Professional Documents
Culture Documents
Nama Proyek
Lokasi
Pemilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
Sub Total I
0.47%
0.45%
0.46%
1.39%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
7.02%
0.19%
7.21%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
1.52%
2.16%
5.00%
0.44%
0.44%
Kontraktor
Nama Proyek
Lokasi
Pemilik
NO
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
VIII
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
Kontraktor
Nama Proyek
Lokasi
Pemilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
100.00%
Kontraktor
Nama Proyek
Lokasi
Pemilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.02%
0.95%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
BOBOT
MGG LALU
100.00%
9.01%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
0.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
100.00%
0.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
1
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
1
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.02%
0.95%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
BOBOT S/D
MGG INI
100.00%
9.01%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
1
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.02%
0.95%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
BOBOT
MGG LALU
100.00%
9.01%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
0.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
100.00%
0.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
2
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
2
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.02%
0.95%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
BOBOT S/D
MGG INI
100.00%
9.01%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
2
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.02%
0.95%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
BOBOT
MGG LALU
100.00%
9.01%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
0.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
10.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.50%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.27%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.27%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.24%
0.00%
0.00%
0.00%
0.00%
0.00%
0.24%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
100.00%
0.51%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
3
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
10.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.50%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
3
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.02%
0.95%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.27%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.27%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.24%
0.00%
0.00%
0.00%
0.00%
0.00%
0.24%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
BOBOT S/D
MGG INI
100.00%
9.52%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
3
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.02%
0.95%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
BOBOT
MGG LALU
100.00%
9.01%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
15.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
65.00%
70.00%
0.00%
85.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
65.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
3a
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.07%
0.07%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.50%
0.35%
0.00%
0.34%
0.00%
0.00%
4.85%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
6.35%
1.86%
0.00%
0.00%
0.00%
0.00%
8.21%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
3a
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
3a
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.80%
0.00%
0.00%
0.00%
0.00%
0.80%
BOBOT
MGG INI
100.00%
13.92%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
3a
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
3a
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
20.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
65.00%
70.00%
0.00%
85.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
65.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
3a
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
3a
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
45.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
3a
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
3a
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.09%
1.02%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.50%
0.35%
0.00%
0.34%
0.00%
0.00%
4.85%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
6.35%
1.86%
0.00%
0.00%
0.00%
0.00%
8.21%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
3a
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
3a
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.90%
0.00%
0.00%
0.00%
0.00%
0.90%
BOBOT S/D
MGG INI
100.00%
22.93%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
3a
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.02%
0.95%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
BOBOT
MGG LALU
100.00%
9.01%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
10.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
45.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
45.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
30.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.05%
0.05%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.04%
0.20%
0.00%
0.00%
0.00%
0.00%
3.89%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
4.39%
0.00%
0.00%
0.00%
0.00%
0.00%
4.39%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.60%
0.00%
0.00%
0.00%
0.00%
0.60%
BOBOT
MGG INI
100.00%
8.93%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
5
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
15.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
45.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
45.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
35.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
5
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.07%
0.99%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.04%
0.20%
0.00%
0.00%
0.00%
0.00%
3.89%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
4.39%
0.00%
0.00%
0.00%
0.00%
0.00%
4.39%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.70%
0.00%
0.00%
0.00%
0.00%
0.70%
BOBOT S/D
MGG INI
100.00%
17.94%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
5
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.02%
0.95%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
BOBOT
MGG LALU
100.00%
9.01%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
15.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
55.00%
50.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
55.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
30.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.07%
0.07%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.27%
0.25%
0.00%
0.00%
0.00%
0.00%
4.17%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
5.37%
1.86%
0.00%
0.00%
0.00%
0.00%
7.23%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.60%
0.00%
0.00%
0.00%
0.00%
0.60%
BOBOT
MGG INI
100.00%
12.07%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
6
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
20.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
55.00%
50.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
55.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
35.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
6
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.09%
1.02%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.27%
0.25%
0.00%
0.00%
0.00%
0.00%
4.17%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
5.37%
1.86%
0.00%
0.00%
0.00%
0.00%
7.23%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.70%
0.00%
0.00%
0.00%
0.00%
0.70%
BOBOT S/D
MGG INI
100.00%
21.08%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
6
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
20.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
85.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
85.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.09%
1.02%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.96%
0.51%
0.00%
0.40%
0.59%
0.00%
6.10%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.30%
0.00%
0.00%
0.00%
0.00%
0.00%
8.30%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.80%
0.00%
0.00%
0.00%
0.00%
0.80%
BOBOT
MGG LALU
100.00%
24.18%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
10.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
65.00%
50.00%
55.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
10.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.05%
0.05%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
3.02%
0.45%
1.65%
0.00%
0.00%
5.12%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.20%
0.00%
0.00%
0.00%
0.00%
0.20%
BOBOT
MGG INI
100.00%
10.30%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
7
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
30.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
85.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
85.00%
65.00%
50.00%
55.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
50.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
7
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.14%
1.06%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.96%
0.51%
0.00%
0.40%
0.59%
0.00%
6.10%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.30%
3.02%
0.45%
1.65%
0.00%
0.00%
13.42%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
1.00%
0.00%
0.00%
0.00%
0.00%
1.00%
BOBOT S/D
MGG INI
100.00%
34.48%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
7
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
20.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
70.00%
100.00%
0.00%
100.00%
40.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
75.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.09%
1.02%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.61%
0.51%
0.00%
0.40%
0.23%
0.00%
5.41%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
7.32%
0.00%
0.00%
0.00%
0.00%
0.00%
7.32%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.80%
0.00%
0.00%
0.00%
0.00%
0.80%
BOBOT
MGG LALU
100.00%
22.51%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
10.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
15.00%
0.00%
0.00%
0.00%
60.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
10.00%
20.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.05%
0.05%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.35%
0.00%
0.00%
0.00%
0.35%
0.00%
0.70%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.98%
0.93%
0.00%
0.00%
0.00%
0.00%
1.91%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
100.00%
7.58%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
8
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
30.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
85.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
85.00%
20.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
8
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.14%
1.06%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.96%
0.51%
0.00%
0.40%
0.59%
0.00%
6.10%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.30%
0.93%
0.00%
0.00%
0.00%
0.00%
9.23%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.80%
0.00%
0.00%
0.00%
0.00%
0.80%
BOBOT S/D
MGG INI
100.00%
30.09%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
8
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
20.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
70.00%
100.00%
0.00%
100.00%
40.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
75.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.09%
1.02%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.61%
0.51%
0.00%
0.40%
0.23%
0.00%
5.41%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
7.32%
0.00%
0.00%
0.00%
0.00%
0.00%
7.32%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.80%
0.00%
0.00%
0.00%
0.00%
0.80%
BOBOT
MGG LALU
100.00%
22.51%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
15.00%
0.00%
0.00%
0.00%
60.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
10.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.02%
0.02%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.35%
0.00%
0.00%
0.00%
0.35%
0.00%
0.70%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.98%
0.00%
0.00%
0.00%
0.00%
0.00%
0.98%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
100.00%
6.62%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
9
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
25.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
85.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
85.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
40.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
9
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.12%
1.04%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.96%
0.51%
0.00%
0.40%
0.59%
0.00%
6.10%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.30%
0.00%
0.00%
0.00%
0.00%
0.00%
8.30%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.80%
0.00%
0.00%
0.00%
0.00%
0.80%
BOBOT S/D
MGG INI
100.00%
29.13%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
9
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
25.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
90.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
90.00%
10.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
45.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.12%
1.04%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
2.07%
0.51%
0.00%
0.40%
0.59%
0.00%
6.22%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.79%
0.46%
0.00%
0.00%
0.00%
0.00%
9.25%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.90%
0.00%
0.00%
0.00%
0.00%
0.90%
BOBOT
MGG LALU
100.00%
25.37%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
5.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
10
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.02%
0.02%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
10
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
10
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
100.00%
4.95%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
10
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
10
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
30.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
90.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
90.00%
10.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
10
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
10
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
45.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
10
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
10
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.14%
1.06%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
2.07%
0.51%
0.00%
0.40%
0.59%
0.00%
6.22%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.79%
0.46%
0.00%
0.00%
0.00%
0.00%
9.25%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
10
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
10
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.90%
0.00%
0.00%
0.00%
0.00%
0.90%
BOBOT S/D
MGG INI
100.00%
30.32%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
10
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
25.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
90.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
90.00%
65.00%
20.00%
35.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
45.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.12%
1.04%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
2.07%
0.51%
0.00%
0.40%
0.59%
0.00%
6.22%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.79%
3.02%
0.18%
1.05%
0.00%
0.00%
13.04%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.90%
0.00%
0.00%
0.00%
0.00%
0.90%
BOBOT
MGG LALU
100.00%
29.16%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
10.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
10.00%
40.00%
30.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
10.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
11
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.05%
0.05%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.46%
0.36%
0.90%
0.00%
0.00%
1.73%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
11
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
11
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.20%
0.00%
0.00%
0.00%
0.00%
0.20%
BOBOT
MGG INI
100.00%
6.90%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
11
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
11
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
35.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
90.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
90.00%
75.00%
60.00%
65.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
11
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
11
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
55.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
11
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
11
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.16%
1.08%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
2.07%
0.51%
0.00%
0.40%
0.59%
0.00%
6.22%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.79%
3.48%
0.55%
1.95%
0.00%
0.00%
14.77%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
11
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
11
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
1.10%
0.00%
0.00%
0.00%
0.00%
1.10%
BOBOT S/D
MGG INI
100.00%
36.06%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
11
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
25.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
90.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
90.00%
65.00%
20.00%
35.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
45.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.12%
1.04%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
2.07%
0.51%
0.00%
0.40%
0.59%
0.00%
6.22%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.79%
3.02%
0.18%
1.05%
0.00%
0.00%
13.04%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.90%
0.00%
0.00%
0.00%
0.00%
0.90%
BOBOT
MGG LALU
100.00%
29.16%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
10.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
10.00%
40.00%
30.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
10.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
12
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.05%
0.05%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
0.46%
0.36%
0.90%
0.00%
0.00%
1.73%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
12
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
12
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.20%
0.00%
0.00%
0.00%
0.00%
0.20%
BOBOT
MGG INI
100.00%
6.90%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
12
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
12
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
35.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
90.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
90.00%
75.00%
60.00%
65.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
12
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
12
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
55.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
12
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
12
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.16%
1.08%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
2.07%
0.51%
0.00%
0.40%
0.59%
0.00%
6.22%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.79%
3.48%
0.55%
1.95%
0.00%
0.00%
14.77%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
12
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
4.93%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
12
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
1.10%
0.00%
0.00%
0.00%
0.00%
1.10%
BOBOT S/D
MGG INI
100.00%
36.06%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
12
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG LALU
100.00%
100.00%
20.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
85.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
90.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
35.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG LALU
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
PERSETAS
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG LALU
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.09%
1.02%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.96%
0.51%
0.00%
0.40%
0.59%
0.00%
6.10%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.79%
0.00%
0.00%
0.00%
0.00%
0.00%
8.79%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.70%
0.00%
0.00%
0.00%
0.00%
0.70%
BOBOT
MGG LALU
100.00%
24.57%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
BOBOT
BOBOT
MGG LALU
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
No
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
MGG INI
0.00%
0.00%
10.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.00%
0.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
75.00%
60.00%
65.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
80.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
No
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
20.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
MGG INI
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
No
BOBOT
PERSETAS
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
12a
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.00%
0.00%
0.05%
0.05%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.00%
0.00%
0.00%
0.00%
0.00%
7.02%
0.19%
7.21%
0.00%
0.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
0.00%
3.48%
0.55%
1.95%
0.00%
0.00%
5.98%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
12a
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
3.94%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.94%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
12a
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
0.40%
0.00%
0.00%
0.00%
0.00%
0.40%
BOBOT
MGG INI
100.00%
10.37%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
12a
BOBOT
BOBOT
MGG INI
Sido
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
PT.
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
12a
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
PERSETAS
S/D MGG IN
100.00%
100.00%
30.00%
Sub Total I
0.47%
0.45%
0.46%
1.39%
100.00%
100.00%
0.00%
100.00%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
100.00%
0.00%
7.02%
0.19%
7.21%
100.00%
0.00%
85.00%
100.00%
0.00%
100.00%
100.00%
0.00%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
90.00%
75.00%
60.00%
65.00%
0.00%
0.00%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
12a
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
80.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PERSETAS
S/D MGG IN
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
12a
URAIAN PEKERJAAN
BOBOT
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total IX
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
55.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
PERSETAS
S/D MGG IN
100.00%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
Diperiksa Oleh,
PT. Adhi Persada Properti
Kuscahyono
Construction Manager
12a
BOBOT
PERSETAS
S/D MGG IN
Sidoarjo, 22 Agust
Dibuat Oleh
PT. Yofa Bangun
Mas Dedi P
Project Manag
ontraktor
ama Proyek
okasi
emilik
NO
II
III
IV
VI
12a
URAIAN PEKERJAAN
BOBOT
PEKERJAAN PERSIAPAN
1 Persiapan Lokasi
2 Uitzet / Pasang Bouwplank
3 Air Kerja/Listrik Kerja
BOBOT S/D
MGG INI
Sub Total I
0.47%
0.45%
0.46%
1.39%
0.47%
0.45%
0.14%
1.06%
Sub Total II
0.70%
0.06%
0.46%
0.18%
1.41%
0.70%
0.06%
0.00%
0.18%
0.94%
7.02%
0.19%
7.21%
7.02%
0.00%
7.02%
Sub Total IV
2.65%
0.00%
2.30%
0.51%
0.14%
0.40%
0.59%
1.99%
8.58%
2.65%
0.00%
1.96%
0.51%
0.00%
0.40%
0.59%
0.00%
6.10%
Sub Total V
9.77%
4.64%
0.91%
3.00%
1.99%
1.32%
21.63%
8.79%
3.48%
0.55%
1.95%
0.00%
0.00%
14.77%
1.52%
2.16%
5.00%
0.44%
0.44%
0.00%
0.00%
0.00%
0.00%
0.00%
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Tanah Kembali
3 Pembuangan Tanah
4 Lantai Kerja T. 5 cm
PEKERJAAN PONDASI
1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
2 Pasang Pondasi Rolaag Bata 1 Pc : 3 Ps
PEKERJAAN BETON
1 Beton Sloof 10 x 20 cm 1 Pc : 2 Kr : 3 Ps
2 Beton Foot Plat 0.6 x 0.6 Kolom Teras 1 Pc : 2 Kr : 3 Ps
3 Beton Kolom Praktis 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
4 Beton Balok Latei Atas Kusen 10 x 13 cm 1 Pc : 2 Kr : 3 Ps
5 Beton Balok Canopy 10 x 15 cm 1 Pc : 2 Kr : 3 Ps
6 Beton Ring Balok 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
7 Beton Gewel Atap 10 x 10 cm 1 Pc : 2 Kr : 3 Ps
8 Beton Canopy/Leufel T. 10 cm 1 Pc : 2 Kr : 3 Ps
PEKERJAAN DINDING DAN PASANGAN
1 Pasangan Dinding Bata Biasa 1 Pc : 6 Ps
2 Plesteran Dinding 1 Pc : 6 Ps
3 Pekerjaan Benangan
4 Acian Dinding Bang. Utama
5 Pengecatan Dinding Dalam ex. Catylac/setara
6 Pengecatan Dinding Luar Weather Shield ex. Mowilek/setara
PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pek. Daun Pintu Panil (Cat Duco) + Handle + Kunci ex. Dekson/setara
2 Pek. Daun Pintu Doubletriplek (Cat Duco) + Handle + Kunci ex. Dekson/setara
3 Kusen Alluminium + Seaalant ex. Alexindo/setara
4 Pek. Daun Jendela PJ1, Polos 5mm ex. Alexindo/setara
5 Pek. Daun Jendela PJ2, Polos 5mm ex. Alexindo/setara
ontraktor
ama Proyek
okasi
emilik
NO
VII
VIII
12a
URAIAN PEKERJAAN
BOBOT
Sub Total VI
0.33%
0.33%
0.33%
0.33%
0.33%
11.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.93%
4.27%
0.32%
0.99%
0.91%
0.35%
1.61%
0.60%
0.54%
0.84%
15.34%
3.94%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.94%
0.13%
4.14%
4.76%
0.63%
0.23%
1.06%
10.95%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
BOBOT S/D
MGG INI
ontraktor
ama Proyek
okasi
emilik
NO
IX
XI
12a
URAIAN PEKERJAAN
BOBOT
5.43%
0.18%
0.18%
0.07%
0.07%
0.20%
0.28%
0.31%
0.13%
0.54%
0.17%
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total X
0.23%
0.32%
0.22%
0.24%
1.77%
1.57%
0.03%
0.24%
0.82%
0.19%
5.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Sub Total XI
0.72%
2.79%
1.99%
1.35%
0.99%
1.14%
0.10%
9.08%
0.00%
0.00%
1.10%
0.00%
0.00%
0.00%
0.00%
1.10%
BOBOT S/D
MGG INI
100.00%
34.94%
ontraktor
ama Proyek
okasi
emilik
NO
URAIAN PEKERJAAN
12a
BOBOT
BOBOT S/D
MGG INI
Kuscahyono
Construction Manager
Project Manager
NO. BLOK
1
2
3
4
5
6
7
8
9
10
11
12
13
A.11
:
:
:
:
36
1
2
3
3a
5
6
7
8
9
10
11
12
12a
HARGA
SATUAN
Rp.
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
2,700,000.00
Rp.
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
97,200,000.00
7.692%
7.692%
7.692%
7.692%
7.692%
7.692%
7.692%
7.692%
7.692%
7.692%
7.692%
7.692%
7.692%
Jumlah Total
### 100.000%
###
9.010%
9.010%
9.010%
9.010%
9.010%
9.010%
24.183%
22.510%
22.510%
25.374%
29.159%
29.159%
24.572%
%
0.693%
0.693%
0.693%
0.693%
0.693%
0.693%
1.860%
1.732%
1.732%
1.952%
2.243%
2.243%
1.890%
PROGRES TERPASANG
Minggu Ini
Rp.
%
%
495,374.25
13,529,060.75
8,682,075.35
11,732,481.53
10,008,403.03
7,364,339.61
6,438,983.81
4,812,781.14
6,708,413.40
6,708,413.40
10,075,403.37
17.810% 86,555,729.64
0.000%
0.000%
0.510%
13.919%
8.932%
12.070%
10.297%
7.576%
6.624%
4.951%
6.902%
6.902%
10.366%
0.000%
0.000%
0.039%
1.071%
0.687%
0.928%
0.792%
0.583%
0.510%
0.381%
0.531%
0.531%
0.797%
6.850%
Sidoarjo, 2
Disetujui oleh :
PT. Adhi Persada Properti
Diperiksa oleh :
PT. Adhi Persada Realti
Dendy Indrabayu
Project Manager Realti
Kuscahyono
Construction Manager
PT. Yofa B
Yohane
PROGRES TERPASANG
s/d Minggu ini
Rp.
%
8,758,071.50
8,758,071.50
9,253,445.74
22,287,132.25
17,440,146.84
20,490,553.03
33,514,223.91
29,243,957.82
28,318,602.03
29,475,859.53
35,051,343.85
35,051,343.85
33,958,974.81
9.010%
9.010%
9.520%
22.929%
17.943%
21.081%
34.480%
30.086%
29.134%
30.325%
36.061%
36.061%
34.937%
###
Sidoarjo, 22 Agustus 2015
Dibuat Oleh :
PT. Yofa Bangun Abadi
Yohanes Fransisco
Direktur
%
0.693%
0.693%
0.732%
1.764%
1.380%
1.622%
2.652%
2.314%
2.241%
2.333%
2.774%
2.774%
2.687%
24.660%