6 Configuring BSC Links

Configuring BSC Links

About This Chapter


This topic describes how to configure BSC links for the signaling transmission within the BSC
and between the BSC and other network elements. BSC links are the links on the Ater interface,
A interface, and Pb interface.
6.1 Configuring Links on the Ater Interface
This topic describes how to configure links on the Ater interface for the signaling transmission
between the GMPS or the GEPS and the GTCS. The links on the Ater interface are the Ater
connection path, Ater OML, and Ater signaling link.
6.2 Configuring Links on the A Interface
This topic describes how to configure E1 connections and SS7 signaling links on the A interface
for the communication between the BSC and the MSC.
6.3 Configuring Links on the Pb Interface
This topic describes how to add a PCU and configure E1 connections and signaling links on the
Pb interface for the communication between the BSC and the PCU.

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-1

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

6.1 Configuring Links on the Ater Interface


This topic describes how to configure links on the Ater interface for the signaling transmission
between the GMPS or the GEPS and the GTCS. The links on the Ater interface are the Ater
connection path, Ater OML, and Ater signaling link.
1.

6.1.1 Configuring the Ater Connection Path


This topic describes how to configure the connection path between the GMPS and the GTCS
as well as between the GEPS and the GTCS on the Ater interface.

2.

6.1.2 Adding an Ater OML


When the GTCS is configured on the MSC side, you have to add an Ater OML between
the GMPS and the main GTCS. The Ater OML transmits the OM information to the GTCS.

3.

6.1.3 Adding an Ater Signaling Link


When the GTCS is configured on the MSC side, the Ater connection path between the
GMPS or GEPS and the GTCS must be configured with an Ater signaling link. The Ater
signaling link transmits the signaling of service control, TC resource management, and Ater
transmission resource management.

6.1.1 Configuring the Ater Connection Path


This topic describes how to configure the connection path between the GMPS and the GTCS as
well as between the GEPS and the GTCS on the Ater interface.
Scenario

BSC initial configuration

Mandatory/ Mandatory
Optional
NOTE

A maximum of 32 Ater connection paths can be configured between two GEIUTs.

A maximum of 63 Ater connection paths can be configured between two GOIUTs.

A maximum of 32 Ater connection paths can be configured between the GOIUT and the GEIUT.

The Ater interface E1 that is configured with the semipermanent connection should not be configured
with the Ater connection path.

Prerequisite
l

The two subracks between which the Ater connection path is to be established are
configured.

The GEIUT/GOIUT in the two subracks between which the Ater connection path is to be
established is configured.

Preparation
NOTE

This parts describes how to configure the Ater connection path between the GMPS and the GTCS as well
as between the GEPS and the GTCS.

6-2

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Table 6-1 Example of data to be negotiated and planned for configuring the Ater connection
path between the GMPS and the GTCS
Parameter

Example

Source

BM Subrack No.

BSC internal planning

BM Slot No.

16

BSC internal planning

BM Port No.

BSC internal planning

TC Subrack No.

BSC internal planning

TC Slot No.

16

BSC internal planning

TC Port No.

BSC internal planning

Table 6-2 Example of data to be negotiated and planned for configuring the Ater connection
path between the GEPS and the GTCS
Parameter

Example

Source

BM Subrack No.

BSC internal planning

BM Slot No.

16

BSC internal planning

BM Port No.

BSC internal planning

TC Subrack No.

BSC internal planning

TC Slot No.

16

BSC internal planning

TC Port No.

BSC internal planning

Procedure
l

Configure the Ater connection path between the GMPS and the GTCS.
1.

On the BSC6000 Local Maintenance Terminal, right-click a GEIUT in the GMPS. A


shortcut menu is displayed, as shown in Figure 6-1.

Figure 6-1 GEIUT shortcut menu

NOTE

The configuration of the Ater connection path can be started only on the GEIUT/GOIUT.

2.

Issue 01 (2007-09-05)

Choose Configure Ater Connection Path. A dialog box is displayed, as shown in


Figure 6-2.
Huawei Technologies Proprietary

6-3

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-2 Configuring the Ater connection path

3.

Click Add. A dialog box is displayed, as shown in Figure 6-3.


Figure 6-3 Adding an Ater connection path

6-4

4.

Set the parameters according to the data listed in Table 6-1.

5.

Click Finish. The configuration of the Ater connection path between the GMPS and
the GTCS is complete.

6.

Repeat 1 through 5 to add more Ater connection paths between the GMPS and the
GTCS.
Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Configure the Ater connection path between the GEPS and the GTCS.
1.

Right-click a GEIUT in the GEPS. A shortcut menu is displayed, as shown in Figure


6-4.

Figure 6-4 GEIUT shortcut menu

NOTE

The configuration of the Ater connection path can be started only on the GEIUT/GOIUT.

2.

Choose Configure Ater Connection Path. A dialog box is displayed, as shown in


Figure 6-5.

Figure 6-5 Configuring the Ater connection path

3.

Issue 01 (2007-09-05)

Click Add. A dialog box is displayed, as shown in Figure 6-6.

Huawei Technologies Proprietary

6-5

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-6 Adding an Ater connection path

4.

Set the parameters according to the data listed in Table 6-2.

5.

Click Finish. The configuration of the Ater connection path between the GEPS and
the GTCS is complete.

6.

Repeat 1 through 5 to add more Ater connection paths between the GEPS and the
GTCS.

----End

6.1.2 Adding an Ater OML


When the GTCS is configured on the MSC side, you have to add an Ater OML between the
GMPS and the main GTCS. The Ater OML transmits the OM information to the GTCS.
Scenario

BSC initial configuration

Mandatory/ Optional. When the GTCS is configured on the MSC side, you have to add an
Optional
Ater OML between the GMPS and the main GTCS.
NOTE

An active and a standby Ater OMLs are usually configured. The timeslot masks of the two links must
be the same.

The timeslot mask of an Ater OML must contain TS1 and at least four successive timeslots.

Prerequisite

6-6

The GTCS is configured on the MSC side.

The Ater connection path between the GMPS and the main GTCS is configured.

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Preparation
Table 6-3 Example of data to be negotiated and planned for adding an OML
Parameter

Example

Source

Logical Group No.

BSC internal planning

Ater Connection Path


Index

BSC internal planning

BM Subrack No. of Ater


Connection Path

BSC internal planning

Timeslot Mask

TS1, TS2TS17

BSC internal planning

Procedure
Step 1 On the BSC6000 Local Maintenance Terminal, right-click a GEIUT in the GMPS. A shortcut
menu is displayed, as shown in Figure 6-7.
Figure 6-7 GEIUT shortcut menu

NOTE

The configuration of the Ater OML can be started only on the GEIUT/GOIUT in the GMPS.

Step 2 Choose Add Ater OML. A dialog box is displayed, as shown in Figure 6-8.

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-7

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-8 Configuring the Ater OML

Step 3 Click Add. A dialog box is displayed, as shown in Figure 6-9.


Figure 6-9 Adding an Ater OML

6-8

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

NOTE

When the total number of the GMPS and GEPS is not greater than two, TS1 and 16 successive timeslots
must be configured.

When the total number of the GMPS and GEPS exceeds two, 31 timeslots from TS1 to TS31 must be
configured.

Step 4 Set the parameters according to the data listed in Table 6-3.
Step 5 Click OK.
Step 6 Click Finish. The configuration is complete.
----End

6.1.3 Adding an Ater Signaling Link


When the GTCS is configured on the MSC side, the Ater connection path between the GMPS
or GEPS and the GTCS must be configured with an Ater signaling link. The Ater signaling link
transmits the signaling of service control, TC resource management, and Ater transmission
resource management.
Scenario

BSC initial configuration

Mandatory/ Optional. When the GTCS is configured on the MSC side, the Ater signaling link
Optional
must be configured.
NOTE

The rate of an Ater signaling link can be 64 kbit/s or 2 Mbit/s, but only one rate type can be selected.

Each GEIUT/GOIUT in the GTCS can be configured with up to sixteen 64 kbit/s Ater signaling links.

Each GEIUT/GOIUT in the GTCS can be configured with up to eight 2 Mbit/s Ater signaling links.
The maximum bandwidth is 4 Mbit/s.

The rate of the Ater signaling link on the Ater interface must be the same as that of the SS7 signaling
link on the A interface.

A total number of eight 2 Mbit/s signaling links and 2 Mbit/s SS7 signaling links can be configured
for the GMPS or GEPS where the Ater connection path is located.

Prerequisite
l

The GTCS is configured on the MSC side.

The Ater connection path between the GMPS or GEPS and the GTCS is configured.

The GMPS or the GEPS is configured with the GXPUM.

Preparation
NOTE

Issue 01 (2007-09-05)

This part describes how to configure the 64 kbit/s Ater signaling link.

For details about the configuration of the 2 Mbit/s signaling link, refer to .

Huawei Technologies Proprietary

6-9

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Table 6-4 Example of data to be negotiated and planned for adding an Ater signaling link
Parameter

Example

Source

Ater Connection Path


Index

BSC internal planning

BM Subrack No. of Ater


Connection Path

BSC internal planning

Rate Type

64 kbit/s

Negotiation with the peer

Satellite Flag

No

BSC internal planning

Timeslot Mask

TS18

BSC internal planning

Procedure
Step 1 On the BSC6000 Local Maintenance Terminal, right-click a GEIUT in the GTCS. A shortcut
menu is displayed, as shown in Figure 6-10.
Figure 6-10 GEIUT shortcut menu

NOTE

The configuration of the Ater signaling link can be started only on the GEIUT/GOIUT in the GTCS.

Step 2 Choose Add Ater Signaling Link. A dialog box is displayed, as shown in Figure 6-11.

6-10

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-11 Configuring the Ater signaling link

Step 3 Click Add. A dialog box is displayed, as shown in Figure 6-12.


Figure 6-12 Adding an Ater signaling link

NOTE

Only one timeslot can be configured for the added 64 kbit/s Ater signaling link.

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-11

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Step 4 Set the parameters according to the data listed in Table 6-4.
Step 5 Click OK.
Step 6 Click Finish. The configuration is complete.
----End

6.2 Configuring Links on the A Interface


This topic describes how to configure E1 connections and SS7 signaling links on the A interface
for the communication between the BSC and the MSC.
1.

6.2.1 Adding an A Interface E1


This topic describes how to configure the E1 connection on the A interface to establish the
path between the BSC and the MSC.

2.

6.2.2 Adding an SS7 Signaling Link


This topic describes how to configure the SS7 signaling link on the A interface for the
signaling transmission between the BSC and the MSC.

6.2.1 Adding an A Interface E1


This topic describes how to configure the E1 connection on the A interface to establish the path
between the BSC and the MSC.
Scenario

BSC initial configuration

Mandatory/ Mandatory
Optional

Prerequisite
The GEIUA/GOIUA in the GTCS is configured.

Preparation
Table 6-5 Example of data to be negotiated and planned for configuring an A interface E1
Parameter

Example

Source

Subrack No.

BSC internal planning

Slot No.

20

BSC internal planning

Port No.

Negotiation with the peer

Start CIC

Negotiation with the peer

Procedure
Step 1 On the BSC6000 Local Maintenance Terminal, right-click a GEIUA in the GTCS. A shortcut
menu is displayed, as shown in Figure 6-13.
6-12

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-13 GEIUA shortcut menu

NOTE

The configuration of the A interface E1 can be started only on the GEIUA/GOIUA in the GTCS.

Step 2 Choose Configure A Interface E1. A dialog box is displayed, as shown in Figure 6-14.
Figure 6-14 Configuring an A interface E1

Step 3 Click Add. A dialog box is displayed, as shown in Figure 6-15. The default tab page is A
Interface E1 Attributes.

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-13

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-15 Adding an A interface E1

Step 4 Set the parameters according to the data listed in Table 6-5.
NOTE

On the CIC Attributes tab page, retain the default settings or modify them according to your requirements.

Step 5 Click OK.


Step 6 Click Finish. The configuration is complete.
Step 7 Repeat Step 1 through Step 6 to add more E1 connections on the A interface.
----End

6.2.2 Adding an SS7 Signaling Link


This topic describes how to configure the SS7 signaling link on the A interface for the signaling
transmission between the BSC and the MSC.
Scenario

BSC initial configuration

Mandatory/ Mandatory
Optional
NOTE

6-14

Each GEIUT/GOIUT in the GTCS can be configured with up to sixteen 64 kbit/s SS7 signaling links.

Each GEIUT/GOIUT in the GTCS can be configured with up to eight 2 Mbit/s SS7 signaling links.
The maximum bandwidth is 4 Mbit/s.

The rate of the SS7 signaling link must be the same as that of the Ater signaling link.

A total number of eight 2 Mbit/s Ater signaling links and 2 Mbit/s SS7 signaling links can be configured
for the GMPS or GEPS where the Ater connection path is located.

Huawei recommends that all the 2 Mbit/s SS7 signaling links have the same number of timeslots to
achieve the optimal load sharing effect.

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Prerequisite
l

The SS7 DSP is configured.

The GXPUM is configured in the GMPS or GEPS that connects with the GTCS. The Ater
connection path is configured.

The A interface E1 is configured.

Preparation
NOTE

This part describes how to configure the 64 kbit/s SS7 signaling link.

For details about the configuration of the 2 Mbit/s signaling link, refer to .

Table 6-6 Example of data to be negotiated and planned for adding an SS7 signaling link
Parameter

Example

Source

Ater Connection Path


Index

BSC internal planning

BM Subrack No. of Ater


Connection Path

BSC internal planning

Rate Type

64 kbit/s

Negotiation with the peer

A Subrack No.

BSC internal planning

A Slot No.

21

BSC internal planning

A Port No.

Negotiation with the peer

Ater Timeslot Mask

TS10

BSC internal planning

A Timeslot Mask

TS1

Negotiation with the peer

SLC

Negotiation with the peer

SLC Send

Negotiation with the peer

Procedure
Step 1 On the BSC6000 Local Maintenance Terminal, right-click a GEIUA in the GTCS. A shortcut
menu is displayed, as shown in Figure 6-16.
Figure 6-16 GEIUA shortcut menu

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-15

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links


NOTE

The configuration of the SS7 signaling link can be started only on the GEIUA/GOIUA in the GTCS.

Step 2 Choose Configure SS7 Signaling Link. A dialog box is displayed, as shown in Figure 6-17.
Figure 6-17 Configuring the SS7 signaling link

Step 3 Click Add. A dialog box is displayed, as shown in Figure 6-18. The default tab page is
MTP2.

6-16

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-18 Adding an SS7 signaling link (MTP2)

Step 4 Set the parameters according to the data listed in Table 6-6.
NOTE

The number of timeslots on the A interface must be the same as that on the Ater interface.

Step 5 Click the MTP3 tab, as shown in Figure 6-19.

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-17

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-19 Adding an SS7 signaling link (MTP3)

Step 6 Set the parameters according to the data listed in Table 6-6.
Step 7 Click OK.
Step 8 Click Finish. The configuration is complete.
----End

6.3 Configuring Links on the Pb Interface


This topic describes how to add a PCU and configure E1 connections and signaling links on the
Pb interface for the communication between the BSC and the PCU.

6-18

1.

6.3.1 Adding a PCU


This topic describes how to add a PCU for the BSC to process PS services.

2.

6.3.2 Configuring a Pb Interface E1


This topic describes how to configure the E1 connection on the Pb interface to establish
the physical path between the BSC and the PCU.

3.

6.3.3 Configuring a Pb Signaling Link


This topic describes how to configure a signaling link on the Pb interface for the signaling
transmission of the control of the PS service process between the BSC and the PCU and
for the signaling transmission of the Pb transmission resource management.

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

6.3.1 Adding a PCU


This topic describes how to add a PCU for the BSC to process PS services.
Scenario

BSC initial configuration

Mandatory/ Optional. The PCU should be configured when the BSC offers PS services.
Optional
NOTE

A maximum of 32 PCUs can be configured for the BSC.

The name and number of each PCU must be unique.

Prerequisite
None.

Preparation
Table 6-7 Example of data to be negotiated and planned for adding a PCU
Parameter

Example

Source

PCU No.

BSC internal planning

PCU Name

PCU 1

BSC internal planning

Procedure
Step 1 On the BSC6000 Local Maintenance Terminal, right-click BSC6000. A shortcut menu is
displayed, as shown in Figure 6-20.
Figure 6-20 Shortcut menu in the management tree

Step 2 Choose Configure PCU. A dialog box is displayed, as shown in Figure 6-21.

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-19

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-21 Configuring the PCU

Step 3 Click Add. A dialog box is displayed, as shown in Figure 6-22.


Figure 6-22 Adding a PCU

Step 4 Set the parameters according to the data listed in Table 6-7.
Step 5 Click OK.
Step 6 Repeat Step 1 through Step 5 to add more PCUs.
6-20

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Step 7 Click Finish. The configuration is complete.


----End

6.3.2 Configuring a Pb Interface E1


This topic describes how to configure the E1 connection on the Pb interface to establish the
physical path between the BSC and the PCU.
Scenario

BSC initial configuration

Mandatory/ Optional. A Pb interface E1 should be configured when the BSC is configured


Optional
with a PCU.

Prerequisite
l

The PCU is configured.

The GEIUP/GOIUP is configured.

Preparation
Table 6-8 Example of data to be negotiated and planned for configuring a Pb interface E1
Parameter

Example

Source

Subrack No.

BSC internal planning

Slot No.

23

BSC internal planning

Port No.

Negotiation with the peer

Transfer Mode

Terrestrial Transmission

Negotiation with the peer

Start PCIC

BSC internal planning

PCU No.

BSC internal planning

Procedure
Step 1 On the BSC6000 Local Maintenance Terminal, right-click a GEIUP in the GMPS. A shortcut
menu is displayed, as shown in Figure 6-23.
Figure 6-23 GEIUP shortcut menu

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-21

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links


NOTE

The configuration of the Pb interface E1 can be started only on the GEIUP/GOIUP in the GMPS or GEPS.

Step 2 Choose Configure Pb Interface E1. A dialog box is displayed, as shown in Figure 6-24.
Figure 6-24 Configuring a Pb interface E1

Step 3 Click Add. A dialog box is displayed, as shown in Figure 6-25. The default tab page is Pb
Interface E1 Attributes.

6-22

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-25 Adding a Pb interface E1

Step 4 Set the parameters according to the data listed in Table 6-8.
NOTE

On the CIC Attributes tab page, retain the default settings or modify them according to your requirements.

Step 5 Click OK.


Step 6 Click Finish. The configuration is complete.
----End

6.3.3 Configuring a Pb Signaling Link


This topic describes how to configure a signaling link on the Pb interface for the signaling
transmission of the control of the PS service process between the BSC and the PCU and for the
signaling transmission of the Pb transmission resource management.
Scenario

BSC initial configuration

Mandatory/ Optional. A Pb signaling link should be configured when the BSC is configured
Optional
with a PCU.
NOTE

Each GMPS or GEPS can be configured with up to 64 Pb signaling links.

Prerequisite
The Pb interface E1 is configured.

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-23

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Preparation
Table 6-9 Example of data to be negotiated and planned for configuring a Pb signaling link
Parameter

Example

Source

Port No.

Negotiation with the peer

Timeslot No.

Negotiation with the peer

Procedure
Step 1 On the BSC6000 Local Maintenance Terminal, right-click a GEIUP in the GMPS. A shortcut
menu is displayed, as shown in Figure 6-26.
Figure 6-26 GEIUP shortcut menu

NOTE

The configuration of a Pb signaling link can be started only on the GEIUP/GOIUP in the GMPS or GEPS.

Step 2 Choose Configure Pb Signaling Link. A dialog box is displayed, as shown in Figure 6-27.

6-24

Huawei Technologies Proprietary

Issue 01 (2007-09-05)

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Figure 6-27 Configuring a Pb signaling link

Step 3 Click Add. A dialog box is displayed, as shown in Figure 6-28.


Figure 6-28 Adding a Pb signaling link

Step 4 Set the parameters according to the data listed in Table 6-9.
Step 5 Click OK.

Issue 01 (2007-09-05)

Huawei Technologies Proprietary

6-25

HUAWEI BSC6000 Base Controller


BSC Initial Configuration Guide

6 Configuring BSC Links

Step 6 Click Finish. The configuration is complete.


----End