitrogen are as follows:
Nm*ih (tatm / 0°C)
Peak for 2 days/month (48 hours) 955
Continuous vaporization (20 days) 95
‘The supply of gaseous nitrogen to the refinery shall is controlled with a pressure control valve
on the vaporizer outlet line. The vaporizer is designed to supply gaseous nitrogen at a minimum
Pressure of 8.7 kg/emég down stream of pressure control valve at vaporizer outiet on a
Continuous basis.
This pressure is higher than the Plant Nitrogen supply pressure to avoid the possi
flow contamination of this nitrogen network.
FEED CHARACTERISTICS
The air taken into compressors is a standard atmospheric air with the following design
characteristics:
Maximum temperature 36°C
Minimum temperature 16°C
Relative humiaity 100%‘VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM) | April 2007
DUNG QUAT REFINERY Rev. A
OPERATING MANUAL Chapter: 1
UNIT 36 Page 5
1.3. PRODUCT SPECIFICATION
Gaseous and liquid nitrogen product quality is:
Nitrogen 98.7 %vol. min
Carbon monoxide 20pm vol. max
‘Oxygen 10 ppm vol. max
Carbon dioxide 20 ppm vol. max
Hydrocarbons 5 ppm vol. max
Hydrogen 20 ppm vol. max
Chiorine 1 ppm vol. max
Water 5 ppm vol. max
Noble gases remainder
1.4 MATERIAL BALANCES
Refer to Nitrogen Balance attached here after:NITROGEN BALANCE
oe saan] a, | urs
elise osenr-unepe] | rows | Dome'| roman
a ea ed rd hd
ob EES : [|
== _| ppeLininanY
al
f
i
gugais g<2
— +000 fone
i
le
is
i
e
ales
oir
alele|
ie
Teg post eee
aig)
& |a| \8)
a
a gees
oe
{Temata stn rset eral ete nr or cae Nz rat ed et18
16
1.6.1
162
Tecip EDC
‘VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM)
DUNG QUAT REFINERY
OPERATING MANUAL
UNIT 36
Rev. A
Chapter 31
BATTERY LIMIT CONDITIONS
The table below shows operating and design conditions of feed supply into Plant and
Instrument Air Unit and product to consumer's battery limit.
PRESSURE, kg/cm’g TEMPERATURE, °C.
DESCRIPTION |
NOR | MAX | MIN_| DES | NOR | MAX | MIN | DES.
Feed
Atmospheric Air_| 1.029 | 1.033 | 1.008| - | 27 | 96 | 16 | -
Product,
CCR Nitrogen | 85 | 9.0 | eo | 117] 90 | 40 | 10 | 65
Refinery Nitrogen| a5 | - | - |1os! a1 | - | - | 65
DESIGN FEATURE
Actual LIN to GAN ratio
‘The plant is actually capable of producing GAN and LIN in the ranges given below:
Max LIN mode Max GAN mode
Liquid Nitrogen (Nm) 679 158
Gaseous Nitrogen (Nm®/h) 347 1611
Total (Nm*in) 1026 1769
LIN to GAN Ratio 1:05 1:10
Operation with back-up Air
In the event of A-3603 compressor failure (A-3603-C-01), wet air can be sourced from Unit 35,
Air Compressors A-3501A/B/C discharge. The air system spare compressor will be dedicated
to this service.
Wet air from A-3501A/B/C is available at 8.5 kg/em*g 100% water saturated at 41°C. Wet ait
will be introduced at the inlet of the Main Air Compressor after cooler A-3603-E-06 within A-
3603.
Due to the lower air supply pressure, Refinery Nitrogen production pressure will be reduced to
7.0 kg/em’g,
In order to maintain the CCR nitrogen pressure to the minimum of 8.0 kg/cm*g, a LIN transfer
Pump (A-3601-P-01) is provided to batch transfer LIN from V-3601A/B to V-3602A/B/C
Operating at a higher pressure.
‘The expected GAN and LIN production capacities are indicated below:
Max LIN mode Max GAN mode
Liquid Nitrogen (Nm®/n) 350 263
Gaseous Nitrogen (Nm°/h) 424 1149
Total (Nem) 774 sa12VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM)
DUNG QUAT REFINERY
OPERATING MANUAL
UNIT 36
‘April 2007,
‘The max LIN production rate will allow storage vessels to be filled in 18 days approximately.VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM) | April 2007
DUNG QUAT REFINERY Rev. A
‘OPERATING MANUAL Chapter :2
UNIT 36 Page it
2 DESCRIPTION OF PROCESS
Refer to attached Process Description 8474L-036-A0101-4112-001-0013.
‘VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM)
DUNG QUAT REFINERY
OPERATING MANUAL
UNIT 36
DESCRIPTION OF UNIT CONTROL
Refer to attached Control Narrative 8474L-036-A3501-4112-001-001.
“April 2007
Rev. A
Chapter :3
Page 144
42
i OPERATING MANUAL Chi 4
Tecip FE me an
‘VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM) —] April 2007
DUNG QUAT REFINERY Rev. A
UTILITY, CHEMICAL AND CATALYST REQUIREMENTS
UTILITY CONSUMPTION
Refer to Nitrogen Unit Utility Consumption Summary 8474L-036-CN-0008-001.
Note that the unit is self-sufficient for Instrument Air consumption, under normal operation. 1A
will be required at start-up only
CHEMICAL CONSUMPTION AND HANDLING.
There is no chemical consumption in Unit 36.5A
52
53
54
‘VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM)
DUNG QUAT REFINERY
OPERATING MANUAL
UNIT 36
DRAWINGS
PLOT PLAN
8474L-031-DW.-0051-001 Block area Plot Plan
8474L-036-A0201-4112-001-003 Package Unit Plot Plan
NA Hazardous Area Classification
PROCESS FLOW DIAGRAMS AND MATERIAL SELECTION DIAGRAMS,
84741-036-PFD-0010-001
8474L-036-PFD-0010-002
8474L-036-A0102-41 12-001-001 (package PFD)
18474L-036-MSD-0011-001
(8474L-036-MSD-0011-002
PIPING AND INSTRUMENTATION DIAGRAMS,
8474L-031-PID-0021-021
8474L-051-PID-0031-005
8474L-036-A0103-4112-001-001 (package P&ID)
OTHER DRAWINGS
Electric Single Line Diagram
Underground Sewer Network
Fire Fighting Water Distribution Diagram
‘April 2007
Rev.
Chapter
Page
A
25